Back to bathroom remodel contractors
Aaron Gordon Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Sep 2005 to Sep 2026
- Last 24 months
- 19 permits filed
329 permits since 2000: 257 completed, 8 in progress, 45 never finaled, 19 expired or cancelled.
Of the 45 never-finaled permits, 5 are 3 to 5 years old, 14 are 5 to 10 years old, 26 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
81 bathroom remodel permits: 63 completed, 2 in progress, 10 never finaled, 6 expired or cancelled. Typically 0 days from filing to permit and 247 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 13, 2025 | In progress issued Feb 2025 | 301 Mission St | gpha: removal of existing ceiling in kitchen and living room. removal of existing kitchen island, new construction of architctural partitions, finishes & fixtures for the addition of a primary bedroom suite, laundry, guest room & bath, new kitchen island, other cabinetry.Details
gpha: removal of existing ceiling in kitchen and living room. removal of existing kitchen island, new construction of architctural partitions, finishes & fixtures for the addition of a primary bedroom suite, laundry, guest room & bath, new kitchen island, other cabinetry. | $718,000 |
| Nov 25, 2024 | Completed final sign-off Feb 2026 | 565 Jersey St | at 1st floor: 1) remodel 2 bathrooms, 2)relocate laundry closet, 3)replace sliding door at rear building wall, 4) replace interior stairs guardrails. a 2nd floor: 5) replace interior stairs opening guardrail. at roof: 6) add 2 new skylights. 7) add a new roof parapet along east property line.Details
at 1st floor: 1) remodel 2 bathrooms, 2)relocate laundry closet, 3)replace sliding door at rear building wall, 4) replace interior stairs guardrails. a 2nd floor: 5) replace interior stairs opening guardrail. at roof: 6) add 2 new skylights. 7) add a new roof parapet along east property line. | $72,000 |
| Dec 8, 2023 | Completed final sign-off Jun 2024 | 1 Steuart Ln | 15/f-unit# 1501: remodel of (e) 3-bedroom condo including new wall finishes, new bathroom fixtures that replace (e) ones, new lighting in the ceiling, and relocated outlets.Details
15/f-unit# 1501: remodel of (e) 3-bedroom condo including new wall finishes, new bathroom fixtures that replace (e) ones, new lighting in the ceiling, and relocated outlets. | $150,000 |
| Oct 5, 2023 | In progress issued Nov 2023 | 715 Buena Vista Ave West Av | revision to 202012261736. revision to interior bath changes, direct vent fire place. waterproofing, minor footing and framing and other misc changes.Details
revision to 202012261736. revision to interior bath changes, direct vent fire place. waterproofing, minor footing and framing and other misc changes. | $20,000 |
| Jun 8, 2023 | Completed final sign-off Mar 2024 | 706 Mission St | unit 29a: 1-bathroom vanity replacement in-kind, toilet replacement in-kindDetails
unit 29a: 1-bathroom vanity replacement in-kind, toilet replacement in-kind | $5,000 |
| Feb 6, 2023 | Completed final sign-off Sep 2023 | 301 Mission St | unit # 54a: remodel of e aprtment, including new light fixtures, new lighting control, new window shades, new flooring, new bath tub, new ceiling soffit, and new cabinetry.Details
unit # 54a: remodel of e aprtment, including new light fixtures, new lighting control, new window shades, new flooring, new bath tub, new ceiling soffit, and new cabinetry. | $300,000 |
| Dec 20, 2022 | Completed final sign-off Feb 2024 | 4930 17th St | renovation of e 2 unit residence at 1st, 2nd, and 3rd levels. no change to the height, exterior envelope, square footage, street facade proposed. kitchen and bathsDetails
renovation of e 2 unit residence at 1st, 2nd, and 3rd levels. no change to the height, exterior envelope, square footage, street facade proposed. kitchen and baths | $100,000 |
| Jul 11, 2022 | Never finaled issued Jul 2022, no final | 3025 Laguna St | replace in kind kitchen, 2 bathrooms, remove all plaster and replace with sheetrock area of plaster to be replaced with 5/8" tyoe -x @ pl walls, @ 1560 sqft of materialDetails
replace in kind kitchen, 2 bathrooms, remove all plaster and replace with sheetrock area of plaster to be replaced with 5/8" tyoe -x @ pl walls, @ 1560 sqft of material | $20,000 |
