Riyad Ghannam
- Listed as
- architect, authorized agent-others, designer
- Firm
- Rg-Architecture
- Based in
- San Francisco
- On San Francisco permits
- Sep 2009 to May 2026
141 permits since 2000 (architect on 138 permits, authorized agent-others on 2 permits, designer on 2 permits): 85 completed, 14 in progress, 27 never finaled, 15 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 141.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 27, 2026 | In progress filed May 2026, not yet issued | 1817 Silliman St | erect (n) type-5 3-story single family dwelling + adu (1817 silliman west).Details
erect (n) type-5 3-story single family dwelling + adu (1817 silliman west). | $1,125,000 | |
| Apr 22, 2026 | In progress issued Jun 2026 | 560 Battery St | Metcon Ti, Inc | combine two commercial suites 560 and 570 to be used as one commercial space. remodel existing b-occupancy spaces into a single b-occupancy gym, add one new accessible bathroom and shower. add shower and secondary restroom, new hvac system, two meditation rooms, locker room and a laundry closet...Details
combine two commercial suites 560 and 570 to be used as one commercial space. remodel existing b-occupancy spaces into a single b-occupancy gym, add one new accessible bathroom and shower. add shower and secondary restroom, new hvac system, two meditation rooms, locker room and a laundry closet... | $639,000 |
| Feb 9, 2026 | In progress filed Feb 2026, not yet issued | 295 La Avanzada St | erect a 3 story,9 dwelling bldg with 1 basement. type v-aDetails
erect a 3 story,9 dwelling bldg with 1 basement. type v-a | $4,900,000 | |
| Jan 12, 2026 | In progress filed Jan 2026, not yet issued | 3900 Geary Bl | remodel of (e) restaurant & offices to incorporate mixed-use conversion. (e) restaurant formula retail (burger king) shall remain while (e) office space will be converted into 9 residential units. 1.5 story vertical addition with a total of 4 stories will be constructed to accomodate new residentialDetails
remodel of (e) restaurant & offices to incorporate mixed-use conversion. (e) restaurant formula retail (burger king) shall remain while (e) office space will be converted into 9 residential units. 1.5 story vertical addition with a total of 4 stories will be constructed to accomodate new residential | $5,619,200 | |
| Jan 3, 2026 | In progress filed Jan 2026, not yet issued | 1817 Silliman St | demolish (e) type v 2-story single family residence.Details
demolish (e) type v 2-story single family residence. | $10,000 | |
| Dec 18, 2025 | In progress filed Dec 2025, not yet issued | 1010 Broadway | erect type 5b over 1a three-story three basement aduDetails
erect type 5b over 1a three-story three basement adu | ||
| Dec 18, 2025 | In progress filed Dec 2025, not yet issued | 1010 Broadway | erect type 5b over 1b three-story three basement single family dwellingDetails
erect type 5b over 1b three-story three basement single family dwelling | ||
| Dec 17, 2025 | In progress filed Dec 2025, not yet issued | 1000 Broadway | 3-story, type 5b, over 3-story basement type 1a, new single family residence.Details
3-story, type 5b, over 3-story basement type 1a, new single family residence. | $18,000,000 | |
| Dec 5, 2025 | In progress issued Mar 2026 | 80 Lomita Av | Mackenzie Construction Services Inc | revision to #202407085951 & 202412126740: replace roof @ dining room & kitchen to align w/ (e) ceiling adjacent to living room & family room ceiling (no additional bldg height per sfpc 260); new parapet; add closet @ stair landing; add mech. room & laundry in garage; relocate fau, water heaterDetails
revision to #202407085951 & 202412126740: replace roof @ dining room & kitchen to align w/ (e) ceiling adjacent to living room & family room ceiling (no additional bldg height per sfpc 260); new parapet; add closet @ stair landing; add mech. room & laundry in garage; relocate fau, water heater | $16,000 |
| Jul 30, 2025 | Completed final sign-off Sep 2026 | 1358 Fell St | Darc Ventures Inc Dba Spl Construction S | revision to 202502079900: expanded scope of work. new rear deck at story 2 and convert e flast roof to deck at story 3. replace rear facing window at kitchen with glass door, create new glass door, create new glass door at story 3 deck. remodel 1 and add 1 new bath in story 3. reconfigure story 3Details
revision to 202502079900: expanded scope of work. new rear deck at story 2 and convert e flast roof to deck at story 3. replace rear facing window at kitchen with glass door, create new glass door, create new glass door at story 3 deck. remodel 1 and add 1 new bath in story 3. reconfigure story 3 | $110,000 |
| Feb 7, 2025 | Completed final sign-off Sep 2026 | 1358 Fell St | Darc Ventures Inc Dba Spl Construction S | interior reconfiguration & remodel containing a remodeled kitchen and remodeled 1/2 bathroom on story 2. remove (e) office in garage, relocate laundry to story 3. replace 2 windows in kind at story 2, add 1 new window in kitchen. patch and repair facade, paint.Details
