Stephen Maccracken
- Listed as
- architect, designer
- Firm
- Mac Cracken Architect
- Based in
- San Francisco
- On San Francisco permits
- Nov 2004 to Sep 2026
82 permits since 2000 (architect on 81 permits, designer on 1 permit): 51 completed, 12 in progress, 13 never finaled, 6 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 3, 2026 | In progress filed Sep 2026, not yet issued | 400 Pacific Av | basement & 1st floor partial seismic upgrades, ada accessibility upgrades, office ti. mep under separate permits.Details
basement & 1st floor partial seismic upgrades, ada accessibility upgrades, office ti. mep under separate permits. | $300,000 | |
| Jul 6, 2026 | In progress filed Jul 2026, not yet issued | 402 Jackson St | new 510sf roof deck and (e) exterior fire escape/landing revision per ab-019. see 2025-012106coa & a0.5 for prior coa approval.Details
new 510sf roof deck and (e) exterior fire escape/landing revision per ab-019. see 2025-012106coa & a0.5 for prior coa approval. | $150,000 | |
| Apr 9, 2026 | In progress issued May 2026 | 821 Sansome St | Aecore Inc. | 1/fl- replace front doors, add 3 enclosed offices, revise bathrooms and add showerDetails
1/fl- replace front doors, add 3 enclosed offices, revise bathrooms and add shower | $50,000 |
| Apr 1, 2026 | In progress filed Apr 2026, not yet issued | 766 San Francisco Golf Club Rd | construction of a new parking area and uncovered sand storage space. under separate pa# 202509245990, new maintenance building and administrative offices and associated site work.cDetails
construction of a new parking area and uncovered sand storage space. under separate pa# 202509245990, new maintenance building and administrative offices and associated site work.c | ||
| Feb 19, 2026 | In progress issued Mar 2026 | 1155 Indiana St | Scott & Warner Builders Inc | (n) commerical wash area in (e) tenant space connection through non structural wall to adjacent spaceDetails
(n) commerical wash area in (e) tenant space connection through non structural wall to adjacent space | $150,000 |
| Dec 22, 2025 | In progress issued Aug 2026 | 402 Jackson St | Rod Heisler Construction | voluntary seismic upgrade -no exterior changes proposed.Details
voluntary seismic upgrade -no exterior changes proposed. | $400,000 |
| Nov 25, 2025 | In progress issued Apr 2026 | 754 San Francisco Golf Club Rd | Cody Vermette Group Inc | construction of a 1-story, type-v gold maintenance building and administrative offices including associated site work.Details
construction of a 1-story, type-v gold maintenance building and administrative offices including associated site work. | $6,500,000 |
| Sep 10, 2025 | In progress issued Oct 2025 | 1170 Harrison St | Achill Beg Construction Inc | interior only ti to (e) office space on all floorsDetails
interior only ti to (e) office space on all floors | $1,000,000 |
| Aug 11, 2025 | In progress issued Sep 2025 | 1170 Harrison St | Achill Beg Construction Inc | fl infill of e space between 1st and 2nd fl. ada upgrades to existing restrooms on 1st and second floors.Details
fl infill of e space between 1st and 2nd fl. ada upgrades to existing restrooms on 1st and second floors. | $215,000 |
| May 8, 2025 | Completed final sign-off Jun 2025 | 600 Townsend St | change of planning use from (group b) wholesale showroom to (group b) office per 2025-001365 pca & 2025-000545 ofa to establish up to 213,400 sf of office use. no work or change of building occupancy classification.Details
change of planning use from (group b) wholesale showroom to (group b) office per 2025-001365 pca & 2025-000545 ofa to establish up to 213,400 sf of office use. no work or change of building occupancy classification. | ||
| Sep 12, 2024 | In progress filed Sep 2024, not yet issued | 2444 Van Ness Av | Murphymckenna Construction | new shared 498 sq ft roof deck accessed by existing stair penthouse.Details
new shared 498 sq ft roof deck accessed by existing stair penthouse. | $180,000 |
