Back to kitchen remodel contractors
William Gregory Clause
- Based in
- San Francisco
- On San Francisco permits
- Mar 2004 to Mar 2025
- Last 24 months
- 5 permits filed
234 permits since 2000: 212 completed, 1 in progress, 12 never finaled, 9 expired or cancelled.
Of the 12 never-finaled permits, 4 are 5 to 10 years old, 8 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
72 kitchen remodel permits: 67 completed, 3 never finaled, 2 expired or cancelled. Typically 0 days from filing to permit and 182 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 17, 2024 | Completed final sign-off Apr 2025 | 88 King St | unit 124- remodel (e) kitchenDetails
unit 124- remodel (e) kitchen | $54,000 |
| Jul 12, 2024 | Completed final sign-off Aug 2025 | 428 Corbett Av | 3/f: remodel existing kitchen and bathroom.Details
3/f: remodel existing kitchen and bathroom. | $65,000 |
| Aug 11, 2023 | Completed final sign-off May 2025 | 464 Douglass St | remodel of (e) kitchen & 2 bahtrooms. relocation of (2) interior walls, add 1 skylight. reconfiguration/replacement of 1 window at rear (not visible from st).Details
remodel of (e) kitchen & 2 bahtrooms. relocation of (2) interior walls, add 1 skylight. reconfiguration/replacement of 1 window at rear (not visible from st). | $160,000 |
| Apr 3, 2023 | Completed final sign-off Jun 2025 | 54 States St | remodel e 2nd flr kitchen, reconfigure bathroom at 1st flr, infill under entry stair landing to add new bathroom and laundry at 1st flr, 2 new windows (not visible from street).Details
remodel e 2nd flr kitchen, reconfigure bathroom at 1st flr, infill under entry stair landing to add new bathroom and laundry at 1st flr, 2 new windows (not visible from street). | $110,000 |
| Nov 3, 2022 | Completed final sign-off Dec 2023 | 333 Haight St | unit 4: interior renovation including kitchen and 2 baths; add new bath; replace windows and add 2 windows (not visible from street)Details
unit 4: interior renovation including kitchen and 2 baths; add new bath; replace windows and add 2 windows (not visible from street) | $290,000 |
| Sep 1, 2022 | Completed final sign-off Apr 2023 | 3828 19th St | renovate (e) kitchen enlarge kitchen wall opening to adjacent dinng room at pantry alcove new vented hood for (e) rangeDetails
renovate (e) kitchen enlarge kitchen wall opening to adjacent dinng room at pantry alcove new vented hood for (e) range | $36,500 |
| Jan 19, 2022 | Completed final sign-off Dec 2023 | 4309 19th St | remove wall and replace sliding glass door in ground floor kitchen, replace plumbing fixtures in bathroom on ground floor, extend 2nd floor bedroom over one story kitchen below and add full bathroom in bedroom. new lighting and electrical in areas of work.Details
remove wall and replace sliding glass door in ground floor kitchen, replace plumbing fixtures in bathroom on ground floor, extend 2nd floor bedroom over one story kitchen below and add full bathroom in bedroom. new lighting and electrical in areas of work. | $125,000 |
| Sep 16, 2021 | Completed final sign-off May 2025 | 54 States St | remodel e 3rd fl kitchen, reconfigure e 2 baths at 3rd fl, new window not visible from street. new skylight and parapetDetails
remodel e 3rd fl kitchen, reconfigure e 2 baths at 3rd fl, new window not visible from street. new skylight and parapet | $85,000 |
| Jul 20, 2021 | Never finaled issued Jul 2021, no final | 350 Church St | remodel kitchen in place- new cabinets, counters, fixtures.Details
remodel kitchen in place- new cabinets, counters, fixtures. | $22,000 |
| Mar 29, 2021 | Completed final sign-off Feb 2022 | 64 Divisadero St | remodel kitchen in place. no walls moved. new cabinets, counters, fixtures, tile, new windows, replace same size, same location. not visible from street.Details
