Contractors with deck permits
Ranked across every deck permit filed since 2000, by the share that reached final inspection, adjusted so a long clean record outranks a short one. Showing contractors with a deck permit in the last 5 years. Include inactive contractors
CompletedIn progressNever finaledExpired or cancelled
- 1Gil Construction & Assoc Inc.License 703705 107 permits: 99 completed, 3 in progress, 2 never finaled, 3 expired or cancelled. Last filed May 2026. Typically 62 days from permit to final inspection.
- 2M & L ConstructionLicense 832092 76 permits: 70 completed, 2 in progress, 3 never finaled, 1 expired or cancelled. Last filed Aug 2026. Typically 55 days from permit to final inspection.
- 3Saarman Construction,Ltd.License 450928 74 permits: 68 completed, 1 in progress, 2 never finaled, 3 expired or cancelled. Last filed Apr 2026. Typically 146 days from permit to final inspection.
- 4Yao Star ConstructionLicense 969667 18 permits: 17 completed, 1 in progress. Last filed Sep 2025. Typically 269 days from permit to final inspection.
- 5Chl Construction CompanyLicense 960561 19 permits: 17 completed, 2 in progress. Last filed Jun 2026. Typically 227 days from permit to final inspection.
- 6Aaron Gordon Construction IncLicense 856802 41 permits: 38 completed, 1 in progress, 2 expired or cancelled. Last filed Apr 2024. Typically 52 days from permit to final inspection.
- 7Houseworks Enterprises Inc.License 858135 27 permits: 24 completed, 2 in progress, 1 never finaled. Last filed Jun 2025. Typically 148 days from permit to final inspection.
- 8Sure, Inc.License 561658 27 permits: 24 completed, 2 in progress, 1 never finaled. Last filed Jul 2026. Typically 78 days from permit to final inspection.
- 9Handy Construction Team IncLicense 828102 14 permits: 14 completed. Last filed Oct 2024. Typically 56 days from permit to final inspection.
- 10Bashland Inc. Dba Bashland BuildersLicense 382913 14 permits: 13 completed, 1 in progress. Last filed Jul 2022. Typically 140 days from permit to final inspection.
- 11Merlyn ConstructionLicense 1024274 14 permits: 13 completed, 1 in progress. Last filed Mar 2026. Typically 64 days from permit to final inspection.
- 12Darc Ventures Inc Dba Spl Construction SLicense 938513 13 permits: 13 completed. Last filed Jul 2025. Typically 147 days from permit to final inspection.
- 13Cht Properties DevelopmentLicense 812058 13 permits: 12 completed, 1 in progress. Last filed Apr 2025. Typically 246 days from permit to final inspection.
- 14Kevin Llorente ConstructionLicense 939133 12 permits: 12 completed. Last filed Apr 2022. Typically 144 days from permit to final inspection.
- 15Traube Construction CompanyLicense 974146 12 permits: 12 completed. Last filed Oct 2024. Typically 239 days from permit to final inspection.
- 16Urban Builder General Contracting IncLicense 869710 23 permits: 20 completed, 2 in progress, 1 never finaled. Last filed Feb 2026. Typically 238 days from permit to final inspection.
- 17Spryscapes Const Inc.License 776680 36 permits: 33 completed, 3 expired or cancelled. Last filed Aug 2022. Typically 105 days from permit to final inspection.
- 18All Homes And Construction IncLicense 1057641 20 permits: 19 completed, 1 expired or cancelled. Last filed Jun 2026. Typically 297 days from permit to final inspection.
- 19Bbc Construction Inc.License 800744 11 permits: 11 completed. Last filed Apr 2023. Typically 79 days from permit to final inspection.
- 20Damar Construction And Remodeling IncLicense 946514 12 permits: 11 completed, 1 in progress. Last filed Mar 2026. Typically 160 days from permit to final inspection.
- 21P 3 Construction & Remodeling IncLicense 957103 12 permits: 11 completed, 1 in progress. Last filed Jul 2024. Typically 371 days from permit to final inspection.
- 22Mascheroni ConstructionLicense 754674 11 permits: 11 completed. Last filed Jun 2022. Typically 362 days from permit to final inspection.
- 23Hammerhouse ConstructionLicense 804459 11 permits: 11 completed. Last filed Nov 2022. Typically 303 days from permit to final inspection.
- 24Gech Inc.License 882641 10 permits: 10 completed. Last filed Oct 2023. Typically 51 days from permit to final inspection.
- 25Hearth CorporationLicense 955784 10 permits: 10 completed. Last filed Apr 2025. Typically 320 days from permit to final inspection.
- 26D S Management Inc Dba Metrocon BuildersLicense 978867 11 permits: 10 completed, 1 in progress. Last filed Oct 2025. Typically 332 days from permit to final inspection.
- 27Modern Craft ConstructionLicense 984971 10 permits: 10 completed. Last filed Aug 2024. Typically 246 days from permit to final inspection.