| May 31, 2022 | Completed final sign-off Apr 2023 | 201 Folsom St | revision to pa 2021-0423-9224 for interior renovation to 201 folsom st, unit 38 d. no structural work; new bathroom finishes. new kitchen cabinetryDetails
revision to pa 2021-0423-9224 for interior renovation to 201 folsom st, unit 38 d. no structural work; new bathroom finishes. new kitchen cabinetry | |
| Apr 21, 2021 | Completed final sign-off Oct 2021 | 706 Mission St | remodel 3 baths & 1 half bath. replace fixtures & finishes, (e) fully sprinkleredDetails
remodel 3 baths & 1 half bath. replace fixtures & finishes, (e) fully sprinklered | $65,939 |
| Mar 31, 2021 | Completed final sign-off May 2022 | 212 Presidio Av | interior remodel of primary bedroom and bathroom. revision to kitchen casework and island, misc. electrical and lighting upgrades. no increase to conditioned space or envelope.Details
interior remodel of primary bedroom and bathroom. revision to kitchen casework and island, misc. electrical and lighting upgrades. no increase to conditioned space or envelope. | $100,000 |
| Jan 20, 2021 | Completed final sign-off Mar 2021 | 201 Folsom St | replace in kind one bathroom sink, faucet and toilet. no tub/shower. unit 42cDetails
replace in kind one bathroom sink, faucet and toilet. no tub/shower. unit 42c | $8,500 |
| Jan 14, 2021 | Completed final sign-off Oct 2021 | 706 Mission St | remodel 3.5 baths. no wall removal. replace finishes and fixtures in kind. new tile floor,wall tile,basebd in pwdr rm. floor,walltile in mster bath, bath 2 and 3. tub in master.tile showers in mster, 2, 3. vanities,sinks,fxtures master,2,3,pwdr. steam in master shwr.Details
remodel 3.5 baths. no wall removal. replace finishes and fixtures in kind. new tile floor,wall tile,basebd in pwdr rm. floor,walltile in mster bath, bath 2 and 3. tub in master.tile showers in mster, 2, 3. vanities,sinks,fxtures master,2,3,pwdr. steam in master shwr. | $150,000 |
| Dec 18, 2020 | Completed final sign-off Oct 2021 | 706 Mission St | modify/add outlets/switches to accomodate wainscot installation. add light fixtures in closets and bedrooms. replace extg kitchen and bathroom faucets and toilets. remove entry door into master closet. paint. no new wall and no extg wall relocation. new lighting shall comply with cec 150 (k) 3.5Details
modify/add outlets/switches to accomodate wainscot installation. add light fixtures in closets and bedrooms. replace extg kitchen and bathroom faucets and toilets. remove entry door into master closet. paint. no new wall and no extg wall relocation. new lighting shall comply with cec 150 (k) 3.5 | $100,000 |
| Jul 9, 2020 | Completed final sign-off Oct 2020 | 1545 Pine St | replace bathroom fl & shower tile in-kind.new shower valves. replace (e) faucets 2 each.new interior doors, replace gas stove with induction cooktop. replace kitchen faucet.Details
replace bathroom fl & shower tile in-kind.new shower valves. replace (e) faucets 2 each.new interior doors, replace gas stove with induction cooktop. replace kitchen faucet. | $8,500 |
| Dec 17, 2019 | Never finaled issued Dec 2019, no final | 338 Spear St | unit 38c - replace bathroom tiles shower stall in kind.Details
unit 38c - replace bathroom tiles shower stall in kind. | $5,000 |
| Sep 16, 2019 | Completed final sign-off Oct 2022 | 201 Folsom St | revision to app#201811024885. architectural ceiling changes and details. work includes structural details for sliding door, master vanity anchorage, bath vanity support and core wall penetration. n/a for maherDetails
revision to app#201811024885. architectural ceiling changes and details. work includes structural details for sliding door, master vanity anchorage, bath vanity support and core wall penetration. n/a for maher | $75,000 |
| Jan 18, 2019 | Never finaled issued Jan 2019, no final | 201 Folsom St | remodel "in-kind" kitchen and bathroom. kitchen 225 sq ft, bathroom 82 sq ftDetails
remodel "in-kind" kitchen and bathroom. kitchen 225 sq ft, bathroom 82 sq ft | $34,000 |
| Nov 8, 2018 | Completed final sign-off Dec 2020 | 401 Harrison St | unit 42 b. reconfigure and remodel bathrooms, reconfigure laundry area, (n) wine area & closet, spaceDetails
unit 42 b. reconfigure and remodel bathrooms, reconfigure laundry area, (n) wine area & closet, space | $39,000 |
| Oct 26, 2018 | Completed final sign-off Jun 2019 | 219 Brannan St | revision to 201804277601. unit 90. master bathroom remodel. converting tub to showerDetails