interior reconfiguration & remodel containing a remodeled kitchen and remodeled 1/2 bathroom on story 2. remove (e) office in garage, relocate laundry to story 3. replace 2 windows in kind at story 2, add 1 new window in kitchen. patch and repair facade, paint. | $75,000 |
| Dec 12, 2024 | In progress issued Aug 2025 | 80 Lomita Av | street facing facade work: remove (e) wood siding & trims. install (n) stucco finish to the facade surfaces visible from lomita ave.Details
street facing facade work: remove (e) wood siding & trims. install (n) stucco finish to the facade surfaces visible from lomita ave. | $2,000 | |
| Jul 8, 2024 | In progress issued Sep 2024 | 80 Lomita Av | new horizontal addition of 251 sf w/new family rm, powder rm, new elevator. reconfigure e) stairway at entry lvl hall. e) kitchen remodel & expansion. replace e) select windows in kind. interior walls reconfigure. new skylight, new rear deck. extend e) gas service to exterior bbq & fire pit.Details
new horizontal addition of 251 sf w/new family rm, powder rm, new elevator. reconfigure e) stairway at entry lvl hall. e) kitchen remodel & expansion. replace e) select windows in kind. interior walls reconfigure. new skylight, new rear deck. extend e) gas service to exterior bbq & fire pit. | $251,000 | |
| Sep 6, 2023 | Never finaled issued Sep 2023, no final | 10 Heron St | to comply with nov 202308270. exterior repair work. repair front wall, frame in doors, window and stucco over.Details
to comply with nov 202308270. exterior repair work. repair front wall, frame in doors, window and stucco over. | $20,000 | |
| Aug 3, 2023 | Completed final sign-off Jun 2025 | 915 North Point St | Js Sullivan Construction Inc | revision to pa 2019-1220-0206 for demolition of west wall, north wall and partil south wallDetails
revision to pa 2019-1220-0206 for demolition of west wall, north wall and partil south wall | |
| Jul 24, 2023 | In progress issued Dec 2023 | 915 North Point St | Js Sullivan Construction Inc | storm water control plan submittal for pa#201912200210-s.Details
storm water control plan submittal for pa#201912200210-s. | |
| Apr 21, 2023 | Completed final sign-off May 2023 | 99 Ocean Av | James E Roberts-Obayashi Corporation | rev pa# 201912038490, to document changes to hvac system.Details
rev pa# 201912038490, to document changes to hvac system. | |
| Apr 17, 2023 | Completed final sign-off Nov 2023 | 99 Ocean Av | James E Roberts-Obayashi Corporation | revision to pa 2019-1203-8490 for changes to horizontal exit doors from asymmetrical s-doors to asymmetrical swing door in the dame direction with panic hardware. exit swing doors swing in direction of egress travel where servubg a room or area containing an occupant load of 50 or more personsDetails
revision to pa 2019-1203-8490 for changes to horizontal exit doors from asymmetrical s-doors to asymmetrical swing door in the dame direction with panic hardware. exit swing doors swing in direction of egress travel where servubg a room or area containing an occupant load of 50 or more persons | |
| Apr 12, 2023 | Completed final sign-off Oct 2024 | 1118 De Haro St | Podesta Construction Inc | 2/f interior remodel: (1) bathroom renovation to full bath, (1) powder room, kitchen alteration, replace (e) sliding door, add new skylights, expand w/d closet, fill in portion of lightwellDetails
2/f interior remodel: (1) bathroom renovation to full bath, (1) powder room, kitchen alteration, replace (e) sliding door, add new skylights, expand w/d closet, fill in portion of lightwell | $109,740 |
| Apr 6, 2023 | Completed final sign-off May 2023 | 99 Ocean Av | James E Roberts-Obayashi Corporation | revision to permit 201912038490 for changes to emergency power to corridor exhaust fans.Details
revision to permit 201912038490 for changes to emergency power to corridor exhaust fans. | |
| Feb 21, 2023 | Completed final sign-off Feb 2025 | 988 Harrison St | Js Sullivan Construction Inc | storm water control plan submittal for bpa# 2019-1212-9351Details
storm water control plan submittal for bpa# 2019-1212-9351 | |
| Dec 20, 2022 | Never finaled filed Dec 2022, never issued | 1462 Pine St | to erect 9 stories, 1 basement, type i-a, 104 units residentialDetails
to erect 9 stories, 1 basement, type i-a, 104 units residential | $25,000,000 | |
| Dec 20, 2022 | Never finaled filed Dec 2022, never issued | 1462 Pine St | demolition of a type 3b 2 story b officeDetails
demolition of a type 3b 2 story b office | $250,000 | |
| Dec 13, 2022 | Expired or cancelled withdrawn Aug 2025 | 1401 Folsom St | erect a 10-story, type 1a, mixed use building with 94 dwelling units, commercial space and no basement. **comply w/ maher ordinance, route to dph**Details
