125 permits since 2000 (contractor on 125 permits, designer on 5 permits, authorized agent-others on 2 permits): 77 completed, 44 never finaled, 4 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
Showing the 100 most recent of 125.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 16, 2025 | Completed final sign-off Jul 2025 | 618 Baker St | Flow Masters Plumbing Inc | 4th floor:install fire sprinkler system nfpa 13-r. as built of 4th floor ref#: 202010287649 and 201702109176.Details
4th floor:install fire sprinkler system nfpa 13-r. as built of 4th floor ref#: 202010287649 and 201702109176. | $15,000 |
| Jul 13, 2023 | Never finaled issued Jul 2023, no final | 2845 18th St | Flow Masters Plumbing Inc | tenant improvement drop 5 sprinklers heads for proper coverageDetails
tenant improvement drop 5 sprinklers heads for proper coverage | $1,000 |
| Oct 14, 2022 | Never finaled issued Oct 2022, no final | 3500 Jackson St | Flow Masters Plumbing Inc | update as builts for #202106081906. to super seed as builts #202202288837Details
update as builts for #202106081906. to super seed as builts #202202288837 | |
| Jun 9, 2022 | Completed final sign-off Oct 2022 | 471 Fulton St | Flow Masters Plumbing Inc | install fire sprinkler system in proposed edu per nfpa 13 utilizing 2" )e) meter fire/demostic underground per nfpa 24. ref 2020 1120 9452 (adu).Details
install fire sprinkler system in proposed edu per nfpa 13 utilizing 2" )e) meter fire/demostic underground per nfpa 24. ref 2020 1120 9452 (adu). | $15,000 |
| Apr 15, 2022 | Completed final sign-off Nov 2024 | 780 Elizabeth St | Flow Masters Plumbing Inc | fire as-builts for pa# 202009285344. (install (47) new fire sprinkler heads throughout per nfpa 13r; ref bpa#201901281447) change ug from combo to dedicated per nfpa 24Details
fire as-builts for pa# 202009285344. (install (47) new fire sprinkler heads throughout per nfpa 13r; ref bpa#201901281447) change ug from combo to dedicated per nfpa 24 | |
| Mar 8, 2022 | Completed final sign-off Apr 2022 | 2300 16th St | Flow Masters Plumbing Inc | relocation of (e) 1" sprinkler branch line to clean the vault at the garage level. overhead sprinkler system per nfpa13 2016 including adopted standards by city of sf & cbc-903.3.1.3. ref pa# 202009013169.Details
relocation of (e) 1" sprinkler branch line to clean the vault at the garage level. overhead sprinkler system per nfpa13 2016 including adopted standards by city of sf & cbc-903.3.1.3. ref pa# 202009013169. | $3,500 |
| Feb 28, 2022 | Never finaled issued Feb 2022, no final | 3500 Jackson St | Flow Masters Plumbing Inc | as builts for pa#202106081906Details
as builts for pa#202106081906 | |
| Jan 26, 2022 | Never finaled issued Feb 2022, no final | 818 Arguello Bl | Flow Masters Plumbing Inc | installation of a new automatic fire sprinkler system in the ground level in existing 3 story bldg, 2" underground per nfpa24. overhead sprinkler system per nfpa 13 2016 including adapted standards by city of sf and cbc-903.3.1.3. 20 total heads.Details
installation of a new automatic fire sprinkler system in the ground level in existing 3 story bldg, 2" underground per nfpa24. overhead sprinkler system per nfpa 13 2016 including adapted standards by city of sf and cbc-903.3.1.3. 20 total heads. | $19,500 |
| Dec 2, 2021 | Completed final sign-off Mar 2022 | 123 Ripley St | Flow Masters Plumbing Inc | install (n) automatic fire sprinkler system in unit a (adu) & adjacent crawl space supplied from (e) 2" lateral/underground/backflow. (n) fdc located outside of unit a on treat ave. total 19 heads.Details
install (n) automatic fire sprinkler system in unit a (adu) & adjacent crawl space supplied from (e) 2" lateral/underground/backflow. (n) fdc located outside of unit a on treat ave. total 19 heads. | $10,000 |
| Sep 22, 2021 | Never finaled issued Sep 2021, no final | 666 Shotwell St | Flow Masters Plumbing Inc | revision to bpa#202105110177. change from 3" t0 4" underground fire serviceDetails
revision to bpa#202105110177. change from 3" t0 4" underground fire service | |
| Jun 14, 2021 | Completed final sign-off Feb 2023 | 1251 Green St | Flow Masters Plumbing Inc | installation of a new automatic fire sprinkler system on the 1st floor of the 2-story building per nfpa 13 2016 and the ordinance of the city of san francisco.Details
installation of a new automatic fire sprinkler system on the 1st floor of the 2-story building per nfpa 13 2016 and the ordinance of the city of san francisco. | $1,500 |
| Jun 14, 2021 | Completed final sign-off Dec 2021 | 2389 Mission St | Flow Masters Plumbing Inc | modify existing fire sprinkler system for remodeling ada restroomarea only per nfpa 13. total 6 heads.Details
modify existing fire sprinkler system for remodeling ada restroomarea only per nfpa 13. total 6 heads. | $1,500 |