| Jun 17, 2024 | Completed final sign-off Aug 2024 | 1 Sansome St | Stockham Construction | per approved pa# 202207188670 & 202202047371, modify approved occupant load for district inspector request during operational permit review for concentrated & unconcentrated assembly use allocations as well as additions of 2 required illuminated signs exit and a clearly reiniated path through conserDetails
per approved pa# 202207188670 & 202202047371, modify approved occupant load for district inspector request during operational permit review for concentrated & unconcentrated assembly use allocations as well as additions of 2 required illuminated signs exit and a clearly reiniated path through conser | |
| Apr 8, 2024 | In progress issued May 2024 | 1 Sansome St | Stockham Construction | 19/f: interior remodel of common areas in an (e) hi-rise downtown building. work to include new partitions, doors, glazing. new suspended ceiling with new light fixtures, new finishes, (electrical, lighting, and hvac deferred submittal).Details
19/f: interior remodel of common areas in an (e) hi-rise downtown building. work to include new partitions, doors, glazing. new suspended ceiling with new light fixtures, new finishes, (electrical, lighting, and hvac deferred submittal). | $135,300 |
| Feb 12, 2024 | In progress issued Feb 2024 | 1 Sansome St | revision to pa# 202307242855, path of travel through gym space revised.Details
revision to pa# 202307242855, path of travel through gym space revised. | ||
| Sep 5, 2023 | Completed final sign-off Feb 2024 | 1 Sansome St | Bevilacqua & Sons | revision to 202207188670 to remove (e) basement bathrooms upgrades from scope of work.Details
revision to 202207188670 to remove (e) basement bathrooms upgrades from scope of work. | |
| Jul 27, 2023 | Completed final sign-off Feb 2025 | 1 Sansome St | Stockham Construction | suite 3210: remodel of (e) suite, new partitions, millwork, doors, glazing, new suspended ceiling w/new light fixtures/finishes/electrical/lighting/hvacDetails
suite 3210: remodel of (e) suite, new partitions, millwork, doors, glazing, new suspended ceiling w/new light fixtures/finishes/electrical/lighting/hvac | $751,122 |
| Jul 24, 2023 | Never finaled issued Aug 2023, no final | 1 Sansome St | demo existing non-compliant basement bathrooms & construction of new bathrooms & gym, all mep permits to followDetails
demo existing non-compliant basement bathrooms & construction of new bathrooms & gym, all mep permits to follow | $1,000,000 | |
| Jul 11, 2023 | Expired or cancelled withdrawn Jul 2023 | 1 Sansome St | permit to document new combined occupant loads for previously issued bp 202202047371, 202207188670Details
permit to document new combined occupant loads for previously issued bp 202202047371, 202207188670 | ||
| Jun 30, 2023 | Completed final sign-off Dec 2023 | 1 Sansome St | Peacock Construction | 36/f: addition of (2) new phone booths in (e) office spaceDetails
36/f: addition of (2) new phone booths in (e) office space | $17,250 |
| Jun 6, 2023 | Never finaled issued Sep 2023, no final | 1 Sansome St | Principal Builders Inc. | change of exterior door swing barrier removal only.Details
change of exterior door swing barrier removal only. | $20,000 |
| May 26, 2023 | Completed final sign-off Nov 2023 | 1 Sansome St | comply w/planning enforcement case # 2022-009341enf. g/f: establish general entertainment on the ground floor publically accessible atrium (conservatory) & install green living walls within the atrium.Details
comply w/planning enforcement case # 2022-009341enf. g/f: establish general entertainment on the ground floor publically accessible atrium (conservatory) & install green living walls within the atrium. | $150,000 | |
| Apr 26, 2023 | Completed final sign-off Dec 2023 | 1 Sansome St | Principal Builders Inc. | 32/f: tenant improvement of existing office space, full demo, except bathrooms, no ceiling demo in non-build out area.mep deferred.Details
