Mascheroni Construction
- Based in
- Berkeley
- On San Francisco permits
- Apr 2000 to Mar 2025
- Last 24 months
- 1 permit filed
127 permits since 2000: 107 completed, 7 never finaled, 13 expired or cancelled.
Of the 7 never-finaled permits, 3 are 5 to 10 years old, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Deck permits
11 deck permits: 11 completed. Typically 92 days from filing to permit and 362 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 7, 2022 | Completed final sign-off Apr 2024 | 182 Hartford St | basement: new exterior multi-fold doors, rebuild stair, move laundry room, new sauna & remodel (e) patio. 1st/f: remodel kitchen and bathroom. remove fire place, new rear deck. 2nd/f: remodel primary bath & closet.Details
basement: new exterior multi-fold doors, rebuild stair, move laundry room, new sauna & remodel (e) patio. 1st/f: remodel kitchen and bathroom. remove fire place, new rear deck. 2nd/f: remodel primary bath & closet. | $400,000 |
| Aug 22, 2017 | Completed final sign-off Sep 2021 | 1430 16th Av | (n)1st fl addtion @ rear. demo of interior walls, plumb/elec.(1)half bath removed.(1)full bath added. 2nd fl(n)deck @ rear. demo interior walls, plumb/elec. remove(2)beds&(1)bath.(1 1/2)bath added. (n)3rd fl addition incl(n)exterior/interior walls, plumb/elec(3)beds,(2)full bath. replace(n)stairsDetails
(n)1st fl addtion @ rear. demo of interior walls, plumb/elec.(1)half bath removed.(1)full bath added. 2nd fl(n)deck @ rear. demo interior walls, plumb/elec. remove(2)beds&(1)bath.(1 1/2)bath added. (n)3rd fl addition incl(n)exterior/interior walls, plumb/elec(3)beds,(2)full bath. replace(n)stairs | $150,000 |
| Jan 15, 2015 | Completed final sign-off May 2017 | 1386 Masonic Av | 97 sq ft kitchen addition. 185 sq ft (n) deck.Details
97 sq ft kitchen addition. 185 sq ft (n) deck. | $19,500 |
| Sep 9, 2014 | Completed final sign-off Aug 2017 | 1226 02nd Av | existing breakfast room enlarged by extending perimeter wall, kitchen remodel, add patio doors to access existing deck.Details
existing breakfast room enlarged by extending perimeter wall, kitchen remodel, add patio doors to access existing deck. | $85,000 |
| Aug 22, 2014 | Completed final sign-off Feb 2015 | 2984 Washington St | revision to 201407100954) replace deck at rear in kind due to dry rot, replace stairs due to rot. repair/replace in kind front facade due to dry rot, repair moment frame at front due to rot, remodel upstairs bathroomDetails
revision to 201407100954) replace deck at rear in kind due to dry rot, replace stairs due to rot. repair/replace in kind front facade due to dry rot, repair moment frame at front due to rot, remodel upstairs bathroom | $30,000 |
| Apr 3, 2012 | Completed final sign-off Aug 2012 | 195 Randall St | remodel the south wall o the kitchen by replacing e door and wondow with a double door with transom. eplace existing waterproofing of existing deck with new sloped subfloor and waterproofing. provide wood pallets for walking surface. replace e wd stair with metal spiral stair.Details
remodel the south wall o the kitchen by replacing e door and wondow with a double door with transom. eplace existing waterproofing of existing deck with new sloped subfloor and waterproofing. provide wood pallets for walking surface. replace e wd stair with metal spiral stair. | $25,000 |
| Nov 17, 2010 | Completed final sign-off Nov 2011 | 2766 Green St | revision to pa#201003198622-s1 use drilled pier in lieu of spread footing @ deck area.Details
revision to pa#201003198622-s1 use drilled pier in lieu of spread footing @ deck area. | $4,000 |
| Mar 19, 2010 | Completed final sign-off Nov 2011 | 2766 Green St | construction of new 39 sf, ground level bay addition below existing bay. new exterior ground level deck, and new balcony at second level.Details
construction of new 39 sf, ground level bay addition below existing bay. new exterior ground level deck, and new balcony at second level. | $30,000 |
| Sep 22, 2008 | Completed final sign-off Sep 2009 | 76 Hernandez Av | remove & replace (e) decking & roofing at rear. remove & replace (e) deck guardrail. repair damaged soffit @ bay @ east side. repair damage under first flr windows. waterproof existing deck & adjacent stuccoDetails
remove & replace (e) decking & roofing at rear. remove & replace (e) deck guardrail. repair damaged soffit @ bay @ east side. repair damage under first flr windows. waterproof existing deck & adjacent stucco | $80,000 |
| Sep 8, 2004 | Completed final sign-off Jan 2005 | 320 Ewing Tr | rear deck replacement in kind and replace in kind existing 2nd floor single glass doors, windows inDetails
rear deck replacement in kind and replace in kind existing 2nd floor single glass doors, windows in | $12,000 |
| Jan 30, 2001 | Completed final sign-off Nov 2001 | 2339 Green St | new deck at rear yardDetails
new deck at rear yard | $8,000 |