| Jun 8, 2021 | Never finaled issued Jun 2021, no final | 3500 Jackson St | Flow Masters Plumbing Inc | install new fire sprinkler system for the building throughout. included 2" underground fire service. total=87 heads.Details
install new fire sprinkler system for the building throughout. included 2" underground fire service. total=87 heads. | $1,500 |
| May 11, 2021 | Completed final sign-off Dec 2022 | 2435 16th St | Flow Masters Plumbing Inc | install new 6" underground fire service for fire sprinkler system (ref. #2021-0329-7476 & #2021-0316-6591)Details
install new 6" underground fire service for fire sprinkler system (ref. #2021-0329-7476 & #2021-0316-6591) | $1,500 |
| May 11, 2021 | Never finaled issued Jul 2021, no final | 666 Shotwell St | Flow Masters Plumbing Inc | install new fire sprinkler system for remodeling building throughout per nfpa 13. included 3" underground fire service. total 101 heads.Details
install new fire sprinkler system for remodeling building throughout per nfpa 13. included 3" underground fire service. total 101 heads. | $1,500 |
| Jan 14, 2021 | Never finaled issued Mar 2021, no final | 123 Ripley St | Flow Masters Plumbing Inc | install new sprinkler system for the aud & egress path. included 2" underground fire service. total = 49 heads.Details
install new sprinkler system for the aud & egress path. included 2" underground fire service. total = 49 heads. | $5,000 |
| Nov 2, 2020 | Never finaled issued Dec 2020, no final | 410 Pacific Av | Flow Masters Plumbing Inc | previous contractor abandoned permit # 2015-1009-9301. as-built drawings. no actual work done to system. underground and backflow already in place. provided hydraulic calculations.Details
previous contractor abandoned permit # 2015-1009-9301. as-built drawings. no actual work done to system. underground and backflow already in place. provided hydraulic calculations. | $2,000 |
| Oct 28, 2020 | Never finaled issued Dec 2020, no final | 618 Baker St | Flow Masters Plumbing Inc | as built drawings re: #2017-0210-9176. slight changes to pipe routing on floors 1-3. final design and hydraulic calculations for attic space tie due to obstruction presented.Details
as built drawings re: #2017-0210-9176. slight changes to pipe routing on floors 1-3. final design and hydraulic calculations for attic space tie due to obstruction presented. | $2,000 |
| Sep 28, 2020 | Completed final sign-off Nov 2024 | 780 Elizabeth St | Flow Masters Plumbing Inc | install (47) new fire sprinkler heads throughout per nfpa 13r; 2" combination fire/comestic supply per nfpa 24. ref bpa#201901281447Details
install (47) new fire sprinkler heads throughout per nfpa 13r; 2" combination fire/comestic supply per nfpa 24. ref bpa#201901281447 | $10,000 |
| Sep 28, 2020 | Completed final sign-off May 2021 | 710 43rd Av | Flow Masters Plumbing Inc | install 13 new fire sprinklers throughout garage and first floor. per nfpa 13; see equivalency in pa# 202007089732. install 2" combination meter per nfpa 24Details
install 13 new fire sprinklers throughout garage and first floor. per nfpa 13; see equivalency in pa# 202007089732. install 2" combination meter per nfpa 24 | $8,000 |
| Sep 28, 2020 | Never finaled issued Oct 2020, no final | 308 Duncan St | Flow Masters Plumbing Inc | as-built drawings for bpa#202007069632. ref bpa#201909272878 & 20179117500Details
as-built drawings for bpa#202007069632. ref bpa#201909272878 & 20179117500 | |
| Sep 28, 2020 | Completed final sign-off Mar 2021 | 2949 Pacific Av | Flow Masters Plumbing Inc | install twenty-nine new sprinkler heads per nfpa13r. supply off existing underground and main. work limited to top floor of building. reference to permit application #202005207647Details
install twenty-nine new sprinkler heads per nfpa13r. supply off existing underground and main. work limited to top floor of building. reference to permit application #202005207647 | $10,000 |
| Sep 28, 2020 | Completed final sign-off Mar 2021 | 581 Waller St | Flow Masters Plumbing Inc | as-built fire sprinkler drawngs 201912260682.Details
as-built fire sprinkler drawngs 201912260682. | |
| Sep 28, 2020 | Completed final sign-off Jul 2021 | 1115 Polk St | Flow Masters Plumbing Inc | install 42 new fire sprinklers throught tenant improvement brewery in basement, cover entire floor. correct orientation & location of existing backflow prevente. ref bpa#201908017653Details
install 42 new fire sprinklers throught tenant improvement brewery in basement, cover entire floor. correct orientation & location of existing backflow prevente. ref bpa#201908017653 | $5,500 |
| Sep 3, 2020 | Never finaled issued Sep 2020, no final | 2950 Webster St | Flow Masters Plumbing Inc | reconfigure piping to garage. no other changes in system. as built drawings re: #201912048679. fire only.Details
reconfigure piping to garage. no other changes in system. as built drawings re: #201912048679. fire only. | |
