Aaron Gordon Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Sep 2005 to Sep 2026
- Last 24 months
- 19 permits filed
329 permits since 2000: 257 completed, 8 in progress, 45 never finaled, 19 expired or cancelled.
Of the 45 never-finaled permits, 5 are 3 to 5 years old, 14 are 5 to 10 years old, 26 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Deck permits
41 deck permits: 38 completed, 1 in progress, 2 expired or cancelled. Typically 0 days from filing to permit and 52 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 2, 2024 | In progress issued Sep 2024 | 30 Palo Alto Av | demo e stair. deck addition at rear with metal railing. new metal stair with railingDetails
demo e stair. deck addition at rear with metal railing. new metal stair with railing | $50,000 |
| Mar 31, 2022 | Completed final sign-off May 2022 | 88 Turquoise Wy | replace in-kind (e) 152 sf deck with (n) ipe decking. (n) ipe posts, & (n) steel cable rail sitting on (e) steel beams to remain, built to (e) footprint.Details
replace in-kind (e) 152 sf deck with (n) ipe decking. (n) ipe posts, & (n) steel cable rail sitting on (e) steel beams to remain, built to (e) footprint. | $10,000 |
| Nov 24, 2020 | Completed final sign-off Mar 2021 | 4015 21st St | voluntary structural upgrade to the ground floor andupgrade to the framing members at the main level deck per 2019 cbc.Details
voluntary structural upgrade to the ground floor andupgrade to the framing members at the main level deck per 2019 cbc. | $25,000 |
| Aug 7, 2020 | Completed final sign-off Dec 2020 | 256 Pennsylvania Av | remove existing 250 sqft rear deck tiles pavers and waterproof membrane and replace in kind. new exterior siding at parapet wall and window/sliding door wall. add one water spigut for future landscape drip system. install gfci outlet for 2 exterior electrical heaters. all work at rear.Details
remove existing 250 sqft rear deck tiles pavers and waterproof membrane and replace in kind. new exterior siding at parapet wall and window/sliding door wall. add one water spigut for future landscape drip system. install gfci outlet for 2 exterior electrical heaters. all work at rear. | $20,000 |
| Jan 28, 2020 | Completed final sign-off Jul 2021 | 3750 21st St | revision to app#201904158039 and 201508063603 to add a parking screen, utility scress, change to front courtyard, and cover over entry deckDetails
revision to app#201904158039 and 201508063603 to add a parking screen, utility scress, change to front courtyard, and cover over entry deck | $50,000 |
| Sep 21, 2018 | Completed final sign-off Dec 2018 | 80 Stanford Heights Av | repair rear deck "in kind" less than 50%. to comply with nov complaint # 201868371, item 1 only.Details
repair rear deck "in kind" less than 50%. to comply with nov complaint # 201868371, item 1 only. | $1,000 |
| Aug 24, 2016 | Expired or cancelled expired Mar 2018 | 314 Los Palmos Dr | in reference to 201614711, reconstruct rear facing deck to adhere to applicable building codes. 13 x9 deep deck is 9'3 above gradeDetails
in reference to 201614711, reconstruct rear facing deck to adhere to applicable building codes. 13 x9 deep deck is 9'3 above grade | $2,000 |
| Feb 2, 2016 | Completed final sign-off Jun 2016 | 110 Cherry St | rebuild lightwell deck at first floor, construct new 1-hour firewall, remove rotted stair, no work visible from public way or neighbor; maher n/aDetails
rebuild lightwell deck at first floor, construct new 1-hour firewall, remove rotted stair, no work visible from public way or neighbor; maher n/a | $10,000 |
| Sep 18, 2015 | Completed final sign-off Jul 2017 | 40 27th Av | revision to app#201506128859. demo extg concrete slab at 1st floor, lower floor with new foundation. new wet bar, reslope driveway. relocate kitchen, construct new half bath, & reconfigure extg bath. replace extg window and deck finishes from dry rot repair. install new radiant floor.Details
revision to app#201506128859. demo extg concrete slab at 1st floor, lower floor with new foundation. new wet bar, reslope driveway. relocate kitchen, construct new half bath, & reconfigure extg bath. replace extg window and deck finishes from dry rot repair. install new radiant floor. | $600,000 |
| Aug 13, 2015 | Completed final sign-off Sep 2015 | 100 Turquoise Wy | deck repair "in kind" at rear of property. less than 50%Details
deck repair "in kind" at rear of property. less than 50% | $4,200 |
| Jul 28, 2015 | Completed final sign-off Sep 2015 | 43 Ora Wy | exterior repair of common space, work to be done at 60 ora way, 2nd floor entrance/exit north. replace railings to meet code, install secondary ledger at garage side, replace decking board, all "in - kind". less than 50%.Details
exterior repair of common space, work to be done at 60 ora way, 2nd floor entrance/exit north. replace railings to meet code, install secondary ledger at garage side, replace decking board, all "in - kind". less than 50%. | $3,500 |
