Walt Reeve
- Listed as
- authorized agent-others, contractor
- Firm
- Reeve-Knight Construction Inc.
- Based in
- Roseville,
- On San Francisco permits
- May 2000 to Jun 2024
51 permits since 2000 (contractor on 51 permits, authorized agent-others on 2 permits): 37 completed, 7 never finaled, 7 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 6, 2024 | Completed final sign-off Aug 2024 | 491 Bay Shore Bl | Reeve-Knight Construction Inc. | frame in and install new doors for public restrooms including combination locksDetails
frame in and install new doors for public restrooms including combination locks | $19,500 |
| Mar 22, 2024 | Expired or cancelled withdrawn Jul 2024 | 491 Bay Shore Bl | Reeve-Knight Construction Inc. | add fence and gates at all emergency exit alcovesDetails
add fence and gates at all emergency exit alcoves | $113,000 |
| Mar 14, 2023 | Completed final sign-off Apr 2023 | 491 Bay Shore Bl | Reeve-Knight Construction Inc. | revision to pa 2022-0803-9808 changes to ada parkingDetails
revision to pa 2022-0803-9808 changes to ada parking | |
| Jan 31, 2023 | Completed final sign-off Jun 2023 | 1633 Fillmore St | Reeve-Knight Construction Inc. | revision to permit #202001232606 specifically for floor plan revision.Details
revision to permit #202001232606 specifically for floor plan revision. | |
| Nov 17, 2022 | Completed final sign-off Mar 2024 | 565 Buckingham Wy | Reeve-Knight Construction Inc. | t.i. @ sf fire credit union (remodel). the improvements include architectural, mechanical, plumbing, & electrical improvments including plans and specs. technical infeasibilty approval requested for the secondary means of egress accessibility for abe program, with the report on sheet g0.05.Details
t.i. @ sf fire credit union (remodel). the improvements include architectural, mechanical, plumbing, & electrical improvments including plans and specs. technical infeasibilty approval requested for the secondary means of egress accessibility for abe program, with the report on sheet g0.05. | $950,000 |
| Sep 8, 2022 | Completed final sign-off Apr 2023 | 3908 24th St | Reeve-Knight Construction Inc. | ti: ground flr for credit union, vacant space (1490 sf) improvement are archtectural mep.Details
ti: ground flr for credit union, vacant space (1490 sf) improvement are archtectural mep. | $250,000 |
| Aug 3, 2022 | Completed final sign-off Apr 2023 | 491 Bay Shore Bl | Reeve-Knight Construction Inc. | new interior ada accessible staff restroom @ back stock area. this work includes electric, mechnical and plumbing modifications for the new restroom addition.Details
new interior ada accessible staff restroom @ back stock area. this work includes electric, mechnical and plumbing modifications for the new restroom addition. | $82,500 |
| Jan 23, 2020 | Completed final sign-off Jun 2023 | 1633 Fillmore St | Feather River Builders, Reeve-Knight Construction Inc. | t.i. for a new 10155 fitness studio to include interior walls, ceilings,restrooms, showers, and assoc. mech, elect, plumbing and to establish a formula retail use d.b.a. orange theory fitnessDetails
t.i. for a new 10155 fitness studio to include interior walls, ceilings,restrooms, showers, and assoc. mech, elect, plumbing and to establish a formula retail use d.b.a. orange theory fitness | $225,000 |
| Dec 3, 2019 | Completed final sign-off May 2021 | 491 Bay Shore Bl | Reeve-Knight Construction Inc. | installation of (n) reinforced concrete column to support cracked girder pad.Details
installation of (n) reinforced concrete column to support cracked girder pad. | $30,000 |
| Oct 1, 2019 | Completed final sign-off Jan 2020 | 2300 16th St | Reeve-Knight Construction Inc. | revision to 201904097457. adding open officeDetails
revision to 201904097457. adding open office | $15,000 |
| Jun 6, 2019 | Completed final sign-off Nov 2019 | 2300 16th St | Reeve-Knight Construction Inc. | ste 220 - selective interior demolition of non structural elements; non-structural partitions, doors, finishes, fixutres, furnishings. ti under separate permit. no ceiling demo.Details
ste 220 - selective interior demolition of non structural elements; non-structural partitions, doors, finishes, fixutres, furnishings. ti under separate permit. no ceiling demo. | $50,000 |
