Peter Yu
- Listed as
- architect, engineer
- Firm
- Structus, Inc.
- Based in
- San Francisco
- On San Francisco permits
- Oct 2004 to Sep 2025
47 permits since 2000 (engineer on 44 permits, architect on 3 permits): 24 completed, 5 in progress, 13 never finaled, 5 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 25, 2025 | In progress filed Sep 2025, not yet issued | 125 Mason St | D & H Construction | convert basement parking to loading zones only; electrification of bldg heating & water heating systems; upgrading lights to led; convert 3-units to mobility; 2-units to hvi; playground replacement 1/f; selective glazing; accessibility upgrade to comm romm @ 9/f lounge; roofing replacment; bldg signDetails
convert basement parking to loading zones only; electrification of bldg heating & water heating systems; upgrading lights to led; convert 3-units to mobility; 2-units to hvi; playground replacement 1/f; selective glazing; accessibility upgrade to comm romm @ 9/f lounge; roofing replacment; bldg sign | $13,000,000 |
| Jun 12, 2025 | In progress issued Oct 2025 | 301 Van Ness Av | Pioneer Contractors Inc | metal roofing reroofing of the historic war memorial opera house building and alternate scope of installing fall protection system with roof access ladders. no hotworks without sffd operating permit.Details
metal roofing reroofing of the historic war memorial opera house building and alternate scope of installing fall protection system with roof access ladders. no hotworks without sffd operating permit. | $9,682,244 |
| May 2, 2025 | In progress issued May 2025 | 38 Hotaling Pl | Aidan Collins & Sons Inc | revision to pa# 202409261671, replace floor joisting on floor 1, replace subfloor in that area, additional plywood sheethed wall in basement.Details
revision to pa# 202409261671, replace floor joisting on floor 1, replace subfloor in that area, additional plywood sheethed wall in basement. | $162,000 |
| Jan 10, 2025 | In progress issued Jan 2025 | 1102 Fulton St | Fifth Arch Llp | interior remodel of a dwelling unit in a 4 unit condo. kitchen and bath remodel. no change to sq ft. no exterior work.Details
interior remodel of a dwelling unit in a 4 unit condo. kitchen and bath remodel. no change to sq ft. no exterior work. | $110,000 |
| Nov 4, 2024 | In progress issued Mar 2025 | 38 Hotaling Pl | Aidan Collins & Sons Inc | 1st & basement fl ti partial demo of (e) 1st fl plate for new openings. remove 2 existing stairs and replace with (n) accessible stairs. add (n) accessible bathroom, storage & mech storgae in the basement. add (n) wet bar & kitchen at 1st fl. remodel (e) bathroom at 1st flDetails
1st & basement fl ti partial demo of (e) 1st fl plate for new openings. remove 2 existing stairs and replace with (n) accessible stairs. add (n) accessible bathroom, storage & mech storgae in the basement. add (n) wet bar & kitchen at 1st fl. remodel (e) bathroom at 1st fl | $122,000 |
| Aug 29, 2022 | Completed final sign-off Dec 2024 | 683 Florida St | Amone Corp | g/f: creating a multi-purpose space with a recording studio, dance rehearsal space, a kitchen and maker's space on ground floor of the base building. signage design will be under separate permit shown here for reference only.Details
g/f: creating a multi-purpose space with a recording studio, dance rehearsal space, a kitchen and maker's space on ground floor of the base building. signage design will be under separate permit shown here for reference only. | $1,750,000 |
| Aug 23, 2021 | Never finaled issued Dec 2022, no final | 1 Dr Carlton B Goodlett Pl | Clw Builders Inc | city hall: to modernize (8) (e) elevators, including replacement / refurbishment of (e) equipment, car control panels & lobby fixtures. additional scope include removal of fire sprinklers & installation of (n) rooftop.Details
city hall: to modernize (8) (e) elevators, including replacement / refurbishment of (e) equipment, car control panels & lobby fixtures. additional scope include removal of fire sprinklers & installation of (n) rooftop. | $4,000,000 |
| Oct 17, 2019 | Never finaled issued Dec 2019, no final | 701 Post St | 2/f:rev. pa#201805179396; enlarge access door/opening to ada restrooms. removing 1 wall at stair. providing 3 hour rated fire/smoke curtain with egress opening, providing new flooring in the storage room and finishes in lobby.Details
