Joseph Francis Lockary
- Based in
- San Francisco
- On San Francisco permits
- May 2000 to Aug 2026
- Last 24 months
- 2 permits filed
63 permits since 2000: 59 completed, 1 in progress, 2 never finaled, 1 expired or cancelled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Deck permits
9 deck permits: 9 completed. Typically 134 days from filing to permit and 307 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 29, 2025 | Completed final sign-off Jun 2026 | 738 33rd Av | demolish a 98 sf add on room structure built onto the existing 2nd fl rear of house. add a new 152 sf family room addition to existing 2nd fl rear of house. add a new 168 sf deck to 2nd fl rear of houseDetails
demolish a 98 sf add on room structure built onto the existing 2nd fl rear of house. add a new 152 sf family room addition to existing 2nd fl rear of house. add a new 168 sf deck to 2nd fl rear of house | $180,000 |
| Nov 18, 2021 | Completed final sign-off Sep 2025 | 730 10th Av | convert part of unconditioned garage/storage space at 1/f to conditioned space & addition at rear of structure at 1/f, to include mud room, rec room, guest bedrm suite. n deck at roof of conditioned space & ext. stairs. combined heating & domestic hot water sys, radiant fl heating. n elec heat pump.Details
convert part of unconditioned garage/storage space at 1/f to conditioned space & addition at rear of structure at 1/f, to include mud room, rec room, guest bedrm suite. n deck at roof of conditioned space & ext. stairs. combined heating & domestic hot water sys, radiant fl heating. n elec heat pump. | $200,000 |
| Mar 2, 2021 | Completed final sign-off Aug 2024 | 754 41st Av | revision to pa #201805240090-s1. revision reduces sq ft size of rear addition on 1st & 2nd fl. increases sq ft of 1st fl area being converted from garage to habitable space. add 2nd fl deck.Details
revision to pa #201805240090-s1. revision reduces sq ft size of rear addition on 1st & 2nd fl. increases sq ft of 1st fl area being converted from garage to habitable space. add 2nd fl deck. | |
| Feb 9, 2018 | Completed final sign-off Dec 2019 | 275 Bella Vista Wy | deck addition @ rear yard, replacement wood stair & landing @ rear yard, replacement patio & concrete stair portion @ rear yard, guardrail @ (e) rear yard planter & handrail @ (e) rear yard landscape stair.Details
deck addition @ rear yard, replacement wood stair & landing @ rear yard, replacement patio & concrete stair portion @ rear yard, guardrail @ (e) rear yard planter & handrail @ (e) rear yard landscape stair. | $35,000 |
| Sep 13, 2016 | Completed final sign-off Apr 2018 | 120 28th St | addition of (n) deck and stairs.Details
addition of (n) deck and stairs. | $30,000 |
| Jul 30, 2012 | Completed final sign-off Sep 2013 | 2628 Filbert St | this project consists solely of the removal of an existing wood deck in the rear of byilding & it's replacement with a new wood deck of different configuration.Details
this project consists solely of the removal of an existing wood deck in the rear of byilding & it's replacement with a new wood deck of different configuration. | $24,000 |
| May 26, 2011 | Completed final sign-off May 2012 | 3938 18th St | enlarge (e) rear deck. replace deck stairs to rear yard. new firewall along property line. no change to house.Details
enlarge (e) rear deck. replace deck stairs to rear yard. new firewall along property line. no change to house. | $20,000 |
| Aug 22, 2007 | Completed final sign-off Dec 2007 | 726 10th Av | revision to pa #2007/07/24/7584 (revise deck only) revision to pa # 2007/03/27/7356 clarification of structural details for deck and fire wallDetails
revision to pa #2007/07/24/7584 (revise deck only) revision to pa # 2007/03/27/7356 clarification of structural details for deck and fire wall | |
| Jul 24, 2007 | Completed final sign-off Dec 2007 | 726 10th Av | revisions to apply# 200610316521 and200703277356 move lav in powder room change deck remove stairwayDetails
revisions to apply# 200610316521 and200703277356 move lav in powder room change deck remove stairway |