| Apr 9, 2019 | Completed final sign-off Nov 2019 | 2300 16th St | Reeve-Knight Construction Inc. | suite 220: t.i. improvement in (e) retail space, new walls, doors, lighting, power, plumbing, mechanical/duct work. n/a maher ref demo pa 2019-0606-2778.Details
suite 220: t.i. improvement in (e) retail space, new walls, doors, lighting, power, plumbing, mechanical/duct work. n/a maher ref demo pa 2019-0606-2778. | $1,400,000 |
| Aug 24, 2018 | Completed final sign-off Mar 2019 | 2162 Union St | Reeve-Knight Construction Inc. | electrical plan sheet revision to app#201801199072. new single line 1 power distributionDetails
electrical plan sheet revision to app#201801199072. new single line 1 power distribution | |
| May 31, 2018 | Never finaled issued Sep 2018, no final | 199 Pine St | Reeve-Knight Construction Inc. | remove (e) sign box and installation of flush perforated metal panel to support future tenant signage. relocation of blade pangel signage to match adjacent neighbor heights relocation of junction box within new perforated panel. sign permit deferred. **maher n/a**Details
remove (e) sign box and installation of flush perforated metal panel to support future tenant signage. relocation of blade pangel signage to match adjacent neighbor heights relocation of junction box within new perforated panel. sign permit deferred. **maher n/a** | $28,000 |
| Mar 14, 2018 | Completed final sign-off Dec 2018 | 768 Market St | Reeve-Knight Construction Inc. | t.i. consists of the removal of (2) two existing v.r display panels and adding a small "experience" table with power/data receptacles as well as (2) two bar tables with power and data receptacles at entry. all table to be located within the (e) sales area. maher n/aDetails
t.i. consists of the removal of (2) two existing v.r display panels and adding a small "experience" table with power/data receptacles as well as (2) two bar tables with power and data receptacles at entry. all table to be located within the (e) sales area. maher n/a | $2,000 |
| Jan 19, 2018 | Completed final sign-off Mar 2019 | 2162 Union St | Reeve-Knight Construction Inc. | new non bearing partition walls, new framing,plumb, air distribution, elect. t.i. establish formula retail use verizon wirelessDetails
new non bearing partition walls, new framing,plumb, air distribution, elect. t.i. establish formula retail use verizon wireless | $124,000 |
| Aug 4, 2017 | Never finaled issued Aug 2017, no final | 768 Market St | Reeve-Knight Construction Inc. | install electric single faced wall sign "a golden state of mind"Details
install electric single faced wall sign "a golden state of mind" | $1,500 |
| Jun 13, 2017 | Completed final sign-off Sep 2017 | 768 Market St | Reeve-Knight Construction Inc. | title 24 revision to pa 2017-0202-8452Details
title 24 revision to pa 2017-0202-8452 | $3,000 |
| Feb 13, 2017 | Completed final sign-off Mar 2017 | 764 Market St | Reeve-Knight Construction Inc. | ground floor: temporary retail store while (e) location at 760 market is remodeled. adding store fixtures/accessory shelving/door/paint/clean. no exterior work life safety deferred if required.Details
ground floor: temporary retail store while (e) location at 760 market is remodeled. adding store fixtures/accessory shelving/door/paint/clean. no exterior work life safety deferred if required. | $20,000 |
| Feb 2, 2017 | Completed final sign-off Sep 2017 | 768 Market St | Reeve-Knight Construction Inc. | 1/f- interior tenant improvement to include selective demolition, new partition walls, suspended ceilings, millwork, finishes and corresponding mechanical/plumbing/electricalDetails
1/f- interior tenant improvement to include selective demolition, new partition walls, suspended ceilings, millwork, finishes and corresponding mechanical/plumbing/electrical | $650,000 |
| Oct 23, 2015 | Completed final sign-off Feb 2016 | 2598 Taylor St | Reeve-Knight Construction Inc. | revision to pa#201509298348 structural revision. n/a ordinance #155-13Details
revision to pa#201509298348 structural revision. n/a ordinance #155-13 | $15,000 |