erect a 10-story, type 1a, mixed use building with 94 dwelling units, commercial space and no basement. **comply w/ maher ordinance, route to dph** | $12,500,000 | |
| Nov 21, 2022 | Never finaled filed Nov 2022, never issued | 1526 Powell St | the project proposes partial demolition of an existing historic resource (delucchi sheet metal works), a two-story with basement 9,892-square-foot industrial building, to allow construction of a vertical and horizontal addition resulting in a six-story residential building.Details
the project proposes partial demolition of an existing historic resource (delucchi sheet metal works), a two-story with basement 9,892-square-foot industrial building, to allow construction of a vertical and horizontal addition resulting in a six-story residential building. | $4,500,000 | |
| Oct 14, 2022 | Never finaled filed Oct 2022, never issued | 530 Turk St | Js Sullivan Construction Inc | to erect 13 stories, no basement, type i-b, 88 unit residential approximately 88,500 square feet of gross area, 35 automobile parking spaces, 88 class-1 bicycle parking spaces, and 5 class-2 bicycle parking spaces.Details
to erect 13 stories, no basement, type i-b, 88 unit residential approximately 88,500 square feet of gross area, 35 automobile parking spaces, 88 class-1 bicycle parking spaces, and 5 class-2 bicycle parking spaces. | $16,000,000 |
| Sep 2, 2022 | Completed final sign-off Jul 2023 | 99 Ocean Av | James E Roberts-Obayashi Corporation | revision to 201912038490 for change of the hvac system in the fire pump roomDetails
revision to 201912038490 for change of the hvac system in the fire pump room | |
| Aug 10, 2022 | Completed final sign-off Sep 2024 | 99 Ocean Av | Garnett Signs Llc | (1) illuminated sign, "ventana residences", alemany blvdDetails
(1) illuminated sign, "ventana residences", alemany blvd | |
| Aug 10, 2022 | Completed final sign-off Sep 2024 | 99 Ocean Av | Garnett Signs Llc | (1) illuminated sign, "ventana residences"Details
(1) illuminated sign, "ventana residences" | |
| Jul 22, 2022 | Completed final sign-off May 2023 | 99 Ocean Av | James E Roberts-Obayashi Corporation | interior signage deferred from new construction, ref bpa#201912038490Details
interior signage deferred from new construction, ref bpa#201912038490 | |
| Jul 1, 2022 | Never finaled filed Jul 2022, never issued | 1034 Folsom St | erect a 3-story over basement plus mezzanine building consisting of 3 residential units.Details
erect a 3-story over basement plus mezzanine building consisting of 3 residential units. | $1,677,000 | |
| Jul 1, 2022 | Never finaled filed Jul 2022, never issued | 1034 Folsom St | demolish a one-story, type 5b, mercantile structure.Details
demolish a one-story, type 5b, mercantile structure. | $10,000 | |
| Jun 24, 2022 | In progress issued Mar 2025 | 1354 York St | Area Development Inc. | to erect 4 stories, no basement, type v-a, 3 units residential building.Details
to erect 4 stories, no basement, type v-a, 3 units residential building. | $900,000 |
| Jun 24, 2022 | In progress issued Mar 2025 | 1356 York St | Area Development Inc. | to erect 4 stories, no basement, type v-a, 3 units residential building.Details
to erect 4 stories, no basement, type v-a, 3 units residential building. | $900,000 |
| Jun 21, 2022 | Never finaled filed Jun 2022, never issued | 819 Ellis St | Js Sullivan Construction Inc | to demolish 3 stories garage building. ** maher: n/a **Details
to demolish 3 stories garage building. ** maher: n/a ** | $25,000 |
| Mar 21, 2022 | Completed final sign-off May 2023 | 99 Ocean Av | James E Roberts-Obayashi Corporation | deferred submittal for bpa# 201912038490 for installation of new exterior building maintenance equipment at level 5 and roof level.Details
deferred submittal for bpa# 201912038490 for installation of new exterior building maintenance equipment at level 5 and roof level. | |
| Feb 4, 2022 | Never finaled filed Feb 2022, never issued | 61 Rodgers St | erect a type v 4-story, 3-unit building with parkingDetails
erect a type v 4-story, 3-unit building with parking | $1,315,500 | |
| Feb 4, 2022 | Never finaled filed Feb 2022, never issued | 61 Rodgers St | demo a 1 story wood/ steel sfd dwelling (1525 sf).Details
demo a 1 story wood/ steel sfd dwelling (1525 sf). | $10,000 | |
| Feb 1, 2022 | Completed final sign-off Apr 2023 | 99 Ocean Av | evacuation maps (29)Details
evacuation maps (29) | $7,250 | |
| Nov 19, 2021 | Never finaled issued Nov 2021, no final | 230 07th St | Js Sullivan Construction Inc | revision to pa 2019 0329 6630. as builts install drain pans under plumbing pipes per plan @ 1st level elec room.Details
revision to pa 2019 0329 6630. as builts install drain pans under plumbing pipes per plan @ 1st level elec room. | |