- 28Outerlands Design IncLicense 1026243 11 permits: 10 completed, 1 in progress. Last filed Dec 2025. Typically 390 days from permit to final inspection.
- 29Tao's Construction Inc.License 1044068 11 permits: 10 completed, 1 in progress. Last filed Jul 2025. Typically 265 days from permit to final inspection.
- 30Hubert PennyLicense 809333 13 permits: 10 completed, 3 in progress. Last filed Aug 2026. Typically 60 days from permit to final inspection.
- 31Cairn ConstructionLicense 752030 20 permits: 17 completed, 2 in progress, 1 expired or cancelled. Last filed Sep 2026. Typically 280 days from permit to final inspection.
- 32Fox Brothers Construction IncLicense 706753 18 permits: 17 completed, 1 never finaled. Last filed Mar 2023. Typically 76 days from permit to final inspection.
- 33Upscale Construction Inc.License 707506 43 permits: 38 completed, 3 never finaled, 2 expired or cancelled. Last filed Apr 2025. Typically 268 days from permit to final inspection.
- 34One Inch To The Left, Inc. Dba RarefieldLicense 825875 31 permits: 27 completed, 1 in progress, 2 never finaled, 1 expired or cancelled. Last filed Mar 2026. Typically 99 days from permit to final inspection.
- 35Lemus Construction CoLicense 913461 10 permits: 9 completed, 1 in progress. Last filed Jun 2026. Typically 46 days from permit to final inspection.
- 36Spotlight Construction Groups IncLicense 701864 10 permits: 9 completed, 1 in progress. Last filed Dec 2025. Typically 129 days from permit to final inspection.
- 37William Gregory ClauseLicense 831583 9 permits: 9 completed. Last filed May 2024. Typically 297 days from permit to final inspection.
- 38Joseph Francis LockaryLicense 542254 9 permits: 9 completed. Last filed Apr 2025. Typically 307 days from permit to final inspection.
- 39O'pro Construction Inc.License 1029997 10 permits: 9 completed, 1 in progress. Last filed Jan 2026. Typically 559 days from permit to final inspection.
- 40Aurora BuildersLicense 759578 9 permits: 9 completed. Last filed Sep 2025. Typically 161 days from permit to final inspection.
Most recent deck permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 1, 2026 | In progress | 171 Margaret Av | repair and partially replace existing residential decks. addition to decks at rear of structure | $60,000 | |
| Oct 1, 2026 | In progress | 2072 Ellis St | 1st flr: add media, sauna, 1 full bath. 2nd flr: remodel kitchen and 1/2 bath. 3rd flr: remodel 2 bath, add 1 full bath. 4th flr: remodel bath reconfigure interior stairs, replace all windows w/ aluminum clad wood. add deck at rear. nfpa 13d under separate permit. | $550,000 | |
| Oct 1, 2026 | In progress | 855 Page St | Arpol Inc | to comply with physical inspection report cc-8748 ladder intall at back deck top floor | $350 |
| Oct 1, 2026 | In progress | 286 25th Av | Integrity Design And Build Group | repair deck in-kind less than 50%. replace 17 total windows, including 7 front windows to be in-kind with vinyl, visible to street. | $5,000 |
| Oct 1, 2026 | In progress | 2412 22nd Av | Kearney Construction Llc | demo and remove (e) deck and patio at rear yard. selective demo of (e) house for new addition. add new adu of 605sqft at ground lvl in rear yard, wood framing on concrete slab on grade w/ new bathroom and kitchen. add new master bedroom and bath addition to rear of (e) house above new adu. remodel | $120,000 |
| Sep 30, 2026 | In progress | 36 Rivoli St | Golden State Builders Group Inc | structural enhancement to construct a new roof and deck. | $20,000 |
| Sep 30, 2026 | In progress | 243 Rey St | Freestone Reconstruction Inc | like in kind maintenance & repair of decks coatings @ 15 units-237 rey, 257 rey, 271 rey, 273 rey, 281 rey, 295 rey, 298 schwerin + 256,228, 208 schwerin, 1075 sunnydale, 15 garrison, 11 towerside, 21 heritage. | $65,000 |
| Sep 29, 2026 | In progress | 889 44th Av | revision to pa #202605221784. revise plans describing deck construction. | ||
| Sep 29, 2026 | In progress | 606 Clarendon Av | r/r damaged decking, joists, beams, post and guardrails. | $12,000 | |
| Sep 29, 2026 | In progress | 662 Clarendon Av | r/r damaged decking, joists, beams, post and guardrails. | $12,000 | |
| Sep 28, 2026 | In progress | 2555 Sacramento St | address/abate notice of violation 202543968 for rear yard deck extension less than 3 feet above grade. | $7,500 | |
| Sep 28, 2026 | In progress | 1838 11th Av | add new wood-framed first and 2nd floor decks in the rear. no firewall construction | $35,000 | |
