Stephen Antonaros
- Listed as
- architect, authorized agent-others, engineer
- Firm
- Stephen Antonaros Arch.
- Based in
- San Francisco
- On San Francisco permits
- Nov 2000 to Aug 2026
166 permits since 2000 (architect on 154 permits, authorized agent-others on 7 permits, engineer on 6 permits): 103 completed, 7 in progress, 17 never finaled, 39 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 166.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 3, 2026 | In progress issued Aug 2026 | 462 Haight St | add new full bath, remodel e) full bath, replace e) tub/shower, install new laundry hook-uo at e) porch laundry @ 2nd/f (unit 462) replace kitchen cabinet & appliance, close up 3 doors, general remodeling, new sheetrock as required (part of kithcen remodel under 202607245529) no exterior workDetails
add new full bath, remodel e) full bath, replace e) tub/shower, install new laundry hook-uo at e) porch laundry @ 2nd/f (unit 462) replace kitchen cabinet & appliance, close up 3 doors, general remodeling, new sheetrock as required (part of kithcen remodel under 202607245529) no exterior work | $7,500 | |
| Mar 31, 2025 | In progress issued Jan 2026 | 99 Onondaga Av | Jian's Builder Corp | convert (e) commercial space into new dwelling unit with 1 kit,2 bath, 3 bed; convert (e) 2-car garage into 1 adu (state) with 1 kit, 1 bath,2 bed. new roof deck and exterior stair to roof deckDetails
convert (e) commercial space into new dwelling unit with 1 kit,2 bath, 3 bed; convert (e) 2-car garage into 1 adu (state) with 1 kit, 1 bath,2 bed. new roof deck and exterior stair to roof deck | $90,000 |
| May 31, 2024 | In progress filed May 2024, not yet issued | 969 Market St | no construction. to legalize existing awning (the village 969 market) to comply with awning amnesty program.Details
no construction. to legalize existing awning (the village 969 market) to comply with awning amnesty program. | ||
| May 31, 2024 | In progress filed May 2024, not yet issued | 3180 22nd St | no construction: to legalize the (e) sign to comply with the awning amnesty program.Details
no construction: to legalize the (e) sign to comply with the awning amnesty program. | ||
| May 31, 2024 | In progress filed May 2024, not yet issued | 3184 22nd St | no construction: to legalize the (e) sign to comply with the awning amnesty program.Details
no construction: to legalize the (e) sign to comply with the awning amnesty program. | ||
| May 28, 2024 | Completed final sign-off Aug 2026 | 1742 Haight St | prop h: to comply with awning amesty program. to legalize double-faced illuminated projecting sign for "sock shop" intalled without permit. no construction.Details
prop h: to comply with awning amesty program. to legalize double-faced illuminated projecting sign for "sock shop" intalled without permit. no construction. | $9,000 | |
| May 6, 2024 | Completed final sign-off Jun 2024 | 3160 22nd St | legalize existing awning to comply with awning amnesty program.Details
legalize existing awning to comply with awning amnesty program. | ||
| May 3, 2024 | Completed final sign-off Feb 2025 | 425 Divisadero St | prop h: to comply with awning amesty program, to legalize existing sign. no construction. "oak street laundry"Details
prop h: to comply with awning amesty program, to legalize existing sign. no construction. "oak street laundry" | ||
| Feb 28, 2024 | Completed final sign-off Feb 2024 | 123 Mullen Av | revision to existing pa# 202008582879s1. move entry door from side to front, remove one window from front due to structural; add new larger window on side.Details
revision to existing pa# 202008582879s1. move entry door from side to front, remove one window from front due to structural; add new larger window on side. | ||
| Jan 10, 2024 | In progress issued Feb 2024 | 1801 Mission St | ti at vacant ground floor space. new ada restroom, lights & elec plugs. no first use proposed.Details
ti at vacant ground floor space. new ada restroom, lights & elec plugs. no first use proposed. | $15,000 | |
| Oct 24, 2023 | Completed final sign-off Apr 2025 | 1042 Pacheco St | new 1st & 2nd floor decks at rear of existing single family dwelling; interior alterations at 1st floor, adding bathroom & bedroom - no new dwelling unit.Details
new 1st & 2nd floor decks at rear of existing single family dwelling; interior alterations at 1st floor, adding bathroom & bedroom - no new dwelling unit. | $60,000 | |
| Oct 24, 2023 | In progress issued Oct 2023 | 123 Mullen Av | request nfpa change 13 to nfpa 13d (6) sprinkler 400sqft under adu. revision to pa 202008282879 and ref fire pa 20303073148.Details
