Permit GraphShortlistSan Francisco building permits since 2000

John Mickow

License
C28429
Look the license up with the state
Listed as
architect
Firm
Flad Architects
Based in
Seattle
On San Francisco permits
Mar 2015 to Jan 2022

17 permits since 2000 (architect on 17 permits): 13 completed, 2 never finaled, 2 expired or cancelled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records

Most recent permits

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Jan 5, 2022Expired or cancelled
expired Apr 2026
2445 Golden Gate AvSkyline Constructionrevision to 201910083932, revision to ground floor plan and associated elevations/details and equipment list. added shafts, including related structural reinforcing for existing slab, from gr fl to roof for dust collection system located on gr floor and laser cutter room located on level one.
Details
Permit
202201055392
Status
expired
Filed
Jan 5, 2022
Permit issued
Nov 28, 2022
Declared cost
$389,600
Address
2445 Golden Gate Av

revision to 201910083932, revision to ground floor plan and associated elevations/details and equipment list. added shafts, including related structural reinforcing for existing slab, from gr fl to roof for dust collection system located on gr floor and laser cutter room located on level one.

Open the permit page

$389,600
Sep 1, 2021Completed
final sign-off Dec 2021
455 Mission Bay Blvd SouthXl Construction, Corporationt.i. adding non bearing partitions, fixtures, mep. fire suppression under separate permit. ref partial t.i. work on 5th fl 2020 1222 1526.
Details
Permit
202109017583
Status
complete
Filed
Sep 1, 2021
Permit issued
Sep 13, 2021
Final sign-off
Dec 10, 2021
Declared cost
$755,762
Address
455 Mission Bay Blvd South

t.i. adding non bearing partitions, fixtures, mep. fire suppression under separate permit. ref partial t.i. work on 5th fl 2020 1222 1526.

Open the permit page

$755,762
Jun 3, 2021Completed
final sign-off Jun 2021
455 Mission Bay Blvd SouthXl Construction, Corporationmodification to e compressed gas distribution system serving ti under 202012221526. modification includes (n) piping runs from (e) storage room at level 1 to renovated areas at level 5
Details
Permit
202106031593
Status
complete
Filed
Jun 3, 2021
Permit issued
Jun 7, 2021
Final sign-off
Jun 23, 2021
Declared cost
$1,000
Address
455 Mission Bay Blvd South

modification to e compressed gas distribution system serving ti under 202012221526. modification includes (n) piping runs from (e) storage room at level 1 to renovated areas at level 5

Open the permit page

$1,000
Dec 22, 2020Completed
final sign-off Jun 2021
455 Mission Bay Blvd SouthXl Construction, Corporation5th fl: tenant improvement. fire suppression system under sep permit. deffered fire sprinklers & life safety system to remain operational during construction and alterations to be system will be design build.
Details
Permit
202012221526
Status
complete
Filed
Dec 22, 2020
Permit issued
Apr 22, 2021
Final sign-off
Jun 23, 2021
Declared cost
$850,000
Address
455 Mission Bay Blvd South

5th fl: tenant improvement. fire suppression system under sep permit. deffered fire sprinklers & life safety system to remain operational during construction and alterations to be system will be design build.

Open the permit page

$850,000
Jul 21, 2020Completed
final sign-off Jun 2021
1201 Bryant StSkyline Capital Builders Llcmodify several rms located in basement, doors & relites. partial enclosures of central communcating stairs at basement level to create security barrier. stairs not egress. install prefab test chamber on 3rd flr. mep + f/a, sprinklers on separate permit.
Details
Permit
202007210568
Status
complete
Filed
Jul 21, 2020
Permit issued
Aug 24, 2020
Final sign-off
Jun 4, 2021
Declared cost
$525,000
Address
1201 Bryant St

modify several rms located in basement, doors & relites. partial enclosures of central communcating stairs at basement level to create security barrier. stairs not egress. install prefab test chamber on 3rd flr. mep + f/a, sprinklers on separate permit.