| Sep 3, 2020 | Never finaled issued Sep 2020, no final | 2190 46th Av | Flow Masters Plumbing Inc | as built for fire only permit: 201911217944. reroute piping between 1st and 2nd fl; no other changes to head placement or coverage. fire onlyDetails
as built for fire only permit: 201911217944. reroute piping between 1st and 2nd fl; no other changes to head placement or coverage. fire only | |
| Sep 3, 2020 | Completed final sign-off Nov 2021 | 2285 Broadway | Flow Masters Plumbing Inc | install (24) new fire sprinklers at entire ground floor per nfpa13 install 2" dedicated fire service per nfpa (ref pa# 201710121124)Details
install (24) new fire sprinklers at entire ground floor per nfpa13 install 2" dedicated fire service per nfpa (ref pa# 201710121124) | $15,000 |
| Sep 2, 2020 | Never finaled issued Sep 2020, no final | 3704 22nd St | Flow Masters Plumbing Inc | as-built drawings for permit 201804176581. added six fire sprinkler heads: replace (2) pendents with sidewall sprinkler.Details
as-built drawings for permit 201804176581. added six fire sprinkler heads: replace (2) pendents with sidewall sprinkler. | |
| Aug 19, 2020 | Completed final sign-off Jan 2022 | 635 Scott St | Flow Masters Plumbing Inc | revision to fire only permit #201912048677. reroute piping in garage. no other changes. provide new calculations. re 201703080995Details
revision to fire only permit #201912048677. reroute piping in garage. no other changes. provide new calculations. re 201703080995 | |
| Jul 21, 2020 | Never finaled filed Jul 2020, never issued | 710 43rd Av | Flow Masters Plumbing Inc | install 15 new fire sprinkler heads per nfpa 13 throughout first fl. install 2" combination fire service & domestic meter. ref #202007079732; 201911217887.Details
install 15 new fire sprinkler heads per nfpa 13 throughout first fl. install 2" combination fire service & domestic meter. ref #202007079732; 201911217887. | $5,000 |
| Jul 6, 2020 | Never finaled issued Jul 2020, no final | 308 Duncan St | Flow Masters Plumbing Inc | correct point of connection to duncan st. ref permit #201909272878: new sprinkler system throughout bldg per nfpa 13 including 2" underground. 55 total heads. sprinkler monitoring under sep permit.Details
correct point of connection to duncan st. ref permit #201909272878: new sprinkler system throughout bldg per nfpa 13 including 2" underground. 55 total heads. sprinkler monitoring under sep permit. | |
| Jul 6, 2020 | Never finaled issued Jul 2020, no final | 926 Grove St | Flow Masters Plumbing Inc | f/s: relocate 1 sprinkler head in restrooom to acco0modate skylight. no other work to system.Details
f/s: relocate 1 sprinkler head in restrooom to acco0modate skylight. no other work to system. | $500 |
| Jun 16, 2020 | Never finaled issued Aug 2020, no final | 455 Eddy St | Flow Masters Plumbing Inc | reconfigure fire sprinkler head to suit tenant improvement. install four new fire sprinkler heads; no other work to system.Details
reconfigure fire sprinkler head to suit tenant improvement. install four new fire sprinkler heads; no other work to system. | $2,000 |
| Mar 11, 2020 | Never finaled issued Mar 2020, no final | 601 Van Ness Av | Flow Masters Plumbing Inc | relocate branchline piping running over pg&e vault. no other work.Details
relocate branchline piping running over pg&e vault. no other work. | $200 |
| Feb 26, 2020 | Completed final sign-off Jun 2021 | 250 Page St | Flow Masters Plumbing Inc | install 36 new fire sprinklers throughout per nfpa 13. install 2" dedicated underground per nfpa 24. ref pa 2016-0908-7163Details
install 36 new fire sprinklers throughout per nfpa 13. install 2" dedicated underground per nfpa 24. ref pa 2016-0908-7163 | $14,000 |
| Feb 20, 2020 | Completed final sign-off Feb 2021 | 3545 Pierce St | Flow Masters Plumbing Inc | ref pa# 201712287576; install (53) new fire sprinklers throughout per nfpa 13r install 2.5" dedicated underground per nfpa 24 n/a maherDetails
ref pa# 201712287576; install (53) new fire sprinklers throughout per nfpa 13r install 2.5" dedicated underground per nfpa 24 n/a maher | $23,000 |
| Feb 19, 2020 | Completed final sign-off Apr 2020 | 166 Geary St | Flow Masters Plumbing Inc | floor 13: relocate 3 (e) sprinkler heads; add 1 new fire sprinkler head to suit tenant improvement. no other work to be performed. ref pa 2019-1108-6846Details
floor 13: relocate 3 (e) sprinkler heads; add 1 new fire sprinkler head to suit tenant improvement. no other work to be performed. ref pa 2019-1108-6846 | $750 |
| Feb 14, 2020 | Completed final sign-off Jan 2021 | 750 Ofarrell St | Flow Masters Plumbing Inc | install 74 new sprinkler heads in basement and 1st floor corridor and egress from adu units. install dedicated 2" underground per nfpa 24. ref app#201612215540Details