| Jan 30, 2015 | Completed final sign-off Oct 2015 | 1455 12th Av | rev.#201412083302. int.remodel 1st,2nd and 3rd flr.include kit, bath and bedrooms. new struct. post & beams. raised flr in master bedroom & ceiling. demo penthouse and 2 skylights and add 3 skylites. new exterior door landing at (e) rear deck. new bolts @ footing. new radiant system and new mep.Details
rev.#201412083302. int.remodel 1st,2nd and 3rd flr.include kit, bath and bedrooms. new struct. post & beams. raised flr in master bedroom & ceiling. demo penthouse and 2 skylights and add 3 skylites. new exterior door landing at (e) rear deck. new bolts @ footing. new radiant system and new mep. | $190,000 |
| Jul 23, 2014 | Completed final sign-off Sep 2014 | 43 Ora Wy | replace 1 6x8x12 beam at deck.Details
replace 1 6x8x12 beam at deck. | $3,000 |
| Jun 19, 2014 | Completed final sign-off Oct 2014 | 1325 Filbert St | replace existing wood planks on rear deck. n/a ordinance #155-13.Details
replace existing wood planks on rear deck. n/a ordinance #155-13. | $3,000 |
| Jun 10, 2014 | Completed final sign-off Jan 2015 | 900 Wisconsin St | renovation of the 2nd floor to include reconfiguring the living, dining, & kitchen area. adding a new bath and closet to the master bedroom, remodel extg half bath and enlarging the rear doors to the extg 2nd floor deck.Details
renovation of the 2nd floor to include reconfiguring the living, dining, & kitchen area. adding a new bath and closet to the master bedroom, remodel extg half bath and enlarging the rear doors to the extg 2nd floor deck. | $50,000 |
| Mar 18, 2014 | Completed final sign-off Oct 2014 | 16 Carnelian Wy | addition of skylight on sun deck.Details
addition of skylight on sun deck. | $35,000 |
| Oct 3, 2013 | Expired or cancelled expired Jun 2021 | 375 Edgehill Wy | rear deck repair 5% not visible from the street.Details
rear deck repair 5% not visible from the street. | $500 |
| Mar 5, 2013 | Completed final sign-off May 2013 | 14 Bonview St | repair dry rot at rear deck as necessary, less than 50% repair in kind.Details
repair dry rot at rear deck as necessary, less than 50% repair in kind. | $4,000 |
| Feb 20, 2013 | Completed final sign-off Mar 2013 | 122 Elsie St | repair deck boards as neccesary, this work constitutes less than 50% of deck to repair, approx. 4x20 deck (upper) and (lower) deck boards.Details
repair deck boards as neccesary, this work constitutes less than 50% of deck to repair, approx. 4x20 deck (upper) and (lower) deck boards. | $1,000 |
| Feb 11, 2013 | Completed final sign-off Feb 2013 | 263 Sanchez St | repair rear stair treads as necessary, replace in kind balusters to comply with code. this work constitutes less than 50 % of deck to repairDetails
repair rear stair treads as necessary, replace in kind balusters to comply with code. this work constitutes less than 50 % of deck to repair | $750 |
| May 25, 2012 | Completed final sign-off Jun 2012 | 1592 Treat Av | front deck repair, less than 50%, replace in kind.Details
front deck repair, less than 50%, replace in kind. | $4,000 |
| Mar 27, 2012 | Completed final sign-off Nov 2013 | 330 Banks St | interior remodel of existing residence,2 story with attic to be converted to 2 story,no attic. gr fl: relocate kitchen, add den, new water closet.2nd fl: 2 bedrooms, 2 full bath,remove front deck.new interior stairs, sideyard balcony. remove side stairs, add front entry gate, new gr fl entryway.Details
interior remodel of existing residence,2 story with attic to be converted to 2 story,no attic. gr fl: relocate kitchen, add den, new water closet.2nd fl: 2 bedrooms, 2 full bath,remove front deck.new interior stairs, sideyard balcony. remove side stairs, add front entry gate, new gr fl entryway. | $200,000 |
| Sep 9, 2011 | Completed final sign-off Apr 2012 | 374 Sanchez St | revision to permit #201105095628, additional structural details for porch framing. repair of deck & stairs in kind at rear.Details
revision to permit #201105095628, additional structural details for porch framing. repair of deck & stairs in kind at rear. | $2,000 |
| Aug 5, 2011 | Completed final sign-off Sep 2011 | 27 Ford St | repair rear deck in kind (less than 50%).Details
repair rear deck in kind (less than 50%). | $1,200 |
| Aug 5, 2011 | Completed final sign-off Aug 2011 | 482 Duboce Av | repair rear deck in kind (less than 50%).Details
repair rear deck in kind (less than 50%). | $2,500 |
| Jun 1, 2011 | Completed final sign-off Aug 2011 | 4279 22nd St | repair rear deck in kind (less than 50%) no change to windows wall and doorDetails
repair rear deck in kind (less than 50%) no change to windows wall and door | $400 |