| Sep 29, 2015 | Completed final sign-off Feb 2016 | 2598 Taylor St | Reeve-Knight Construction Inc. | replace 250 sq ft +/- of exterior concrete steps with a concrete ramp, maher not requiredDetails
replace 250 sq ft +/- of exterior concrete steps with a concrete ramp, maher not required | $50,000 |
| Jul 7, 2015 | Completed final sign-off Dec 2015 | 2552 Taylor St | Reeve-Knight Construction Inc. | revisions to pa#s 2015-0604-8106, 2015-0106-5041, 2014-0418-3636 da checklist update, technical infeasability and equivalent facilitation formsDetails
revisions to pa#s 2015-0604-8106, 2015-0106-5041, 2014-0418-3636 da checklist update, technical infeasability and equivalent facilitation forms | |
| Jul 7, 2015 | Completed final sign-off Dec 2015 | 2598 Taylor St | Reeve-Knight Construction Inc. | revision to pa3s 2015-0604-8113, 2015-0106-5010,and 2014-6418-3640 da checklist update and technical infeasability/equivalent facilitation formsDetails
revision to pa3s 2015-0604-8113, 2015-0106-5010,and 2014-6418-3640 da checklist update and technical infeasability/equivalent facilitation forms | |
| Jun 4, 2015 | Completed final sign-off Dec 2015 | 2598 Taylor St | Reeve-Knight Construction Inc. | revision to app#201501065010 and 201404183640. revision per field verifications. structural revisions and new skylight and addition of floor drain. n/a for the maher.Details
revision to app#201501065010 and 201404183640. revision per field verifications. structural revisions and new skylight and addition of floor drain. n/a for the maher. | |
| Jun 4, 2015 | Completed final sign-off Dec 2015 | 2552 Taylor St | Reeve-Knight Construction Inc. | revision to app#201501065041 and 201404183636. revision per field verifications. structural only. n/a for maher.Details
revision to app#201501065041 and 201404183636. revision per field verifications. structural only. n/a for maher. | |
| Mar 2, 2015 | Completed final sign-off Dec 2015 | 3251 20th Av | Reeve-Knight Construction Inc. | interior t.i. includes plumbing, electrical, mechanical & framing. new sales floor at back of house.Details
interior t.i. includes plumbing, electrical, mechanical & framing. new sales floor at back of house. | $297,843 |
| Jan 13, 2015 | Expired or cancelled withdrawn Dec 2015 | 2598 Taylor St | Reeve-Knight Construction Inc. | submittal for fire alarm system. ** maher: compliance with ordinance no# 155-13 not required **Details
submittal for fire alarm system. ** maher: compliance with ordinance no# 155-13 not required ** | $50,000 |
| Jan 13, 2015 | Completed final sign-off Dec 2015 | 2598 Taylor St | Reeve-Knight Construction Inc. | submittal for storage rack layout and anchorage details. ** maher: compliance with ordinance no# 155-13 not required **Details
submittal for storage rack layout and anchorage details. ** maher: compliance with ordinance no# 155-13 not required ** | $50,000 |
| Jan 13, 2015 | Completed final sign-off Dec 2015 | 2552 Taylor St | Reeve-Knight Construction Inc. | submittal for storage rack layout & anchorage details. ** maher: compliance with ordinance no# 155-13 not required **Details
submittal for storage rack layout & anchorage details. ** maher: compliance with ordinance no# 155-13 not required ** | $50,000 |
| Jan 13, 2015 | Expired or cancelled withdrawn Dec 2015 | 2552 Taylor St | Reeve-Knight Construction Inc. | submittal for fire alarm system. ** maher: compliance with ordinance no# 155-13 not required **Details
submittal for fire alarm system. ** maher: compliance with ordinance no# 155-13 not required ** | $50,000 |
| Jan 6, 2015 | Completed final sign-off Dec 2015 | 2598 Taylor St | Reeve-Knight Construction Inc. | revision appl. 201404183640. interior t.i. improvement revisions. new staircase and elevator and removal of existing. 663 s.f. of infill to second floor. new lighting fixture layout and removal of new skylights. maher n/a.Details
revision appl. 201404183640. interior t.i. improvement revisions. new staircase and elevator and removal of existing. 663 s.f. of infill to second floor. new lighting fixture layout and removal of new skylights. maher n/a. | $325,000 |