install 74 new sprinkler heads in basement and 1st floor corridor and egress from adu units. install dedicated 2" underground per nfpa 24. ref app#201612215540 | $30,000 |
| Jan 28, 2020 | Completed final sign-off Sep 2020 | 2526 Broadway | Flow Masters Plumbing Inc | reocnfigure 4th fl fire sprinkler system to suite residential remodel. relocate 15 (e) sprinklers, add 11 new sprinklers. no work to 3rd fl. utilize (e) 4" dedicated underground: install new 4" backflow preventionDetails
reocnfigure 4th fl fire sprinkler system to suite residential remodel. relocate 15 (e) sprinklers, add 11 new sprinklers. no work to 3rd fl. utilize (e) 4" dedicated underground: install new 4" backflow prevention | $12,000 |
| Dec 26, 2019 | Completed final sign-off Mar 2021 | 581 Waller St | Flow Masters Plumbing Inc | revision to pa #2018-1011-2894: install 2" dedicated fire service per nfpa 24. install 60 fire sprinkler heads per nfpa 13r.Details
revision to pa #2018-1011-2894: install 2" dedicated fire service per nfpa 24. install 60 fire sprinkler heads per nfpa 13r. | |
| Dec 4, 2019 | Completed final sign-off Jan 2022 | 635 Scott St | Flow Masters Plumbing Inc | install 37 new fire sprinklers nfpa 13. install 2" meter with 2.5" underground per nfpa 24. reference pa# 2017-0308-0995Details
install 37 new fire sprinklers nfpa 13. install 2" meter with 2.5" underground per nfpa 24. reference pa# 2017-0308-0995 | $6,000 |
| Dec 4, 2019 | Never finaled issued Dec 2019, no final | 2950 Webster St | Flow Masters Plumbing Inc | install 46 new sprinkler heads throughout per nfpa 13r. install 2" dedicated underground service per nfpa 24. reference pa# 2018-0124-9439Details
install 46 new sprinkler heads throughout per nfpa 13r. install 2" dedicated underground service per nfpa 24. reference pa# 2018-0124-9439 | $15,000 |
| Nov 21, 2019 | Completed final sign-off Feb 2020 | 166 Geary St | Flow Masters Plumbing Inc | install 3 fire sprinkler heads per nfpa 13 to suit ti ref pa 2019-0930-3119Details
install 3 fire sprinkler heads per nfpa 13 to suit ti ref pa 2019-0930-3119 | $2,000 |
| Nov 21, 2019 | Never finaled issued Nov 2019, no final | 2190 46th Av | Flow Masters Plumbing Inc | install 44 new fire sprinklers throughout per nfpa 13r. install 2" dedicated underground fire service ref pa 2019-0612-3261Details
install 44 new fire sprinklers throughout per nfpa 13r. install 2" dedicated underground fire service ref pa 2019-0612-3261 | $24,024 |
| Oct 30, 2019 | Completed final sign-off Dec 2021 | 1206 19th St | Flow Masters Plumbing Inc | install 41 new fire sprinklers per nfpa 13r. install 2" dedicated fire service per nfpa 24 ref 201710131186Details
install 41 new fire sprinklers per nfpa 13r. install 2" dedicated fire service per nfpa 24 ref 201710131186 | $15,000 |
| Sep 27, 2019 | Never finaled issued Sep 2019, no final | 308 Duncan St | Flow Masters Plumbing Inc | install 55 fire sprinkler heads throughout bld per nfpa 13. install 2" dedicated underground per nfpa 24 ref 201709117500Details
install 55 fire sprinkler heads throughout bld per nfpa 13. install 2" dedicated underground per nfpa 24 ref 201709117500 | $15,000 |
| Sep 18, 2019 | Completed final sign-off Dec 2020 | 2232 Webster St | Flow Masters Plumbing Inc | install 115 new fire sprinklers throughout per nfpa 13. relocate (e) 4" ames 3000ss backflow to front of building. no underground work. utilize existing 4" combination standpipe. no relocation of hose angle valves etc. ref pa 2018-0821-7877Details
install 115 new fire sprinklers throughout per nfpa 13. relocate (e) 4" ames 3000ss backflow to front of building. no underground work. utilize existing 4" combination standpipe. no relocation of hose angle valves etc. ref pa 2018-0821-7877 | $15,000 |
| Sep 13, 2019 | Never finaled issued Nov 2019, no final | 229 Ellis St | Flow Masters Plumbing Inc | installation of hydrponic hot water heating system with boilers & hydronic wall hung heat emittersDetails
installation of hydrponic hot water heating system with boilers & hydronic wall hung heat emitters | $52,000 |
| Aug 14, 2019 | Never finaled issued Aug 2019, no final | 1090 Chestnut St | Flow Masters Plumbing Inc | relocate 1 fire sprinler head in office to accomodate window shade housing. no other work ref 201908017541Details
relocate 1 fire sprinler head in office to accomodate window shade housing. no other work ref 201908017541 | $5,000 |
| Aug 14, 2019 | Completed final sign-off Dec 2020 | 1509 10th Av | Flow Masters Plumbing Inc | revision to 201811085423, add 3 fire sprinkler heads, relocate 2 heads. all work is outside most remote areas. no other changes.Details
revision to 201811085423, add 3 fire sprinkler heads, relocate 2 heads. all work is outside most remote areas. no other changes. | |