remodel kitchen in place. no walls moved. new cabinets, counters, fixtures, tile, new windows, replace same size, same location. not visible from street. | $45,000 |
| Dec 1, 2020 | Completed final sign-off Jun 2024 | 4348 26th St | reconfigure 2 interior stairs,convert some unconditioned space to habitaable on lower level; remodel 1 bath,relocate 1 bath,remodel kitchen,replace 5 pairs sliders at rear, removed 2 wood burning fireplaces.add 1 new gas fireplace, add 3 stop elevator, 2 new skylights.Details
reconfigure 2 interior stairs,convert some unconditioned space to habitaable on lower level; remodel 1 bath,relocate 1 bath,remodel kitchen,replace 5 pairs sliders at rear, removed 2 wood burning fireplaces.add 1 new gas fireplace, add 3 stop elevator, 2 new skylights. | $450,000 |
| Oct 21, 2020 | Completed final sign-off Jan 2021 | 374 11th St | remodel kitchen in place, new cabinet, counters, no walls moved. replace wood floors.Details
remodel kitchen in place, new cabinet, counters, no walls moved. replace wood floors. | $30,000 |
| Sep 11, 2020 | Completed final sign-off Feb 2021 | 363 Princeton St | kitchen remodel in kind; no walls moved; new cabinets, counter appliances; bath remodl in kind - no walls moved; new fixtures, vanity, tileDetails
kitchen remodel in kind; no walls moved; new cabinets, counter appliances; bath remodl in kind - no walls moved; new fixtures, vanity, tile | $65,000 |
| Jul 21, 2020 | Completed final sign-off Jun 2021 | 1212 08th Av | remodel kitchen in place - new cabinets, counters, appliances, remove new bearing wall. remodel bath - new tile, vanity, fixtures. add 1/2 bath at former pantry.Details
remodel kitchen in place - new cabinets, counters, appliances, remove new bearing wall. remodel bath - new tile, vanity, fixtures. add 1/2 bath at former pantry. | $95,000 |
| Feb 27, 2020 | Completed final sign-off Sep 2020 | 1998 Broadway | remodel kitchen in kind. no walls moved. replace vanity in (2) bathrooms. all work in kind.Details
remodel kitchen in kind. no walls moved. replace vanity in (2) bathrooms. all work in kind. | $45,000 |
| Oct 15, 2019 | Completed final sign-off Apr 2021 | 292 San Jose Av | at existing 3rd fl. renovate (e) kitchen, relocate washer/dryer into enlarged closet at hall area, add new opening between (e) living room and kitchenDetails
at existing 3rd fl. renovate (e) kitchen, relocate washer/dryer into enlarged closet at hall area, add new opening between (e) living room and kitchen | $31,000 |
| Apr 5, 2018 | Completed final sign-off Jul 2019 | 36 Seward St | kitchen renovation at new location. convert half bath to full bath on 2nd floor. full bath renovation at 3rd floor. sheetrock garage and storage. install 5 new windows at rear not visible to street.Details
kitchen renovation at new location. convert half bath to full bath on 2nd floor. full bath renovation at 3rd floor. sheetrock garage and storage. install 5 new windows at rear not visible to street. | $200,000 |
| Mar 21, 2018 | Expired or cancelled expired Mar 2025 | 1509 10th Av | third flr renovation adding dormers to create new fourth flr. with kitchen (n) roof deck at fourth flr. restoring bldg to (2) units.Details
third flr renovation adding dormers to create new fourth flr. with kitchen (n) roof deck at fourth flr. restoring bldg to (2) units. | $100,000 |
| Mar 5, 2018 | Completed final sign-off Aug 2019 | 1720 Larkin St | remodel of 2 units: unit #1 relocate kitchen, remodel bathroom and add 2 new bathroom. unit #2: relocate kitchen remodel 2 bathroom. 3rd unit - relocate kitchen - add bath - remodel (e) bathDetails
remodel of 2 units: unit #1 relocate kitchen, remodel bathroom and add 2 new bathroom. unit #2: relocate kitchen remodel 2 bathroom. 3rd unit - relocate kitchen - add bath - remodel (e) bath | $50,000 |