| Jan 6, 2015 | Completed final sign-off Dec 2015 | 2552 Taylor St | Reeve-Knight Construction Inc. | revision to appl. 201404183636. interior t.i. revision. additional doors and plumbing to be removed. new light fixture layout and removal of proposed new skylights form approved plan. maher n/a.Details
revision to appl. 201404183636. interior t.i. revision. additional doors and plumbing to be removed. new light fixture layout and removal of proposed new skylights form approved plan. maher n/a. | $325,000 |
| Apr 18, 2014 | Completed final sign-off Nov 2015 | 2598 Taylor St | Reeve-Knight Construction Inc. | pre construction demolition under ab - 017, including demolition of interior non bearing walls, doors, open wood stairs and portion of floors for future work. linked with pa #200404183627, 2552 taylor street permit (compliance with maher ord. no.155-13 not required). t.i. of pa#201404183640Details
pre construction demolition under ab - 017, including demolition of interior non bearing walls, doors, open wood stairs and portion of floors for future work. linked with pa #200404183627, 2552 taylor street permit (compliance with maher ord. no.155-13 not required). t.i. of pa#201404183640 | $150,000 |
| Apr 18, 2014 | Completed final sign-off Dec 2015 | 2552 Taylor St | Reeve-Knight Construction Inc. | open a new 35,000 sq ft store with 2 (e) bldgs @ 2552 taylor & 2598 taylor. 2552 taylor will be renovated on the 2nd fl/above street level & 2598 will be renovated on both floors. project will include new 328 sq customer walkway to connect both 2nd fl to each other via lot 0030/011a.Details
open a new 35,000 sq ft store with 2 (e) bldgs @ 2552 taylor & 2598 taylor. 2552 taylor will be renovated on the 2nd fl/above street level & 2598 will be renovated on both floors. project will include new 328 sq customer walkway to connect both 2nd fl to each other via lot 0030/011a. | $1,050,000 |
| Apr 18, 2014 | Completed final sign-off Nov 2015 | 2552 Taylor St | Reeve-Knight Construction Inc. | pre construction demolition unde ab-017 including demolition of interior non bearing walls, doors, open wood stairs and portions of floors for future work. linked with pa #201404183630, 2598 taylor street permit(compliance with maher ord no.155-13 not required). t.i. of pa#201404183636Details
pre construction demolition unde ab-017 including demolition of interior non bearing walls, doors, open wood stairs and portions of floors for future work. linked with pa #201404183630, 2598 taylor street permit(compliance with maher ord no.155-13 not required). t.i. of pa#201404183636 | $150,000 |
| Apr 18, 2014 | Completed final sign-off Dec 2015 | 2598 Taylor St | Reeve-Knight Construction Inc. | open a new 35,000 sq ft store with 2 (e) bldgs @ 2552 taylor & 2598 taylor. 2552 taylor will be renovated on 2nd fl/above street level & 2598 will be renovated on both floors. project will include new 328 sq customer walkway to connect both 2nd fl to each other via lot 0030/011a. new bldg entry &Details
open a new 35,000 sq ft store with 2 (e) bldgs @ 2552 taylor & 2598 taylor. 2552 taylor will be renovated on 2nd fl/above street level & 2598 will be renovated on both floors. project will include new 328 sq customer walkway to connect both 2nd fl to each other via lot 0030/011a. new bldg entry & | $1,050,000 |
| Feb 26, 2013 | Completed final sign-off May 2013 | 3251 20th Av | Reeve-Knight Construction Inc. | existing storage unit #9 at stonestown galleria. wanting to modify to a secured storage area with new door way, electrical and new secured wall.Details
existing storage unit #9 at stonestown galleria. wanting to modify to a secured storage area with new door way, electrical and new secured wall. | $30,000 |
| Jun 2, 2010 | Completed final sign-off Aug 2010 | 350 Rhode Island St | Reeve-Knight Construction Inc. | to obtain final inspection for work approved under pa 200808260051. all work is complete.Details
to obtain final inspection for work approved under pa 200808260051. all work is complete. | |
| Aug 19, 2009 | Completed final sign-off Nov 2009 | 1040 Grant Av | Reeve-Knight Construction Inc. | remodel to existing bank basement, 1st fl and 2nd fl. this includes demo of finishes, non struc wall partitions and case work. new finishes, millwork and non struc walls. minor elec. work only. two atms replacement of surroundsDetails