| Aug 13, 2019 | Completed final sign-off Sep 2019 | 888 Tennessee St | Flow Masters Plumbing Inc | install new fire sprinkler heads within new walk-in-collers and 1 head above loading dock; total of 52 heads. no work to existing underground, riser, bfp, etc. ref pa 2019-0410-7585Details
install new fire sprinkler heads within new walk-in-collers and 1 head above loading dock; total of 52 heads. no work to existing underground, riser, bfp, etc. ref pa 2019-0410-7585 | $18,000 |
| Jun 27, 2019 | Completed final sign-off Jan 2023 | 2709 22nd St | Flow Masters Plumbing Inc | install 39 new fire sprinklers throughout per nfpa13, install 4" dedicated underground per nfpa 24.Details
install 39 new fire sprinklers throughout per nfpa13, install 4" dedicated underground per nfpa 24. | $13,000 |
| Jun 18, 2019 | Never finaled issued Jun 2019, no final | 42 Dorantes Av | Flow Masters Plumbing Inc | install 42 new fire sprinklers throughtout per nfpa 13r. install 2" dedicated fire service per nfpa 24. ref pa 2016-0906-6826Details
install 42 new fire sprinklers throughtout per nfpa 13r. install 2" dedicated fire service per nfpa 24. ref pa 2016-0906-6826 | $25,000 |
| Apr 26, 2019 | Completed final sign-off Nov 2020 | 269 Waller St | Flow Masters Plumbing Inc | install new wet fire sprinkler system - 38 heads per nfpa#13r. install 2" dedicated fire service per nfpa#24 ref 201811085363Details
install new wet fire sprinkler system - 38 heads per nfpa#13r. install 2" dedicated fire service per nfpa#24 ref 201811085363 | $20,000 |
| Apr 10, 2019 | Completed final sign-off Feb 2020 | 256 Casitas Av | Flow Masters Plumbing Inc | design and installation of 2" dedicated fire service only per nfpa 24 all aother work by johnson controlsDetails
design and installation of 2" dedicated fire service only per nfpa 24 all aother work by johnson controls | $5,000 |
| Apr 10, 2019 | Completed final sign-off Jul 2019 | 952 Sutter St | Flow Masters Plumbing Inc | install reconfiguration of e fire sprinkler system to suit tenant improvement thru adu units and immediate hallway corridor per ndpa 13. no alteration or work to e underground backflow riserDetails
install reconfiguration of e fire sprinkler system to suit tenant improvement thru adu units and immediate hallway corridor per ndpa 13. no alteration or work to e underground backflow riser | $17,000 |
| Apr 1, 2019 | Never finaled issued Apr 2019, no final | 622 Haight St | Flow Masters Plumbing Inc | revision to 201903286456. installation of 1.5" combo fire service per nfpa 13r/&24. no other changes to head placementDetails
revision to 201903286456. installation of 1.5" combo fire service per nfpa 13r/&24. no other changes to head placement | |
| Mar 28, 2019 | Never finaled issued Mar 2019, no final | 622 Haight St | Flow Masters Plumbing Inc | install 14 fire sprinklers throughout adu unit only per nfpa 13r. install 2" dedicated underground fire service per nfpa 24Details
install 14 fire sprinklers throughout adu unit only per nfpa 13r. install 2" dedicated underground fire service per nfpa 24 | $12,700 |
| Feb 19, 2019 | Never finaled issued Feb 2019, no final | 39 Taylor St | Flow Masters Plumbing Inc | reconfigure (e) fire sprinkler system t.i. relocate (e 4" main: relocate 5 sprinkler heads to area behind new pg&e vault, relocate 2 sprinkler heads to north of vault, relocate 4 sprinkler heads and add 1 within foot print of vaultDetails
reconfigure (e) fire sprinkler system t.i. relocate (e 4" main: relocate 5 sprinkler heads to area behind new pg&e vault, relocate 2 sprinkler heads to north of vault, relocate 4 sprinkler heads and add 1 within foot print of vault | $20,000 |
| Feb 12, 2019 | Never finaled issued Feb 2019, no final | 2350 Washington St | Flow Masters Plumbing Inc | install (76) new fires sprinklers throughout per nfpa13, install 4" dedicated underground fire service per nfpa24, install combination standpipe per nfpa14Details
install (76) new fires sprinklers throughout per nfpa13, install 4" dedicated underground fire service per nfpa24, install combination standpipe per nfpa14 | $24,000 |
| Feb 12, 2019 | Completed final sign-off Jan 2020 | 350 Jersey St | Flow Masters Plumbing Inc | ref pa# 201809190719; replace 1 1/4" cpvc with 1" cpvc as indicated by revision clouds, no change to 1st fl./garage, underground, head placement/coverageDetails
ref pa# 201809190719; replace 1 1/4" cpvc with 1" cpvc as indicated by revision clouds, no change to 1st fl./garage, underground, head placement/coverage | |
| Jan 22, 2019 | Never finaled issued Jan 2019, no final | 2600 Broadway | Flow Masters Plumbing Inc | install 11 new fire sprinklers per nfpa 13r through new addition only, and path of egress. install 2in dedicated fire sprinkler service per nfpa 24. ref pa.201805098606. maher n/a.Details
install 11 new fire sprinklers per nfpa 13r through new addition only, and path of egress. install 2in dedicated fire sprinkler service per nfpa 24. ref pa.201805098606. maher n/a. | $5,000 |
