Robin Paul Roderick
- Listed as
- engineer
- Firm
- Guttmann & Blaevoet
- Based in
- Walnut Creek
- On San Francisco permits
- Feb 2016 to Oct 2024
5 permits since 2000 (engineer on 5 permits): 4 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 2, 2024 | Completed final sign-off Feb 2026 | 888 Post St | Swinerton Builders | ab004 priority: t.i. at g/f homeless shelter. repair (e) windows of hyde st. new fencing & bldg sign on post st. no structural work. all appliances are electrical. remove portion of concrete slab for plumbing & trenching. replace portion of glazed wood-framed wall btwn interior & covered...Details
ab004 priority: t.i. at g/f homeless shelter. repair (e) windows of hyde st. new fencing & bldg sign on post st. no structural work. all appliances are electrical. remove portion of concrete slab for plumbing & trenching. replace portion of glazed wood-framed wall btwn interior & covered... | $3,500,000 |
| Mar 20, 2024 | Completed final sign-off Sep 2024 | 100 01st St | Richlen Construction | restaurant tenant improvement. take out restaurant includes new prep & dishwashing, new electrical and plumbing, mechanical systems, finishes & equipment. no exterior changesDetails
restaurant tenant improvement. take out restaurant includes new prep & dishwashing, new electrical and plumbing, mechanical systems, finishes & equipment. no exterior changes | $75,000 |
| Dec 12, 2022 | Completed final sign-off Dec 2023 | 999 Brotherhood Wy | O'dwyer Construction Inc | transform one of (e) office into an unisex restroom and a laundry room. associated electrical, mechanical and plumbing work as required to complete the room alteration.Details
transform one of (e) office into an unisex restroom and a laundry room. associated electrical, mechanical and plumbing work as required to complete the room alteration. | $215,000 |
| Feb 28, 2022 | Completed final sign-off May 2023 | 100 01st St | Msr Mechanical Llc | basement level: in-kind chiller replacementDetails
basement level: in-kind chiller replacement | $168,000 |
| Feb 16, 2016 | Expired or cancelled expired Apr 2021 | 1390 Market St | Field Construction Inc. | revision to mep. permit #201508103781 different drawing layout. n/a ordinance #155-13Details
revision to mep. permit #201508103781 different drawing layout. n/a ordinance #155-13 |