revision to 201804277601. unit 90. master bathroom remodel. converting tub to shower | |
| Oct 19, 2018 | Expired or cancelled withdrawn Dec 2018 | 375 Edgehill Wy | adition of 784 sf adu (2 bedrooms & 1 bathroom) within (e) space per ordinance# 95-17. proposed location of adu is within 2nd floor renovation of approved pa# 2015/08/20/4819-s1. proposed adu include close off entry from lower hall. add new range with fan above. 1 hour separation @ walls & ceiling.Details
adition of 784 sf adu (2 bedrooms & 1 bathroom) within (e) space per ordinance# 95-17. proposed location of adu is within 2nd floor renovation of approved pa# 2015/08/20/4819-s1. proposed adu include close off entry from lower hall. add new range with fan above. 1 hour separation @ walls & ceiling. | $5,000 |
| Sep 28, 2018 | Never finaled issued Sep 2018, no final | 401 Harrison St | replace master bathroom in kind, move electric ventless washer & dryer units to bathroom #2. master bathroom 107 sq ft. bath 2: 90 sq ft.Details
replace master bathroom in kind, move electric ventless washer & dryer units to bathroom #2. master bathroom 107 sq ft. bath 2: 90 sq ft. | $12,000 |
| Sep 28, 2018 | Completed final sign-off Aug 2022 | 201 Folsom St | remodel kitchen in kind. remodel bathroom 1 in kind; remodel bathroom 2 in kind. master bath: 170 sq ft. bath 1: 75 sq ft. bath 2: 72 sq ft.Details
remodel kitchen in kind. remodel bathroom 1 in kind; remodel bathroom 2 in kind. master bath: 170 sq ft. bath 1: 75 sq ft. bath 2: 72 sq ft. | $47,000 |
| Feb 28, 2018 | Expired or cancelled cancelled Dec 2018 | 201 Folsom St | replace in-kind 2 full bathrooms, 1 powder room, 1 kitchen & laundry room. n/a for maher.Details
replace in-kind 2 full bathrooms, 1 powder room, 1 kitchen & laundry room. n/a for maher. | $200,000 |
| Sep 20, 2017 | Completed final sign-off May 2018 | 301 Main St | unit 32e: rev to 201705257618, 1/f: guest bath, new grab bars, blocking, increase shwr area; kitchen, replace fire rated gyp bd in kind; hall, new recessed closet; 2/f: stairwell, blocking, low shoe cab to stair landing;Details
unit 32e: rev to 201705257618, 1/f: guest bath, new grab bars, blocking, increase shwr area; kitchen, replace fire rated gyp bd in kind; hall, new recessed closet; 2/f: stairwell, blocking, low shoe cab to stair landing; | $20,000 |
| May 25, 2017 | Completed final sign-off May 2018 | 301 Main St | #32e - add shower in 1st level guest bathroom; expand shower in upstairs guest bathroom; remodel master bathroom "in-kind"' remodel kitchen "in-kind" relocate laundry washer & dryer. no change to exterior envelope. all work to be done in unit 32e only. n/a maher ordinanceDetails
#32e - add shower in 1st level guest bathroom; expand shower in upstairs guest bathroom; remodel master bathroom "in-kind"' remodel kitchen "in-kind" relocate laundry washer & dryer. no change to exterior envelope. all work to be done in unit 32e only. n/a maher ordinance | $60,000 |
| May 18, 2017 | Completed final sign-off Aug 2017 | 338 Spear St | #31d- add shower in 1/f bathroom, and remodel 1/f bathroom. n/a ordinance #155-13Details
#31d- add shower in 1/f bathroom, and remodel 1/f bathroom. n/a ordinance #155-13 | $13,000 |
| Apr 20, 2017 | Completed final sign-off Feb 2018 | 338 Spear St | #38c: remodel of master bathroom, bathroom 2, and bathroom 3. remodel of kitchen. no change to exterior envelope. all work to be done in unit #38c only. n/a for maher.Details
#38c: remodel of master bathroom, bathroom 2, and bathroom 3. remodel of kitchen. no change to exterior envelope. all work to be done in unit #38c only. n/a for maher. | $47,000 |
| Mar 20, 2017 | Completed final sign-off Dec 2017 | 154 Juanita Wy | interior remodel of ground floor to include 1)remodel extg bathroom, 2)add new office(133 sq ft). 3)update electrical.Details
interior remodel of ground floor to include 1)remodel extg bathroom, 2)add new office(133 sq ft). 3)update electrical. | $60,000 |
| Dec 21, 2016 | Completed final sign-off Apr 2018 | 140 Stanyan St | remodel of 3 bathrooms in kind, no change to homes exterior envelpoeDetails
remodel of 3 bathrooms in kind, no change to homes exterior envelpoe | $25,000 |