| Nov 16, 2021 | Completed final sign-off Jul 2023 | 99 Ocean Av | James E Roberts-Obayashi Corporation | deferred submittal for pa# 201912038490. construction of steel stairs.Details
deferred submittal for pa# 201912038490. construction of steel stairs. | |
| Nov 12, 2021 | Never finaled filed Nov 2021, never issued | 795 Noriega St | addition and renovation of an r3 occupancy single family home in an rh-1 district. the project scope will include a one-story vertical addition and convert a portion of the currently uninhabitable crawlspace into a habitable story.Details
addition and renovation of an r3 occupancy single family home in an rh-1 district. the project scope will include a one-story vertical addition and convert a portion of the currently uninhabitable crawlspace into a habitable story. | $475,000 | |
| Nov 3, 2021 | Never finaled filed Nov 2021, never issued | 5012 03rd St | Genuine Construction Inc. | to erect 6 stories, no basement, type iii-a over i-a fground floor, 29 units residential with mixed use building. (r-2,m,s-2)Details
to erect 6 stories, no basement, type iii-a over i-a fground floor, 29 units residential with mixed use building. (r-2,m,s-2) | $5,000,000 |
| Sep 23, 2021 | Completed final sign-off Apr 2022 | 343 08th St | Guzman Construction Group Inc. | dbi review of t 24 tco exception associated with 201707121715Details
dbi review of t 24 tco exception associated with 201707121715 | |
| Aug 5, 2021 | Completed final sign-off May 2023 | 99 Ocean Av | James E Roberts-Obayashi Corporation | dbi review of tower crane erection per abo23 associated with pa# 2019-1203-8490Details
dbi review of tower crane erection per abo23 associated with pa# 2019-1203-8490 | $49,113 |
| May 25, 2021 | Completed final sign-off Apr 2023 | 485 Tehama St | residential remodel, interior alteration annd repair of unit 2, kitchen alteration, add 2nd bath in mezzanine, alteration of e full bath to 1/2 bathDetails
residential remodel, interior alteration annd repair of unit 2, kitchen alteration, add 2nd bath in mezzanine, alteration of e full bath to 1/2 bath | $50,000 | |
| Mar 30, 2021 | Completed final sign-off May 2021 | 555 Golden Gate Av | Js Sullivan Construction Inc | sf planning administrative permit to revise # of class ii bicycle racks installed for approved pa 201712156653. a total of 6 class ii bike spaces were required. only 4 paces were installed. project sponsor paid partial in lieu fee for the 2 missing spaces and shall pay remaining fees under this pa.Details
sf planning administrative permit to revise # of class ii bicycle racks installed for approved pa 201712156653. a total of 6 class ii bike spaces were required. only 4 paces were installed. project sponsor paid partial in lieu fee for the 2 missing spaces and shall pay remaining fees under this pa. | |
| Mar 9, 2021 | Completed final sign-off Jul 2023 | 99 Ocean Av | James E Roberts-Obayashi Corporation | administrative dbi plumbing inspection review of stormwater flow associated with pa# 201912038490.Details
administrative dbi plumbing inspection review of stormwater flow associated with pa# 201912038490. | |
| Sep 17, 2020 | Completed final sign-off Feb 2022 | 1800 Alemany Bl | James E Roberts-Obayashi Corporation | to document extension of tieback ground anchors into adjacent property line under bpa# 202009144142 associated with apn # 6954/018Details
to document extension of tieback ground anchors into adjacent property line under bpa# 202009144142 associated with apn # 6954/018 | |
| Sep 14, 2020 | Completed final sign-off Jul 2023 | 65 Ocean Av | James E Roberts-Obayashi Corporation | excavation and shoring, drill displacement columns. site improvement permit to prepare for new bldg under pa# 201912038490. demolition of (e) building under separate permit.Details
excavation and shoring, drill displacement columns. site improvement permit to prepare for new bldg under pa# 201912038490. demolition of (e) building under separate permit. | $807,000 |
| Sep 5, 2020 | Completed final sign-off Feb 2021 | 101 Coleridge St | Professional Home Designs | revision to pa #2019-1220-0200: add new roof dormer in compliance w/ sf planing dept. zoning admin bulletin #3. window replacement for 6 windows.Details
revision to pa #2019-1220-0200: add new roof dormer in compliance w/ sf planing dept. zoning admin bulletin #3. window replacement for 6 windows. | $8,000 |
| Jul 10, 2020 | Completed final sign-off Sep 2022 | 100 Duboce Av | Crime Watch Security Sys Llc, Js Sullivan Construction Inc | altered site permit revision to pa #201408053094s, ncrease unit count fr 28 to 29 unts, eliminate basement, garage parking, relocate to g/f, revise to unit layout, stair, roofdeck & ext facde essign, add addresses 100 duboce(residential lobby), 196 valencia st (comm space).Details