Open the permit page

$525,000
Dec 27, 2019Completed
final sign-off Mar 2020
2445 Golden Gate AvSkyline Constructioninterior non-structural soft demo. to comply with ab-17; refer to pa#2019-10-08-3932
Details
Permit
201912270787
Status
complete
Filed
Dec 27, 2019
Permit issued
Dec 27, 2019
Final sign-off
Mar 3, 2020
Address
2445 Golden Gate Av

interior non-structural soft demo. to comply with ab-17; refer to pa#2019-10-08-3932

Open the permit page

Oct 8, 2019Expired or cancelled
expired Mar 2026
2445 Golden Gate AvSkyline Constructioninterior demolition & renovation of a portion of the ground & 1st levels to create new maker spaces, lounge & office. ** maher: n/a **
Details
Permit
201910083932
Status
expired
Filed
Oct 8, 2019
Permit issued
Feb 27, 2020
Declared cost
$1,712,718
Address
2445 Golden Gate Av

interior demolition & renovation of a portion of the ground & 1st levels to create new maker spaces, lounge & office. ** maher: n/a **

Open the permit page

$1,712,718
Apr 29, 2019Completed
final sign-off Aug 2019
360 03rd StXl Construction, Corporationrevision to 201901281353 to provide structural drawings and calculations for equip weighing over 450 lbs. inclucing manifold system. ups support system and fishtank support as shown on ti permit,maher not req
Details
Permit
201904299173
Status
complete
Filed
Apr 29, 2019
Permit issued
May 6, 2019
Final sign-off
Aug 2, 2019
Address
360 03rd St

revision to 201901281353 to provide structural drawings and calculations for equip weighing over 450 lbs. inclucing manifold system. ups support system and fishtank support as shown on ti permit,maher not req

Open the permit page

Jan 28, 2019Completed
final sign-off Aug 2019
360 03rd StXl Construction, Corporation7th fl - ti of office to include non structural improvement of office area, break room (no food service), mep improvement. sprinkler, & fire safety under separate permit. no exterior work
Details
Permit
201901281353
Status
complete
Filed
Jan 28, 2019
Permit issued
Jan 29, 2019
Final sign-off
Aug 2, 2019
Declared cost
$7,273,098
Address
360 03rd St

7th fl - ti of office to include non structural improvement of office area, break room (no food service), mep improvement. sprinkler, & fire safety under separate permit. no exterior work

Open the permit page

$7,273,098
Dec 6, 2018Completed
final sign-off Jun 2019
360 03rd StXl Construction, Corporationinterior soft demo on 7th floor office space. approx 26,500 sf. no exterior work, no cou, sprinkler permit under sep permit
Details
Permit
201812067656
Status
complete
Filed
Dec 6, 2018
Permit issued
Dec 7, 2018
Final sign-off
Jun 4, 2019
Declared cost
$100,000
Address
360 03rd St

interior soft demo on 7th floor office space. approx 26,500 sf. no exterior work, no cou, sprinkler permit under sep permit

Open the permit page

$100,000
Nov 6, 2018Completed
final sign-off May 2019
360 03rd StXl Construction, Corporationdemo per ab-017 of 29,500 sf of (e) offices in ste 700 partitions, electrical, data cabling, ceilings, and flooring to be removed, temp const. barrier to be provided between ste 700 & 750, mep is design-build, fire sprinklers & life safety to remain operational, defered sprinkler to be
Details
Permit
201811065181
Status
complete
Filed
Nov 6, 2018
Permit issued
Nov 8, 2018
Final sign-off
May 8, 2019
Declared cost
$5,000
Address
360 03rd St

demo per ab-017 of 29,500 sf of (e) offices in ste 700 partitions, electrical, data cabling, ceilings, and flooring to be removed, temp const. barrier to be provided between ste 700 & 750, mep is design-build, fire sprinklers & life safety to remain operational, defered sprinkler to be

Open the permit page

$5,000
Oct 12, 2018Never finaled
issued Nov 2018, no final
1800 Owens StHathaway Dinwiddie Co.levels 1,p4 & 3 - miscellaneous ti work to building including: valet office, breakroom, building management office suite, mailroom.
Details
Permit
201810123032
Status
issued
Filed
Oct 12, 2018
Permit issued
Nov 19, 2018
Declared cost
$2,000,000
Address
1800 Owens St

levels 1,p4 & 3 - miscellaneous ti work to building including: valet office, breakroom, building management office suite, mailroom.

