19 permits since 2000 (engineer on 9 permits, pmt consultant/expediter on 6 permits, authorized agent-others on 5 permits): 12 completed, 5 never finaled, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 14, 2021 | Completed final sign-off Dec 2022 | 170 Clara St | Jps Builders | fire & water damage repair @ rear of bldg in kind, repair. replace rear deck trellis, stud walls, deck framing, in kind. replace damaged insulation waterproofing, siding stucco & sheetrock per plan. replace glass siding door in kindDetails
fire & water damage repair @ rear of bldg in kind, repair. replace rear deck trellis, stud walls, deck framing, in kind. replace damaged insulation waterproofing, siding stucco & sheetrock per plan. replace glass siding door in kind | $15,000 |
| Feb 7, 2018 | Never finaled issued Mar 2018, no final | 1198 Valencia St | Js Sullivan Construction Inc | revision to pa 2015-0714-1495 to document recorded bmr nsr (below market rate notice of special restrictions) per planning. no work done.Details
revision to pa 2015-0714-1495 to document recorded bmr nsr (below market rate notice of special restrictions) per planning. no work done. | |
| Jun 24, 2014 | Completed final sign-off Jan 2015 | 109 Gladeview Wy | C & N Construction | interior kitchen remodel; new rear deck @ 2nd floor; replace window w/new sliding door @ rear per plan; 2 new skylights at kitchen per planDetails
interior kitchen remodel; new rear deck @ 2nd floor; replace window w/new sliding door @ rear per plan; 2 new skylights at kitchen per plan | $40,000 |
| May 13, 2014 | Completed final sign-off Mar 2015 | 821 Peru Av | Module Construction Inc. | add 1 master bedroom and bath on the 1st fl. apprx 262 sf. add spiral stair to connect 1st fl to basement. add 152 sf rear deck and stair, replace 2 front windows on 2/f with wood-clad in same size & slider on both sides in kind, 5 windows at rear, replace garage door.Details
add 1 master bedroom and bath on the 1st fl. apprx 262 sf. add spiral stair to connect 1st fl to basement. add 152 sf rear deck and stair, replace 2 front windows on 2/f with wood-clad in same size & slider on both sides in kind, 5 windows at rear, replace garage door. | $35,000 |
| Jul 24, 2013 | Completed final sign-off Feb 2018 | 1412 Market St | main floor and rear facade redmodel for suites #1414, 1412, 1400, 1420 & 1408 and remodel the lobby of the hotel. replace mezzanine floor new windows.Details
main floor and rear facade redmodel for suites #1414, 1412, 1400, 1420 & 1408 and remodel the lobby of the hotel. replace mezzanine floor new windows. | $60,000 | |
| Jul 3, 2013 | Expired or cancelled expired Mar 2016 | 540 Elizabeth St | Nuport Construction Inc | interior remodel - remove wall @ living room, new beam & posts per plan.Details
interior remodel - remove wall @ living room, new beam & posts per plan. | $5,000 |
| May 10, 2013 | Completed final sign-off Feb 2014 | 1235 26th Av | Jason Liu Construction Company | revision to app#201304124450. replace foundation along rear and side approx 75 feet.Details
revision to app#201304124450. replace foundation along rear and side approx 75 feet. | $7,000 |
| Apr 15, 2013 | Completed final sign-off Aug 2013 | 1510 Revere Av | Transbay Builders Inc. | add family room, bedroom, bathroom & storage ( around 633 sq ft) on 1st floor, infill (around 60 sq ft) (e) lightwell on 2nd floor, remodel (e) kitchen & relocate (e) bathroom & add one half bath on 2nd floor, remodel (e) bathroom on 3rd floor.Details
add family room, bedroom, bathroom & storage ( around 633 sq ft) on 1st floor, infill (around 60 sq ft) (e) lightwell on 2nd floor, remodel (e) kitchen & relocate (e) bathroom & add one half bath on 2nd floor, remodel (e) bathroom on 3rd floor. | $58,000 |
| Mar 8, 2013 | Completed final sign-off Nov 2014 | 331 Teresita Bl | Kelly Brother's Construction | partial foundation replacement & framing repairs. voluntary plywood walls; basement for storage onlyDetails