altered site permit revision to pa #201408053094s, ncrease unit count fr 28 to 29 unts, eliminate basement, garage parking, relocate to g/f, revise to unit layout, stair, roofdeck & ext facde essign, add addresses 100 duboce(residential lobby), 196 valencia st (comm space). | |
| Mar 4, 2020 | Completed final sign-off Jun 2020 | 2444 Lombard St | Js Sullivan Construction Inc | adminstrative permit to correct consturction type on pa #201712156664, approved plans is type 3a.Details
adminstrative permit to correct consturction type on pa #201712156664, approved plans is type 3a. | |
| Mar 4, 2020 | Completed final sign-off Jun 2020 | 2444 Lombard St | Js Sullivan Construction Inc | revision to pa #201712156664. revise bmr units 202 & 204 bedrooms closets into bathroom per plan. unit 202 & 204 to be two bedrooms, 2 bath units, to match nsr.Details
revision to pa #201712156664. revise bmr units 202 & 204 bedrooms closets into bathroom per plan. unit 202 & 204 to be two bedrooms, 2 bath units, to match nsr. | |
| Feb 20, 2020 | Never finaled issued Aug 2021, no final | 210 Beacon St | Rico's General Construction | vertical addition to an existing 3 story plus basement single family residence. modify roof slope to increase height of room below, interior remodel. no new additionsDetails
vertical addition to an existing 3 story plus basement single family residence. modify roof slope to increase height of room below, interior remodel. no new additions | $100,000 |
| Feb 20, 2020 | Completed final sign-off Dec 2021 | 230 07th St | Js Sullivan Construction Inc | strom water control plan review only. for pa# 2019/03/29/6630-s1 & pa# 2018/06/26/3029-s1. ** maher: n/a **Details
strom water control plan review only. for pa# 2019/03/29/6630-s1 & pa# 2018/06/26/3029-s1. ** maher: n/a ** | |
| Jan 16, 2020 | Completed final sign-off Jun 2021 | 65 Ocean Av | James E Roberts-Obayashi Corporation | building 1. to demolish a type 5, 1-story school.Details
building 1. to demolish a type 5, 1-story school. | $37,500 |
| Jan 16, 2020 | Completed final sign-off Jun 2021 | 65 Ocean Av | James E Roberts-Obayashi Corporation | building 2. to demolish a type 5, 2-story school.Details
building 2. to demolish a type 5, 2-story school. | $37,500 |
| Jan 16, 2020 | Completed final sign-off Jun 2021 | 65 Ocean Av | James E Roberts-Obayashi Corporation | building 4. to demolish a type 5, 1-story school.Details
building 4. to demolish a type 5, 1-story school. | $37,500 |
| Jan 16, 2020 | Completed final sign-off Jun 2021 | 65 Ocean Av | James E Roberts-Obayashi Corporation | building 3. to demolish a type 5, 1-story school.Details
building 3. to demolish a type 5, 1-story school. | $37,500 |
| Dec 20, 2019 | Completed final sign-off Feb 2021 | 101 Coleridge St | add 2 baths, at gr fl add guest bedroom, full bath, stair. 2nd fl, relocate e bath and kitchen, new master bed/bath, add mezzanine bedroom. relocate skylight,Details
add 2 baths, at gr fl add guest bedroom, full bath, stair. 2nd fl, relocate e bath and kitchen, new master bed/bath, add mezzanine bedroom. relocate skylight, | $75,000 | |
| Dec 20, 2019 | Completed final sign-off Aug 2025 | 915 North Point St | Js Sullivan Construction Inc | erect a 4 story, 34 dwelling units, 1 basement residential condo with parking.type 3aDetails
erect a 4 story, 34 dwelling units, 1 basement residential condo with parking.type 3a | $8,000,000 |
| Dec 16, 2019 | Completed final sign-off May 2020 | 5 Olive St | Js Sullivan Construction Inc | provide electrical & mechanical infrastructure for future ti. install electrical outlet & lighting per plan. install hvac system. no change of use. no exterior work. refer to nc pa #201612225735Details
provide electrical & mechanical infrastructure for future ti. install electrical outlet & lighting per plan. install hvac system. no change of use. no exterior work. refer to nc pa #201612225735 | $15,000 |
| Dec 16, 2019 | Completed final sign-off Apr 2020 | 1425 Bush St | Js Sullivan Construction Inc | provide elec and mech infrastructure for future ti. raise floor level to match landing. install elec outlets and lighting per plan. install hvac system. no exterior work no change of useDetails
provide elec and mech infrastructure for future ti. raise floor level to match landing. install elec outlets and lighting per plan. install hvac system. no exterior work no change of use | $20,000 |
| Dec 16, 2019 | Completed final sign-off May 2020 | 3 Olive St | Js Sullivan Construction Inc | provide electrical & mechanical infrastructure for future ti. install electrical outlet & lighting per plan. install hvac system. no change of use. no exterior work. refer to nc pa #201612225735Details
provide electrical & mechanical infrastructure for future ti. install electrical outlet & lighting per plan. install hvac system. no change of use. no exterior work. refer to nc pa #201612225735 | $15,000 |