| Sep 28, 2026 | In progress | 67 Everson St | A L Martin Construction | renovate (e) 2 story house. provide veritcal addition above (e) residence. convert part of (e) basement into new adu. new windows & finishes throughout. new deck at rear yard. new open fence at front yard. seismic upgrade & new fire sprinkler system throughout. | $1,194,404 |
| Sep 28, 2026 | In progress | 270 Parker Av | D3 Construction | remove non-compliant ballaster and add 2x2 ballasters no greater than 4" apart at rear deck/stairs. (2x4 horizontal). not visible from the street. | $3,500 |
| Sep 25, 2026 | In progress | 130 Caine Av | relocate/remodel (e) kitchen, bedroom & bathroom. add one bedroom & 1 full bathroom. rmeodel (e) front deck. add tankless water heater. | $100,000 | |
| Sep 25, 2026 | In progress | 17 Alpha St | remove & replace (e) deck exterior. | $9,000 | |
| Sep 25, 2026 | In progress | 564 Alvarado St | interior renovation at 1st, 2nd, 3rd, floors including new conditioned space at 1st floor, kitchen renovation, new bathroom at third floor, and new finishes throughout, new windows and foors at rear, new roof, and new deck material at covered porch. | $495,000 | |
| Sep 25, 2026 | In progress | 655 Noe St | front building:horizontal and vertical expansion and local adu studio. new windows, doors, siding, decks at front and rear of bldg. expand garage and building below grade, new garage door and gate. interior full remodel and reconfiguration, main residence to be 4 bed, 5 baths. | $500,000 | |
| Sep 25, 2026 | In progress | 61 Pearl St | to comply wiht nov 202654861; metal stair case approx 20' in height and located in the rear commiting the ground floor for the second story deck. | $500 | |
| Sep 25, 2026 | In progress | 812 Lyon St | Perez Rough Frame Specialists | revision to pa#202609107885: in addition to 202609107885, replace stringers with pressure treated lumber, replace decking with trex, replace dry-rotte railing posts. no structural changes. all work in kind and less than 50%. not visible from street. | $6,000 |
| Sep 25, 2026 | In progress | 717 Kansas St | Constantine Construction | revision to issued permit pa#202608116369. additional steps and landing for replacement deck at the rear of the building. | $1,500 |
| Sep 25, 2026 | In progress | 44 Vicksburg St | G-Man Construction | dry rot repair at the front deck. replacing damaged areas only. to comply with nov 202662741; repair in-kind less than 50%, approximately 190 square feet | $2,000 |
| Sep 25, 2026 | In progress | 2407 21st Av | Eg Construction Inc | repair leak: remove and replace affected shingles on deck in kind. repair water damaged drywall at affected areas. interior and exterior work, not visible from street. no stud or joist replacement, affected area approx. 256 sqft. | $2,000 |
| Sep 25, 2026 | In progress | 2665 Laguna St | Ping Hong Liang | deck column repair, to remove 3 (e) posts dryrot & replace w/ 8" x 8" structure #1-3 posts in kind | $18,000 |
| Sep 24, 2026 | In progress | 944 Madrid St | 1st fl: add 2 new bedrooms, 2 full baths, media room with wetbar. relocate laundry. 2nd fl reconfigure e kitche, living, dining, bedrms and bathroom. add 1 full bath. infill at rear and add new deck. remove shingles siding and replace to stucco. replace front windows with vinyl. subject to ab-112. | $200,000 | |
| Sep 24, 2026 | In progress | 192 Casitas Av | exterior remodel (n) decorative roof, replace all exterior siding with (n) stucco & hardi plank, new deck at level 1, replace all exterior doors & windows. interior remodel: relocate living room, dining room, kitchen to level 3,add 2 bedrooms, 2 full bathrooms, 2 1/2 bathrooms, no change to (e) bldg | $60,000 | |
| Sep 24, 2026 | In progress | 1670 42nd Av | 1st flr: add 2 bedrooms, 2 full baths and media room. 2nd flr:remodel kitchen and bathroom, relocated 2 bedrooms, add a full bath and pantry. infill at rear, add new deck and patio at rear. replace all front windows in kind with vinyle. | $180,000 | |
| Sep 24, 2026 | In progress | 380 Monterey Bl | H & D Construction Inc | unit 1 aka 105 rev to 202609148057, sister joist to (e) joist under deck. | $1,500 |
| Sep 24, 2026 | In progress | 367 Bartlett St | Sf Building Group | replace wood members of 2 decks that are rotted no more that 50%. rear of building. | $10,000 |
| Sep 24, 2026 | In progress | 233 30th St | Mireles Construction Inc | replace (e) deteriorated rear deck and stairs and construct a roof over the new stair landing. project includes a new 1 hour firewall near the property line. | $10,000 |