| May 9, 2011 | Completed final sign-off Apr 2012 | 370 Sanchez St | all work in building common area. renovate of (e) 2 story porch @ top& middle floor. reduction of (e) non-conforming bulk by removing roof @ top floor & making a deck, add 3 skylights @ top floor. replace glazing & doors @ rear facade, replace siding @ rear facade. no work visible from street.Details
all work in building common area. renovate of (e) 2 story porch @ top& middle floor. reduction of (e) non-conforming bulk by removing roof @ top floor & making a deck, add 3 skylights @ top floor. replace glazing & doors @ rear facade, replace siding @ rear facade. no work visible from street. | $50,000 |
| May 2, 2011 | Completed final sign-off May 2011 | 531 29th St | repair front deck, stair & guardrail. less than 50%, repair replacement in kind.Details
repair front deck, stair & guardrail. less than 50%, repair replacement in kind. | $5,800 |
| Mar 18, 2011 | Completed final sign-off Apr 2011 | 543 Dolores St | repair rear deck less than 50% in-kind, not visible from street. repair to include deckboards, joists and handrail.Details
repair rear deck less than 50% in-kind, not visible from street. repair to include deckboards, joists and handrail. | $5,000 |
| Oct 19, 2010 | Completed final sign-off Feb 2011 | 86 Lundys Ln | rebuild rear deck as necessary, less than 50% replacement in kind.Details
rebuild rear deck as necessary, less than 50% replacement in kind. | $5,000 |
| Oct 12, 2010 | Completed final sign-off Oct 2010 | 57 Lapidge St | remove and replace 1-4x4 post, 8 joists, and ledger from bottom deck, less than 50% replacement in totalDetails
remove and replace 1-4x4 post, 8 joists, and ledger from bottom deck, less than 50% replacement in total | $1,000 |
| Jul 9, 2010 | Completed final sign-off Aug 2010 | 1130 Broderick St | repair rear deck as necessary less than 50%, 2 posts, siding, trim, water proofing windowsDetails
repair rear deck as necessary less than 50%, 2 posts, siding, trim, water proofing windows | $2,000 |
| Jul 9, 2010 | Completed final sign-off Jul 2010 | 57 Lapidge St | repair rear deck as neccessary less than 50 %; 2 stringers with treads 3 posts, 1 piece of decking, 2 joists.Details
repair rear deck as neccessary less than 50 %; 2 stringers with treads 3 posts, 1 piece of decking, 2 joists. | $1,500 |
| May 4, 2010 | Completed final sign-off Jul 2010 | 570 Ramsell St | replace (e) rear stair w/ a (n) 25'wx5' deck, replace (e) fixtures in (e) bathroom.Details
replace (e) rear stair w/ a (n) 25'wx5' deck, replace (e) fixtures in (e) bathroom. | $15,000 |
| Dec 10, 2009 | Completed final sign-off Dec 2009 | 28 Raleigh Av | replace deck boards and rotten framing as necessary on rear deck. less than 50%. all work in kind.Details
replace deck boards and rotten framing as necessary on rear deck. less than 50%. all work in kind. | $1,500 |
| Sep 15, 2009 | Completed final sign-off Jan 2010 | 75 07th Av | replace in kind decking material and sleepers on top and bottom rear decking. replacement in kind of ballstrader railing on top and bottom rear deck. all work less than 50%. no structuralDetails
replace in kind decking material and sleepers on top and bottom rear decking. replacement in kind of ballstrader railing on top and bottom rear deck. all work less than 50%. no structural | $2,000 |
| May 20, 2009 | Completed final sign-off Jun 2009 | 422 Russia Av | replace gurad rail at top deck location only. total 20' max. less than 50% of deck repair in kind. guardrail nail shall be 42" high less than 4" spacing or clear with minimum 2 1/2" bolts per post. verify in field.Details
replace gurad rail at top deck location only. total 20' max. less than 50% of deck repair in kind. guardrail nail shall be 42" high less than 4" spacing or clear with minimum 2 1/2" bolts per post. verify in field. | $1,000 |
| May 18, 2009 | Completed final sign-off Jul 2009 | 140 Paloma Av | remove existing rear deck. replace with new (2) level deck.Details
remove existing rear deck. replace with new (2) level deck. | $8,500 |
| Apr 27, 2009 | Completed final sign-off May 2009 | 422 Russia Av | repair or replace in kind front stairs & deck less than 50%.Details
repair or replace in kind front stairs & deck less than 50%. | $2,000 |
| Oct 5, 2007 | Completed final sign-off Oct 2007 | 45 Sussex St | remove and replace 3 4x4 redwood posts at back deck " in kind" less than 50% repair in kind.Details
remove and replace 3 4x4 redwood posts at back deck " in kind" less than 50% repair in kind. | $1,000 |
| Jun 7, 2007 | Completed final sign-off Jul 2007 | 900 Bush St | work @ unit# 905 only. repair deck bands as necessary. repair siding as necessary at deck area at guardrails min 36" high. total height of deck is 4" less than 50% to comply with sec 1511.5 sfbc.Details
work @ unit# 905 only. repair deck bands as necessary. repair siding as necessary at deck area at guardrails min 36" high. total height of deck is 4" less than 50% to comply with sec 1511.5 sfbc. | $2,500 |