Back to bathroom remodel contractors
Nor - Cal Construction
- Based in
- Pacifica
- On San Francisco permits
- May 2010 to Jan 2013
- Last 24 months
- 0 permits filed
3 permits since 2000: 3 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
1 bathroom remodel permit: 1 completed. Typically 0 days from filing to permit and 433 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 11, 2010 | Completed final sign-off Jul 2011 | 406 Carl St | unit a-bathroom remodel-demo exist bath to bare studs.install new tub,mixing valve to exist copper pipe,waste pipe. install special wall mount vanity faucet, new lavi,w/c, xp sheetrock, vanity cabinet/cultured top,new tile surround,mirror,can flouresent light,prime & paint.Details
unit a-bathroom remodel-demo exist bath to bare studs.install new tub,mixing valve to exist copper pipe,waste pipe. install special wall mount vanity faucet, new lavi,w/c, xp sheetrock, vanity cabinet/cultured top,new tile surround,mirror,can flouresent light,prime & paint. | $15,000 |