- Mar 2015 to Jan 2022
17 permits since 2000 (architect on 17 permits): 13 completed, 2 never finaled, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 5, 2022 | Expired or cancelled expired Apr 2026 | 2445 Golden Gate Av | Skyline Construction | revision to 201910083932, revision to ground floor plan and associated elevations/details and equipment list. added shafts, including related structural reinforcing for existing slab, from gr fl to roof for dust collection system located on gr floor and laser cutter room located on level one.Details
revision to 201910083932, revision to ground floor plan and associated elevations/details and equipment list. added shafts, including related structural reinforcing for existing slab, from gr fl to roof for dust collection system located on gr floor and laser cutter room located on level one. | $389,600 |
| Sep 1, 2021 | Completed final sign-off Dec 2021 | 455 Mission Bay Blvd South | Xl Construction, Corporation | t.i. adding non bearing partitions, fixtures, mep. fire suppression under separate permit. ref partial t.i. work on 5th fl 2020 1222 1526.Details
t.i. adding non bearing partitions, fixtures, mep. fire suppression under separate permit. ref partial t.i. work on 5th fl 2020 1222 1526. | $755,762 |
| Jun 3, 2021 | Completed final sign-off Jun 2021 | 455 Mission Bay Blvd South | Xl Construction, Corporation | modification to e compressed gas distribution system serving ti under 202012221526. modification includes (n) piping runs from (e) storage room at level 1 to renovated areas at level 5Details
modification to e compressed gas distribution system serving ti under 202012221526. modification includes (n) piping runs from (e) storage room at level 1 to renovated areas at level 5 | $1,000 |
| Dec 22, 2020 | Completed final sign-off Jun 2021 | 455 Mission Bay Blvd South | Xl Construction, Corporation | 5th fl: tenant improvement. fire suppression system under sep permit. deffered fire sprinklers & life safety system to remain operational during construction and alterations to be system will be design build.Details
5th fl: tenant improvement. fire suppression system under sep permit. deffered fire sprinklers & life safety system to remain operational during construction and alterations to be system will be design build. | $850,000 |
| Jul 21, 2020 | Completed final sign-off Jun 2021 | 1201 Bryant St | Skyline Capital Builders Llc | modify several rms located in basement, doors & relites. partial enclosures of central communcating stairs at basement level to create security barrier. stairs not egress. install prefab test chamber on 3rd flr. mep + f/a, sprinklers on separate permit.Details
modify several rms located in basement, doors & relites. partial enclosures of central communcating stairs at basement level to create security barrier. stairs not egress. install prefab test chamber on 3rd flr. mep + f/a, sprinklers on separate permit. | $525,000 |
| Dec 27, 2019 | Completed final sign-off Mar 2020 | 2445 Golden Gate Av | Skyline Construction | interior non-structural soft demo. to comply with ab-17; refer to pa#2019-10-08-3932Details
interior non-structural soft demo. to comply with ab-17; refer to pa#2019-10-08-3932 | |
| Oct 8, 2019 | Expired or cancelled expired Mar 2026 | 2445 Golden Gate Av | Skyline Construction | interior demolition & renovation of a portion of the ground & 1st levels to create new maker spaces, lounge & office. ** maher: n/a **Details
interior demolition & renovation of a portion of the ground & 1st levels to create new maker spaces, lounge & office. ** maher: n/a ** | $1,712,718 |
| Apr 29, 2019 | Completed final sign-off Aug 2019 | 360 03rd St | Xl Construction, Corporation | revision to 201901281353 to provide structural drawings and calculations for equip weighing over 450 lbs. inclucing manifold system. ups support system and fishtank support as shown on ti permit,maher not reqDetails
revision to 201901281353 to provide structural drawings and calculations for equip weighing over 450 lbs. inclucing manifold system. ups support system and fishtank support as shown on ti permit,maher not req | |
| Jan 28, 2019 | Completed final sign-off Aug 2019 | 360 03rd St | Xl Construction, Corporation | 7th fl - ti of office to include non structural improvement of office area, break room (no food service), mep improvement. sprinkler, & fire safety under separate permit. no exterior workDetails