| Dec 16, 2019 | Completed final sign-off Apr 2020 | 118 Fern St | Js Sullivan Construction Inc | provide electrical & mechanical infrastructure for future ti. install electrical outlet & lighting per plan. install hvac system. no change of use. no exterior work. refer to nc pa 201605318777Details
provide electrical & mechanical infrastructure for future ti. install electrical outlet & lighting per plan. install hvac system. no change of use. no exterior work. refer to nc pa 201605318777 | $15,000 |
| Dec 12, 2019 | Completed final sign-off Aug 2023 | 1570 Pacific Av | Serrano Fire Protection Systems, Js Sullivan Construction Inc | to erect 6 stories, no basement, type iii-a over type i-a, 53 residential units with mixed use building. (r-2,b,m,s-2) ** maher: yes; route to dph **Details
to erect 6 stories, no basement, type iii-a over type i-a, 53 residential units with mixed use building. (r-2,b,m,s-2) ** maher: yes; route to dph ** | $9,200,000 |
| Dec 12, 2019 | Completed final sign-off Aug 2023 | 1580 Pacific Av | to demolish 1 story, retail building. ** maher: n/a **Details
to demolish 1 story, retail building. ** maher: n/a ** | $65,000 | |
| Dec 12, 2019 | Completed final sign-off Feb 2025 | 988 Harrison St | Js Sullivan Construction Inc | alter site. revision to approved site pa# 201712146448-s. re-arrange of residential units. re-arrange garage parking. relocate elevator & stair cores. modification to exterior facade. revise type i-a to i-b. use from s to s-2. ** maher: yes. route to dph **Details
alter site. revision to approved site pa# 201712146448-s. re-arrange of residential units. re-arrange garage parking. relocate elevator & stair cores. modification to exterior facade. revise type i-a to i-b. use from s to s-2. ** maher: yes. route to dph ** | |
| Dec 3, 2019 | Completed final sign-off Nov 2023 | 65 Ocean Av | James E Roberts-Obayashi Corporation | to erect 6 stories, 1 basement, type i-a / iii-a, 193 residential units with child care, mix use building. (r-2,e,s-2)Details
to erect 6 stories, 1 basement, type i-a / iii-a, 193 residential units with child care, mix use building. (r-2,e,s-2) | $30,000,000 |
| Oct 23, 2019 | Never finaled filed Oct 2019, never issued | 2670 Geary Bl | Bcci Construction Company | to erect 8 stories, 1 basement, type i-b, 101 residential units with mixed use building. (r-2,b,s-2)Details
to erect 8 stories, 1 basement, type i-b, 101 residential units with mixed use building. (r-2,b,s-2) | $25,000,000 |
| Aug 8, 2019 | Completed final sign-off Jun 2020 | 2444 Lombard St | Js Sullivan Construction Inc | revision to pa #201712156664-s3. revise townhouse stair 03 per plan. tread rise and run to be 7.75"h and 11"d. stair 03 serves the town home units only (occupancy r3).Details
revision to pa #201712156664-s3. revise townhouse stair 03 per plan. tread rise and run to be 7.75"h and 11"d. stair 03 serves the town home units only (occupancy r3). | |
| Jun 18, 2019 | Never finaled filed Jun 2019, never issued | 10 Heron St | erect (4) story multi-family dwelling unit building with eleven unitsDetails
erect (4) story multi-family dwelling unit building with eleven units | $1,990,000 | |
| May 30, 2019 | Completed final sign-off Jul 2019 | 719 Larkin St | Js Sullivan Construction Inc | revision to 201612225735 s3 revise bike storage room layout per plan. no other changes. n/a for maher.Details
revision to 201612225735 s3 revise bike storage room layout per plan. no other changes. n/a for maher. | |
| Mar 29, 2019 | Completed final sign-off Dec 2021 | 230 07th St | Crime Watch Security Sys Llc, Js Sullivan Construction Inc | altered site permit & revision to pa #2018-0626-3029 s. rearrangement of residential unit layouts, removal of ground flr commercial, relocate elevator & stair cores, elimination of interior court, reconfigure light court, revise front & rear facade.Details
altered site permit & revision to pa #2018-0626-3029 s. rearrangement of residential unit layouts, removal of ground flr commercial, relocate elevator & stair cores, elimination of interior court, reconfigure light court, revise front & rear facade. | |
| Jan 31, 2019 | Completed final sign-off Aug 2022 | 595 Mariposa St | Guzman Construction Group Inc. | revision to pa 2015-0806-3607 s3 to add elevator shaft access doorDetails
revision to pa 2015-0806-3607 s3 to add elevator shaft access door | |
| Nov 7, 2018 | Completed final sign-off Apr 2020 | 51 Iris Av | Oak Leaf Construction | new adu per ord no.162-16 located within (e) garage. change of occupancy r-3 to r-2, (n) slab at adu, (n) mep at adu, relocation of (e) furnaces, (n) doors & windows at rear (south) facade, (n) access corridor to rear yard.Details
new adu per ord no.162-16 located within (e) garage. change of occupancy r-3 to r-2, (n) slab at adu, (n) mep at adu, relocation of (e) furnaces, (n) doors & windows at rear (south) facade, (n) access corridor to rear yard. | $104,400 |
