William Gregory Clause
- Based in
- San Francisco
- On San Francisco permits
- Mar 2004 to Mar 2025
- Last 24 months
- 5 permits filed
234 permits since 2000: 212 completed, 1 in progress, 12 never finaled, 9 expired or cancelled.
Of the 12 never-finaled permits, 4 are 5 to 10 years old, 8 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for roof deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Roof deck permits
4 roof deck permits: 3 completed, 1 expired or cancelled. Typically 233 days from filing to permit and 321 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 21, 2018 | Expired or cancelled expired Mar 2025 | 1509 10th Av | third flr renovation adding dormers to create new fourth flr. with kitchen (n) roof deck at fourth flr. restoring bldg to (2) units.Details
third flr renovation adding dormers to create new fourth flr. with kitchen (n) roof deck at fourth flr. restoring bldg to (2) units. | $100,000 |
| Aug 7, 2015 | Completed final sign-off Apr 2019 | 450 27th St | 2 story side & rear addition with decks. alter roof line & enlarge 3rd story @ front, sides & rear. modify front facade & add 3rd floor concealed front deck. new retractable skylt for roof access & new roof deck. relocate kit. renovate 2 full baths. add 2 full bahts & 1/2 bath. seismic upgrades.Details
2 story side & rear addition with decks. alter roof line & enlarge 3rd story @ front, sides & rear. modify front facade & add 3rd floor concealed front deck. new retractable skylt for roof access & new roof deck. relocate kit. renovate 2 full baths. add 2 full bahts & 1/2 bath. seismic upgrades. | $550,000 |
| Jul 15, 2015 | Completed final sign-off May 2017 | 3446 19th St | vert addition. kit & 2 full baths. (n) elevator from 1st fl to 4th fl & roof. (n) stair from 4th fl to roof. (n) penthouse & rear roof deck (488 sq ft). (3) exterior doors, 21 windows & 2 skylights. not visible from street. fire sprinklers and life safety @ 4th fl & roof under separate permit.Details
vert addition. kit & 2 full baths. (n) elevator from 1st fl to 4th fl & roof. (n) stair from 4th fl to roof. (n) penthouse & rear roof deck (488 sq ft). (3) exterior doors, 21 windows & 2 skylights. not visible from street. fire sprinklers and life safety @ 4th fl & roof under separate permit. | $275,000 |
| Apr 3, 2015 | Completed final sign-off Dec 2015 | 161 Beaver St | add roof deck at extg penthouse, a.k.a. top floor.Details
add roof deck at extg penthouse, a.k.a. top floor. | $15,000 |