| May 3, 2017 | Completed final sign-off May 2017 | 3448 19th St | remodel kitchen, in kind - new cabinets, countertops, fixtures, tiles. redel bath in kind - new fixtures, tiles. replace (2) windows in (e) openings. not visible from street.Details
remodel kitchen, in kind - new cabinets, countertops, fixtures, tiles. redel bath in kind - new fixtures, tiles. replace (2) windows in (e) openings. not visible from street. | $40,000 |
| May 3, 2017 | Completed final sign-off May 2017 | 3446 19th St | remodel kitchen, in kind - new cabinets, countertops, fixtures, tiles. redel bath in kind - new fixtures, tiles. replace (2) windows in (e) openings. not visible from street.Details
remodel kitchen, in kind - new cabinets, countertops, fixtures, tiles. redel bath in kind - new fixtures, tiles. replace (2) windows in (e) openings. not visible from street. | $40,000 |
| Mar 29, 2017 | Completed final sign-off Jun 2017 | 45 Henry St | apt #2: revision to 201701278062 - replace windows at lightwell kitchen and slider at living area - not visible from street. move 1 partition wall at bath, change door location at closet, add door from foyer to bedroom, close-up bath window, repair dryrot at sliderDetails
apt #2: revision to 201701278062 - replace windows at lightwell kitchen and slider at living area - not visible from street. move 1 partition wall at bath, change door location at closet, add door from foyer to bedroom, close-up bath window, repair dryrot at slider | $9,000 |
| Feb 8, 2017 | Completed final sign-off Jun 2017 | 2318 44th Av | remodel kitchen in place. new cabinets, countertops, appliances.Details
remodel kitchen in place. new cabinets, countertops, appliances. | $25,000 |
| Jan 27, 2017 | Completed final sign-off Jun 2017 | 45 Henry St | remodel kitchen in place, new cabinets, counters, remodel bath in place, new fixtures, tile no walls moved.( unit # 2)Details
remodel kitchen in place, new cabinets, counters, remodel bath in place, new fixtures, tile no walls moved.( unit # 2) | $55,000 |
| Aug 1, 2016 | Completed final sign-off Nov 2016 | 1450 Post St | remodel bathroom & kitchen. no walls moved.Details
remodel bathroom & kitchen. no walls moved. | $38,000 |
| Feb 9, 2016 | Completed final sign-off Mar 2016 | 1865 California St | replace (1) lightwell kitchen window in kind, not visible from street. same location, same opening.Details
replace (1) lightwell kitchen window in kind, not visible from street. same location, same opening. | $3,000 |
| Jan 21, 2016 | Completed final sign-off Aug 2016 | 423 Eureka St | interior remodel. remove wall between kitchen, dining rm. replace cabinets, counters, appliances at kitchen, new high eff lighting, remodel bath, new fixtures, tile. add 1/2 bathDetails
interior remodel. remove wall between kitchen, dining rm. replace cabinets, counters, appliances at kitchen, new high eff lighting, remodel bath, new fixtures, tile. add 1/2 bath | $150,000 |
| Nov 17, 2015 | Completed final sign-off Mar 2016 | 733 Joost Av | partial kitchen remodel - replace lower cabinets, counters, sink, faucet only.Details
partial kitchen remodel - replace lower cabinets, counters, sink, faucet only. | $12,000 |
| Nov 9, 2015 | Completed final sign-off Feb 2016 | 45 Henry St | remodel kitchen in place - new cabinets, counters, plumbing fixtures, new high efficacy lighting, new sliding door. replace in-kind.Details
remodel kitchen in place - new cabinets, counters, plumbing fixtures, new high efficacy lighting, new sliding door. replace in-kind. | $38,000 |
| Oct 16, 2015 | Completed final sign-off Mar 2016 | 1865 California St | remodel bathroom in-place, new tub, vanity, tilet. remodel kitchen in place, new cabinets, counters, appliances, new light efficiency lighting.Details
remodel bathroom in-place, new tub, vanity, tilet. remodel kitchen in place, new cabinets, counters, appliances, new light efficiency lighting. | $38,000 |