request nfpa change 13 to nfpa 13d (6) sprinkler 400sqft under adu. revision to pa 202008282879 and ref fire pa 20303073148. | $2,000 | |
| May 16, 2023 | Completed final sign-off Nov 2025 | 79 Melrose Av | O Donoghue Construction Inc. | new 2-story addition at rear of existing single family dwelling; interior alteration at 1st floor adding 1/2 bath & kitchenette at 1st floor -no new dwelling unitDetails
new 2-story addition at rear of existing single family dwelling; interior alteration at 1st floor adding 1/2 bath & kitchenette at 1st floor -no new dwelling unit | $117,100 |
| May 12, 2023 | Completed final sign-off Aug 2024 | 15 Joy St | Ace Drilling & Excavation | ref pa# 202012301906. replace glass railing at roof deck with metal railings (42" high + 4" o.c. balusters)Details
ref pa# 202012301906. replace glass railing at roof deck with metal railings (42" high + 4" o.c. balusters) | |
| May 12, 2023 | Never finaled issued May 2023, no final | 9 Joy St | Ace Drilling & Excavation | ref pa# 202012301913. replace glass railing at roof deck with metal railings (42" high + 4" o.c. balusters)Details
ref pa# 202012301913. replace glass railing at roof deck with metal railings (42" high + 4" o.c. balusters) | |
| May 12, 2023 | Completed final sign-off Aug 2024 | 21 Joy St | Ace Drilling & Excavation | ref pa# 202101062180. replace glass railing at roof deck with metal railings (42" high + 4" o.c. balusters)Details
ref pa# 202101062180. replace glass railing at roof deck with metal railings (42" high + 4" o.c. balusters) | |
| Jun 30, 2022 | Completed final sign-off Jul 2022 | 3168 22nd St | John P Brennan Co Inc. | install power door operator to comply with accessible entrance program. abe 201901254670Details
install power door operator to comply with accessible entrance program. abe 201901254670 | $2,500 |
| Jun 8, 2022 | Completed final sign-off Jan 2025 | 101 Liberty St | Javier Magana Construction Services | remodel all (e) bathrooms. new windows & doors. repair (e) siding in-kind. relocate (e) wood shear wall at penthouse level. widen (e) roof deck at penthouse level.Details
remodel all (e) bathrooms. new windows & doors. repair (e) siding in-kind. relocate (e) wood shear wall at penthouse level. widen (e) roof deck at penthouse level. | $55,000 |
| May 25, 2022 | Completed final sign-off Oct 2024 | 4340 25th St | Seapoint Construction | interior remodel at ground floor - addition of new kitchen, new bathroom and storage area at ground floor. **building envelope will not be englarged. no new unit added.Details
interior remodel at ground floor - addition of new kitchen, new bathroom and storage area at ground floor. **building envelope will not be englarged. no new unit added. | $50,000 |
| Nov 19, 2021 | Expired or cancelled cancelled Mar 2025 | 239 Ordway St | the project proposes a new 2 bedroom 2 bath adu (under the state program) to be created from the converted previously approved but not yet constructed lower floor of a new construction 3-story house. the resulting single family dwelling will be 2-stories and 3 bedrooms, 3 1/2 baths.Details
the project proposes a new 2 bedroom 2 bath adu (under the state program) to be created from the converted previously approved but not yet constructed lower floor of a new construction 3-story house. the resulting single family dwelling will be 2-stories and 3 bedrooms, 3 1/2 baths. | $10,000 | |
| Nov 15, 2021 | Expired or cancelled cancelled Mar 2025 | 237 Ordway St | the project proposes a new 2 bedroom 2 bath adu (under the state program) to be created from the converted previously approved but not yet constructed lower floor of a new construction 3-story house. the resulting single family dwelling will be 2-stories and 3 bedrooms, 3 1/2 baths.Details
the project proposes a new 2 bedroom 2 bath adu (under the state program) to be created from the converted previously approved but not yet constructed lower floor of a new construction 3-story house. the resulting single family dwelling will be 2-stories and 3 bedrooms, 3 1/2 baths. | $10,000 | |
| Oct 18, 2021 | Expired or cancelled withdrawn Mar 2023 | 1863 Mission St | as built non- structural interior partition. changes to dwelling unit layouts. changing all studios to 1 bedrooms. ref app#200603277584.Details
as built non- structural interior partition. changes to dwelling unit layouts. changing all studios to 1 bedrooms. ref app#200603277584. | ||
| Sep 10, 2021 | Completed final sign-off Sep 2023 | 2591 Mission St | John P Brennan Co Inc. | ceiling repair & restroom upgrade at existing ground floor retail space.Details
