Permit GraphShortlistSan Francisco building permits since 2000

Shahla Saiidnia

License
M33664
Mechanical engineer
About the Board for Professional Engineers, Land Surveyors, and Geologists
Look up M33664 at the Board for Professional Engineers
Listed as
designer, engineer
Firm
A & S Engineers Inc.
Based in
San Francisco
On San Francisco permits
Sep 2013 to Oct 2024

14 permits since 2000 (engineer on 13 permits, designer on 1 permit): 7 completed, 5 never finaled, 2 expired or cancelled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records

Worked with

Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.

Contractors
Air Perfection Heating & Air Condition (2), Swinerton Builders (2), Battery Street Construction, Carrier Corporation, Fdr Construction Inc, Gci, Inc, Il Mechanical, Inc., Msr Mechanical Llc, Owr Mechanical Dba Monarch Mechanical, Richlen Construction, Structural & Refrigeration Mechanicalref
Architects
Alan Martinez, Andrew Chen, Christopher Sullivan, Irene U. Aquino, Peter Engel, Randall Dowler
Engineers
Robin Roderick (3), James Toby, Michael Buenaventura, Michael Ross, Nathan Tremblay, Ramid Arbabaraghi

Where they worked

One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.

Most recent permits

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Oct 2, 2024Completed
final sign-off Feb 2026
888 Post StSwinerton Buildersab004 priority: t.i. at g/f homeless shelter. repair (e) windows of hyde st. new fencing & bldg sign on post st. no structural work. all appliances are electrical. remove portion of concrete slab for plumbing & trenching. replace portion of glazed wood-framed wall btwn interior & covered...
Details
Permit
202410022175
Permit issued
Jan 13, 2025
Final sign-off
Feb 20, 2026

ab004 priority: t.i. at g/f homeless shelter. repair (e) windows of hyde st. new fencing & bldg sign on post st. no structural work. all appliances are electrical. remove portion of concrete slab for plumbing & trenching. replace portion of glazed wood-framed wall btwn interior & covered...

Open the permit page

$3,500,000
Mar 20, 2024Completed
final sign-off Sep 2024
100 01st StRichlen Constructionrestaurant tenant improvement. take out restaurant includes new prep & dishwashing, new electrical and plumbing, mechanical systems, finishes & equipment. no exterior changes
Details
Permit
202403208233
Permit issued
Jun 21, 2024
Final sign-off
Sep 17, 2024

restaurant tenant improvement. take out restaurant includes new prep & dishwashing, new electrical and plumbing, mechanical systems, finishes & equipment. no exterior changes

Open the permit page

$75,000
Nov 3, 2022Completed
final sign-off Mar 2025
25 Van Ness Av7/f: selective demolition of interior partitions, construction of new partitions, new lighting, new finishes, new plumbing in breakroom, ada upgrades in restrooms, new power and data receptacles.
Details
Permit
202211035811
Permit issued
Oct 4, 2023
Final sign-off
Mar 26, 2025

7/f: selective demolition of interior partitions, construction of new partitions, new lighting, new finishes, new plumbing in breakroom, ada upgrades in restrooms, new power and data receptacles.

Open the permit page

$1,275,000
Feb 28, 2022Completed
final sign-off May 2023
100 01st StMsr Mechanical Llcbasement level: in-kind chiller replacement
Details
Permit
202202288820
Permit issued
Mar 8, 2022
Final sign-off
May 25, 2023

basement level: in-kind chiller replacement

Open the permit page

$168,000
Oct 8, 2021Never finaled
issued Oct 2021, no final
299 02nd StFdr Construction Increv pa202104098212: (e) 4 pipe fan coil unit to be reused & supply air to 2 (n) offices using same cfu for (n) air distrib, replace (e) fan coil unit merv13 3rd party indy air balance shall balance (n) supply & exh sys min outside air for fc149 to be set 300cfm.
Details
Permit
202110080117
Permit issued
Oct 21, 2021

rev pa202104098212: (e) 4 pipe fan coil unit to be reused & supply air to 2 (n) offices using same cfu for (n) air distrib, replace (e) fan coil unit merv13 3rd party indy air balance shall balance (n) supply & exh sys min outside air for fc149 to be set 300cfm.