32/f: tenant improvement of existing office space, full demo, except bathrooms, no ceiling demo in non-build out area.mep deferred. | $750,000 |
| Feb 27, 2023 | Never finaled issued Jul 2023, no final | 1 Sansome St | Principal Builders Inc. | floors 22-27: existing tenant space demo and new ada bathrooms. (ref pa#s 202302272649 & 202302272651 for fire sprinklers)Details
floors 22-27: existing tenant space demo and new ada bathrooms. (ref pa#s 202302272649 & 202302272651 for fire sprinklers) | $420,000 |
| Feb 16, 2023 | Completed final sign-off Oct 2023 | 1480 Folsom St | Bcci Construction Company | addition of exterior metal panelsDetails
addition of exterior metal panels | $25,000 |
| Jan 12, 2023 | Never finaled issued Jan 2023, no final | 1 Sansome St | Bevilacqua & Sons | 1st floor and basement: revision to pa# 202207188670 walk-in cooler & storage rm locations.Details
1st floor and basement: revision to pa# 202207188670 walk-in cooler & storage rm locations. | |
| Dec 13, 2022 | Completed final sign-off May 2023 | 1 Sansome St | Peacock Construction | provide existing ada elevator access to basement. all mep permits to follow.Details
provide existing ada elevator access to basement. all mep permits to follow. | $80,000 |
| Nov 8, 2022 | Completed final sign-off Apr 2023 | 1 Sansome St | Peacock Construction | absorbative acoustic material in consevatory space.Details
absorbative acoustic material in consevatory space. | $150,000 |
| Oct 25, 2022 | Completed final sign-off Apr 2023 | 1 Sansome St | Peacock Construction | electrical only title 24 ref 202203109738Details
electrical only title 24 ref 202203109738 | $15,000 |
| Oct 5, 2022 | Completed final sign-off Oct 2023 | 1480 Folsom St | Bcci Construction Company | addition of exterior mechanical platform and security gate in private alley. structural drawings and calcs included.Details
addition of exterior mechanical platform and security gate in private alley. structural drawings and calcs included. | $80,000 |
| Sep 29, 2022 | Completed final sign-off Dec 2023 | 1480 Folsom St | Bcci Construction Company | revision to bpa#202210251080 to provide new egress to 11th streetDetails
revision to bpa#202210251080 to provide new egress to 11th street | $10,000 |
| Sep 29, 2022 | Completed final sign-off Nov 2023 | 776 Carolina St | Murphymckenna Construction | revision to bpa#201812067579, replace in-kind (e) brick watt @ front entryDetails
revision to bpa#201812067579, replace in-kind (e) brick watt @ front entry | $10,000 |
| Jul 22, 2022 | Completed final sign-off Apr 2024 | 258 09th St | K 2 Builders Inc | change of use from warehouse s-2 to industrial f-2. new sprinkler system & new bathroom & showerDetails
change of use from warehouse s-2 to industrial f-2. new sprinkler system & new bathroom & shower | $400,000 |
| May 17, 2022 | Never finaled issued Aug 2022, no final | 1 Sansome St | Peacock Construction | 1/f: remove (e) column on ground floor, future bar area (bar t.i. under separate permit)Details
1/f: remove (e) column on ground floor, future bar area (bar t.i. under separate permit) | $150,000 |
| May 5, 2022 | Completed final sign-off Jul 2024 | 430 Pacific Av | Rod Heisler Construction | revision to pa# 201912311067. interior tenant improvement of existing office space. no exterior changes. mep under separate permit.Details
revision to pa# 201912311067. interior tenant improvement of existing office space. no exterior changes. mep under separate permit. | |
| Apr 21, 2022 | Completed final sign-off Oct 2023 | 1480 Folsom St | Bcci Construction Company | (n) ada restrooms in (e) automotive use space. (n) 1-hr rated exit corridor. demo (e) restrooms and office space. no change of use under this permit.Details
(n) ada restrooms in (e) automotive use space. (n) 1-hr rated exit corridor. demo (e) restrooms and office space. no change of use under this permit. | $75,000 |
| Apr 13, 2022 | Expired or cancelled withdrawn Apr 2022 | 1480 Folsom St | Bcci Construction Company | new mezzanine and ada compliant bathrooms- mep to follow.Details