| May 23, 2016 | Completed final sign-off Feb 2017 | 301 Mission St | install (19) new recessed lights, new ceiling soffit in living room (no change to rated ceiling assembly), move 3 sprinklers in living room seperate permit. replace master bath toilet, powder room, floor tile, install 2 switch outlets in each bedroom, plumbing, electrical & sprinkler under sep bpaDetails
install (19) new recessed lights, new ceiling soffit in living room (no change to rated ceiling assembly), move 3 sprinklers in living room seperate permit. replace master bath toilet, powder room, floor tile, install 2 switch outlets in each bedroom, plumbing, electrical & sprinkler under sep bpa | $50,000 |
| Sep 29, 2015 | Completed final sign-off Oct 2017 | 850 Powell St | unit #703: reconfigure non structural interior partition walls. remodel kitchen, bath, bedrooms, living room, dining room, entry hall, & laundry room. no change to windows or exterior openings. this is an apt on 7th floor of an 11 story bldg.Details
unit #703: reconfigure non structural interior partition walls. remodel kitchen, bath, bedrooms, living room, dining room, entry hall, & laundry room. no change to windows or exterior openings. this is an apt on 7th floor of an 11 story bldg. | $350,000 |
| Sep 18, 2015 | Completed final sign-off Jul 2017 | 40 27th Av | revision to app#201506128859. demo extg concrete slab at 1st floor, lower floor with new foundation. new wet bar, reslope driveway. relocate kitchen, construct new half bath, & reconfigure extg bath. replace extg window and deck finishes from dry rot repair. install new radiant floor.Details
revision to app#201506128859. demo extg concrete slab at 1st floor, lower floor with new foundation. new wet bar, reslope driveway. relocate kitchen, construct new half bath, & reconfigure extg bath. replace extg window and deck finishes from dry rot repair. install new radiant floor. | $600,000 |
| Sep 15, 2015 | Completed final sign-off Aug 2016 | 2225 Bay St | unit legalization per ord 43-14. all work to be done @ 1st fl rear unit, relocating kitchen, remodel bathroom "inkind", replace sliding glass door "inkind", add window @ rear of property in (e) opening.Details
unit legalization per ord 43-14. all work to be done @ 1st fl rear unit, relocating kitchen, remodel bathroom "inkind", replace sliding glass door "inkind", add window @ rear of property in (e) opening. | $50,000 |
| Jul 28, 2015 | Completed final sign-off Apr 2016 | 1763 12th Av | interior kitchen, master bathroom & master closet remodel. relocating int partitoin walls at master bath & master closet. refinish facade of int. fireplace. replace doors & windows (not visible from street) & replace int stair railing "in-kind". replace all int doors "in-kind". add new skylights atDetails
interior kitchen, master bathroom & master closet remodel. relocating int partitoin walls at master bath & master closet. refinish facade of int. fireplace. replace doors & windows (not visible from street) & replace int stair railing "in-kind". replace all int doors "in-kind". add new skylights at | $45,000 |
| Jun 23, 2015 | Completed final sign-off Jun 2016 | 110 Cherry St | remodel kitchen, 2nd fl master bath, 3rd fl east bath, 3rd fl west bath, new 3rd fl bath, create larger opening between kitchen and dining room, new beams adn posts per structural. remove 2 existing post in basementDetails
remodel kitchen, 2nd fl master bath, 3rd fl east bath, 3rd fl west bath, new 3rd fl bath, create larger opening between kitchen and dining room, new beams adn posts per structural. remove 2 existing post in basement | $200,000 |
| Jun 12, 2015 | Never finaled issued Jun 2015, no final | 40 27th Av | replace kitchen, 3 bathrooms, remove and replace sheet rock through house. all work is "in-kind". finsih work, fixtures and casework to be replace "in-kind." no structural work to be done.Details
replace kitchen, 3 bathrooms, remove and replace sheet rock through house. all work is "in-kind". finsih work, fixtures and casework to be replace "in-kind." no structural work to be done. | $70,000 |
| May 27, 2015 | Completed final sign-off Jan 2016 | 839 Rhode Island St | replace 2 bathrooms in kind; no structural work; to comply with cec150.0(k)5Details
replace 2 bathrooms in kind; no structural work; to comply with cec150.0(k)5 | $25,000 |
| Apr 17, 2015 | Completed final sign-off Oct 2015 | 530 Banks St | remodel 2 bathrooms at 1st floor. add interior partition walls. replace 3 windows in kind at 1st floor. add new window to guest bathroom at 1st floor.Details