| Jan 22, 2019 | Never finaled issued Jan 2019, no final | 1198 Valencia St | Flow Masters Plumbing Inc | space 105: install 3 f/s heads to suite t.i per nfpa13. no work to u/g, (e) piping, etc. ref pa201804257379. maher n/a.Details
space 105: install 3 f/s heads to suite t.i per nfpa13. no work to u/g, (e) piping, etc. ref pa201804257379. maher n/a. | $2,000 |
| Dec 19, 2018 | Completed final sign-off Apr 2019 | 731 Sansome St | Flow Masters Plumbing Inc | 3rd floor: reconfigure existing fire sprinkler system to suit t.i to 3rd floor only. no work to existing underground, riser, standpipe system, main ,cross main, or spinkler line in existing gridded fs system. no work to existing seismic bracing or sprinkler line hingers. install 80 sprinkler head.Details
3rd floor: reconfigure existing fire sprinkler system to suit t.i to 3rd floor only. no work to existing underground, riser, standpipe system, main ,cross main, or spinkler line in existing gridded fs system. no work to existing seismic bracing or sprinkler line hingers. install 80 sprinkler head. | $5,000 |
| Dec 18, 2018 | Never finaled issued Dec 2018, no final | 1186 Valencia St | Flow Masters Plumbing Inc | install 2 new fire sprinkler heads to suit ti. no underground work, main, (e) branches, hangers, seismic bracesDetails
install 2 new fire sprinkler heads to suit ti. no underground work, main, (e) branches, hangers, seismic braces | $1,500 |
| Nov 8, 2018 | Completed final sign-off Aug 2024 | 1509 10th Av | Flow Masters Plumbing Inc | install 18 new fire sprinklers on 3rd and 4th floor and along path of egress for same per nfpa 13r. install 2" dedicated fire service connection per nfpa 24. ref app#201803214224Details
install 18 new fire sprinklers on 3rd and 4th floor and along path of egress for same per nfpa 13r. install 2" dedicated fire service connection per nfpa 24. ref app#201803214224 | $28,500 |
| Nov 8, 2018 | Completed final sign-off Apr 2023 | 652 Hayes St | Flow Masters Plumbing Inc | install 45 new fire sprinklers per nfpa 13r throughout. install 2" dedicated fire service per nfpa 24Details
install 45 new fire sprinklers per nfpa 13r throughout. install 2" dedicated fire service per nfpa 24 | $28,500 |
| Oct 11, 2018 | Completed final sign-off Apr 2021 | 581 Waller St | Flow Masters Plumbing Inc | install 52 fire sprinklers throughout home per nfpa 13r. install 2 1/2" dedicated fire service per nfpa 24.Details
install 52 fire sprinklers throughout home per nfpa 13r. install 2 1/2" dedicated fire service per nfpa 24. | $22,800 |
| Sep 28, 2018 | Never finaled issued Oct 2018, no final | 217 Chestnut St | Flow Masters Plumbing Inc | install 58 sprinkler heads throughout bldg per nfpa13r. underground 2" k-copper dedicated fire service line per nfpa 24. ref app#201708185301Details
install 58 sprinkler heads throughout bldg per nfpa13r. underground 2" k-copper dedicated fire service line per nfpa 24. ref app#201708185301 | $12,000 |
| Sep 19, 2018 | Completed final sign-off Dec 2019 | 350 Jersey St | Flow Masters Plumbing Inc | install new sprinkler system with 51 sprinklers through entire home per nfpa 13r. also install new 2-inch fire service off of 4-inch main on jersey per nfpa 24. 2"k copper.Details
install new sprinkler system with 51 sprinklers through entire home per nfpa 13r. also install new 2-inch fire service off of 4-inch main on jersey per nfpa 24. 2"k copper. | $28,800 |
| Sep 19, 2018 | Completed final sign-off Jul 2021 | 162 Grand View Av | Flow Masters Plumbing Inc | install 56 sprinklers throughout front and rear bldg per nfpa#13-r, underground per nfpa#24. t.i. app#201410229565 and 201410229570Details
install 56 sprinklers throughout front and rear bldg per nfpa#13-r, underground per nfpa#24. t.i. app#201410229565 and 201410229570 | $15,000 |
| Aug 28, 2018 | Completed final sign-off Nov 2018 | 3092 16th St | Flow Masters Plumbing Inc | 1st fl - add 6 new heads; relocate 10 heads to suit framing for tenant improvement. no work to main riser, bfp underground. replace all heads with new model. ref pa 2018-0702-3518Details
1st fl - add 6 new heads; relocate 10 heads to suit framing for tenant improvement. no work to main riser, bfp underground. replace all heads with new model. ref pa 2018-0702-3518 | $17,500 |
| Aug 24, 2018 | Completed final sign-off Nov 2019 | 549 El Camino Del Mar | Flow Masters Plumbing Inc | install 54 heads through entire house per nfpa 13r. install new underground fire service off of 4-inch main on el camino del mar per nfpa 24Details
install 54 heads through entire house per nfpa 13r. install new underground fire service off of 4-inch main on el camino del mar per nfpa 24 | $35,000 |
| Jul 27, 2018 | Completed final sign-off Oct 2020 | 4251 23rd St | Flow Masters Plumbing Inc | ref 201806131734 & 201805038137; revisions to previous pert add 3hds in attic; reroute same supply; reroute underground, 3rd fl to remainDetails