new mezzanine and ada compliant bathrooms- mep to follow. | $250,000 |
| Mar 10, 2022 | Completed final sign-off Apr 2023 | 1 Sansome St | Peacock Construction | revision to pa#201812057541 to revise door locations to conservatory and demo of non code req'd door to egress enclosure on first floor. no work to historic building.Details
revision to pa#201812057541 to revise door locations to conservatory and demo of non code req'd door to egress enclosure on first floor. no work to historic building. | $10,000 |
| Feb 3, 2022 | Expired or cancelled cancelled Feb 2025 | 251 Lake Merced Hill St North St | interior remodel of kitchen per plans on second floor.Details
interior remodel of kitchen per plans on second floor. | $30,000 | |
| Dec 16, 2021 | Completed final sign-off May 2023 | 1 Sansome St | Dpr Construction A | 42nd fl - ti include demo of non-structural partitions and building new non structural partitions. all new ore revised meps, life safety & sprinklers will be design build and submitted separately (bldg is fully sprinklered)Details
42nd fl - ti include demo of non-structural partitions and building new non structural partitions. all new ore revised meps, life safety & sprinklers will be design build and submitted separately (bldg is fully sprinklered) | $416,000 |
| Dec 16, 2021 | Completed final sign-off May 2023 | 1 Sansome St | Dpr Construction | 41st fl - ti includes demo of non-structural partitions and building (n) non-structural partitions; all new or revised meps, life safety and sprinklers will be design build & submitted separately (bldg is fully sprinklered)Details
41st fl - ti includes demo of non-structural partitions and building (n) non-structural partitions; all new or revised meps, life safety and sprinklers will be design build & submitted separately (bldg is fully sprinklered) | $875,000 |
| Dec 14, 2021 | Never finaled issued Dec 2021, no final | 1950 Cesar Chavez St | Rod Heisler Construction | legalize s-2 to f-1 change of partial 1/f area for new proposed tenant.Details
legalize s-2 to f-1 change of partial 1/f area for new proposed tenant. | $99 |
| Nov 3, 2021 | Never finaled issued Jan 2022, no final | 1 Sansome St | Stockham Construction | demising of 40th floor for 2 future tenants - under separate ti permits. all mep to follow.Details
demising of 40th floor for 2 future tenants - under separate ti permits. all mep to follow. | $110,000 |
| Oct 25, 2021 | Completed final sign-off Dec 2023 | 1480 Folsom St | Bcci Construction Company | conversion of ext single story + or - 40000 sq ft automotive repair bldg to trade shop with accessory parking and storage. all associated ti fit out.Details
conversion of ext single story + or - 40000 sq ft automotive repair bldg to trade shop with accessory parking and storage. all associated ti fit out. | $2,000,000 |
| Oct 19, 2021 | Expired or cancelled withdrawn Nov 2023 | 776 Carolina St | Murphymckenna Construction | rev to pa201812067579 to revise grage demo scope & shoring due to onsite conditions.Details
rev to pa201812067579 to revise grage demo scope & shoring due to onsite conditions. | $8,000 |
| Aug 6, 2021 | Completed final sign-off Jun 2022 | 559 Clay St | Rod Heisler Construction | tenant improvement in extg basement. all mep permit to follow.Details
tenant improvement in extg basement. all mep permit to follow. | $200,000 |
| Nov 23, 2020 | Completed final sign-off May 2021 | 3201 California St | Rod Heisler Construction | exterior only: replace (e) atm surround assembly.Details
exterior only: replace (e) atm surround assembly. | $20,000 |
| Aug 23, 2019 | Completed final sign-off May 2020 | 22 Moore Pl | Ventana 76 | removal of illegale built wood decking @ (e) roof and replace with green roof to comply with planning notice of violation 201-006431enf. green roof approved per p.a.#2015-0622-9587Details