remodel 2 bathrooms at 1st floor. add interior partition walls. replace 3 windows in kind at 1st floor. add new window to guest bathroom at 1st floor. | $28,000 |
| Apr 16, 2015 | Completed final sign-off Dec 2015 | 735 France Av | to comply with nov 201411572 remove illegal unit: remove illegal kitchen at 1st flr. remove shower in existing bathroom.Details
to comply with nov 201411572 remove illegal unit: remove illegal kitchen at 1st flr. remove shower in existing bathroom. | $10,000 |
| Mar 19, 2015 | Completed final sign-off Mar 2016 | 2940 21st Av | remodel master bath at second floor. replace 2 windows at master bath with 2 new window. add interior partition walls, relocate (e) front door to adjacent wall per plan.Details
remodel master bath at second floor. replace 2 windows at master bath with 2 new window. add interior partition walls, relocate (e) front door to adjacent wall per plan. | $20,000 |
| Mar 19, 2015 | Completed final sign-off Mar 2016 | 2940 21st Av | legalize and remodel guest bath at first floor. replace window at guest bath with new wood window "in kind" legalize (2) guest bedrooms at 1st floor to code. no expansion of (e) bulding envelope.Details
legalize and remodel guest bath at first floor. replace window at guest bath with new wood window "in kind" legalize (2) guest bedrooms at 1st floor to code. no expansion of (e) bulding envelope. | $12,000 |
| Feb 11, 2015 | Completed final sign-off Mar 2016 | 2672 Filbert St | (e) kitchen remodel, replacement of doors, (n) mudroom & laundry construction @ 1/f, removal interior stair between 3/f & 4/f, bathrooms remodel. n/a ordinance #155-13Details
(e) kitchen remodel, replacement of doors, (n) mudroom & laundry construction @ 1/f, removal interior stair between 3/f & 4/f, bathrooms remodel. n/a ordinance #155-13 | $50,000 |
| Jan 30, 2015 | Completed final sign-off Oct 2015 | 1455 12th Av | rev.#201412083302. int.remodel 1st,2nd and 3rd flr.include kit, bath and bedrooms. new struct. post & beams. raised flr in master bedroom & ceiling. demo penthouse and 2 skylights and add 3 skylites. new exterior door landing at (e) rear deck. new bolts @ footing. new radiant system and new mep.Details
rev.#201412083302. int.remodel 1st,2nd and 3rd flr.include kit, bath and bedrooms. new struct. post & beams. raised flr in master bedroom & ceiling. demo penthouse and 2 skylights and add 3 skylites. new exterior door landing at (e) rear deck. new bolts @ footing. new radiant system and new mep. | $190,000 |
| Jan 28, 2015 | Expired or cancelled withdrawn Feb 2015 | 3773 17th St | front bldg- seismic retrofit, replace (e) brick foundation w/new reinforced concrete, convert (e) basement to 2 bedrooms & 1 bath, increase (e) 72 s.f. rear covered porch, remodel kitchen, add one bedroom & 1-1/2 bathroom, replace (e) fau w/hydronic radiant heat, replace (e) comp roof in kind,Details
front bldg- seismic retrofit, replace (e) brick foundation w/new reinforced concrete, convert (e) basement to 2 bedrooms & 1 bath, increase (e) 72 s.f. rear covered porch, remodel kitchen, add one bedroom & 1-1/2 bathroom, replace (e) fau w/hydronic radiant heat, replace (e) comp roof in kind, | $425,000 |
| Jan 22, 2015 | Completed final sign-off Apr 2015 | 1600 Webster St | all new hardwood floors, new paint of all walls,ceiling and trim. new track light fixtures at living room. new pendant fixtures at dining room counter. new stone counters, sink, faucet at kitchen. bath remoel in kind. new cabinet, plumbing, fixtures, glass. mo walls to be movedDetails
all new hardwood floors, new paint of all walls,ceiling and trim. new track light fixtures at living room. new pendant fixtures at dining room counter. new stone counters, sink, faucet at kitchen. bath remoel in kind. new cabinet, plumbing, fixtures, glass. mo walls to be moved | $25,000 |
| Dec 19, 2014 | Completed final sign-off Aug 2016 | 3481 Washington St | expand below grade wine cellar. infill e lightwell for new elevator and machine room. construct new elevator hoistway. replace various windows in kind. remodel baths. install new fireplaces gas insertsDetails
expand below grade wine cellar. infill e lightwell for new elevator and machine room. construct new elevator hoistway. replace various windows in kind. remodel baths. install new fireplaces gas inserts | $178,937 |