remodel to existing bank basement, 1st fl and 2nd fl. this includes demo of finishes, non struc wall partitions and case work. new finishes, millwork and non struc walls. minor elec. work only. two atms replacement of surrounds | $96,420 |
| Jun 9, 2009 | Never finaled issued Jun 2009, no final | 5655 Geary Bl | Reeve-Knight Construction Inc. | revision to appl #200905158484 - framing revision at bm office.Details
revision to appl #200905158484 - framing revision at bm office. | $500 |
| May 15, 2009 | Never finaled issued Jun 2009, no final | 5655 Geary Bl | Reeve-Knight Construction Inc. | t.i. for conversion rom washington mutual to chase, demolition of existing finishes, non-structural partitions & millwork, also includes install of new finishes, floor & ceiling, non-structural partitions, & minor electrical & mechanical, replacement of exterior atm surround.Details
t.i. for conversion rom washington mutual to chase, demolition of existing finishes, non-structural partitions & millwork, also includes install of new finishes, floor & ceiling, non-structural partitions, & minor electrical & mechanical, replacement of exterior atm surround. | $96,416 |
| Aug 26, 2008 | Never finaled issued Aug 2008, no final | 350 Rhode Island St | Reeve-Knight Construction Inc. | 1st floor -installation of new brewer & new coutnertop for brewer, removal of old coutner at new brower location - minor plumbing & electrical for brewer.Details
1st floor -installation of new brewer & new coutnertop for brewer, removal of old coutner at new brower location - minor plumbing & electrical for brewer. | $6,900 |
| Aug 26, 2008 | Never finaled issued Aug 2008, no final | 259 California St | Reeve-Knight Construction Inc. | 1st floor -installation of new brewer & new countertop for brewer, removal of old countner at new brewer location - minor plumbing & electrical for brewer.Details
1st floor -installation of new brewer & new countertop for brewer, removal of old countner at new brewer location - minor plumbing & electrical for brewer. | $6,900 |
| Aug 26, 2008 | Never finaled issued Aug 2008, no final | 3595 California St | Reeve-Knight Construction Inc. | installation of (n) brewer & new countertop for brewer, removal of old counter at new brewer location - minor plumbing & electrical for brewer.Details
installation of (n) brewer & new countertop for brewer, removal of old counter at new brewer location - minor plumbing & electrical for brewer. | $6,900 |
| Mar 17, 2003 | Completed final sign-off Nov 2003 | 120 Howard St | Reeve-Knight Construction Inc. | oti-1 (4th fl) = el, me, ls, spDetails
oti-1 (4th fl) = el, me, ls, sp | $60,000 |
| Feb 26, 2003 | Expired or cancelled cancelled Jun 2005 | 33 03rd St | Reeve-Knight Construction Inc. | accessible parking layout. adn access commission approval letter.Details
accessible parking layout. adn access commission approval letter. | |
| Nov 8, 2002 | Completed final sign-off Mar 2003 | 33 03rd St | Reeve-Knight Construction Inc. | remodel existing retail space on the 1st fl. partitions,lighting, elect. 2 accessible restrooms & emDetails
remodel existing retail space on the 1st fl. partitions,lighting, elect. 2 accessible restrooms & em | $100,000 |
| Nov 6, 2001 | Expired or cancelled expired Sep 2003 | 123 Mission St | Reeve-Knight Construction Inc. | g/f-renew appl#9913953/200106151672 for remain work: waterproofing @ entrance, install door, drywallDetails
g/f-renew appl#9913953/200106151672 for remain work: waterproofing @ entrance, install door, drywall | $30,000 |
| Dec 6, 2000 | Expired or cancelled expired Apr 2001 | 3741 Buchanan St | Reeve-Knight Construction Inc. | pay penalty on work w/o permit based on const cost per appl #200008077180Details
pay penalty on work w/o permit based on const cost per appl #200008077180 | |
| May 2, 2000 | Expired or cancelled expired Nov 2000 | 1255 Battery St | Reeve-Knight Construction Inc. | new pipes are to be layed down beneath the existing slab-on-grade. details provded rev-9911602Details
new pipes are to be layed down beneath the existing slab-on-grade. details provded rev-9911602 | $10,000 |