Bbc Construction Inc.
- Based in
- San Rafael
- On San Francisco permits
- Jan 2002 to Sep 2026
- Last 24 months
- 8 permits filed
214 permits since 2000: 190 completed, 2 in progress, 10 never finaled, 12 expired or cancelled.
Of the 10 never-finaled permits, 1 is 5 to 10 years old, 9 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Deck permits
11 deck permits: 11 completed. Typically 0 days from filing to permit and 79 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 20, 2023 | Completed final sign-off Aug 2023 | 65 Homestead St | repairs to rear decking and deck boards as needed- less than 50%. no change to size or shape, in like kind.Details
repairs to rear decking and deck boards as needed- less than 50%. no change to size or shape, in like kind. | $8,000 |
| Jan 29, 2021 | Completed final sign-off Mar 2021 | 1729 Grove St | repair rear deck, new membrane, guardrail at 42". no change to size of deck. lass than 50%Details
repair rear deck, new membrane, guardrail at 42". no change to size of deck. lass than 50% | $5,000 |
| Jan 29, 2021 | Completed final sign-off Mar 2021 | 1731 Grove St | repair rear deck, new membrane, guardrail at 42". no change to size of deck. lass than 50%Details
repair rear deck, new membrane, guardrail at 42". no change to size of deck. lass than 50% | $5,000 |
| Jul 27, 2018 | Completed final sign-off Dec 2018 | 239 Castro St | sfd remodel, (n) structural opening between (e) kitchen and (e) dining rm, (n) lighting, (n) cabinetry, (n) finishes at new opening. replace decking boards at rear deckDetails
sfd remodel, (n) structural opening between (e) kitchen and (e) dining rm, (n) lighting, (n) cabinetry, (n) finishes at new opening. replace decking boards at rear deck | $22,000 |
| Jan 11, 2012 | Completed final sign-off May 2012 | 175 29th Av | rebuild extg deck in kind due to dry rot. add stair to ground level from deck. add railing at front balcony for safety 42" tall.Details
rebuild extg deck in kind due to dry rot. add stair to ground level from deck. add railing at front balcony for safety 42" tall. | $13,000 |
| Dec 7, 2010 | Completed final sign-off Mar 2011 | 111 Page St | work consists of repair fo existing rotted wood framed cantilevered 2nd floor walkway, same for same, (deck in courtyard)Details
work consists of repair fo existing rotted wood framed cantilevered 2nd floor walkway, same for same, (deck in courtyard) | $10,000 |
| Feb 9, 2007 | Completed final sign-off Jun 2007 | 2270 Beach St | remove and replace rear deck for dryrot repairDetails
remove and replace rear deck for dryrot repair | $20,000 |
| Dec 12, 2006 | Completed final sign-off Mar 2007 | 2369 Union St | expand new deck and stair. rev. to pa#2006/09/28/3694.Details
expand new deck and stair. rev. to pa#2006/09/28/3694. | $2,000 |
| Apr 26, 2006 | Completed final sign-off Aug 2006 | 1965 15th Av | remove and replace (e) fiberglass w.p. deck 150 sqft. membrane. repair deck rail as needed. repair & replace miscellious siding & trim as required.Details
remove and replace (e) fiberglass w.p. deck 150 sqft. membrane. repair deck rail as needed. repair & replace miscellious siding & trim as required. | $23,000 |
| Mar 19, 2004 | Completed final sign-off May 2004 | 1786 10th Av | replace (e) deck & stairs w/new deck.Details
replace (e) deck & stairs w/new deck. | $11,000 |
| Jul 21, 2003 | Completed final sign-off Sep 2003 | 167 Topaz Wy | replace extg sliding door & transom wndw in kchn/rplc extg tile deck & membrane/rplc extg sidingDetails
replace extg sliding door & transom wndw in kchn/rplc extg tile deck & membrane/rplc extg siding | $8,000 |