Mascheroni Construction
- Based in
- Berkeley
- On San Francisco permits
- Apr 2000 to Mar 2025
- Last 24 months
- 1 permit filed
127 permits since 2000: 107 completed, 7 never finaled, 13 expired or cancelled.
Of the 7 never-finaled permits, 3 are 5 to 10 years old, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
13 stairs permits: 10 completed, 2 never finaled, 1 expired or cancelled. Typically 23 days from filing to permit and 348 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 7, 2022 | Completed final sign-off Apr 2024 | 182 Hartford St | basement: new exterior multi-fold doors, rebuild stair, move laundry room, new sauna & remodel (e) patio. 1st/f: remodel kitchen and bathroom. remove fire place, new rear deck. 2nd/f: remodel primary bath & closet.Details
basement: new exterior multi-fold doors, rebuild stair, move laundry room, new sauna & remodel (e) patio. 1st/f: remodel kitchen and bathroom. remove fire place, new rear deck. 2nd/f: remodel primary bath & closet. | $400,000 |
| Aug 22, 2017 | Completed final sign-off Sep 2021 | 1430 16th Av | (n)1st fl addtion @ rear. demo of interior walls, plumb/elec.(1)half bath removed.(1)full bath added. 2nd fl(n)deck @ rear. demo interior walls, plumb/elec. remove(2)beds&(1)bath.(1 1/2)bath added. (n)3rd fl addition incl(n)exterior/interior walls, plumb/elec(3)beds,(2)full bath. replace(n)stairsDetails
(n)1st fl addtion @ rear. demo of interior walls, plumb/elec.(1)half bath removed.(1)full bath added. 2nd fl(n)deck @ rear. demo interior walls, plumb/elec. remove(2)beds&(1)bath.(1 1/2)bath added. (n)3rd fl addition incl(n)exterior/interior walls, plumb/elec(3)beds,(2)full bath. replace(n)stairs | $150,000 |
| Jul 28, 2016 | Never finaled issued May 2017, no final | 3545 21st St | rebuild (e) rear enclosed porch, stairs & deck. fill in rear left corner of bldg at 3rd flrs. expand (e) master bath with addition. remodel (e) kitchen & bathroom at 3rd flr. add new roof deck at 4th flr.Details
rebuild (e) rear enclosed porch, stairs & deck. fill in rear left corner of bldg at 3rd flrs. expand (e) master bath with addition. remodel (e) kitchen & bathroom at 3rd flr. add new roof deck at 4th flr. | $145,000 |
| Jul 28, 2016 | Never finaled issued May 2017, no final | 3547 21st St | rebuild (e) rear porch, stairs. fill in rear left corner of bldg at 2nd floor.Details
rebuild (e) rear porch, stairs. fill in rear left corner of bldg at 2nd floor. | $30,000 |
| Aug 22, 2014 | Completed final sign-off Feb 2015 | 2984 Washington St | revision to 201407100954) replace deck at rear in kind due to dry rot, replace stairs due to rot. repair/replace in kind front facade due to dry rot, repair moment frame at front due to rot, remodel upstairs bathroomDetails
revision to 201407100954) replace deck at rear in kind due to dry rot, replace stairs due to rot. repair/replace in kind front facade due to dry rot, repair moment frame at front due to rot, remodel upstairs bathroom | $30,000 |
| Jan 14, 2014 | Completed final sign-off Feb 2016 | 3928 23rd St | rear addition to single family dwelling, including (n) living room, (n) master bed & bath, (n) interior stair. plumbing & elect work via separate permit.Details
rear addition to single family dwelling, including (n) living room, (n) master bed & bath, (n) interior stair. plumbing & elect work via separate permit. | $183,408 |
| Sep 17, 2012 | Completed final sign-off Mar 2014 | 3235 Folsom St | interior remodeling, develop basement and 1st floor area with (n) interior stair, (n) master suite, (n) family room & bath; remodel (e) bath @ 2nd floorDetails
interior remodeling, develop basement and 1st floor area with (n) interior stair, (n) master suite, (n) family room & bath; remodel (e) bath @ 2nd floor | $102,675 |
| Apr 3, 2012 | Completed final sign-off Aug 2012 | 195 Randall St | remodel the south wall o the kitchen by replacing e door and wondow with a double door with transom. eplace existing waterproofing of existing deck with new sloped subfloor and waterproofing. provide wood pallets for walking surface. replace e wd stair with metal spiral stair.Details
remodel the south wall o the kitchen by replacing e door and wondow with a double door with transom. eplace existing waterproofing of existing deck with new sloped subfloor and waterproofing. provide wood pallets for walking surface. replace e wd stair with metal spiral stair. | $25,000 |
| Dec 21, 2009 | Completed final sign-off May 2010 | 650 Florida St | suite #m -new tenant improvemnet in unoccupied space: new h/c accessible restroom, new break area w/sink/dishwasher, new 1/2 stair to existing raised area.Details
suite #m -new tenant improvemnet in unoccupied space: new h/c accessible restroom, new break area w/sink/dishwasher, new 1/2 stair to existing raised area. | $20,000 |
| Nov 20, 2009 | Completed final sign-off Jun 2011 | 2766 Green St | construction of new media room and master bedroom, bathroom and closet spaces in existing unfinished lower level with interior connection stair. structural work.Details
construction of new media room and master bedroom, bathroom and closet spaces in existing unfinished lower level with interior connection stair. structural work. | $100,000 |
| Jul 2, 2009 | Completed final sign-off Jan 2010 | 3616 Jackson St | this project consists of a interior remodel which includes the addition of a 3-stop elevator, new master bath, mechanical room + the reconfiguration of a stair serving the 1st. + 2nd. floors.Details
this project consists of a interior remodel which includes the addition of a 3-stop elevator, new master bath, mechanical room + the reconfiguration of a stair serving the 1st. + 2nd. floors. | $145,000 |
| Feb 9, 2004 | Expired or cancelled expired Feb 2005 | 1255 Stanyan St | rear horizontal addition & remodel to (e) 1st & 2nd floors, delete roof deck, spiral stair & bayDetails
rear horizontal addition & remodel to (e) 1st & 2nd floors, delete roof deck, spiral stair & bay | |
| Apr 8, 2002 | Completed final sign-off Apr 2002 | 3352 21st St | replace in kind dryrotted entry stairs. repair not to exceed 50% of stair structureDetails
replace in kind dryrotted entry stairs. repair not to exceed 50% of stair structure | $4,000 |