Western Division Build
- Based in
- San Francisco
- On San Francisco permits
- Sep 2016 to Dec 2017
- Last 24 months
- 0 permits filed
7 permits since 2000: 6 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 12, 2017 | Never finaled issued Dec 2017, no final | 1177 California St | street spaceDetails
street space | |
| Aug 14, 2017 | Completed final sign-off May 2018 | 136 Mateo St | removal of (e) closets for new 2nd floor bathroomDetails
removal of (e) closets for new 2nd floor bathroom | $8,000 |
| Jun 12, 2017 | Completed final sign-off Oct 2017 | 262 Frederick St | unit #5 (top floor) - remove (e) non-load bearing wall in (e) entry. reconfigure (e) bathroom, relocate toilet to reconfigured bathroom, new lighting in entry & bathroom.Details
unit #5 (top floor) - remove (e) non-load bearing wall in (e) entry. reconfigure (e) bathroom, relocate toilet to reconfigured bathroom, new lighting in entry & bathroom. | $15,000 |
| May 8, 2017 | Completed final sign-off Apr 2018 | 3262 25th St | repair and replace existing stucco at facade. replace existing lath and paper where needed.Details
repair and replace existing stucco at facade. replace existing lath and paper where needed. | $4,500 |
| Jan 27, 2017 | Completed final sign-off Apr 2017 | 82 Allston Wy | replace vanity, sinks/faucets, tile, tub/shower, exhaust fan - all existing locations, no structural walls to be moved. overhead lighting and drywall to remain. 2nd floor bathroomDetails
replace vanity, sinks/faucets, tile, tub/shower, exhaust fan - all existing locations, no structural walls to be moved. overhead lighting and drywall to remain. 2nd floor bathroom | $28,000 |
| Nov 15, 2016 | Completed final sign-off Mar 2017 | 136 Mateo St | replace existing toilet, vanity, sink, tile, drywall w/ new fixtures. all plumbing locations to remain. add 2 recessed canned lights, replace fan w/ humidistat fixture. no walls moved, removed, added or infilled. all existing layout to remain unchanged.Details
replace existing toilet, vanity, sink, tile, drywall w/ new fixtures. all plumbing locations to remain. add 2 recessed canned lights, replace fan w/ humidistat fixture. no walls moved, removed, added or infilled. all existing layout to remain unchanged. | $25,000 |
| Sep 28, 2016 | Completed final sign-off Mar 2017 | 10 Page St | ground floor, unit b: ti - instructional exercise space, open to public. add new finished floor, installing new finishe, adding droped ceilings, new elect. lighting anfd mech hvacDetails
ground floor, unit b: ti - instructional exercise space, open to public. add new finished floor, installing new finishe, adding droped ceilings, new elect. lighting anfd mech hvac | $50,000 |