partial foundation replacement & framing repairs. voluntary plywood walls; basement for storage only | $30,000 |
| Feb 1, 2013 | Expired or cancelled disapproved Sep 2018 | 56 Mason St | replace 75 street facing windows in kindDetails
replace 75 street facing windows in kind | $100,000 | |
| Dec 14, 2012 | Never finaled issued Jan 2013, no final | 646 30th Av | remodel extg kitchen and adding half bathroom at 2nd floor as per plan. replace extg foundation less than 50%. no change of extg bldg envelope under this permit.Details
remodel extg kitchen and adding half bathroom at 2nd floor as per plan. replace extg foundation less than 50%. no change of extg bldg envelope under this permit. | $48,000 | |
| Dec 3, 2012 | Never finaled issued Dec 2012, no final | 1631 Florida St | obtain final inspection for work approved under pa# 2009-0312-4007. all work is completeDetails
obtain final inspection for work approved under pa# 2009-0312-4007. all work is complete | ||
| Dec 3, 2012 | Never finaled issued Dec 2012, no final | 1631 Florida St | obtain final inspection for work approved under pa# 2008-1119-6908. all work is completeDetails
obtain final inspection for work approved under pa# 2008-1119-6908. all work is complete | ||
| Nov 19, 2012 | Completed final sign-off Jun 2014 | 1523 15th St | install 68ft length of hand excavated underpinning tie backs & lagging at rear. east property line, install 12ft length of drilled piers, tie backs & shoring at rear east property line. ref pa#201211194482.Details
install 68ft length of hand excavated underpinning tie backs & lagging at rear. east property line, install 12ft length of drilled piers, tie backs & shoring at rear east property line. ref pa#201211194482. | $8,000 | |
| Nov 19, 2012 | Never finaled issued Dec 2012, no final | 430 South Van Ness Av | install 125ft length of drilled piers, tie backs & shoring at south property line. refer to pa#201211194482Details
install 125ft length of drilled piers, tie backs & shoring at south property line. refer to pa#201211194482 | $8,000 | |
| Nov 19, 2012 | Completed final sign-off Jun 2014 | 400 South Van Ness Av | install 125ft length of drilled piers, tie backs & shoring @south property line. install 125ft length of drilled piers tie backs & shoring @15th st. north property line. install 113ft length of drilled piers, tie backs & shoring on south van ness ave (east property line). refer to pa# 2011-1103-8205Details
install 125ft length of drilled piers, tie backs & shoring @south property line. install 125ft length of drilled piers tie backs & shoring @15th st. north property line. install 113ft length of drilled piers, tie backs & shoring on south van ness ave (east property line). refer to pa# 2011-1103-8205 | $20,000 | |
| Oct 3, 2012 | Completed final sign-off Apr 2013 | 245 05th St | Nor - Cal Construction | extension of (e) storage closet into open studio spaceDetails
extension of (e) storage closet into open studio space | $7,500 |
| Oct 3, 2012 | Completed final sign-off Mar 2015 | 1946 Stockton St | Betta Construction | unit #1-remodel with creation of new master bathroom & closet. remodel (e) kitchen & bathroom in kind. new spiral stairs to new living space at ground floor, remove post at garage & upgrade foundation. structural strengthening per plansDetails
unit #1-remodel with creation of new master bathroom & closet. remodel (e) kitchen & bathroom in kind. new spiral stairs to new living space at ground floor, remove post at garage & upgrade foundation. structural strengthening per plans | $150,000 |
| Feb 7, 2012 | Completed final sign-off Nov 2012 | 575 11th Av | Planart Construction Corp | ground floor rehabilitation - (n) study, (n) family room, (n) bathroom. replace (e) stairway, structural strengthing, additional foundation slab upgrade, widen garage door to 10 ft.Details
ground floor rehabilitation - (n) study, (n) family room, (n) bathroom. replace (e) stairway, structural strengthing, additional foundation slab upgrade, widen garage door to 10 ft. | $60,000 |