Block 0927, lot 036
2225 Bay St
- City’s use
- Multi-Family Residential
- Built
- 1927
- Stories
- 2
- Rooms
- 3 bedrooms, 3 bathrooms
- Building
- 2,791 sq ft
- Lot
- 2,500 sq ft
- Zoning
- RH3
- Construction type
- NA
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
10 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 9, 2018 | Never finaled issued Oct 2018, no final | 2225 Bay St | reroofingDetails
reroofing | $5,000 | |
| Jun 21, 2016 | Never finaled issued Jun 2016, no final | 2225 Bay St | streetspaceDetails
streetspace | ||
| Apr 29, 2016 | Completed final sign-off Aug 2016 | 2225 Bay St | Aaron Gordon Construction Inc | revision to pa 2015-0915-6951 r1; in lieu of ab-020 (n) proposed egress.Details
revision to pa 2015-0915-6951 r1; in lieu of ab-020 (n) proposed egress. | $20,000 |
| Mar 17, 2016 | Never finaled issued Mar 2016, no final | 2225 Bay St | street spaceDetails
street space | ||
| Feb 3, 2016 | Never finaled issued Feb 2016, no final | 2225 Bay St | per legalization unit pa #201509156951, add address to 2nd unit at block 0927, lot 036 as; 2225a bay streetDetails
per legalization unit pa #201509156951, add address to 2nd unit at block 0927, lot 036 as; 2225a bay street | ||
| Nov 24, 2015 | Completed final sign-off Jul 2016 | 2225 Bay St | Aaron Gordon Construction Inc | remodel kitchen at second floor. n/a ordinance #155-13; any wall remove are laod bearing requires engineer's submittal.Details
remodel kitchen at second floor. n/a ordinance #155-13; any wall remove are laod bearing requires engineer's submittal. | $23,000 |
| Sep 15, 2015 | Completed final sign-off Aug 2016 | 2225 Bay St | Aaron Gordon Construction Inc | unit legalization per ord 43-14. all work to be done @ 1st fl rear unit, relocating kitchen, remodel bathroom "inkind", replace sliding glass door "inkind", add window @ rear of property in (e) opening.Details
unit legalization per ord 43-14. all work to be done @ 1st fl rear unit, relocating kitchen, remodel bathroom "inkind", replace sliding glass door "inkind", add window @ rear of property in (e) opening. | $50,000 |
| Jul 22, 2013 | Never finaled issued Jul 2013, no final | 2225 Bay St | Nor Cal Quake Construction Inc. | add steel frame to (e) front wall opening for structural improvements per plan.Details
add steel frame to (e) front wall opening for structural improvements per plan. | $19,500 |
| Feb 27, 2012 | Completed final sign-off Apr 2012 | 2225 Bay St | S C Anderson Group International Inc. | break stucco @ window and 1 sliding glass door to repair water leak in building paper/flashing. replace insulation and sheetrock and paint @ basement level water damaged area only. no window or door replacementDetails
break stucco @ window and 1 sliding glass door to repair water leak in building paper/flashing. replace insulation and sheetrock and paint @ basement level water damaged area only. no window or door replacement | $2,200 |
| Oct 25, 2002 | Completed final sign-off Oct 2002 | 2225 Bay St | Lingruen Associates | repair dry rot as per lingruen assoc. report dated 09/24/02 items#4a,11a onlyDetails
repair dry rot as per lingruen assoc. report dated 09/24/02 items#4a,11a only | $2,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Aaron Gordon Construction Inc (3), Lingruen Associates, Nor Cal Quake Construction Inc., S C Anderson Group International Inc.
- Engineers
- Lazar Vivat
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.