| Sep 2, 2015 | Completed final sign-off Nov 2015 | 119 Parnassus Av | kitchen remodel: sreplace (3) cabinets, countertops, tile, backsplash, sink, faucet, replace undercabinet lighting to led.Details
kitchen remodel: sreplace (3) cabinets, countertops, tile, backsplash, sink, faucet, replace undercabinet lighting to led. | $22,000 |
| Jun 11, 2015 | Completed final sign-off Jan 2016 | 92 Sotelo Av | remodel existing kitchen, relocate half bath @ ground floor.Details
remodel existing kitchen, relocate half bath @ ground floor. | $55,000 |
| Dec 24, 2014 | Completed final sign-off May 2015 | 4150 17th St | remodel (2) bath in place new tile, vanity, fixtures, lights on occupancy sensor, kitchen remodel in place -new cabinets, counters, appliancesDetails
remodel (2) bath in place new tile, vanity, fixtures, lights on occupancy sensor, kitchen remodel in place -new cabinets, counters, appliances | $42,000 |
| Oct 16, 2014 | Completed final sign-off Jun 2015 | 926 Grove St | bath remodel, new vanity, tile, fixtures, kitchen remodel, 2 new cabinets, new counters, new wood flooring at upstairs. no change in layoutDetails
bath remodel, new vanity, tile, fixtures, kitchen remodel, 2 new cabinets, new counters, new wood flooring at upstairs. no change in layout | $40,000 |
| Oct 15, 2014 | Completed final sign-off May 2015 | 733 Joost Av | minor kitchen remodel. add range hood, add shutoff for range gas, replace 1 wall cabinet.Details
minor kitchen remodel. add range hood, add shutoff for range gas, replace 1 wall cabinet. | $6,000 |
| Oct 6, 2014 | Completed final sign-off Dec 2014 | 526 Hugo St | remodel kitchen - new cabinets, counters, flooring, high efficacy lighting, no alteration of walls, window & door.Details
remodel kitchen - new cabinets, counters, flooring, high efficacy lighting, no alteration of walls, window & door. | $18,000 |
| Sep 3, 2014 | Completed final sign-off Nov 2014 | 2185 Bush St | unit 210: remodel bath - new tiles, vanity, tub. remodel kitchen - new cabinets, counters, high efficacy lighting. n/a maher ordinance # 155-13Details
unit 210: remodel bath - new tiles, vanity, tub. remodel kitchen - new cabinets, counters, high efficacy lighting. n/a maher ordinance # 155-13 | $22,000 |
| Sep 3, 2014 | Completed final sign-off Mar 2015 | 3946 17th St | remodel kitchen - new cabinets, counters, appliances - high efficiency lighting. remodel (2) baths - new tile, vanity, tub, shower. no alteration onf walls, windows and doors. n/a maher ordinance # 155-13Details
remodel kitchen - new cabinets, counters, appliances - high efficiency lighting. remodel (2) baths - new tile, vanity, tub, shower. no alteration onf walls, windows and doors. n/a maher ordinance # 155-13 | $42,000 |
| Jun 16, 2014 | Completed final sign-off Mar 2015 | 1333 Jones St | unit 1404 - remodel kitchen in place - new cabinets, countertops, no walls moved, high efficacy lighting, new hardwood flooringDetails
unit 1404 - remodel kitchen in place - new cabinets, countertops, no walls moved, high efficacy lighting, new hardwood flooring | $32,000 |
| Feb 25, 2014 | Completed final sign-off Sep 2014 | 504 Hugo St | project proposes an interior remodel which includes a relocated kitchen, new bathroom, and new bedroom.Details
project proposes an interior remodel which includes a relocated kitchen, new bathroom, and new bedroom. | $35,000 |
| Feb 13, 2014 | Completed final sign-off Mar 2014 | 1461 Sanchez St | kitchen remodel in plce new cabinets, new countr tops, no walls moved , light is high effeciancyDetails
kitchen remodel in plce new cabinets, new countr tops, no walls moved , light is high effeciancy | $18,000 |
| Feb 3, 2014 | Completed final sign-off Dec 2014 | 726 Masonic Av | remodel existing kitchen & bathroom and add a new bathroom to master bedroom.Details
remodel existing kitchen & bathroom and add a new bathroom to master bedroom. | $80,000 |