7th fl - ti of office to include non structural improvement of office area, break room (no food service), mep improvement. sprinkler, & fire safety under separate permit. no exterior work | $7,273,098 |
| Dec 6, 2018 | Completed final sign-off Jun 2019 | 360 03rd St | Xl Construction, Corporation | interior soft demo on 7th floor office space. approx 26,500 sf. no exterior work, no cou, sprinkler permit under sep permitDetails
interior soft demo on 7th floor office space. approx 26,500 sf. no exterior work, no cou, sprinkler permit under sep permit | $100,000 |
| Nov 6, 2018 | Completed final sign-off May 2019 | 360 03rd St | Xl Construction, Corporation | demo per ab-017 of 29,500 sf of (e) offices in ste 700 partitions, electrical, data cabling, ceilings, and flooring to be removed, temp const. barrier to be provided between ste 700 & 750, mep is design-build, fire sprinklers & life safety to remain operational, defered sprinkler to beDetails
demo per ab-017 of 29,500 sf of (e) offices in ste 700 partitions, electrical, data cabling, ceilings, and flooring to be removed, temp const. barrier to be provided between ste 700 & 750, mep is design-build, fire sprinklers & life safety to remain operational, defered sprinkler to be | $5,000 |
| Oct 12, 2018 | Never finaled issued Nov 2018, no final | 1800 Owens St | Hathaway Dinwiddie Co. | levels 1,p4 & 3 - miscellaneous ti work to building including: valet office, breakroom, building management office suite, mailroom.Details
levels 1,p4 & 3 - miscellaneous ti work to building including: valet office, breakroom, building management office suite, mailroom. | $2,000,000 |
| Sep 4, 2018 | Completed final sign-off Jan 2019 | 2445 Golden Gate Av | Mai Construction Inc. | remodel existing lab room 3323. (n) finishes and casework. remove fume hood exhaust rebalance general lab air. replace sinks and emergency shower/eyewash. new biosafty cabinet/incubator emergency power.Details
remodel existing lab room 3323. (n) finishes and casework. remove fume hood exhaust rebalance general lab air. replace sinks and emergency shower/eyewash. new biosafty cabinet/incubator emergency power. | $109,000 |
| Jun 29, 2017 | Never finaled issued Jul 2017, no final | 455 Mission Bay Blvd South | Dome Construction Corp | 3/f- reconfigure conference rooms, av, lab gas for new bsc, demo of existing exhaust hood, reconfigure breakroom, (n) lab desks. n/a ordinance #155-13Details
3/f- reconfigure conference rooms, av, lab gas for new bsc, demo of existing exhaust hood, reconfigure breakroom, (n) lab desks. n/a ordinance #155-13 | $800,000 |
| May 10, 2017 | Completed final sign-off Jun 2019 | 1800 Owens St | landscape design that includes planter, vegetation & roof pavers for sector 2 roof, as well as trellis & metal panels that connect mechanical roof screen to stair dog house. (ref #2014-0904-5458 s)Details
landscape design that includes planter, vegetation & roof pavers for sector 2 roof, as well as trellis & metal panels that connect mechanical roof screen to stair dog house. (ref #2014-0904-5458 s) | ||
| Oct 5, 2016 | Completed final sign-off Jul 2017 | 455 Mission Bay Blvd South | Dome Construction Corp | bldg. 2, 2/f- renovation for nektar theraputics corporate headquarters to include new offices & laboratory spaces. n/a ordinance #155-13. deferred submittal for fire alarm & fire sprinkler.Details
bldg. 2, 2/f- renovation for nektar theraputics corporate headquarters to include new offices & laboratory spaces. n/a ordinance #155-13. deferred submittal for fire alarm & fire sprinkler. | $1,300,000 |
| Mar 10, 2015 | Completed final sign-off Nov 2015 | 455 Mission Bay Blvd South | Dome Construction Corp | building 3 - 2nd floor -19525 sf ti build out for 1st time occupant of shell space. bathrooms, elevators and stairs are (e). project will build office space for use of tenant. this project is on the 2nd flr. of the (e) bdg.life and safety under separate permit. maher-not req'dDetails
building 3 - 2nd floor -19525 sf ti build out for 1st time occupant of shell space. bathrooms, elevators and stairs are (e). project will build office space for use of tenant. this project is on the 2nd flr. of the (e) bdg.life and safety under separate permit. maher-not req'd | $2,831,125 |