| Oct 5, 2018 | Completed final sign-off Sep 2020 | 241 10th St | Js Sullivan Construction Inc | g/f: #101: tenant improvement to formerly unoccupied space for professional services office. space is fully compliant per cbc chapter 11b ada. ada compliant bath is existing.Details
g/f: #101: tenant improvement to formerly unoccupied space for professional services office. space is fully compliant per cbc chapter 11b ada. ada compliant bath is existing. | $80,000 |
| Sep 27, 2018 | Never finaled filed Sep 2018, never issued | 661 Natoma St | P 3 Construction & Remodeling Inc | alteration & renovation of (e) 2-story commercial bldg & vertical addition of 2 stories(4 stories total) including 3 dwelling units.Details
alteration & renovation of (e) 2-story commercial bldg & vertical addition of 2 stories(4 stories total) including 3 dwelling units. | $915,240 |
| Sep 10, 2018 | Completed final sign-off Aug 2022 | 595 Mariposa St | revision to pa 201508063607 addendum 3 door size to bike room. unit 103: winder stairs, fancoil unit relocated to soffit, unit 102 bath exhaust, gas bbq on roof deck & fire rated shafts as indicatedDetails
revision to pa 201508063607 addendum 3 door size to bike room. unit 103: winder stairs, fancoil unit relocated to soffit, unit 102 bath exhaust, gas bbq on roof deck & fire rated shafts as indicated | ||
| Jun 26, 2018 | Completed final sign-off Dec 2021 | 230 07th St | Crime Watch Security Sys Llc, Js Sullivan Construction Inc | remodel & vertical addition,convert (e) garage to new 6 story mixed use bldg, 5 stories of residential over ground level commercial & residential private parking garageDetails
remodel & vertical addition,convert (e) garage to new 6 story mixed use bldg, 5 stories of residential over ground level commercial & residential private parking garage | $6,500,000 |
| May 24, 2018 | Completed final sign-off Jul 2021 | 1523 Franklin St | Crime Watch Security Sys Llc, Js Sullivan Construction Inc | alteration of (e) 2-story over basement commercial bldg to construction of an 8-stroy, 83'-7" tall, 24,458 sf mixed use reisdential/commercial bldg. include (7) dwelling units, 649 sf commercial space @ ground flr & 7 parking spaces.Details
alteration of (e) 2-story over basement commercial bldg to construction of an 8-stroy, 83'-7" tall, 24,458 sf mixed use reisdential/commercial bldg. include (7) dwelling units, 649 sf commercial space @ ground flr & 7 parking spaces. | $6,000,000 |
| Feb 7, 2018 | Never finaled issued Mar 2018, no final | 1198 Valencia St | Js Sullivan Construction Inc | revision to pa 2015-0714-1495 to document recorded bmr nsr (below market rate notice of special restrictions) per planning. no work done.Details
revision to pa 2015-0714-1495 to document recorded bmr nsr (below market rate notice of special restrictions) per planning. no work done. | |
| Dec 15, 2017 | Completed final sign-off Nov 2019 | 2444 Lombard St | Granite Excavation & Demolition Inc | to demolish 1 story retail building. ** maher: n/a **Details
to demolish 1 story retail building. ** maher: n/a ** | $50,000 |
| Dec 15, 2017 | Completed final sign-off Mar 2021 | 555 Golden Gate Av | Js Sullivan Construction Inc | to erect 11 stories, type i-b, 55 residential units with retail mixed use building (r-2,m,s-2)Details
to erect 11 stories, type i-b, 55 residential units with retail mixed use building (r-2,m,s-2) | $12,000,000 |
| Dec 15, 2017 | Completed final sign-off May 2020 | 2444 Lombard St | All Star Fire Protection Llc, Crime Watch Security Sys Llc, Js Sullivan Construction Inc | to erect 4 stories, no basement, type v-a over i-a, 2 townhouse & 41 residential units with commercial office mixed use building(r-3,r-2,b,s-2) ** maher: disturbance of at least 50 cu.yd of soil, route to dph **Details
to erect 4 stories, no basement, type v-a over i-a, 2 townhouse & 41 residential units with commercial office mixed use building(r-3,r-2,b,s-2) ** maher: disturbance of at least 50 cu.yd of soil, route to dph ** | $10,000,000 |
| Dec 15, 2017 | Completed final sign-off Oct 2019 | 555 Golden Gate Av | Granite Excavation & Demolition Inc | to demolish 1 story restaurant / club building.Details
to demolish 1 story restaurant / club building. | $50,000 |
| Dec 14, 2017 | Expired or cancelled cancelled Nov 2024 | 2670 Geary Bl | to demolish 1 story restaurant building.Details
to demolish 1 story restaurant building. | $100,000 | |
| Dec 14, 2017 | Expired or cancelled withdrawn Oct 2019 | 2670 Geary Bl | to erect 8 stories, 1 basement, type i-b, 95 units residential with commercial mixed use building. (r-2, b, s-2)Details
to erect 8 stories, 1 basement, type i-b, 95 units residential with commercial mixed use building. (r-2, b, s-2) | $15,077,340 | |