| Nov 13, 2013 | Completed final sign-off Nov 2014 | 4732 Fulton St | remodel extg kitchen and remove wall between kitchen and dining room. remodel extg bath and add master bath.Details
remodel extg kitchen and remove wall between kitchen and dining room. remodel extg bath and add master bath. | $85,000 |
| Oct 28, 2013 | Never finaled issued Oct 2013, no final | 55 Page St | replace kitchen counters, add cabinets, move 1 electric fixture & add 2nd at kitchen bar. add shower glass. no change in wall, windows or doorsDetails
replace kitchen counters, add cabinets, move 1 electric fixture & add 2nd at kitchen bar. add shower glass. no change in wall, windows or doors | $6,700 |
| Oct 10, 2013 | Completed final sign-off Jul 2015 | 999 Green St | interior remodel of unit #3005, including kitchen and bathroom remodel. new front door to unit, new exterior sliding doors and glazing. capture exterior balcony space.Details
interior remodel of unit #3005, including kitchen and bathroom remodel. new front door to unit, new exterior sliding doors and glazing. capture exterior balcony space. | $90,000 |
| Oct 8, 2013 | Completed final sign-off Dec 2013 | 1416 18th Av | remodel kitchen in place- new cabinets, counters appliances, new high effeciency lighting, no walls moved new windows to lightwell remodel bath, new tile vanity, toilet lights on occupancy sensor.Details
remodel kitchen in place- new cabinets, counters appliances, new high effeciency lighting, no walls moved new windows to lightwell remodel bath, new tile vanity, toilet lights on occupancy sensor. | $32,000 |
| Sep 13, 2013 | Completed final sign-off Oct 2013 | 151 Galewood Cr | bath remodel, no walls moved, new shower, tub, vanity, no change to lighting. kitchen, replace cabinets, counters, no change to lighting.Details
bath remodel, no walls moved, new shower, tub, vanity, no change to lighting. kitchen, replace cabinets, counters, no change to lighting. | $17,000 |
| Jul 15, 2013 | Completed final sign-off Jan 2014 | 119 Buena Vista Tr | remodel (2) bathrooms - new fixtures, vanity, tile, lighting with occ. sensors, new kitchen cabinets - keep (e) appliances. new hardwood floors and carpet.Details
remodel (2) bathrooms - new fixtures, vanity, tile, lighting with occ. sensors, new kitchen cabinets - keep (e) appliances. new hardwood floors and carpet. | $55,000 |
| May 31, 2013 | Completed final sign-off Dec 2013 | 521 Lake St | add 1/2 bath by removing secondary stair to 1st level. remodel kitchen. new cabinets, counters, appliances. new high efficacy lighting in kitchenDetails
add 1/2 bath by removing secondary stair to 1st level. remodel kitchen. new cabinets, counters, appliances. new high efficacy lighting in kitchen | $22,000 |
| Jan 31, 2013 | Completed final sign-off Jun 2013 | 3066 24th St | restaurant remodel, removal of non load bearing walls. install new refrigeration units, 3 compartment sink hand wash sink and dishwasher in kitchen area. construct bar in dining room area.Details
restaurant remodel, removal of non load bearing walls. install new refrigeration units, 3 compartment sink hand wash sink and dishwasher in kitchen area. construct bar in dining room area. | $75,000 |
| Jul 13, 2012 | Completed final sign-off Dec 2012 | 1434 Guerrero St | remodel kitchen in place - new cabinets, counters, tile. no walls moved. no change to windows. new high efficacy lightingDetails
remodel kitchen in place - new cabinets, counters, tile. no walls moved. no change to windows. new high efficacy lighting | $11,000 |
| Jun 25, 2012 | Completed final sign-off Nov 2012 | 109 Caselli Av | remodel kitchen in place. new tile, appliances, cabinets, counters. no walls moved, high efficacy lighting. remodel bath in place. new tile, fixtures, plmg, new lighting on occupancy sensor.Details
