Block 0561, lot 035
2520 Broadway
- City’s use
- Single Family Residential
- Built
- 1905
- Stories
- 1
- Units
- 1
- Rooms
- 1 bathroom
- Building
- 2,255 sq ft
- Zoning
- RH1
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
7 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 9, 2024 | Completed final sign-off May 2024 | 2520 Broadway | 0303 Construction Inc. | install 1200 sqft hardi plank over existing siding. not visble from street.Details
install 1200 sqft hardi plank over existing siding. not visble from street. | $25,000 |
| Jan 28, 2020 | Completed final sign-off Sep 2020 | 2526 Broadway | Flow Masters Plumbing Inc | reocnfigure 4th fl fire sprinkler system to suite residential remodel. relocate 15 (e) sprinklers, add 11 new sprinklers. no work to 3rd fl. utilize (e) 4" dedicated underground: install new 4" backflow preventionDetails
reocnfigure 4th fl fire sprinkler system to suite residential remodel. relocate 15 (e) sprinklers, add 11 new sprinklers. no work to 3rd fl. utilize (e) 4" dedicated underground: install new 4" backflow prevention | $12,000 |
| Jul 17, 2019 | Never finaled issued Jul 2019, no final | 2524 Broadway | street spaceDetails
street space | ||
| Dec 14, 2017 | Completed final sign-off Jan 2018 | 2520 Broadway | San Francisco Fire Protection | like for like fire system replacement w/new control panel, smoke detector & pull stations at the same location. install radio communicator monitor modules to tie in (e) flow and tamper switch to (n) panel connect 2 bells to (n) panel. will comply with new sffc by 2021 systemDetails
like for like fire system replacement w/new control panel, smoke detector & pull stations at the same location. install radio communicator monitor modules to tie in (e) flow and tamper switch to (n) panel connect 2 bells to (n) panel. will comply with new sffc by 2021 system | $4,800 |
| Jun 2, 2015 | Completed final sign-off Apr 2016 | 2520 Broadway | Ashbury Gen Constructing & Eng | soft story retrofit per sfbc chapter 34b. asce 41-13 - foundation bracing. n/a for maher ordinance.Details
soft story retrofit per sfbc chapter 34b. asce 41-13 - foundation bracing. n/a for maher ordinance. | $230,000 |
| Jun 1, 2015 | Expired or cancelled cancelled Jan 2026 | 2530 Broadway | sofit story retrofit and foundation strengthening per sfbc chapter 34b. engineer criteria comply with 2012 iebc appendix a-4. maher n/a.Details
sofit story retrofit and foundation strengthening per sfbc chapter 34b. engineer criteria comply with 2012 iebc appendix a-4. maher n/a. | $230,000 | |
| Sep 14, 2010 | Never finaled issued Sep 2010, no final | 2520 Broadway | street space & sidewalk permitDetails
street space & sidewalk permit |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- 0303 Construction Inc., Ashbury Gen Constructing & Eng, Flow Masters Plumbing Inc, San Francisco Fire Protection
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.