Open the permit page

$2,000,000
Sep 4, 2018Completed
final sign-off Jan 2019
2445 Golden Gate AvMai Construction Inc.remodel existing lab room 3323. (n) finishes and casework. remove fume hood exhaust rebalance general lab air. replace sinks and emergency shower/eyewash. new biosafty cabinet/incubator emergency power.
Details
Permit
201809049034
Status
complete
Filed
Sep 4, 2018
Permit issued
Oct 5, 2018
Final sign-off
Jan 15, 2019
Declared cost
$109,000
Address
2445 Golden Gate Av

remodel existing lab room 3323. (n) finishes and casework. remove fume hood exhaust rebalance general lab air. replace sinks and emergency shower/eyewash. new biosafty cabinet/incubator emergency power.

Open the permit page

$109,000
Jun 29, 2017Never finaled
issued Jul 2017, no final
455 Mission Bay Blvd SouthDome Construction Corp3/f- reconfigure conference rooms, av, lab gas for new bsc, demo of existing exhaust hood, reconfigure breakroom, (n) lab desks. n/a ordinance #155-13
Details
Permit
201706290676
Status
issued
Filed
Jun 29, 2017
Permit issued
Jul 17, 2017
Declared cost
$800,000
Address
455 Mission Bay Blvd South

3/f- reconfigure conference rooms, av, lab gas for new bsc, demo of existing exhaust hood, reconfigure breakroom, (n) lab desks. n/a ordinance #155-13

Open the permit page

$800,000
May 10, 2017Completed
final sign-off Jun 2019
1800 Owens Stlandscape design that includes planter, vegetation & roof pavers for sector 2 roof, as well as trellis & metal panels that connect mechanical roof screen to stair dog house. (ref #2014-0904-5458 s)
Details
Permit
201705106159
Status
complete
Filed
May 10, 2017
Permit issued
Feb 2, 2018
Final sign-off
Jun 5, 2019
Address
1800 Owens St

landscape design that includes planter, vegetation & roof pavers for sector 2 roof, as well as trellis & metal panels that connect mechanical roof screen to stair dog house. (ref #2014-0904-5458 s)

Open the permit page

Oct 5, 2016Completed
final sign-off Jul 2017
455 Mission Bay Blvd SouthDome Construction Corpbldg. 2, 2/f- renovation for nektar theraputics corporate headquarters to include new offices & laboratory spaces. n/a ordinance #155-13. deferred submittal for fire alarm & fire sprinkler.
Details
Permit
201610059559
Status
complete
Filed
Oct 5, 2016
Permit issued
Oct 18, 2016
Final sign-off
Jul 12, 2017
Declared cost
$1,300,000
Address
455 Mission Bay Blvd South

bldg. 2, 2/f- renovation for nektar theraputics corporate headquarters to include new offices & laboratory spaces. n/a ordinance #155-13. deferred submittal for fire alarm & fire sprinkler.

Open the permit page

$1,300,000
Mar 10, 2015Completed
final sign-off Nov 2015
455 Mission Bay Blvd SouthDome Construction Corpbuilding 3 - 2nd floor -19525 sf ti build out for 1st time occupant of shell space. bathrooms, elevators and stairs are (e). project will build office space for use of tenant. this project is on the 2nd flr. of the (e) bdg.life and safety under separate permit. maher-not req'd
Details
Permit
201503100342
Status
complete
Filed
Mar 10, 2015
Permit issued
Mar 18, 2015
Final sign-off
Nov 20, 2015
Declared cost
$2,831,125
Address
455 Mission Bay Blvd South

building 3 - 2nd floor -19525 sf ti build out for 1st time occupant of shell space. bathrooms, elevators and stairs are (e). project will build office space for use of tenant. this project is on the 2nd flr. of the (e) bdg.life and safety under separate permit. maher-not req'd

Open the permit page

$2,831,125