| Dec 8, 2014 | Completed final sign-off Oct 2015 | 1455 12th Av | remodel kitchen and bathroom "in kind" ; to comply with cec150.0(k)3 & 5Details
remodel kitchen and bathroom "in kind" ; to comply with cec150.0(k)3 & 5 | $32,000 |
| Dec 8, 2014 | Expired or cancelled cancelled Jan 2015 | 3481 Washington St | remodel kitchen and bathroom in kind; to comply with cec150.0(k)3 & 5Details
remodel kitchen and bathroom in kind; to comply with cec150.0(k)3 & 5 | $32,000 |
| Oct 27, 2014 | Expired or cancelled cancelled Jul 2015 | 3773 17th St | remodel "in kind" bathroom; replace exterior sidings on side of house (less than 200 sq.ft.). siding is not visible to street. to comply with cec150.0(k)5Details
remodel "in kind" bathroom; replace exterior sidings on side of house (less than 200 sq.ft.). siding is not visible to street. to comply with cec150.0(k)5 | $18,000 |
| Sep 16, 2014 | Expired or cancelled expired Feb 2016 | 154 Dorchester Wy | remodeling bathroom in-kind. new plumbing fixtures, new electrical fixtures, and new finishes. self performing plumbing and elelctrical work. no structural work being doneDetails
remodeling bathroom in-kind. new plumbing fixtures, new electrical fixtures, and new finishes. self performing plumbing and elelctrical work. no structural work being done | $12,000 |
| Sep 16, 2014 | Never finaled issued Sep 2014, no final | 134 De Soto St | remodel bathroom "in kind". new plumbing and electrical fixtures and new finishes. self performing plumbing and electrical work. no structural workDetails
remodel bathroom "in kind". new plumbing and electrical fixtures and new finishes. self performing plumbing and electrical work. no structural work | $12,000 |
| Aug 11, 2014 | Completed final sign-off Dec 2014 | 3867 Jackson St | revision to permit 201405095369; reconfigure master bath & closet 3rd flr, add one vanity, add window to bath. maher n/aDetails
revision to permit 201405095369; reconfigure master bath & closet 3rd flr, add one vanity, add window to bath. maher n/a | $5,000 |
| Jul 7, 2014 | Completed final sign-off Apr 2015 | 511 15th Av | remove & replace 2nd floor kitchen & bathroom in-kind. remove & replace sheetrock in kitchen, dining & living room as necessary.Details
remove & replace 2nd floor kitchen & bathroom in-kind. remove & replace sheetrock in kitchen, dining & living room as necessary. | $20,000 |
| Jul 2, 2014 | Never finaled issued Jul 2014, no final | 850 Powell St | unit 703: remove & replace 1 kitchen and 4 bathrooms in-kind, remove & replace sheet rock, trim in-kindDetails
unit 703: remove & replace 1 kitchen and 4 bathrooms in-kind, remove & replace sheet rock, trim in-kind | $25,000 |
| Jul 2, 2014 | Completed final sign-off Oct 2014 | 420 Kirkham St | remodel (e) bathroom & water closet, new toilet, replace sink, tub & window at (e) bathroom, new toilet/sink @ (e) water closet, new finishes @ both rooms.Details
remodel (e) bathroom & water closet, new toilet, replace sink, tub & window at (e) bathroom, new toilet/sink @ (e) water closet, new finishes @ both rooms. | $5,000 |
| Jun 18, 2014 | Completed final sign-off Oct 2014 | 463 Hill St | remodel existing bathroom in kind with the exception of moving an interior door in the bathroom (2nd flr)Details
remodel existing bathroom in kind with the exception of moving an interior door in the bathroom (2nd flr) | $15,000 |
| Jun 12, 2014 | Completed final sign-off Aug 2015 | 1444 La Playa | remodel in kind bathroom.Details
remodel in kind bathroom. | $12,000 |
| Jun 10, 2014 | Completed final sign-off Jan 2015 | 900 Wisconsin St | renovation of the 2nd floor to include reconfiguring the living, dining, & kitchen area. adding a new bath and closet to the master bedroom, remodel extg half bath and enlarging the rear doors to the extg 2nd floor deck.Details
renovation of the 2nd floor to include reconfiguring the living, dining, & kitchen area. adding a new bath and closet to the master bedroom, remodel extg half bath and enlarging the rear doors to the extg 2nd floor deck. | $50,000 |
| May 9, 2014 | Completed final sign-off Dec 2014 | 3867 Jackson St | lwr basement (n) doors, & radiation heating 1st flr, garage wall, /bd rm & bath remodel, 2nd flr (n) walls reconfigure bathroom & kitchen-remove bd rm ,3rd flr bath remodel, reconfiguration for addt'l bd rm, remove columns @ rear, new colums & beam support of (e) terrace. (n) windows (n) garage doorDetails