2/f:rev. pa#201805179396; enlarge access door/opening to ada restrooms. removing 1 wall at stair. providing 3 hour rated fire/smoke curtain with egress opening, providing new flooring in the storage room and finishes in lobby. | $45,000 | |
| Jun 14, 2019 | Completed final sign-off Aug 2022 | 681 Florida St | Cahill Contractors Llc. | tower crane foundation for pa #201802211851.Details
tower crane foundation for pa #201802211851. | $1,000,000 |
| Mar 11, 2019 | Completed final sign-off Oct 2019 | 3500 Fulton St | Bai Construction | soft story retrofit per sfebc chapter 4d engineering criteria: asce 41-13Details
soft story retrofit per sfebc chapter 4d engineering criteria: asce 41-13 | $50,000 |
| Sep 6, 2018 | Completed final sign-off Dec 2020 | 500 Folsom St | Balfour Beatty Construction Llc | shoring & hold down anchors to combat hydrostatic pressure from ground water: relocation of one hydrostatic tiedown anchor one foot away from the original location. (ref pa #2015-0311-0506 s1)Details
shoring & hold down anchors to combat hydrostatic pressure from ground water: relocation of one hydrostatic tiedown anchor one foot away from the original location. (ref pa #2015-0311-0506 s1) | $240,000 |
| Jul 23, 2018 | Never finaled issued Aug 2018, no final | 701 Post St | revised structural drawing for permit app. #201805179391 & 201612195301. revision required to meet existing building conditions. no change in scope of work.Details
revised structural drawing for permit app. #201805179391 & 201612195301. revision required to meet existing building conditions. no change in scope of work. | $15,000 | |
| Nov 27, 2017 | Completed final sign-off Dec 2020 | 500 Folsom St | Balfour Beatty Construction Llc | phase 2 of the tower crane submital - tower crane permit for tie-ins. ref pa# 2015/03/11/0506-s. ** maher: n/a **Details
phase 2 of the tower crane submital - tower crane permit for tie-ins. ref pa# 2015/03/11/0506-s. ** maher: n/a ** | $116,000 |
| Oct 27, 2017 | Expired or cancelled cancelled Nov 2018 | 230 Eddy St | Bbi - Con Inc | voluntary seismic strengthening of the lateral force resisting system. voluntary accessibility upgrade at building entrance.Details
voluntary seismic strengthening of the lateral force resisting system. voluntary accessibility upgrade at building entrance. | $200,000 |
| May 11, 2017 | Completed final sign-off Oct 2019 | 3500 Fulton St | voluntary strenghtening of (e) structure. added moment frames and plywood sheer walls throughout building.Details
voluntary strenghtening of (e) structure. added moment frames and plywood sheer walls throughout building. | $80,000 | |
| May 10, 2017 | Completed final sign-off May 2019 | 1500 Mission St | Charles Pankow Builders Ltd | structural only. ** maher: n/a **Details
structural only. ** maher: n/a ** | $310,000 |
| Mar 22, 2017 | Never finaled issued Nov 2017, no final | 1 Harding Rd | G E C M S Inc | site & utility for future (n) modular building. construct (n) concrete foundation, provide water & electrical service to (n) building. (n) sump pump & connect to (e) sump pump on site. vacant lot within lake merced pistol range, adjacent to lake merced. ** maher: yes! route to dph **Details
site & utility for future (n) modular building. construct (n) concrete foundation, provide water & electrical service to (n) building. (n) sump pump & connect to (e) sump pump on site. vacant lot within lake merced pistol range, adjacent to lake merced. ** maher: yes! route to dph ** | $400,000 |
| Mar 20, 2017 | Completed final sign-off Dec 2020 | 500 Folsom St | Balfour Beatty Construction Llc | tower crane for new construction at 500 folsom street. (ref pa#201503110506). this permit is for phase 1 tower crane erection up to level 16 (mast height 217 ft) ** maher; n/a **Details
tower crane for new construction at 500 folsom street. (ref pa#201503110506). this permit is for phase 1 tower crane erection up to level 16 (mast height 217 ft) ** maher; n/a ** | $200,000 |
| Jun 29, 2016 | Never finaled issued Jul 2016, no final | 12 Amber Dr | A -1 Roof Management & Construction, Inc | eck repair, structural strengthening, (e) decks at unit 12, less than 50% in-kind. revision to bpa#201603253138Details
eck repair, structural strengthening, (e) decks at unit 12, less than 50% in-kind. revision to bpa#201603253138 | $10,000 |
| Feb 25, 2016 | Never finaled issued May 2016, no final | 160 Russ St | J P Builders Inc | revision to ref pa 2012 0820 7754: additional structural support for hanging art fiat piece maher naDetails