ceiling repair & restroom upgrade at existing ground floor retail space. | $16,000 |
| Sep 10, 2021 | Never finaled issued Jul 2022, no final | 237 Ordway St | Cullinane Plastering | revision to rear retaining walls @ rear yard of new construction, extension of 18' toward rear property line. ref bpa#201605258270Details
revision to rear retaining walls @ rear yard of new construction, extension of 18' toward rear property line. ref bpa#201605258270 | $8,000 |
| Sep 10, 2021 | Expired or cancelled expired May 2025 | 239 Ordway St | Cullinane Plastering, Achill Beg Construction Inc | revision to rear retaining walls @ rear yard of new construction, extension of 18' toward rear property line. ref bpa#201605258264Details
revision to rear retaining walls @ rear yard of new construction, extension of 18' toward rear property line. ref bpa#201605258264 | $8,000 |
| Feb 12, 2021 | Completed final sign-off Jan 2024 | 5 Joy St | Cullinane Plastering | revision to pa 201702270142. relocate kitchen and half bath to rear at 2nd floor. relocate washer/dryer to 3rd floor from garage level.Details
revision to pa 201702270142. relocate kitchen and half bath to rear at 2nd floor. relocate washer/dryer to 3rd floor from garage level. | |
| Jan 6, 2021 | Completed final sign-off Sep 2024 | 21 Joy St | Cullinane Plastering | as-builts plans for newly constructed single family dwelling and new roof deck above 3rd fl. ref pa#201506229594 (duplicate permit submitted)Details
as-builts plans for newly constructed single family dwelling and new roof deck above 3rd fl. ref pa#201506229594 (duplicate permit submitted) | $10,000 |
| Dec 30, 2020 | Completed final sign-off Sep 2024 | 15 Joy St | Cullinane Plastering | as-built plans & add new roof deck above 3/f for pa201506229593.Details
as-built plans & add new roof deck above 3/f for pa201506229593. | $10,000 |
| Dec 30, 2020 | Never finaled issued Jun 2021, no final | 9 Joy St | Cullinane Plastering | to comply with nov 202071573. as-built plans & add new roof deck above 3/fDetails
to comply with nov 202071573. as-built plans & add new roof deck above 3/f | $10,000 |
| Nov 19, 2020 | Completed final sign-off Jul 2024 | 21 Joy St | Cullinane Plastering, Ace Drilling & Excavation | convert entire lowest floor of existing new (unbuilt) single family house to add a 1 bedroom aduDetails
convert entire lowest floor of existing new (unbuilt) single family house to add a 1 bedroom adu | $10,000 |
| Nov 19, 2020 | Completed final sign-off Aug 2024 | 15 Joy St | Cullinane Plastering, Ace Drilling & Excavation | convert entire lowest floor of existing new (unbuilt) single family house to add a 1 bedroom aduDetails
convert entire lowest floor of existing new (unbuilt) single family house to add a 1 bedroom adu | $10,000 |
| Nov 19, 2020 | Never finaled issued Apr 2022, no final | 9 Joy St | Cullinane Plastering, Ace Drilling & Excavation | convert entire lowest floor of existing new (unbuilt) single family house to add a 1 bedroom aduDetails
convert entire lowest floor of existing new (unbuilt) single family house to add a 1 bedroom adu | $10,000 |
| Nov 17, 2020 | Completed final sign-off Apr 2022 | 3099 22nd St | Bannon Construction Inc | convert space at gr flr of (n) bldg from workshop/gym to new 1-brm 490 sq ft adu. bath existing as part of approved space, kitchen, w/d and partitions added to convert to dwelling. 3 new condo units within bldg on 2nd, 3rd and 4th floors under base building permit # 2007-1228-1474 & 2020-0930-5600.Details
convert space at gr flr of (n) bldg from workshop/gym to new 1-brm 490 sq ft adu. bath existing as part of approved space, kitchen, w/d and partitions added to convert to dwelling. 3 new condo units within bldg on 2nd, 3rd and 4th floors under base building permit # 2007-1228-1474 & 2020-0930-5600. | $5,000 |
| Oct 30, 2020 | Completed final sign-off May 2021 | 1050 Valencia St | Harris Construction Co | new roof decks & railing to replace (e) on 5/f.Details
new roof decks & railing to replace (e) on 5/f. | $10,000 |
| Oct 30, 2020 | Expired or cancelled withdrawn Dec 2023 | 1801 Mission St | new coffee shop tenant improvement-first use. sprinkler under separate permit.Details
new coffee shop tenant improvement-first use. sprinkler under separate permit. | $80,000 | |
| Sep 30, 2020 | Completed final sign-off Oct 2021 | 1101 South Van Ness Av | Bannon Construction Inc | revision to pa# 2007-1228-1474, for new residential 3-unit condominum. change type of const. from 3 stories type va over 1a podium to 4 stories type va. interior partition layout altered throughout. shared elevator changed to private residential elevators to 3rd and 4th flrs.Details