lwr basement (n) doors, & radiation heating 1st flr, garage wall, /bd rm & bath remodel, 2nd flr (n) walls reconfigure bathroom & kitchen-remove bd rm ,3rd flr bath remodel, reconfiguration for addt'l bd rm, remove columns @ rear, new colums & beam support of (e) terrace. (n) windows (n) garage door | $350,000 |
| May 2, 2014 | Completed final sign-off Jan 2015 | 900 Wisconsin St | replacement in kind. 1 bathroom, 1 kitchen. remove plaster in living room and replace with sheetrockDetails
replacement in kind. 1 bathroom, 1 kitchen. remove plaster in living room and replace with sheetrock | $15,000 |
| Apr 14, 2014 | Completed final sign-off Oct 2014 | 1325 Filbert St | remodel 2 bathrooms and kitchen in kind with updated finishes and fixtures. no walls to be removed.Details
remodel 2 bathrooms and kitchen in kind with updated finishes and fixtures. no walls to be removed. | $45,000 |
| Apr 8, 2014 | Completed final sign-off Dec 2014 | 3867 Jackson St | replacement in kind kitchen & 3 bathrooms, remove and repair dry rot to rear facade including removing and replacing stucco, approx. 400 sq.ft.Details
replacement in kind kitchen & 3 bathrooms, remove and repair dry rot to rear facade including removing and replacing stucco, approx. 400 sq.ft. | $40,000 |
| Jan 24, 2014 | Completed final sign-off Jul 2014 | 178 Amber Dr | replace lower story finishes of a two story house damaged by a ruptured sewer pipe.all lower level floor, wall & ceiling finishes to be replaced. 1/2 bathroom and kitchen replacement on 1st floor. electrical, plumbing and mechanical work. all work on first floor. no exterior work, & no structural.Details
replace lower story finishes of a two story house damaged by a ruptured sewer pipe.all lower level floor, wall & ceiling finishes to be replaced. 1/2 bathroom and kitchen replacement on 1st floor. electrical, plumbing and mechanical work. all work on first floor. no exterior work, & no structural. | $150,000 |
| Nov 25, 2013 | Completed final sign-off Apr 2014 | 182 32nd Av | remodel hall bath in kind, lighting to comply with cec 150 (k).Details
remodel hall bath in kind, lighting to comply with cec 150 (k). | $6,500 |
| Oct 24, 2013 | Never finaled issued Oct 2013, no final | 839 Rhode Island St | renovate hall bathroom & upstairs bathroom in kind. ni change of walls, windows or doors.Details
renovate hall bathroom & upstairs bathroom in kind. ni change of walls, windows or doors. | $27,000 |
| Oct 3, 2013 | Never finaled issued Oct 2013, no final | 327 Richland Av | remove and replace bathtub,bathtile, shower/tub same "in kind" in one bathroom.Details
remove and replace bathtub,bathtile, shower/tub same "in kind" in one bathroom. | $1,500 |
| Aug 20, 2013 | Never finaled issued Aug 2013, no final | 66 San Fernando Wy | to remodel master bath, add dressing room, bath remodel on 2/f; to comply with cec 150(k) 10Details
to remodel master bath, add dressing room, bath remodel on 2/f; to comply with cec 150(k) 10 | $40,000 |
| May 1, 2013 | Completed final sign-off Nov 2013 | 484 29th St | remodel an existing basement level, new family room includes a new conc slab, bathroom & stairway.Details
remodel an existing basement level, new family room includes a new conc slab, bathroom & stairway. | $95,000 |
| Jan 14, 2013 | Completed final sign-off Dec 2013 | 76 Turquoise Wy | remodel 2 baths, enlarge 2 windows at side elevation, replacement in kind 3 windows at side elevation. replacement in kind 5 (e) aluminum frame sliding doors. new interior flooring. new in floor radiant heat system, new 200amp servicesDetails
remodel 2 baths, enlarge 2 windows at side elevation, replacement in kind 3 windows at side elevation. replacement in kind 5 (e) aluminum frame sliding doors. new interior flooring. new in floor radiant heat system, new 200amp services | $175,000 |
| Nov 2, 2012 | Completed final sign-off Jun 2013 | 2900 Washington St | traditional kitchen remodel. cabinets, lighting, appliances, minor replumbing. remodel 2 baths, new tub and shower and lighting. move toilet and tub in one bath, move shower in 2nd bathDetails