| Dec 14, 2017 | Completed final sign-off Feb 2025 | 377 06th St | Js Sullivan Construction Inc | to erect 8 stories, no basement, type i-a, 90 units residential with commercial mixed use building and parking. (r-2, a-2, s)Details
to erect 8 stories, no basement, type i-a, 90 units residential with commercial mixed use building and parking. (r-2, a-2, s) | $26,068,060 |
| Jul 20, 2017 | Completed final sign-off Mar 2018 | 1198 Valencia St | Js Sullivan Construction Inc | revision to pa #2015-0714-1495. delta 3 architectural revisions per plan. revise layout for units 101,102 &103. (n) stair penthouse for unit 103. revise storefront glazing to operable sliding glass panel along 23rd st. updated door schedule eliminated roof sky lights. relocate bike rack to basement.Details
revision to pa #2015-0714-1495. delta 3 architectural revisions per plan. revise layout for units 101,102 &103. (n) stair penthouse for unit 103. revise storefront glazing to operable sliding glass panel along 23rd st. updated door schedule eliminated roof sky lights. relocate bike rack to basement. | $5,000 |
| May 8, 2017 | Completed final sign-off Jun 2021 | 650 De Haro St | S F Garage Company Inc., Dawson - Clinton Gen Contr Corp | front bldg. comply with nov #201653731. new facades , add two floors to frong bldg (650), interior remodel. new elevator front bldg (separate permit).Details
front bldg. comply with nov #201653731. new facades , add two floors to frong bldg (650), interior remodel. new elevator front bldg (separate permit). | $200,000 |
| May 8, 2017 | Completed final sign-off Jun 2021 | 650 De Haro St | S F Garage Company Inc., Dawson - Clinton Gen Contr Corp | rear bldg. to comply with nov #201653731 (ces). reconfigure front facade. interior remodel. legalize (e) dwelling unit 650b at rear bldg under separate permit 201801057944.Details
rear bldg. to comply with nov #201653731 (ces). reconfigure front facade. interior remodel. legalize (e) dwelling unit 650b at rear bldg under separate permit 201801057944. | $200,000 |
| Apr 21, 2017 | Completed final sign-off Apr 2018 | 685 Florida St | revision to app#2012-0920-0274. install access panel for elevator shaft smoke detector. n/a for maherDetails
revision to app#2012-0920-0274. install access panel for elevator shaft smoke detector. n/a for maher | ||
| Dec 22, 2016 | Completed final sign-off Oct 2018 | 719 Larkin St | Granite Excavation & Demolition Inc | to demolish 1 story, laundry, restaurant, massage building. ** maher: n/a **Details
to demolish 1 story, laundry, restaurant, massage building. ** maher: n/a ** | $20,000 |
| Dec 22, 2016 | Completed final sign-off Jul 2019 | 719 Larkin St | Js Sullivan Construction Inc | to erect 8 stories, no basement, type ib, 42 residential units with mixed used building. ** maher: n/a **Details
to erect 8 stories, no basement, type ib, 42 residential units with mixed used building. ** maher: n/a ** | $6,000,000 |
| Dec 2, 2016 | Completed final sign-off Jul 2021 | 1274 De Haro St | Dawson - Clinton Gen Contr Corp | (n) front door, (n) front entry stairs, (n) ext. siding, (n) roof deck w/ glass guard rails, (n) stair to roof deck, remodel kitchen, add powder room, modify lightwell, fill in deck @ west elevation, remodel master suite.Details
(n) front door, (n) front entry stairs, (n) ext. siding, (n) roof deck w/ glass guard rails, (n) stair to roof deck, remodel kitchen, add powder room, modify lightwell, fill in deck @ west elevation, remodel master suite. | $200,000 |
| Sep 28, 2016 | Completed final sign-off Mar 2017 | 10 Page St | Western Division Build | ground floor, unit b: ti - instructional exercise space, open to public. add new finished floor, installing new finishe, adding droped ceilings, new elect. lighting anfd mech hvacDetails
ground floor, unit b: ti - instructional exercise space, open to public. add new finished floor, installing new finishe, adding droped ceilings, new elect. lighting anfd mech hvac | $50,000 |
| Aug 31, 2016 | Completed final sign-off Feb 2021 | 246 Carl St | Dawson - Clinton Gen Contr Corp | interior remodel, (n) windows & doors in the rear, (n) hydraulic elevator. replace street-facing windows, in kind. seismic upgrade under bpa #201603101729 & #201512034126. full nfpa 13r under separate permit. (n) bedroom & bathroom at basement & 1st floor.Details
interior remodel, (n) windows & doors in the rear, (n) hydraulic elevator. replace street-facing windows, in kind. seismic upgrade under bpa #201603101729 & #201512034126. full nfpa 13r under separate permit. (n) bedroom & bathroom at basement & 1st floor. | $300,000 |
| Aug 4, 2016 | Never finaled issued Aug 2016, no final | 685 Florida St | revision to 201209200274; additional 16 pv panels added to array; maher n/aDetails
revision to 201209200274; additional 16 pv panels added to array; maher n/a | $20,000 |