William Gregory Clause
- Based in
- San Francisco
- On San Francisco permits
- Mar 2004 to Mar 2025
- Last 24 months
- 5 permits filed
234 permits since 2000: 212 completed, 1 in progress, 12 never finaled, 9 expired or cancelled.
Of the 12 never-finaled permits, 4 are 5 to 10 years old, 8 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Deck permits
9 deck permits: 9 completed. Typically 7 days from filing to permit and 297 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 20, 2024 | Completed final sign-off May 2025 | 54 States St | repair and replace (2) front facing wood decks and guardrails in kind.Details
repair and replace (2) front facing wood decks and guardrails in kind. | $35,000 |
| Feb 4, 2021 | Completed final sign-off Aug 2024 | 1509 10th Av | rev to pa# 201805148991: update to window schedule. sprinklers under separated permit. remove non-compliant 3-story stairs and replace with new stair & deck. add windows at domerd.Details
rev to pa# 201805148991: update to window schedule. sprinklers under separated permit. remove non-compliant 3-story stairs and replace with new stair & deck. add windows at domerd. | $25,000 |
| May 12, 2015 | Completed final sign-off Oct 2017 | 3855 17th St | replace (e) brick foundation, convert 1st fl storage into room & deck. add 3rd fl master suite & (n) internal stair to connect all floors. (n) sliding doors @ back of house, (3) (n) skylights.Details
replace (e) brick foundation, convert 1st fl storage into room & deck. add 3rd fl master suite & (n) internal stair to connect all floors. (n) sliding doors @ back of house, (3) (n) skylights. | $460,000 |
| May 14, 2013 | Completed final sign-off Nov 2013 | 2799 Broadway | install hot tub on upper terrace, structural deck strengthening performed under pa#201302271073Details
install hot tub on upper terrace, structural deck strengthening performed under pa#201302271073 | $6,000 |
| Feb 27, 2013 | Completed final sign-off Nov 2013 | 2799 Broadway | reinforce (e) framing system at deck to support gravity loading from new hot tub.Details
reinforce (e) framing system at deck to support gravity loading from new hot tub. | $10,000 |
| Aug 11, 2011 | Completed final sign-off Feb 2013 | 823 Vermont St | repair dryrot at: interior stairs, rear deck, rear deck stairs, less than 40% repair. revision to pa #201106137994. repair in kind, no structural work.Details
repair dryrot at: interior stairs, rear deck, rear deck stairs, less than 40% repair. revision to pa #201106137994. repair in kind, no structural work. | $2,000 |
| May 12, 2010 | Completed final sign-off Jul 2010 | 293 Chenery St | deck replacement in kind in rear of buildingDetails
deck replacement in kind in rear of building | $3,500 |
| Jul 16, 2009 | Completed final sign-off Apr 2011 | 75 Park Hill Av | repair deck at rear less than 50%.same size.Details
repair deck at rear less than 50%.same size. | $5,000 |
| Apr 16, 2008 | Completed final sign-off Oct 2008 | 2111 Vallejo St | demo 3rd floor wall at lightwell, install 2nd floor powder room exhaust fan, construct 3rd floor joists and roof system, demo 3rd fl interior walls to remodel 2 baths, 1 bedroom. add 1 window 3rd floor rear, move deck accesss door from bedroom to master bedroom. mep sep permitDetails
demo 3rd floor wall at lightwell, install 2nd floor powder room exhaust fan, construct 3rd floor joists and roof system, demo 3rd fl interior walls to remodel 2 baths, 1 bedroom. add 1 window 3rd floor rear, move deck accesss door from bedroom to master bedroom. mep sep permit | $60,000 |