traditional kitchen remodel. cabinets, lighting, appliances, minor replumbing. remodel 2 baths, new tub and shower and lighting. move toilet and tub in one bath, move shower in 2nd bath | $125,000 |
| Jun 25, 2012 | Completed final sign-off Oct 2012 | 2577 Sacramento St | bathroom remodel, replacement in kind, no lighting work under this permit.Details
bathroom remodel, replacement in kind, no lighting work under this permit. | $12,000 |
| Mar 27, 2012 | Completed final sign-off Nov 2013 | 330 Banks St | interior remodel of existing residence,2 story with attic to be converted to 2 story,no attic. gr fl: relocate kitchen, add den, new water closet.2nd fl: 2 bedrooms, 2 full bath,remove front deck.new interior stairs, sideyard balcony. remove side stairs, add front entry gate, new gr fl entryway.Details
interior remodel of existing residence,2 story with attic to be converted to 2 story,no attic. gr fl: relocate kitchen, add den, new water closet.2nd fl: 2 bedrooms, 2 full bath,remove front deck.new interior stairs, sideyard balcony. remove side stairs, add front entry gate, new gr fl entryway. | $200,000 |
| Feb 28, 2012 | Completed final sign-off Jun 2012 | 150 Juanita Wy | remodel upstairs & downstairs bathroom, install 30" skylight in kitchen, max u-factor 0.4 for skylight. min. 5' from property line. field inspector to verify framing, all new lighting must comply with cec150(k)10.Details
remodel upstairs & downstairs bathroom, install 30" skylight in kitchen, max u-factor 0.4 for skylight. min. 5' from property line. field inspector to verify framing, all new lighting must comply with cec150(k)10. | $22,000 |
| Jan 23, 2012 | Completed final sign-off Jul 2012 | 955 Green St | remodel kitchen in kind, replace guest bathroom shower valves and tile in kind. bathroom + kitchen vent to exterior min 3' from prop. line. all (n) lighting must comply with cec 150 (k) 10 + 8Details
remodel kitchen in kind, replace guest bathroom shower valves and tile in kind. bathroom + kitchen vent to exterior min 3' from prop. line. all (n) lighting must comply with cec 150 (k) 10 + 8 | $20,000 |
| Jun 8, 2011 | Completed final sign-off Apr 2012 | 370 Sanchez St | interior remodel of top floor unit. addition of 1 full bath with in extg s.f. remodel extg bathroom and kitchen. relocate garage posts.Details
interior remodel of top floor unit. addition of 1 full bath with in extg s.f. remodel extg bathroom and kitchen. relocate garage posts. | $100,000 |
| Jan 3, 2011 | Completed final sign-off Mar 2011 | 3883 23rd St | remodel bathroom, replace bathtub with shower, no fixtures will be moving location. remove & replace 10 double hang windows in kind. windows will be wood windows.Details
remodel bathroom, replace bathtub with shower, no fixtures will be moving location. remove & replace 10 double hang windows in kind. windows will be wood windows. | $15,000 |
| Nov 23, 2010 | Completed final sign-off Mar 2011 | 1439 Hayes St | remodel master one bath, remove bath tub and replace with shower, all fixtures to remain in current location, provide high efficiency lights or manual on occupancy sensor in bathroom, dry rot repair on exterior of building approx 2x20 repair in kindDetails
remodel master one bath, remove bath tub and replace with shower, all fixtures to remain in current location, provide high efficiency lights or manual on occupancy sensor in bathroom, dry rot repair on exterior of building approx 2x20 repair in kind | $10,000 |
| Jul 30, 2010 | Completed final sign-off Oct 2023 | 25 Lisbon St | remodel of kitchen and bathroom on 2nd floor. demolition of shower, toilet and sink to verify with pa# 2007.06.08.3389 to revert to storage roomDetails
remodel of kitchen and bathroom on 2nd floor. demolition of shower, toilet and sink to verify with pa# 2007.06.08.3389 to revert to storage room | $18,000 |
| May 4, 2010 | Completed final sign-off Jul 2010 | 570 Ramsell St | replace (e) rear stair w/ a (n) 25'wx5' deck, replace (e) fixtures in (e) bathroom.Details
replace (e) rear stair w/ a (n) 25'wx5' deck, replace (e) fixtures in (e) bathroom. | $15,000 |
| Jun 2, 2008 | Completed final sign-off Feb 2009 | 3451 18th St | comply with physical inspection report #3r-5297 and to legalize bathroom and storage room at back of garageDetails
comply with physical inspection report #3r-5297 and to legalize bathroom and storage room at back of garage | $10,000 |