removal of illegale built wood decking @ (e) roof and replace with green roof to comply with planning notice of violation 201-006431enf. green roof approved per p.a.#2015-0622-9587 | $2,500 |
| Aug 9, 2019 | Completed final sign-off Feb 2020 | 2601 Mission St | Rod Heisler Construction | 7th floor: addition of lobby enclosures on the 7th floor. demo of 2 extg enclosed offices. all mep under seperate permit.Details
7th floor: addition of lobby enclosures on the 7th floor. demo of 2 extg enclosed offices. all mep under seperate permit. | $40,000 |
| May 3, 2019 | Never finaled issued Jun 2019, no final | 311 28th St | interior remodel of existing historic home. new skylight not visible from street.Details
interior remodel of existing historic home. new skylight not visible from street. | $150,000 | |
| Jun 1, 2018 | Completed final sign-off Jun 2019 | 910 Valencia St | interior barrier removal, (n) interior ramp & interior compliant ada bathroom, all exterior work under seperate permit (201806010827 ). maher n/a.Details
interior barrier removal, (n) interior ramp & interior compliant ada bathroom, all exterior work under seperate permit (201806010827 ). maher n/a. | $50,000 | |
| Mar 24, 2017 | Completed final sign-off Mar 2018 | 810 Valencia St | Vision Builders | remodel of (e) b occupancy street level commercial space. (n) non-structural partitions, (n) hvac, electrical & plumbing. (n) ada bathroom "float facility" enclosing sensory deprivation tanksDetails
remodel of (e) b occupancy street level commercial space. (n) non-structural partitions, (n) hvac, electrical & plumbing. (n) ada bathroom "float facility" enclosing sensory deprivation tanks | $250,000 |
| Apr 22, 2016 | Completed final sign-off Nov 2016 | 4711 18th St | Solstice Enterprises Inc. | unit #2 top floor - new roof deck including sink & grill & refrigerator. architectural and structural only. mep under separate permit.Details
unit #2 top floor - new roof deck including sink & grill & refrigerator. architectural and structural only. mep under separate permit. | $80,000 |
| Dec 10, 2015 | Never finaled issued Dec 2015, no final | 1 Sansome St | Stockham Construction | 3rd floor interior infill of double height atrium & new ada bathrooms - addition of 3,354 sq ft. all mep permits to follow.Details
3rd floor interior infill of double height atrium & new ada bathrooms - addition of 3,354 sq ft. all mep permits to follow. | $600,000 |
| Jun 3, 2015 | Never finaled issued Jun 2015, no final | 1 Sansome St | Stockham Construction | 38th floor: interior demo of extg office space and ada bathroom upgrade. lobby upgrade. all mep permit to follow.Details
38th floor: interior demo of extg office space and ada bathroom upgrade. lobby upgrade. all mep permit to follow. | $250,000 |
| May 8, 2015 | Completed final sign-off Jul 2015 | 600 Townsend St | Blue Bay Painting Contractor | 4th flr: minor demo to non structural partitions, (n) door to (e) office space. maher naDetails
4th flr: minor demo to non structural partitions, (n) door to (e) office space. maher na | $25,000 |
| Feb 24, 2015 | Never finaled issued Feb 2015, no final | 600 Townsend St | Dpr Construction | demo & infill non-exit stair connection between 2nd & 3rd floor . no change to exiting or occupancy. n/a maher ordinanceDetails
demo & infill non-exit stair connection between 2nd & 3rd floor . no change to exiting or occupancy. n/a maher ordinance | $150,000 |
| Sep 12, 2014 | Completed final sign-off Dec 2014 | 1 Sansome St | Stockham Construction | 36th floor - bathroom ada compliance & barrier removal. (plumbing & electrical permit to follow)Details
36th floor - bathroom ada compliance & barrier removal. (plumbing & electrical permit to follow) | $50,000 |
| Jul 25, 2014 | Completed final sign-off Sep 2014 | 101 Henry Adams St | C C I Commercial Construction & Improv | ste #144 - remodel of retail tenant space in existing bldg. mep and sprinkler under separate permit. maher n/a.Details