remodel kitchen in place. new tile, appliances, cabinets, counters. no walls moved, high efficacy lighting. remodel bath in place. new tile, fixtures, plmg, new lighting on occupancy sensor. | $30,000 |
| Jan 18, 2012 | Completed final sign-off Oct 2012 | 9 Ord St | remodel bath in place _ new shower, vanity, lighting , sensor, remvoe 1 reframe bearing wall bet dining & kitchen. relocate/remodel kitchen - new cabinety, appliances,new high efficacy lighting.Details
remodel bath in place _ new shower, vanity, lighting , sensor, remvoe 1 reframe bearing wall bet dining & kitchen. relocate/remodel kitchen - new cabinety, appliances,new high efficacy lighting. | $65,000 |
| Dec 13, 2011 | Completed final sign-off Feb 2012 | 1020 Church St | remodel kitchen in place. new cabinets, counters, appliances, lighting, high eff. remodel bath in place. new tub,tile, vanity. lighting on occupancy sensor. to comply with cec 150kDetails
remodel kitchen in place. new cabinets, counters, appliances, lighting, high eff. remodel bath in place. new tub,tile, vanity. lighting on occupancy sensor. to comply with cec 150k | $19,000 |
| Oct 19, 2011 | Completed final sign-off Jan 2014 | 21 Beaver St | 3rd floor horizontal addition. ground floor build-out & interior remodel: partial excauvation to un-occupied ground floor, new slab, remodel as habitable space. new addition on 3rd floor. remodel entire dwelling including 2 new bathrooms, remodel kitchen, remodel all (e) living rooms &Details
3rd floor horizontal addition. ground floor build-out & interior remodel: partial excauvation to un-occupied ground floor, new slab, remodel as habitable space. new addition on 3rd floor. remodel entire dwelling including 2 new bathrooms, remodel kitchen, remodel all (e) living rooms & | $280,829 |
| Jun 13, 2011 | Completed final sign-off Feb 2013 | 823 Vermont St | remodel bath in place - new shower, toilet, vanity, occupancy sensor in bath for new lighting. remodel kitchen in place - new appliances, cabinets, coutners, new lighting at least 50% high efficacy.Details
remodel bath in place - new shower, toilet, vanity, occupancy sensor in bath for new lighting. remodel kitchen in place - new appliances, cabinets, coutners, new lighting at least 50% high efficacy. | $60,000 |
| May 12, 2011 | Completed final sign-off Dec 2011 | 2168 Bush St | kitchen remodel in place - new cabinets, counters, appliances; bath remodel in place - new tub, tile, fixtures. new high efficacy lighting in kitchen occupancy sensor in bath. selective window repalcement (rear). remove nonbearing partition.Details
kitchen remodel in place - new cabinets, counters, appliances; bath remodel in place - new tub, tile, fixtures. new high efficacy lighting in kitchen occupancy sensor in bath. selective window repalcement (rear). remove nonbearing partition. | $90,000 |
| Apr 27, 2010 | Completed final sign-off Jun 2010 | 1736 Noe St | to comply with nov 2010042484. kitchen remodel in place no walls moved, new cabinets, new floor. new lighting high efficacyDetails
to comply with nov 2010042484. kitchen remodel in place no walls moved, new cabinets, new floor. new lighting high efficacy | $15,000 |
| Dec 7, 2009 | Completed final sign-off Mar 2010 | 42 Littlefield Tr | remodel kitchen in place, no walls moved. new cabinets, counters, appliancesDetails
remodel kitchen in place, no walls moved. new cabinets, counters, appliances | $22,000 |
| Aug 6, 2009 | Completed final sign-off May 2010 | 171 Caselli Av | kitchen remodel. replace appliances, cabinets, countertops, flooring.Details
kitchen remodel. replace appliances, cabinets, countertops, flooring. | $30,000 |
| Apr 23, 2009 | Completed final sign-off Aug 2009 | 1321 06th Av | relocate kitchen to adjacent room on 2nd fl inl. new cabinets, counters, floring and windows. new skyligfht 2'x 4'. remove two windows at rear and infill; new 8' opening (between living and dining) by reframing structural wallDetails
