- Sep 2013 to Oct 2024
14 permits since 2000 (engineer on 13 permits, designer on 1 permit): 7 completed, 5 never finaled, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 2, 2024 | Completed final sign-off Feb 2026 | 888 Post St | Swinerton Builders | ab004 priority: t.i. at g/f homeless shelter. repair (e) windows of hyde st. new fencing & bldg sign on post st. no structural work. all appliances are electrical. remove portion of concrete slab for plumbing & trenching. replace portion of glazed wood-framed wall btwn interior & covered...Details
ab004 priority: t.i. at g/f homeless shelter. repair (e) windows of hyde st. new fencing & bldg sign on post st. no structural work. all appliances are electrical. remove portion of concrete slab for plumbing & trenching. replace portion of glazed wood-framed wall btwn interior & covered... | $3,500,000 |
| Mar 20, 2024 | Completed final sign-off Sep 2024 | 100 01st St | Richlen Construction | restaurant tenant improvement. take out restaurant includes new prep & dishwashing, new electrical and plumbing, mechanical systems, finishes & equipment. no exterior changesDetails
restaurant tenant improvement. take out restaurant includes new prep & dishwashing, new electrical and plumbing, mechanical systems, finishes & equipment. no exterior changes | $75,000 |
| Nov 3, 2022 | Completed final sign-off Mar 2025 | 25 Van Ness Av | 7/f: selective demolition of interior partitions, construction of new partitions, new lighting, new finishes, new plumbing in breakroom, ada upgrades in restrooms, new power and data receptacles.Details
7/f: selective demolition of interior partitions, construction of new partitions, new lighting, new finishes, new plumbing in breakroom, ada upgrades in restrooms, new power and data receptacles. | $1,275,000 | |
| Feb 28, 2022 | Completed final sign-off May 2023 | 100 01st St | Msr Mechanical Llc | basement level: in-kind chiller replacementDetails
basement level: in-kind chiller replacement | $168,000 |
| Oct 8, 2021 | Never finaled issued Oct 2021, no final | 299 02nd St | Fdr Construction Inc | rev pa202104098212: (e) 4 pipe fan coil unit to be reused & supply air to 2 (n) offices using same cfu for (n) air distrib, replace (e) fan coil unit merv13 3rd party indy air balance shall balance (n) supply & exh sys min outside air for fc149 to be set 300cfm.Details
rev pa202104098212: (e) 4 pipe fan coil unit to be reused & supply air to 2 (n) offices using same cfu for (n) air distrib, replace (e) fan coil unit merv13 3rd party indy air balance shall balance (n) supply & exh sys min outside air for fc149 to be set 300cfm. | $8,500 |
| Sep 22, 2017 | Never finaled issued Oct 2017, no final | 155 05th St | Carrier Corporation | 5th fl: installation of (2) fire smoke dampers and add (1) return diffuser. ref #201707212567. maher naDetails
5th fl: installation of (2) fire smoke dampers and add (1) return diffuser. ref #201707212567. maher na | $25,061 |
| Dec 29, 2016 | Never finaled issued Jan 2017, no final | 948 Mission St | Air Perfection Heating & Air Condition | installation of hvac systems per the applicable mechanical drawing (2 heat pump system and ventilation) ref #201502239053Details
installation of hvac systems per the applicable mechanical drawing (2 heat pump system and ventilation) ref #201502239053 | $48,000 |
| Jul 1, 2016 | Completed final sign-off Dec 2016 | 20 California St | Gci, Inc | 7th flr: revision to ref pa 206 0127 8056: modified mep layout based on arch changes & site conditions which include 4 fire smoke dampers, permit # 201601278056Details
7th flr: revision to ref pa 206 0127 8056: modified mep layout based on arch changes & site conditions which include 4 fire smoke dampers, permit # 201601278056 | |
| Aug 24, 2015 | Never finaled issued Sep 2015, no final | 501 Geary St | Structural & Refrigeration Mechanicalref | remove old chiller and install new chiller. basement area, mechanical room. refrigerant monitoring under separate permit. maher naDetails
remove old chiller and install new chiller. basement area, mechanical room. refrigerant monitoring under separate permit. maher na | $139,000 |
| Dec 5, 2014 | Completed final sign-off Mar 2015 | 150 Broadway | Air Perfection Heating & Air Condition | revision appl 2013.0801.3307. revised mechanical drawings. maher n/a.Details
revision appl 2013.0801.3307. revised mechanical drawings. maher n/a. | |
| Jun 30, 2014 | Expired or cancelled cancelled Jan 2026 | 20 California St | Battery Street Construction | 6th floor title 24 - relocate 10/8' pendant lights, install 4 duplex to existing wiremold, add 4 switches. n/a maher ordinanceDetails
6th floor title 24 - relocate 10/8' pendant lights, install 4 duplex to existing wiremold, add 4 switches. n/a maher ordinance | $9,000 |
| Feb 19, 2014 | Expired or cancelled expired Nov 2020 | 200 Paul Av | Il Mechanical, Inc. | installation of (5) new computer room air conditoiners.Details
installation of (5) new computer room air conditoiners. | $150,000 |
| Dec 26, 2013 | Never finaled issued Jun 2015, no final | 401 Duboce Av | Owr Mechanical Dba Monarch Mechanical | new mech equip. on building roof. platforms & roof remetrations & roof repair. equipment support. fan shutdown required, interconnection to life safety (n). co alarms (n).Details
new mech equip. on building roof. platforms & roof remetrations & roof repair. equipment support. fan shutdown required, interconnection to life safety (n). co alarms (n). | $124,000 |
| Sep 10, 2013 | Completed final sign-off Apr 2014 | 200 Kansas St | Swinerton Builders | tenant improvement of 1st floor of (e) design warehouse building. construction of a day care center for 126 children.Details
tenant improvement of 1st floor of (e) design warehouse building. construction of a day care center for 126 children. | $1,581,483 |