revision to pa# 2007-1228-1474, for new residential 3-unit condominum. change type of const. from 3 stories type va over 1a podium to 4 stories type va. interior partition layout altered throughout. shared elevator changed to private residential elevators to 3rd and 4th flrs. | |
| Aug 28, 2020 | Completed final sign-off Feb 2024 | 123 Mullen Av | Bay Cities General Contractor Inc | erect a type 5, 1 story,detached single family dwelling(adu),no basement at rearDetails
erect a type 5, 1 story,detached single family dwelling(adu),no basement at rear | $80,000 |
| Aug 20, 2020 | Completed final sign-off Nov 2020 | 2820 Franklin St | John P Brennan Co Inc. | replace wood siding along front of building with hardi-board approx 200 sq ftDetails
replace wood siding along front of building with hardi-board approx 200 sq ft | $2,500 |
| Mar 5, 2020 | Completed final sign-off Jan 2022 | 210 Montcalm St | rebuild (e) garage extension built without permit, garage extention will be reduced to meet the extent of adjacent neighbor building per planning code section 242(e)(2)(c)(i)Details
rebuild (e) garage extension built without permit, garage extention will be reduced to meet the extent of adjacent neighbor building per planning code section 242(e)(2)(c)(i) | $1,000 | |
| Feb 24, 2020 | Completed final sign-off Dec 2020 | 2853 Broderick St | revision to 201802282519, 201103252839 s1, r1, 201307010898 s1, 201108031630 rs. entry stairs/driveway, backyard retaining wall, roof skylight removal, minor window alterations. minor interior non structural wall alterationsDetails
revision to 201802282519, 201103252839 s1, r1, 201307010898 s1, 201108031630 rs. entry stairs/driveway, backyard retaining wall, roof skylight removal, minor window alterations. minor interior non structural wall alterations | ||
| Jan 16, 2020 | Expired or cancelled withdrawn Jan 2021 | 125 Mullen Av | add new adu unit w/ bedroom and bath at garage area to existing single family dwelling per ord# 95-17.Details
add new adu unit w/ bedroom and bath at garage area to existing single family dwelling per ord# 95-17. | $75,000 | |
| Dec 24, 2019 | Completed final sign-off May 2020 | 354 Divisadero St | John P Brennan Co Inc. | mandatory disability access improvement programDetails
mandatory disability access improvement program | $16,000 |
| Dec 10, 2019 | Completed final sign-off Jul 2022 | 3178 22nd St | John P Brennan Co Inc. | power door openers to comply with ada. accessbile business entrance program per ordinance 51-16Details
power door openers to comply with ada. accessbile business entrance program per ordinance 51-16 | $2,500 |
| Dec 10, 2019 | Completed final sign-off Sep 2023 | 2591 Mission St | John P Brennan Co Inc. | power door openers to comply with ada. accessbile business entrance program per ordinance 51-16Details
power door openers to comply with ada. accessbile business entrance program per ordinance 51-16 | $2,500 |
| Dec 10, 2019 | Completed final sign-off Jan 2022 | 210 Montcalm St | adding an adu per ordinance 95-17 and legalize exterior stair at rear.Details
adding an adu per ordinance 95-17 and legalize exterior stair at rear. | $6,630 | |
| Dec 10, 2019 | Completed final sign-off Sep 2023 | 2589 Mission St | John P Brennan Co Inc. | power door openers to comply with ada; accessible business entrance program per ordinance 51-16.Details
power door openers to comply with ada; accessible business entrance program per ordinance 51-16. | $2,500 |
| Oct 29, 2019 | Completed final sign-off Sep 2020 | 1801 Mission St | Cullinane Plastering | revision to pa 2019-0425-8975rerevise unit 204 to 486 ft 1 bed/bath, reassign previous 2nd bedroom to storage room off corridor. change east rooftop penthouse room designation to mechanical room from previous designation as emergency generator; show uninterrupted power supply room at basement levelDetails
revision to pa 2019-0425-8975rerevise unit 204 to 486 ft 1 bed/bath, reassign previous 2nd bedroom to storage room off corridor. change east rooftop penthouse room designation to mechanical room from previous designation as emergency generator; show uninterrupted power supply room at basement level | |
| Sep 12, 2019 | Completed final sign-off Nov 2025 | 1314 Page St | Barton Builders | restore original two residential flats with one dwelling unit on the 2nd floor and the second unit on the third floor to satisfy planning enforcement #2019015765enf and building department nov#201975082Details