ste #144 - remodel of retail tenant space in existing bldg. mep and sprinkler under separate permit. maher n/a. | $25,000 |
| May 15, 2014 | Completed final sign-off Dec 2014 | 3201 California St | C C I Commercial Construction & Improv | additoin of approx 2,265 sf in interior exisitng two story space, no change ot building exterior. (cup approved 4/24/14 #2013c.1654c. compliance with ordinance #155-13 not requiredDetails
additoin of approx 2,265 sf in interior exisitng two story space, no change ot building exterior. (cup approved 4/24/14 #2013c.1654c. compliance with ordinance #155-13 not required | $500,000 |
| Apr 14, 2014 | Completed final sign-off Aug 2014 | 1 Sansome St | Stockham Construction | 32nd floor: interior remodel of extg office space and ada bathroom upgrade. (all mep permits to follow)Details
32nd floor: interior remodel of extg office space and ada bathroom upgrade. (all mep permits to follow) | $750,000 |
| Dec 23, 2013 | Completed final sign-off Aug 2014 | 1 Sansome St | Stockham Construction | 28th floor:t.i. of single suite "a" on extg 28th floor. all mep permits to follow. (sprinkler fire/life safety to follow)Details
28th floor:t.i. of single suite "a" on extg 28th floor. all mep permits to follow. (sprinkler fire/life safety to follow) | $250,000 |
| Dec 19, 2013 | Completed final sign-off Feb 2014 | 1 Sansome St | Stockham Construction | new exit corridor, tenant divisions & tenant improvement on 28th floor, all mep. ls and sprinklers permit to follow.Details
new exit corridor, tenant divisions & tenant improvement on 28th floor, all mep. ls and sprinklers permit to follow. | $250,000 |
| Nov 1, 2013 | Expired or cancelled withdrawn Sep 2014 | 345 Liberty St | site permit for horizontal extension. remodel of (e) 2 units building.dwelling merger applied for separately. case# 2013.1134d.Details
site permit for horizontal extension. remodel of (e) 2 units building.dwelling merger applied for separately. case# 2013.1134d. | $200,000 | |
| Oct 10, 2013 | Completed final sign-off Jan 2014 | 3201 California St | Cci Com'l Constr & Improv**See 985808*** | interior remodel of 2nd floor office space including ada improvements to (e) bathrooms; mep under separate permitDetails
interior remodel of 2nd floor office space including ada improvements to (e) bathrooms; mep under separate permit | $350,000 |
| Oct 7, 2013 | Completed final sign-off Oct 2015 | 1 Sansome St | Stockham Construction | interior remodel of existing baths. provide ada upgrades at 40/f & 41/f. all mep permits to follow.Details
interior remodel of existing baths. provide ada upgrades at 40/f & 41/f. all mep permits to follow. | $150,000 |
| Aug 14, 2013 | Completed final sign-off May 2014 | 1 Sansome St | Stockham Construction | 20th floor: t.i. in previously demo'd extg office space. all mep permit to follow.Details
20th floor: t.i. in previously demo'd extg office space. all mep permit to follow. | $475,000 |
| Aug 9, 2013 | Completed final sign-off Feb 2016 | 47 Moss St | Moroso Construction Inc | site permit only, change of use from industrial to residential including 3 bedrooms, 1 kitchen, 3.5 baths and vertical extension approx 62"Details
site permit only, change of use from industrial to residential including 3 bedrooms, 1 kitchen, 3.5 baths and vertical extension approx 62" | $1,000,000 |
| May 21, 2013 | Completed final sign-off Feb 2014 | 1 Sansome St | Stockham Construction | 28th floor: demo of non-structural partitions. lobby and bathroom remodel inc. ada upgrades.Details
28th floor: demo of non-structural partitions. lobby and bathroom remodel inc. ada upgrades. | $150,000 |
| Dec 7, 2012 | Completed final sign-off Jun 2013 | 1 Sansome St | Stockham Construction | tenant improvement of existing demolished 34th floor office space. all mep permit to follow.Details
tenant improvement of existing demolished 34th floor office space. all mep permit to follow. | $400,000 |