Open the permit page

$8,500
Sep 22, 2017Never finaled
issued Oct 2017, no final
155 05th StCarrier Corporation5th fl: installation of (2) fire smoke dampers and add (1) return diffuser. ref #201707212567. maher na
Details
Permit
201709229286
Permit issued
Oct 6, 2017

5th fl: installation of (2) fire smoke dampers and add (1) return diffuser. ref #201707212567. maher na

Open the permit page

$25,061
Dec 29, 2016Never finaled
issued Jan 2017, no final
948 Mission StAir Perfection Heating & Air Conditioninstallation of hvac systems per the applicable mechanical drawing (2 heat pump system and ventilation) ref #201502239053
Details
Permit
201612296255
Permit issued
Jan 24, 2017

installation of hvac systems per the applicable mechanical drawing (2 heat pump system and ventilation) ref #201502239053

Open the permit page

$48,000
Jul 1, 2016Completed
final sign-off Dec 2016
20 California StGci, Inc7th flr: revision to ref pa 206 0127 8056: modified mep layout based on arch changes & site conditions which include 4 fire smoke dampers, permit # 201601278056
Details
Permit
201607011452
Permit issued
Jul 14, 2016
Final sign-off
Dec 14, 2016

7th flr: revision to ref pa 206 0127 8056: modified mep layout based on arch changes & site conditions which include 4 fire smoke dampers, permit # 201601278056

Open the permit page

Aug 24, 2015Never finaled
issued Sep 2015, no final
501 Geary StStructural & Refrigeration Mechanicalrefremove old chiller and install new chiller. basement area, mechanical room. refrigerant monitoring under separate permit. maher na
Details
Permit
201508245025
Permit issued
Sep 21, 2015

remove old chiller and install new chiller. basement area, mechanical room. refrigerant monitoring under separate permit. maher na

Open the permit page

$139,000
Dec 5, 2014Completed
final sign-off Mar 2015
150 BroadwayAir Perfection Heating & Air Conditionrevision appl 2013.0801.3307. revised mechanical drawings. maher n/a.
Details
Permit
201412053199
Permit issued
Dec 16, 2014
Final sign-off
Mar 24, 2015

revision appl 2013.0801.3307. revised mechanical drawings. maher n/a.

Open the permit page

Jun 30, 2014Expired or cancelled
cancelled Jan 2026
20 California StBattery Street Construction6th floor title 24 - relocate 10/8' pendant lights, install 4 duplex to existing wiremold, add 4 switches. n/a maher ordinance
Details
Permit
201406300039

6th floor title 24 - relocate 10/8' pendant lights, install 4 duplex to existing wiremold, add 4 switches. n/a maher ordinance

Open the permit page

$9,000
Feb 19, 2014Expired or cancelled
expired Nov 2020
200 Paul AvIl Mechanical, Inc.installation of (5) new computer room air conditoiners.
Details
Permit
201402198861
Permit issued
Mar 3, 2014

installation of (5) new computer room air conditoiners.

Open the permit page

$150,000
Dec 26, 2013Never finaled
issued Jun 2015, no final
401 Duboce AvOwr Mechanical Dba Monarch Mechanicalnew mech equip. on building roof. platforms & roof remetrations & roof repair. equipment support. fan shutdown required, interconnection to life safety (n). co alarms (n).
Details
Permit
201312265042
Permit issued
Jun 9, 2015

new mech equip. on building roof. platforms & roof remetrations & roof repair. equipment support. fan shutdown required, interconnection to life safety (n). co alarms (n).

Open the permit page

$124,000
Sep 10, 2013Completed
final sign-off Apr 2014
200 Kansas StSwinerton Builderstenant improvement of 1st floor of (e) design warehouse building. construction of a day care center for 126 children.
Details
Permit
201309106386
Permit issued
Jan 9, 2014
Final sign-off
Apr 24, 2014

tenant improvement of 1st floor of (e) design warehouse building. construction of a day care center for 126 children.

Open the permit page