restore original two residential flats with one dwelling unit on the 2nd floor and the second unit on the third floor to satisfy planning enforcement #2019015765enf and building department nov#201975082 | |
| Mar 13, 2019 | Never finaled issued Apr 2019, no final | 5201 03rd St | John P Brennan Co Inc. | g/f: fire repair and restoration of (e) restaurant.Details
g/f: fire repair and restoration of (e) restaurant. | $95,000 |
| Sep 24, 2018 | Completed final sign-off Aug 2023 | 225 Sadowa St | Quinlan Company, Leung Construction | comply complaint #201893701 (his) & 201888681 (bid). remove 3rd floor additions of den, storage closet & sunroom; remove bath and kitchen at aground floor to revert to previously approved work under pa#2002.0225.9957. maher /aDetails
comply complaint #201893701 (his) & 201888681 (bid). remove 3rd floor additions of den, storage closet & sunroom; remove bath and kitchen at aground floor to revert to previously approved work under pa#2002.0225.9957. maher /a | $15,000 |
| Apr 24, 2018 | Completed final sign-off Dec 2021 | 878 Rhode Island St | alterations to (e) 2 units to add new dwelling unit & new 1st & 4th floor. unit# 1 to be 1 bedroom, den, 1.5 bath. unit# 2 to be 2 bedroom & 2.5 bath. unit# 3 to be 3 bedroom & 4 baths.Details
alterations to (e) 2 units to add new dwelling unit & new 1st & 4th floor. unit# 1 to be 1 bedroom, den, 1.5 bath. unit# 2 to be 2 bedroom & 2.5 bath. unit# 3 to be 3 bedroom & 4 baths. | $750,000 | |
| Apr 3, 2018 | Completed final sign-off Oct 2018 | 1050 Valencia St | relocate new commercial kitchen within restaurant space approved under app#201703030634Details
relocate new commercial kitchen within restaurant space approved under app#201703030634 | ||
| Mar 12, 2018 | Expired or cancelled withdrawn Apr 2018 | 212 California St | no physical work. change of use permit applicatoin to add adult retail to (e) mcd (medical cannabis dispensory)Details
no physical work. change of use permit applicatoin to add adult retail to (e) mcd (medical cannabis dispensory) | ||
| Nov 22, 2017 | Never finaled issued Aug 2020, no final | 61 Prentiss St | Mc Gee & Mc Gee Construction Corp | erect a single family dwelling, one basement, 3 story. type 5a bldg.Details
erect a single family dwelling, one basement, 3 story. type 5a bldg. | $685,000 |
| Oct 31, 2017 | Completed final sign-off Mar 2018 | 333 Parnassus Av | revision to app#201505206843. replace alaternating stair to patio with spriral stair to access below grade bedroom. clarify wall layout at 1st floor. adding bar sink at 3rd floor and relocate bath.Details
revision to app#201505206843. replace alaternating stair to patio with spriral stair to access below grade bedroom. clarify wall layout at 1st floor. adding bar sink at 3rd floor and relocate bath. | ||
| Aug 28, 2017 | Expired or cancelled expired Jan 2019 | 2853 Broderick St | Lowry Construction Inc | comply with nov 201700981 - replace front street side roof approx 500 sq ft. replace in kind trim around dormersDetails
comply with nov 201700981 - replace front street side roof approx 500 sq ft. replace in kind trim around dormers | $4,000 |
| Mar 10, 2017 | Completed final sign-off Mar 2017 | 1050 Valencia St | install double door to street from 2/f deck, revision to new bldg. pa#201012277437. proposed doors no longer impose on the public way.Details
install double door to street from 2/f deck, revision to new bldg. pa#201012277437. proposed doors no longer impose on the public way. | $2,500 | |
| Mar 3, 2017 | Completed final sign-off Oct 2018 | 1050 Valencia St | install new commercial kitchen in restaurant space. hood suppression system and alarm under deferred submittals.Details
install new commercial kitchen in restaurant space. hood suppression system and alarm under deferred submittals. | $50,000 | |
| Feb 27, 2017 | Completed final sign-off Jan 2024 | 5 Joy St | Cullinane Plastering | to erect 2 stories, 1 basement, type va, single family residence.Details
to erect 2 stories, 1 basement, type va, single family residence. | $900,000 |
| Dec 5, 2016 | Expired or cancelled withdrawn Apr 2018 | 878 Rhode Island St | to demolish a 2 stories of 2 family dwellingDetails
to demolish a 2 stories of 2 family dwelling | $10,000 | |
| Dec 5, 2016 | Expired or cancelled withdrawn Apr 2018 | 878 Rhode Island St | to erect 4 stories of 3 family dwellingsDetails
to erect 4 stories of 3 family dwellings | $850,000 | |