| Aug 22, 2012 | Completed final sign-off Apr 2013 | 6508 California St | Lingruen Associates | demo of rotten cantilevered deck & replacement with new larger deck supported by columns below.Details
demo of rotten cantilevered deck & replacement with new larger deck supported by columns below. | $5,000 |
| Apr 19, 2012 | Completed final sign-off Dec 2013 | 1 Sansome St | Stockham Construction | 34th floor- division of previously demolished floor into future tenant spaces, bathroom ada upgrades, tenant improvement in southeast corner. all mep permits to follow.Details
34th floor- division of previously demolished floor into future tenant spaces, bathroom ada upgrades, tenant improvement in southeast corner. all mep permits to follow. | $250,000 |
| Apr 19, 2012 | Completed final sign-off Dec 2012 | 1 Sansome St | Stockham Construction | remodel existing exit corridor. remove e stair between floor 17 and 18. bathroom ada upgrades and tenant improvement in e demolished office space. all mep permits to follow.Details
remodel existing exit corridor. remove e stair between floor 17 and 18. bathroom ada upgrades and tenant improvement in e demolished office space. all mep permits to follow. | $161,800 |
| Apr 19, 2012 | Never finaled issued May 2012, no final | 1 Sansome St | Stockham Construction | interior remodel of existing office space and ada bathroom upgradesDetails
interior remodel of existing office space and ada bathroom upgrades | $400,000 |
| Mar 1, 2012 | Never finaled issued Apr 2012, no final | 1 Sansome St | Stockham Construction | 15th floor tenant improvement in existing office space - new walls, new ceiling, new lighting & finishes. all mep under separate permit.Details
15th floor tenant improvement in existing office space - new walls, new ceiling, new lighting & finishes. all mep under separate permit. | $200,000 |
| Jun 13, 2011 | Completed final sign-off Mar 2012 | 1070 Green St | unit #703: non structural interior renovation of e condo unitDetails
unit #703: non structural interior renovation of e condo unit | $165,000 | |
| Jul 15, 2008 | Completed final sign-off Apr 2009 | 600 Townsend St | addition of slabs on grade for mechanical equipment and construction of a structural frame to support proposed 2nd floor ups equipment/revision to app #200804179928.Details
addition of slabs on grade for mechanical equipment and construction of a structural frame to support proposed 2nd floor ups equipment/revision to app #200804179928. | $20,000 | |
| Mar 26, 2008 | Completed final sign-off Oct 2008 | 600 Townsend St | interior tenant improvement for new conference space in an existing office buildingDetails
interior tenant improvement for new conference space in an existing office building | $670,000 | |
| Dec 21, 2007 | Completed final sign-off Sep 2008 | 600 Townsend St | 2nd floor:ti for new offices. new non-load bearing walls to separate offices. 2 new handicap restrooms. new mechanical heating and air conditioning system. fire safety under separate permitDetails
2nd floor:ti for new offices. new non-load bearing walls to separate offices. 2 new handicap restrooms. new mechanical heating and air conditioning system. fire safety under separate permit | $1,550,000 | |
| Apr 13, 2007 | Expired or cancelled expired May 2009 | 600 Townsend St | revision to 200602154640, cafe prep catering space, cafe for employee onlyDetails
revision to 200602154640, cafe prep catering space, cafe for employee only | $30,000 | |
| Aug 16, 2005 | Completed final sign-off Dec 2006 | 27 South Park | Dawson - Clinton Gen Contr Corp | oti-1 2nd fl-el.Details
oti-1 2nd fl-el. | $60,000 |
| Jan 12, 2005 | Completed final sign-off Jan 2005 | 3352 Clay St | appl#200003134135 as built to 2 units.to correct appl#200208012838 to 200208112838.Details
appl#200003134135 as built to 2 units.to correct appl#200208012838 to 200208112838. | ||
| Nov 18, 2004 | Completed final sign-off Feb 2005 | 303 02nd St | Plant Construction | oti-1, 9th floor, n. tower, me, ls, sp, el.Details
oti-1, 9th floor, n. tower, me, ls, sp, el. | $30,000 |