ref 201806131734 & 201805038137; revisions to previous pert add 3hds in attic; reroute same supply; reroute underground, 3rd fl to remain | |
| Jul 27, 2018 | Expired or cancelled cancelled Aug 2023 | 447 Hayes St | Flow Masters Plumbing Inc | ref: 201712156572 & 201712045456; install overhead cpvc piping & head adapters only. all cpvc is concealed & copped client wishes to abandon projectDetails
ref: 201712156572 & 201712045456; install overhead cpvc piping & head adapters only. all cpvc is concealed & copped client wishes to abandon project | |
| Jul 3, 2018 | Completed final sign-off Feb 2019 | 570 Lombard St | Flow Masters Plumbing Inc | unit #7: new residential sprinkler system with 2" dedicated fire line to city main. ref app#201711305124Details
unit #7: new residential sprinkler system with 2" dedicated fire line to city main. ref app#201711305124 | $3,000 |
| Jun 13, 2018 | Expired or cancelled cancelled Aug 2023 | 1890 Bryant St | Flow Masters Plumbing Inc | remodel of 6 fire sprinkler heads for duration of constructionm rebuilt exactly to previous state ref 201709259521 (as builts) maher naDetails
remodel of 6 fire sprinkler heads for duration of constructionm rebuilt exactly to previous state ref 201709259521 (as builts) maher na | |
| Jun 13, 2018 | Completed final sign-off Oct 2020 | 4251 23rd St | Flow Masters Plumbing Inc | updated underground plans to 2 inches fire only ref 201805038137 water department would only approve 1-1/2" meter, add sprinkler protection in attic. new calculations through out. sprinkler monitoring separate permit.Details
updated underground plans to 2 inches fire only ref 201805038137 water department would only approve 1-1/2" meter, add sprinkler protection in attic. new calculations through out. sprinkler monitoring separate permit. | $2,200 |
| May 15, 2018 | Never finaled issued Jun 2018, no final | 3639 17th St | Flow Masters Plumbing Inc | revision to pa 2017-0915-8406, add 2 heads to 3rd fl bedroomDetails
revision to pa 2017-0915-8406, add 2 heads to 3rd fl bedroom | |
| May 15, 2018 | Completed final sign-off Jun 2018 | 901 Valencia St | Flow Masters Plumbing Inc | revistion to 2018-0403-5419 - add 6 flexhead connections; relocate riserDetails
revistion to 2018-0403-5419 - add 6 flexhead connections; relocate riser | |
| May 15, 2018 | Completed final sign-off Oct 2018 | 460 Noe St | Flow Masters Plumbing Inc | revision to pa 2017-0919-8980 and 2015-0327-2091. remove 1 head, reroute pipes on 2nd fl to supply aboveDetails
revision to pa 2017-0919-8980 and 2015-0327-2091. remove 1 head, reroute pipes on 2nd fl to supply above | |
| May 3, 2018 | Completed final sign-off Oct 2020 | 4251 23rd St | Flow Masters Plumbing Inc | install 16 heads to 3rd fl only ref pa 2014-0305-9932Details
install 16 heads to 3rd fl only ref pa 2014-0305-9932 | $5,000 |
| Apr 27, 2018 | Completed final sign-off Oct 2019 | 2517 Pacific Av | Flow Masters Plumbing Inc | install (n) sprikler system through building per nfpa 13r w/ 85 heads through entire home per nfpa13r. install underground service per nfpa 24 85 heads w/ 2" dedicated fire service. ref #201709013591/r3. maher naDetails
install (n) sprikler system through building per nfpa 13r w/ 85 heads through entire home per nfpa13r. install underground service per nfpa 24 85 heads w/ 2" dedicated fire service. ref #201709013591/r3. maher na | $39,000 |
| Apr 17, 2018 | Never finaled issued Apr 2018, no final | 3704 22nd St | Flow Masters Plumbing Inc | install new underground fireline and 40 fire sprinkler heads throughoutDetails
install new underground fireline and 40 fire sprinkler heads throughout | $25,000 |
| Apr 3, 2018 | Completed final sign-off Nov 2018 | 901 Valencia St | Flow Masters Plumbing Inc | re-install fire sprinkler system per nfpa 13 for the remodel restaurant. ground floor 39 heads. n/a for maher.Details
re-install fire sprinkler system per nfpa 13 for the remodel restaurant. ground floor 39 heads. n/a for maher. | $20,000 |
| Mar 23, 2018 | Completed final sign-off Feb 2021 | 2502 Broadway | Flow Masters Plumbing Inc | reinstall fire sprinkler system per nfpa 13 for ground floor and basement only 26 hesads ref 201704254805. n/a for maher.Details
reinstall fire sprinkler system per nfpa 13 for ground floor and basement only 26 hesads ref 201704254805. n/a for maher. | $14,000 |
| Mar 14, 2018 | Never finaled issued Mar 2018, no final | 460 Noe St | Flow Masters Plumbing Inc | sprinkler plans revision to 201709198980 (fs) & bld pa 201503272091 relocate 6 heads and add 6 new heads. remove 2 heads.Details
sprinkler plans revision to 201709198980 (fs) & bld pa 201503272091 relocate 6 heads and add 6 new heads. remove 2 heads. | |
