Nor - Cal Construction
- Based in
- Pacifica
- On San Francisco permits
- May 2010 to Jan 2013
- Last 24 months
- 0 permits filed
3 permits since 2000: 3 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 14, 2013 | Completed final sign-off Apr 2013 | 245 05th St | revision to 201210031251. detail of existing and proposed ceiling and wall framingDetails
revision to 201210031251. detail of existing and proposed ceiling and wall framing | |
| Oct 3, 2012 | Completed final sign-off Apr 2013 | 245 05th St | extension of (e) storage closet into open studio spaceDetails
extension of (e) storage closet into open studio space | $7,500 |
| May 11, 2010 | Completed final sign-off Jul 2011 | 406 Carl St | unit a-bathroom remodel-demo exist bath to bare studs.install new tub,mixing valve to exist copper pipe,waste pipe. install special wall mount vanity faucet, new lavi,w/c, xp sheetrock, vanity cabinet/cultured top,new tile surround,mirror,can flouresent light,prime & paint.Details
unit a-bathroom remodel-demo exist bath to bare studs.install new tub,mixing valve to exist copper pipe,waste pipe. install special wall mount vanity faucet, new lavi,w/c, xp sheetrock, vanity cabinet/cultured top,new tile surround,mirror,can flouresent light,prime & paint. | $15,000 |