relocate kitchen to adjacent room on 2nd fl inl. new cabinets, counters, floring and windows. new skyligfht 2'x 4'. remove two windows at rear and infill; new 8' opening (between living and dining) by reframing structural wall | $55,000 |
| Feb 24, 2009 | Completed final sign-off Oct 2009 | 1407 Kansas St | kitchen remodel in place-new cabinets, new countertops, appliances. no walls moved.Details
kitchen remodel in place-new cabinets, new countertops, appliances. no walls moved. | $25,000 |
| Feb 10, 2009 | Completed final sign-off Jul 2009 | 634 Castro St | partial abatement work for 3r-5340 for kitchen remodeling for unit 638 & 640. total 2 kitchen remodeling.Details
partial abatement work for 3r-5340 for kitchen remodeling for unit 638 & 640. total 2 kitchen remodeling. | $16,700 |
| Aug 11, 2008 | Completed final sign-off Nov 2008 | 725 Hampshire St | remodel kitchen in place - replace cabients, counters, appliances, tile. remodel bath in place - new shower pan, new toilet, tile. replace windows at rear in kind.Details
remodel kitchen in place - replace cabients, counters, appliances, tile. remodel bath in place - new shower pan, new toilet, tile. replace windows at rear in kind. | $40,000 |
| Apr 18, 2008 | Completed final sign-off Dec 2008 | 110 Hoffman Av | 3rd fl: new bath and bath remodel, reconfigure master bedroom and closets, new laundry, new beam at hallway. 2nd floor: new beam between kitchen and dining, kitchen remodel. 1st floor: new beams and posts, new footingDetails
3rd fl: new bath and bath remodel, reconfigure master bedroom and closets, new laundry, new beam at hallway. 2nd floor: new beam between kitchen and dining, kitchen remodel. 1st floor: new beams and posts, new footing | $70,000 |
| Jan 8, 2008 | Completed final sign-off Jun 2008 | 1475 Noe St | remodel kitchen in place, replace cabinets, counter tops, appliances & flooringDetails
remodel kitchen in place, replace cabinets, counter tops, appliances & flooring | $25,000 |
| Sep 6, 2007 | Never finaled issued Sep 2007, no final | 77 Park Hill Av | remodel kitchen in (e) space. change out doors (not visible from street). add shear walls.Details
remodel kitchen in (e) space. change out doors (not visible from street). add shear walls. | $80,000 |
| Sep 5, 2007 | Completed final sign-off Jun 2008 | 290 San Jose Av | remodel kitchen in place; replace cabinets, flooring, and appliances. lighting to remain. remodel bath in place; replace shower, fixtures, tile. lighting to remain.Details
remodel kitchen in place; replace cabinets, flooring, and appliances. lighting to remain. remodel bath in place; replace shower, fixtures, tile. lighting to remain. | $55,000 |
| Jul 31, 2007 | Completed final sign-off Dec 2007 | 751 Corbett Av | remodel 1 kitchen and bath in place replace fixture , appliances, cabinets. replace bath window in kind. lighting to remain work on unit #751Details
remodel 1 kitchen and bath in place replace fixture , appliances, cabinets. replace bath window in kind. lighting to remain work on unit #751 | $20,000 |
| Apr 4, 2007 | Completed final sign-off Sep 2007 | 64 Nordhoff St | remodel bath & kitchen in place per drawing.Details
remodel bath & kitchen in place per drawing. | $15,000 |
| Nov 17, 2005 | Completed final sign-off Jun 2006 | 40 Douglass St | remodel kitchen- bath relocate from family to entry/pantry. modify wall between kitchen and family.Details
remodel kitchen- bath relocate from family to entry/pantry. modify wall between kitchen and family. | $40,000 |
| Mar 30, 2004 | Expired or cancelled expired Feb 2006 | 145 Gardenside Dr | replace kitchen cabinets, countertops. move electrical service paner, replace lights. move applianceDetails
replace kitchen cabinets, countertops. move electrical service paner, replace lights. move appliance | $40,000 |