| Nov 8, 2016 | Completed final sign-off Jul 2017 | 837 South Van Ness Av | Cullinane Plastering | reapproval for roof deck railing installed at front of (e) roof deck over "e" garage. replace previous approved railing setback 4'0" from front of "e" roof deck over garage. ref pa #2014-0912-6185.Details
reapproval for roof deck railing installed at front of (e) roof deck over "e" garage. replace previous approved railing setback 4'0" from front of "e" roof deck over garage. ref pa #2014-0912-6185. | |
| May 25, 2016 | Expired or cancelled expired May 2025 | 239 Ordway St | Cullinane Plastering, Achill Beg Construction Inc | to erect 3 stories, no basement, single family dwelling.Details
to erect 3 stories, no basement, single family dwelling. | $250,000 |
| May 25, 2016 | Expired or cancelled expired May 2025 | 237 Ordway St | Cullinane Plastering | to erect 3 stories, no basement, signle family dwelling.Details
to erect 3 stories, no basement, signle family dwelling. | $250,000 |
| Mar 18, 2016 | Expired or cancelled cancelled Sep 2026 | 2207 25th St | Cullinane Plastering | enclose entry porch, relocate (e) entry door and window.Details
enclose entry porch, relocate (e) entry door and window. | $10,000 |
| Feb 3, 2016 | Completed final sign-off Feb 2016 | 969 Market St | John P Brennan Co Inc. | change of occupancy at 3rd floor from b to a-2 prior work under permits 201311222658 and 201211305183 and 201409095914; maher n/aDetails
change of occupancy at 3rd floor from b to a-2 prior work under permits 201311222658 and 201211305183 and 201409095914; maher n/a | |
| Jan 28, 2016 | Expired or cancelled withdrawn Jun 2016 | 4340 25th St | remove 90 sq ft sunroom unit from existing 2nd floor area & replace with exterior framed wall and roof. no added sq footage, uses same floor area containing (e) sunroom. add lighting and electrical outlets. total work area 90 sq ft.Details
remove 90 sq ft sunroom unit from existing 2nd floor area & replace with exterior framed wall and roof. no added sq footage, uses same floor area containing (e) sunroom. add lighting and electrical outlets. total work area 90 sq ft. | $20,000 | |
| Dec 31, 2015 | Completed final sign-off May 2022 | 318 30th Av | Alliance Environmental Grp, Incp | to demolish 2 stories, single family dwelling building.Details
to demolish 2 stories, single family dwelling building. | $10,000 |
| Dec 31, 2015 | Completed final sign-off Dec 2020 | 1058 Mississippi St | Area Development Inc. | to erect 3 stories, no basement, type v-b, 2 family dwelling.Details
to erect 3 stories, no basement, type v-b, 2 family dwelling. | $800,000 |
| Dec 31, 2015 | Completed final sign-off Feb 2023 | 318 30th Av | Kent Deng | to erect 3 stories, 1 basement, 2 family dwelling. type 5b constructionDetails
to erect 3 stories, 1 basement, 2 family dwelling. type 5b construction | $800,000 |
| Sep 22, 2015 | Completed final sign-off Dec 2015 | 2589 Mission St | John P Brennan Co Inc. | upgrade bath to ada standards. barrier removal work only.Details
upgrade bath to ada standards. barrier removal work only. | $12,000 |
| Sep 22, 2015 | Expired or cancelled cancelled Jan 2019 | 892 Lombard St | John P Brennan Co Inc. | new dwelling unit at gr fl per mandatory soft story upgrade under serp permit 201508043312Details
new dwelling unit at gr fl per mandatory soft story upgrade under serp permit 201508043312 | $20,000 |
| Mar 24, 2015 | Completed final sign-off Aug 2015 | 212 California St | One Stop Shop Construction | ground flr: relocate interior lobby door to medical cannabis. no other wook. maher - not req'dDetails
ground flr: relocate interior lobby door to medical cannabis. no other wook. maher - not req'd | $500 |
| Feb 11, 2015 | Completed final sign-off Feb 2015 | 806 Dolores St | Cullinane Plastering | relocate stair at 2nd floor to lower level from previously approved, other interior changes, identify unit parking/ storage/ yard ownership. revision to app#201309207368. add half bath at 2nd floor. corrects overall bldg length from previous approved permit.Details
relocate stair at 2nd floor to lower level from previously approved, other interior changes, identify unit parking/ storage/ yard ownership. revision to app#201309207368. add half bath at 2nd floor. corrects overall bldg length from previous approved permit. | |
| Dec 12, 2014 | Completed final sign-off Apr 2015 | 128 27th Av | Caruso Construction Inc. | revision to 201305036095. framing revisins to roof, skylights, as built site plan. revised roof planDetails
revision to 201305036095. framing revisins to roof, skylights, as built site plan. revised roof plan | |