revision to ref pa 2012 0820 7754: additional structural support for hanging art fiat piece maher na | |
| Oct 26, 2015 | Completed final sign-off Dec 2019 | 438 Broadway | comply with soft story retrofit per sfbc chapter 34b. fema p-807.Details
comply with soft story retrofit per sfbc chapter 34b. fema p-807. | $50,000 | |
| Jun 26, 2015 | Never finaled issued May 2016, no final | 160 Russ St | J P Builders Inc | revision pa# 2012-0820-7754. revise structural details. maher n/a.Details
revision pa# 2012-0820-7754. revise structural details. maher n/a. | $10,000 |
| Jan 28, 2015 | Never finaled issued May 2016, no final | 160 Russ St | J P Builders Inc | minor reivison to foundation of issued permit #2012.0820.7754. maherDetails
minor reivison to foundation of issued permit #2012.0820.7754. maher | |
| Aug 11, 2014 | Completed final sign-off Feb 2015 | 1411 Market St | T Delaney Inc Dba: Seam Studio | revision to permit #201403070150; update plaza paving slab. ref pa#200607207084Details
revision to permit #201403070150; update plaza paving slab. ref pa#200607207084 | |
| Apr 10, 2014 | Completed final sign-off Mar 2015 | 1411 Market St | T Delaney Inc Dba: Seam Studio | install pier footing for monoliths & monoliths.Details
install pier footing for monoliths & monoliths. | $15,000 |
| Mar 27, 2014 | Completed final sign-off Mar 2015 | 398 Kansas St | shop drawings for glass curtain wall and supporting structure approved under 201306109032; compliance with ordinance 155-13 not requiredDetails
shop drawings for glass curtain wall and supporting structure approved under 201306109032; compliance with ordinance 155-13 not required | $65,000 | |
| Mar 12, 2014 | Expired or cancelled cancelled Jan 2026 | 1411 Market St | T Delaney Inc Dba: Seam Studio | install monoliths & footings for monoliths. new construction pa #2006.0720.7084Details
install monoliths & footings for monoliths. new construction pa #2006.0720.7084 | $15,000 |
| Mar 7, 2014 | Completed final sign-off Feb 2015 | 1411 Market St | T Delaney Inc Dba: Seam Studio | revision to pa #201401035500 - install sub slab for stone slab pavers, install stone slab pavers, pour concrete for plaza.Details
revision to pa #201401035500 - install sub slab for stone slab pavers, install stone slab pavers, pour concrete for plaza. | $15,000 |
| Jan 3, 2014 | Completed final sign-off Mar 2015 | 1411 Market St | T Delaney Inc Dba: Seam Studio | installation of sidewalk slab and sub-slab for stone paving at entry. revision to pa 201311192279Details
installation of sidewalk slab and sub-slab for stone paving at entry. revision to pa 201311192279 | $15,000 |
| Dec 3, 2013 | Completed final sign-off Mar 2015 | 254 San Jose Av | Classic Construction Company | creation of basement accessory room (403 sq.ft.) in existing 970 sq.ft. basement/garage.Details
creation of basement accessory room (403 sq.ft.) in existing 970 sq.ft. basement/garage. | $40,000 |
| Nov 19, 2013 | Never finaled issued Dec 2013, no final | 42 Hotaling Pl | Van Acker Const Assoc Inc, Capomastro Group:Acalifornia Corp. | revision to 201311192276: relocate existing mechanical equipment and associated structural upgradesDetails
revision to 201311192276: relocate existing mechanical equipment and associated structural upgrades | $20,000 |
| May 22, 2013 | Never finaled issued May 2013, no final | 42 Hotaling Pl | Van Acker Const Assoc Inc, Capomastro Group:Acalifornia Corp. | roof strengthening by sistering existing joists.Details
roof strengthening by sistering existing joists. | $20,000 |
| Apr 9, 2013 | Never finaled issued Dec 2014, no final | 42 Hotaling Pl | T Delaney Inc Dba: Seam Studio, Van Acker Const Assoc Inc | renovation of existing terrace to simplify the planting. introduction of decking congrvent with the roof to replace existing green/orange plastic decking. structural improvements for the roof.(comply with maher ordinance - extended ordinance no.155-13 not required)Details
renovation of existing terrace to simplify the planting. introduction of decking congrvent with the roof to replace existing green/orange plastic decking. structural improvements for the roof.(comply with maher ordinance - extended ordinance no.155-13 not required) | $50,000 |
