Block 0532, lot 022
2950 Webster St
- City’s use
- Multi-Family Residential
- Built
- 1904
- Stories
- 2
- Units
- 2
- Rooms
- 2 bathrooms
- Building
- 2,250 sq ft
- Lot
- 2,500 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
8 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 18, 2020 | Completed final sign-off Oct 2020 | 2950 Webster St | San Francisco Fire Protection | monitoring system installation of new fire alarm in fully sprinkled building - install of new ifp-75cfacui aes 7707 heat detector, manual pull station monitor modules.Details
monitoring system installation of new fire alarm in fully sprinkled building - install of new ifp-75cfacui aes 7707 heat detector, manual pull station monitor modules. | $4,013 |
| Sep 3, 2020 | Never finaled issued Sep 2020, no final | 2950 Webster St | Flow Masters Plumbing Inc | reconfigure piping to garage. no other changes in system. as built drawings re: #201912048679. fire only.Details
reconfigure piping to garage. no other changes in system. as built drawings re: #201912048679. fire only. | |
| Jun 11, 2020 | Never finaled issued Jun 2020, no final | 2950 Webster St | street spaceDetails
street space | ||
| Dec 4, 2019 | Never finaled issued Dec 2019, no final | 2950 Webster St | Flow Masters Plumbing Inc | install 46 new sprinkler heads throughout per nfpa 13r. install 2" dedicated underground service per nfpa 24. reference pa# 2018-0124-9439Details
install 46 new sprinkler heads throughout per nfpa 13r. install 2" dedicated underground service per nfpa 24. reference pa# 2018-0124-9439 | $15,000 |
| Aug 13, 2019 | Never finaled issued Aug 2019, no final | 2950 Webster St | street spaceDetails
street space | ||
| Jan 24, 2018 | Never finaled issued Mar 2019, no final | 2950 Webster St | Finbarr Collins Construction Inc. | rear horizontal expansion of the 2nd & 3rd fl and a deeper 1st floor expansion with rood deck above.new interior walls doors, doors, lighting, plumbing fixtures and finishes. exterior work to include new windows & doors at the rear yard only. new finishes on the rear facade & roof skylightsDetails
rear horizontal expansion of the 2nd & 3rd fl and a deeper 1st floor expansion with rood deck above.new interior walls doors, doors, lighting, plumbing fixtures and finishes. exterior work to include new windows & doors at the rear yard only. new finishes on the rear facade & roof skylights | $202,528 |
| Oct 16, 2006 | Expired or cancelled expired Feb 2026 | 2950 Webster St | Occidental Express | establishing legality of office at rear ground floor level. (home office)Details
establishing legality of office at rear ground floor level. (home office) | $1,500 |
| May 1, 2006 | Expired or cancelled expired Jan 2007 | 2950 Webster St | remove walls on 1st floor and add new beams and post to support new walls. infill lightwell on 1st & ground floor. not visible from street.Details
remove walls on 1st floor and add new beams and post to support new walls. infill lightwell on 1st & ground floor. not visible from street. | $25,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Flow Masters Plumbing Inc (2), Finbarr Collins Construction Inc., Occidental Express, San Francisco Fire Protection
- Architects
- Brian Milford
- Engineers
- Rodrigo Santos
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover two-family buildings like this one.