| Dec 11, 2014 | Completed final sign-off Mar 2019 | 835 South Van Ness Av | Cullinane Plastering | to erect 4 stories, no basement, type 3a, 3 dwelling units building.Details
to erect 4 stories, no basement, type 3a, 3 dwelling units building. | $1,500,000 |
| Oct 22, 2014 | Completed final sign-off Oct 2016 | 837 South Van Ness Av | Cullinane Plastering | revision to pa# 2014/09/12/6185. (n) elevator and stair dormer at 4th floor.Details
revision to pa# 2014/09/12/6185. (n) elevator and stair dormer at 4th floor. | $15,000 |
| Sep 19, 2014 | Completed final sign-off Mar 2016 | 1857 Greenwich St | Chang Chao Ming Constr | revision to appl #2009.1028.0056: remove skylight at rear 2nd floor, relocate entry to upper unit to original location, remove wall between bedrooms at 3rd floor.Details
revision to appl #2009.1028.0056: remove skylight at rear 2nd floor, relocate entry to upper unit to original location, remove wall between bedrooms at 3rd floor. | $2,500 |
| Sep 9, 2014 | Completed final sign-off Sep 2014 | 969 Market St | revision to 201311222658, 201211305183. to correct use from a-3 to a-2. show approved a-2 for basement level with food service at 1st flDetails
revision to 201311222658, 201211305183. to correct use from a-3 to a-2. show approved a-2 for basement level with food service at 1st fl | ||
| Jul 21, 2014 | Completed final sign-off Mar 2018 | 333 Parnassus Av | interior alterations to floors 1,2,&3. reconfigure extg 2 units, move dwelling #2 to first floor. reduce from 658 to 557 sq ft, increase dwelling #1 from 883 to 1716 sq ft on 2nd and 3rd floors.Details
interior alterations to floors 1,2,&3. reconfigure extg 2 units, move dwelling #2 to first floor. reduce from 658 to 557 sq ft, increase dwelling #1 from 883 to 1716 sq ft on 2nd and 3rd floors. | $60,000 | |
| Jul 21, 2014 | Expired or cancelled withdrawn Aug 2014 | 969 Market St | intumescent paint on exposed steel beams of ceiling at ground floor in lieu of 1-hour covered with sheetrock. n/a for the maher ordinance #155-13Details
intumescent paint on exposed steel beams of ceiling at ground floor in lieu of 1-hour covered with sheetrock. n/a for the maher ordinance #155-13 | $1,500 | |
| Jul 9, 2014 | Never finaled issued Dec 2021, no final | 1513 York St | building b: erect 2-story, type 3a, two family dwelling. 1513c york st & 1513d york st.Details
building b: erect 2-story, type 3a, two family dwelling. 1513c york st & 1513d york st. | $100,000 | |
| Jul 9, 2014 | Completed final sign-off Mar 2017 | 1050 Valencia St | board of appeal decision no#13-095 & 13-097. date 04-10-2014. app#201012277436Details
board of appeal decision no#13-095 & 13-097. date 04-10-2014. app#201012277436 | ||
| Jul 9, 2014 | Completed final sign-off Mar 2017 | 1050 Valencia St | board of appeal decision no#13-096 & 13-098. date 04-10-2014. app#201012277437-s. 1) front + rear set backs at 5th flr. 2) 50 dba wall at south pl. 3) planter on 2nd flr deck.Details
board of appeal decision no#13-096 & 13-098. date 04-10-2014. app#201012277437-s. 1) front + rear set backs at 5th flr. 2) 50 dba wall at south pl. 3) planter on 2nd flr deck. | ||
| Jul 9, 2014 | Never finaled issued Dec 2021, no final | 1513 York St | building d: erect 3-story, type 3a, two family dwelling. 1513g york st & 1513h york st.Details
building d: erect 3-story, type 3a, two family dwelling. 1513g york st & 1513h york st. | $100,000 | |
| Jul 9, 2014 | Never finaled issued Dec 2021, no final | 1513 York St | building a: erect 2-story over basement, type 3a, 2 family dwelling units building, 1513-a & 1513-b york street.Details
building a: erect 2-story over basement, type 3a, 2 family dwelling units building, 1513-a & 1513-b york street. | $180,000 | |
| Jul 9, 2014 | Never finaled issued Dec 2021, no final | 1513 York St | building c: erect 3-story, type 3a, two family dwelling. 1513e york st & 1513f york st.Details
building c: erect 3-story, type 3a, two family dwelling. 1513e york st & 1513f york st. | $100,000 | |
| Jul 9, 2014 | Never finaled issued Dec 2021, no final | 1513 York St | building e: erect 3-story, type 3a, two family dwelling. 1513j york st & 1513k york st.Details
building e: erect 3-story, type 3a, two family dwelling. 1513j york st & 1513k york st. | $100,000 | |
| May 27, 2014 | Completed final sign-off Mar 2016 | 1857 Greenwich St | Chang Chao Ming Constr | revision to app#200910280056. rebuild interior stair to each unit. foundation and framing revisions. new 1/2 bath at 1st fl, remove non bearing wall at west prop line; revise moment frame and shearwall.Details