| Feb 15, 2013 | Never finaled issued Mar 2013, no final | 133 Steuart St | Terra Nova Industries | revision to pa# 2012/04/24/8997. these revisions were the result of a peer review process by degenkolb engineers. attached a copy of the review summary to this application.Details
revision to pa# 2012/04/24/8997. these revisions were the result of a peer review process by degenkolb engineers. attached a copy of the review summary to this application. | $10,000 |
| Aug 13, 2012 | Completed final sign-off Dec 2012 | 2222 Broadway | revision to approved pa#2012.05.29.1343 for additional structural work at new accessible ramp.Details
revision to approved pa#2012.05.29.1343 for additional structural work at new accessible ramp. | $16,000 | |
| Apr 24, 2012 | Never finaled issued Nov 2012, no final | 133 Steuart St | Terra Nova Industries | revision to (e) pa# 2012/01/19/2518 & pa# 2011/10/18/7065. replace 6 existing braced seismic frames in basement with new steel moment resisting frames.Details
revision to (e) pa# 2012/01/19/2518 & pa# 2011/10/18/7065. replace 6 existing braced seismic frames in basement with new steel moment resisting frames. | $30,000 |
| May 11, 2011 | Expired or cancelled expired Nov 2022 | 501 Cole St | Greig Neilson | voluntary structural seismic strengtheing plus foundation replacementDetails
voluntary structural seismic strengtheing plus foundation replacement | $50,000 |
| Aug 11, 2008 | Completed final sign-off Aug 2013 | 1051 Francisco St | Ethan Allen Construction | horizontal addition & interior remodel.Details
horizontal addition & interior remodel. | $300,000 |
| Jul 30, 2008 | Completed final sign-off Mar 2009 | 2400 Broadway | E B W Builders Inc | construct new pier & retaining wall between 2400 & 2404 broadway street in front of existing brick retaining wall.Details
construct new pier & retaining wall between 2400 & 2404 broadway street in front of existing brick retaining wall. | $3,500 |
| Jul 21, 2008 | Completed final sign-off Feb 2009 | 100 Quintara St | J P Builders Inc | revision to application 200608028334 s-1. delete exterior stairs to rear yard, remove and replace interior stair to 2nd floor with new winder complyieng to current existing cbc.Details
revision to application 200608028334 s-1. delete exterior stairs to rear yard, remove and replace interior stair to 2nd floor with new winder complyieng to current existing cbc. | |
| May 23, 2008 | Expired or cancelled expired Dec 2008 | 2404 Broadway | T Delaney Inc Dba: Seam Studio | new 6 ft tall metal fence at the rear of property above grade, reference pa #200712120299.Details
new 6 ft tall metal fence at the rear of property above grade, reference pa #200712120299. | $3,000 |
| Aug 2, 2006 | Completed final sign-off Feb 2009 | 100 Quintara St | remodel (e) bathroom with new counter top, sink, toilet & other fixture. enlarge (e) master bedroom & add new bedroom on 2nd floor. (total approx 600 sq. ft. addition to the 2nd floor) replace (e) roof. new exterior stairs.Details
remodel (e) bathroom with new counter top, sink, toilet & other fixture. enlarge (e) master bedroom & add new bedroom on 2nd floor. (total approx 600 sq. ft. addition to the 2nd floor) replace (e) roof. new exterior stairs. | $200,000 | |
| Jan 19, 2006 | Completed final sign-off Aug 2006 | 1244 Washington St | Baycraft Building | repair patio doors, repair railing on roof deck.Details
repair patio doors, repair railing on roof deck. | $10,000 |
| Sep 19, 2005 | Completed final sign-off Aug 2006 | 1244 Washington St | remove portions of existing walls <33%.replace elex&plumb fixtures.create step to interior patio....Details
remove portions of existing walls <33%.replace elex&plumb fixtures.create step to interior patio.... | $90,000 | |
| Aug 24, 2005 | Expired or cancelled expired Jun 2025 | 1530 Hayes St | Kinann & Associates Construction | replace door & window with french door, remove portion of wall. fill opening,Details
replace door & window with french door, remove portion of wall. fill opening, | $5,000 |
| Jan 31, 2005 | Completed final sign-off Sep 2006 | 603 Gates St | erect 3-story type-5 single family residential buildingDetails
erect 3-story type-5 single family residential building | $264,000 | |
| Oct 28, 2004 | Completed final sign-off Feb 2006 | 140 Mason St | revision to pa #2004/02/13/6468. chnage front entrance from cross beam to moment frame.Details
revision to pa #2004/02/13/6468. chnage front entrance from cross beam to moment frame. |