Permit GraphShortlistSan Francisco building permits since 2000

Aura Building Company Llc

Contractor license
1104805
State license record
Based in
San Francisco
On San Francisco permits
Apr 2024 to Jun 2026
Last 24 months
5 permits filed

7 permits since 2000: 5 completed, 2 in progress.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywideThis contractor’s finished permits

Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.

Most recent permits

AllKitchen remodel 1Bathroom remodel 6
FiledOutcomeAddressWork described on the permitDeclared cost
Jun 1, 2026In progress
issued Jun 2026
42 Topaz Wy2.5 bathroom remodel in-kind. kitchen counter top replacement, minor relocation of 6 recessed lights. no wall or framing modification, all work is"non-structural" only.
Details
Permit
202606012238
Status
issued
Filed
Jun 1, 2026
Permit issued
Jun 1, 2026
Declared cost
$25,000
Address
42 Topaz Wy

2.5 bathroom remodel in-kind. kitchen counter top replacement, minor relocation of 6 recessed lights. no wall or framing modification, all work is"non-structural" only.

Open the permit page

$25,000
Dec 9, 2025Completed
final sign-off Aug 2026
634 12th Avconvert ground floor rear storage area to bedroom, add eero compliant window. establish compliance for rescue per eg-02. construct new, interior partion wall to separate garage from habitable spaces. document as-built bathroom configuration.
Details
Permit
202512091279
Status
complete
Filed
Dec 9, 2025
Permit issued
Jan 16, 2026
Final sign-off
Aug 17, 2026
Declared cost
$15,000
Address
634 12th Av

convert ground floor rear storage area to bedroom, add eero compliant window. establish compliance for rescue per eg-02. construct new, interior partion wall to separate garage from habitable spaces. document as-built bathroom configuration.

Open the permit page

$15,000
Dec 4, 2025In progress
issued Jun 2026
215 Thornton Av1)add restroom of main level. 2) add 2 bed and 2 bathroom on lower level.
Details
Permit
202512041031
Status
issued
Filed
Dec 4, 2025
Permit issued
Jun 16, 2026
Declared cost
$48,000
Address
215 Thornton Av

1)add restroom of main level. 2) add 2 bed and 2 bathroom on lower level.

Open the permit page

$48,000
Sep 2, 2025Completed
final sign-off Nov 2025
309 Steiner Stunit #c: in kind bathroom remodel: bath tub and plumbing, fixture and floor tile.
Details
Permit
202509024412
Status
complete
Filed
Sep 2, 2025
Permit issued
Sep 4, 2025
Final sign-off
Nov 17, 2025
Declared cost
$8,500
Address
309 Steiner St

unit #c: in kind bathroom remodel: bath tub and plumbing, fixture and floor tile.

Open the permit page

$8,500
Feb 20, 2025Completed
final sign-off Sep 2025
109 22nd Avin kind bathroom remodel, shower stall, toilet, vanity & mirrors. plumbing fixtures, heated flooring, towel bar, lighting tiling & painting
Details
Permit
202502200710
Status
complete
Filed
Feb 20, 2025
Permit issued
Feb 21, 2025
Final sign-off
Sep 29, 2025
Declared cost
$8,000
Address
109 22nd Av

in kind bathroom remodel, shower stall, toilet, vanity & mirrors. plumbing fixtures, heated flooring, towel bar, lighting tiling & painting

Open the permit page

$8,000
Sep 27, 2024Completed
final sign-off May 2025
42 August Alrevision to conc. of plans 1/s3 details a & f of sheet a4 of permit #202404119791; this revision is a result of adjacent neighboring footing verified to be lower than originally expected (note on original sheet s3 for exploratory work)
Details
Permit
202409271837
Status
complete
Filed
Sep 27, 2024
Permit issued
Sep 27, 2024
Final sign-off
May 14, 2025
Address
42 August Al

revision to conc. of plans 1/s3 details a & f of sheet a4 of permit #202404119791; this revision is a result of adjacent neighboring footing verified to be lower than originally expected (note on original sheet s3 for exploratory work)

Open the permit page

Apr 11, 2024Completed
final sign-off May 2025
42 August Alto abate nov 202312969 - construction of lower floor rear of building behind the (e) garage. convert 450sf of non conditioned space to conditioned consisting of (e) mech room and a portion of the garage to a habitable space w/ 3/4 bathroom.
Details
Permit
202404119791
Status
complete
Filed
Apr 11, 2024
Permit issued
Jun 10, 2024
Final sign-off
May 14, 2025
Declared cost
$120,000
Address
42 August Al

to abate nov 202312969 - construction of lower floor rear of building behind the (e) garage. convert 450sf of non conditioned space to conditioned consisting of (e) mech room and a portion of the garage to a habitable space w/ 3/4 bathroom.

Open the permit page

$120,000
Aura Building Company Llc, contractor license 1104805 | Permit Graph