revision to app#200910280056. rebuild interior stair to each unit. foundation and framing revisions. new 1/2 bath at 1st fl, remove non bearing wall at west prop line; revise moment frame and shearwall. | $30,000 |
| May 27, 2014 | Completed final sign-off Jul 2014 | 556 Jones St | re-install window in like kind, remove atm installed with out benefit of permit. to comply with n.o.v. 201255843Details
re-install window in like kind, remove atm installed with out benefit of permit. to comply with n.o.v. 201255843 | $1,000 | |
| May 15, 2014 | Never finaled issued May 2014, no final | 969 Market St | John P Brennan Co Inc. | remove smoke blankets at 5 elevator doors (4 not required by code). replace 1 smoke blanket on first floor with 60 min doors with magnetic latch. n/a for the maher ordinance #155-13. ref# 201311222658Details
remove smoke blankets at 5 elevator doors (4 not required by code). replace 1 smoke blanket on first floor with 60 min doors with magnetic latch. n/a for the maher ordinance #155-13. ref# 201311222658 | |
| Mar 14, 2014 | Completed final sign-off Jul 2015 | 440 29th St | revision to appl #200609152421: interior partitons altered, two units re-configured, infill (1) front window opening. project is under construction.Details
revision to appl #200609152421: interior partitons altered, two units re-configured, infill (1) front window opening. project is under construction. | ||
| Dec 23, 2013 | Completed final sign-off Mar 2014 | 1732 Leavenworth St | add bathroom at lower level (basement)Details
add bathroom at lower level (basement) | $2,000 | |
| Dec 12, 2013 | Completed final sign-off Sep 2014 | 128 27th Av | Caruso Construction Inc. | demo one story garageDetails
demo one story garage | $1,000 |
| Dec 5, 2013 | Completed final sign-off Feb 2014 | 969 Market St | John P Brennan Co Inc. | install new window in existing opening at front, remove portion of existing plaster covering window opening, reference under pa#201211305183Details
install new window in existing opening at front, remove portion of existing plaster covering window opening, reference under pa#201211305183 | $5,000 |
| Nov 22, 2013 | Completed final sign-off Aug 2014 | 969 Market St | John P Brennan Co Inc. | revision to application 201211305283. change uses at basement level from assembly & office to bar/brewery & assembly & storage. alter layout to food service at 1st floor; add unisex ada bathroom at 2nd floor.electrical panel closet at 1st floor. server room at basement. f/a, sprnklr seprate.Details
revision to application 201211305283. change uses at basement level from assembly & office to bar/brewery & assembly & storage. alter layout to food service at 1st floor; add unisex ada bathroom at 2nd floor.electrical panel closet at 1st floor. server room at basement. f/a, sprnklr seprate. | $40,000 |
| Oct 3, 2013 | Expired or cancelled cancelled Jan 2026 | 3665 Sacramento St | t.i. to remove non-load bearing partitions, install new ada restroom, install new sheetrock.Details
t.i. to remove non-load bearing partitions, install new ada restroom, install new sheetrock. | $15,000 | |
| Oct 3, 2013 | Completed final sign-off Sep 2020 | 1801 Mission St | Cullinane Plastering, Crime Watch Security Sys Llc | erect 7 stories,17 dwelling unit,mix use,type 1 .Details
erect 7 stories,17 dwelling unit,mix use,type 1 . | $2,000,000 |
| Sep 24, 2013 | Expired or cancelled expired Jan 2019 | 2853 Broderick St | remove fire damaged and unsound framing discovered during alteration underway(2011-03-25-2839) remove & replace all floor & deck joists & exterior wall framing at 2nd & 3rd floors only, replac bays & window openings in kind. all new exterior elements in kind.Details
remove fire damaged and unsound framing discovered during alteration underway(2011-03-25-2839) remove & replace all floor & deck joists & exterior wall framing at 2nd & 3rd floors only, replac bays & window openings in kind. all new exterior elements in kind. | $2,500 | |
| Sep 20, 2013 | Completed final sign-off Feb 2015 | 806 Dolores St | Cullinane Plastering | interior alteration at all floors: infill lightwells, new bedroom & bath @ garage level, expand rooms at 1st floor to connect with unit on 2nd floor. wet bar, new bath @ 2nd & new bath @ 3rd floor. new sprinkler system @ all floor under separate permit.Details
interior alteration at all floors: infill lightwells, new bedroom & bath @ garage level, expand rooms at 1st floor to connect with unit on 2nd floor. wet bar, new bath @ 2nd & new bath @ 3rd floor. new sprinkler system @ all floor under separate permit. | $40,000 |