| Dec 15, 2017 | Never finaled issued Dec 2017, no final | 447 Hayes St | Flow Masters Plumbing Inc | revision to fire sprinkler pa #201712045456. install new fire sprinkler system for the remodel building througout. includes 2" underground fire service. total 21 heads.Details
revision to fire sprinkler pa #201712045456. install new fire sprinkler system for the remodel building througout. includes 2" underground fire service. total 21 heads. | |
| Dec 4, 2017 | Never finaled issued Dec 2017, no final | 447 Hayes St | Flow Masters Plumbing Inc | install new fire sprinkler system for the remodel building throughout. included 2" underground fire service. total 20 heads. ref app#201706159479Details
install new fire sprinkler system for the remodel building throughout. included 2" underground fire service. total 20 heads. ref app#201706159479 | $15,000 |
| Dec 4, 2017 | Completed final sign-off Apr 2021 | 1472 06th Av | Flow Masters Plumbing Inc | install new fire sprinkler system for the remodel building 4th floor. included 1 1/4" underground fire service. total 13 heads. ref app#201511122394Details
install new fire sprinkler system for the remodel building 4th floor. included 1 1/4" underground fire service. total 13 heads. ref app#201511122394 | $10,000 |
| Oct 18, 2017 | Completed final sign-off Oct 2017 | 300 Pine St | Flow Masters Plumbing Inc | extend (9) existing pendent sprinkler drop and relocate (1) head at existing fire sprinkler system. ref 201706260289. maher naDetails
extend (9) existing pendent sprinkler drop and relocate (1) head at existing fire sprinkler system. ref 201706260289. maher na | $3,500 |
| Oct 6, 2017 | Never finaled issued Nov 2017, no final | 477 Elizabeth St | Flow Masters Plumbing Inc | install new fire sprinkler system per nfpa13 throughout bldg including 2" underground fire service. total 79 heads. arch. pa#201503063561Details
install new fire sprinkler system per nfpa13 throughout bldg including 2" underground fire service. total 79 heads. arch. pa#201503063561 | $45,000 |
| Sep 27, 2017 | Completed final sign-off Feb 2019 | 2774 Green St | Flow Masters Plumbing Inc | install new 2 1/2 underground fire service only for 201708175086Details
install new 2 1/2 underground fire service only for 201708175086 | $8,000 |
| Sep 19, 2017 | Completed final sign-off Oct 2018 | 460 Noe St | Flow Masters Plumbing Inc | nstall (64) new sprinklers throughout per nfpa #13 underground per nfpa 24. ref #201503272091.Details
nstall (64) new sprinklers throughout per nfpa #13 underground per nfpa 24. ref #201503272091. | $15,000 |
| Sep 15, 2017 | Never finaled issued Sep 2017, no final | 3639 17th St | Flow Masters Plumbing Inc | install 36 new sprinklers throughtout per nfpa#13r and underground per nfpa #24. ref app#201511193096Details
install 36 new sprinklers throughtout per nfpa#13r and underground per nfpa #24. ref app#201511193096 | $15,000 |
| Aug 4, 2017 | Completed final sign-off Sep 2017 | 2929 19th St | Flow Masters Plumbing Inc | extend existing fire sprinkler heads with new at remodel restroom & staircase. total 9 heads. n/a maher ordinanceDetails
extend existing fire sprinkler heads with new at remodel restroom & staircase. total 9 heads. n/a maher ordinance | $4,500 |
| Apr 24, 2017 | Completed final sign-off Jan 2019 | 3976 25th St | Flow Masters Plumbing Inc | sprinkler ti revision to pa#201604255549, relocate and replace (6) heads from pendant style to sidewall style on 1/f, 2/f & 3/f per nfpa 13r. ref. to pa#201411040658 and pa 201611102408; rtp pa 201607273530Details
sprinkler ti revision to pa#201604255549, relocate and replace (6) heads from pendant style to sidewall style on 1/f, 2/f & 3/f per nfpa 13r. ref. to pa#201411040658 and pa 201611102408; rtp pa 201607273530 | $3,000 |
| Apr 7, 2017 | Never finaled issued Apr 2017, no final | 858 Ashbury St | Flow Masters Plumbing Inc | install 34 new sprinklers throughout ground & 2nd floor per nfpa #13 underground per nfpa #24. ref pa #201603091629.Details
install 34 new sprinklers throughout ground & 2nd floor per nfpa #13 underground per nfpa #24. ref pa #201603091629. | $15,000 |
| Apr 7, 2017 | Completed final sign-off Sep 2017 | 226 Haight St | Flow Masters Plumbing Inc | ground floor - add 7 new sprinklers to an existing fire sprinkler system per nfpa #13. ref pa #201605046586.Details
ground floor - add 7 new sprinklers to an existing fire sprinkler system per nfpa #13. ref pa #201605046586. | $5,000 |
| Feb 23, 2017 | Completed final sign-off Apr 2019 | 2834 Jackson St | Shield Fire & Safety Solutions Inc, Flow Masters Plumbing Inc | design & install a new nfpa 13r wet pipe fire sprinkler system throughout existing residence & 158 st ft addition. 60 srpinklers total. ref pa 2016-0705-1541; n/a maher ord. 155-13Details
design & install a new nfpa 13r wet pipe fire sprinkler system throughout existing residence & 158 st ft addition. 60 srpinklers total. ref pa 2016-0705-1541; n/a maher ord. 155-13 | $15,000 |