Brendan Dunnigan
- Listed as
- architect, authorized agent-others, engineer, lessee, pmt consultant/expediter
- Firm
- Hks Architects
- Based in
- San Francisco
- On San Francisco permits
- Jul 2003 to Dec 2024
46 permits since 2000 (architect on 41 permits, authorized agent-others on 2 permits, engineer on 1 permit, lessee on 1 permit, pmt consultant/expediter on 1 permit): 26 completed, 2 in progress, 10 never finaled, 8 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 9, 2024 | In progress issued Sep 2025 | 2200 Pacific Av | Battalion One Fire Protection | installation of code required fire alarm to comply with/ ab-3.08Details
installation of code required fire alarm to comply with/ ab-3.08 | $1,100,000 |
| Jun 20, 2024 | In progress issued Apr 2025 | 2200 Pacific Av | Saarman Construction,Ltd. | replacement of the roof at pool, pool deck and perimeter area.Details
replacement of the roof at pool, pool deck and perimeter area. | $1,900,000 |
| Jan 25, 2023 | Expired or cancelled cancelled Jan 2026 | 2550 Van Ness Av | permit is to establish existing restaurant occupancy to obtain sffd operational permit. no work to be done.Details
permit is to establish existing restaurant occupancy to obtain sffd operational permit. no work to be done. | ||
| Sep 15, 2022 | Completed final sign-off Feb 2024 | 335 Powell St | Marchetti Group | barrier removal to replace non-accessible rotating doors and side doors with two sets of automatic sliding doors (no public right away)Details
barrier removal to replace non-accessible rotating doors and side doors with two sets of automatic sliding doors (no public right away) | |
| Jun 3, 2022 | Never finaled issued Aug 2022, no final | 335 Powell St | Marchetti Group | demolition in discoveries gift shop. remove fixtures, furnishings, ceiling, walls, casework & supporting structures of those items to reveal eisting structural. ab-007 appliesDetails
demolition in discoveries gift shop. remove fixtures, furnishings, ceiling, walls, casework & supporting structures of those items to reveal eisting structural. ab-007 applies | $8,000 |
| Nov 17, 2021 | Completed final sign-off Dec 2021 | 1500 Mission St | Related California Construction Llc | doors shall be provided in 2 locations to comply with cbc 11b-404.3.2 maneuvering clearance exception. provide uninterruptible power supply that operates door to open position in building power-loss event.Details
doors shall be provided in 2 locations to comply with cbc 11b-404.3.2 maneuvering clearance exception. provide uninterruptible power supply that operates door to open position in building power-loss event. | $5,000 |
| Sep 22, 2021 | Expired or cancelled cancelled Jul 2023 | 1500 Mission St | to calculate occupant load and provide furniture lay-out for the following assembly spaces shown on the approved & issued pa# 2016-06-20-0387 s3 (arch): level 02 - residential open area; level 05 - dog park amenity; level 11 - sports bar, pool lounge, screening roomDetails
to calculate occupant load and provide furniture lay-out for the following assembly spaces shown on the approved & issued pa# 2016-06-20-0387 s3 (arch): level 02 - residential open area; level 05 - dog park amenity; level 11 - sports bar, pool lounge, screening room | ||
| Jul 13, 2021 | Completed final sign-off Nov 2021 | 340 Townsend St | Turner Group Construction | soft demo at level 5. remain vacancy under ab-017Details
soft demo at level 5. remain vacancy under ab-017 | $20,000 |
| Jan 29, 2021 | Never finaled issued Sep 2021, no final | 1500 Mission St | Related California Construction Llc, Aguilera Construction Company | security improvements to the stairs at level -1 and level - 2 to prevent unauthorized individuals from gaining access to the building via the garage; added card readers at two doors to control access to the building. ** maher: n/a **Details
security improvements to the stairs at level -1 and level - 2 to prevent unauthorized individuals from gaining access to the building via the garage; added card readers at two doors to control access to the building. ** maher: n/a ** | $2,000 |
| Jan 29, 2021 | Never finaled issued Sep 2021, no final | 1500 Mission St | Related California Construction Llc, Aguilera Construction Company | garage improvements to the vehicular entry and vehicle valet pick-up & drop-off area for the existing mixed-use project. ** maher: n/a **Details
garage improvements to the vehicular entry and vehicle valet pick-up & drop-off area for the existing mixed-use project. ** maher: n/a ** | $100,000 |
| Sep 5, 2020 | Completed final sign-off Aug 2021 | 1500 Mission St | Build Group Inc. | alteration permit in response to the attached notice of volation dated 8/4/20 to document change re elevatorlobby doors at levels 11 & 40 that were replaced with similar doors of a large size.Details
alteration permit in response to the attached notice of volation dated 8/4/20 to document change re elevatorlobby doors at levels 11 & 40 that were replaced with similar doors of a large size. | $2,500 |
| Jun 15, 2020 | Never finaled issued Nov 2020, no final | 1500 Mission St | Build Group Inc. | revision to pa# 2018-05-16-9291; elevator access hatch for fire alarm in shaft.Details
revision to pa# 2018-05-16-9291; elevator access hatch for fire alarm in shaft. | |
| Mar 4, 2020 | Never finaled issued Feb 2021, no final | 1500 Mission St | Crown Sign Systems Inc Dba Non-Electrica | evac/wayfinding interior signage.Details
evac/wayfinding interior signage. | $500 |
| Feb 5, 2020 | Never finaled issued Feb 2020, no final | 546 Howard St | Hope Construction | archeological exploration of designated archelogically sensitive areas by excavating trenches for sf planning archeologist; when exploration is complete all trenches will be backfilled and graded to original rough grade; all excavations will be protected a tall times untill backfilled.Details
archeological exploration of designated archelogically sensitive areas by excavating trenches for sf planning archeologist; when exploration is complete all trenches will be backfilled and graded to original rough grade; all excavations will be protected a tall times untill backfilled. | $3,000 |
| Dec 19, 2019 | Never finaled filed Dec 2019, never issued | 1270 Mission St | altered site permit-pa#2016-1130-3826s. change include addition of 22 residential units within footprint, in former set back btwn levels 10-21. revision of building cladding design & aesthtic.Details
altered site permit-pa#2016-1130-3826s. change include addition of 22 residential units within footprint, in former set back btwn levels 10-21. revision of building cladding design & aesthtic. | $1,500,000 | |
| Oct 21, 2019 | Never finaled issued Mar 2020, no final | 1500 Mission St | Crown Sign Systems Inc Dba Non-Electrica | sign to be installed on prodesignted areas. ** maher: n/a **Details
sign to be installed on prodesignted areas. ** maher: n/a ** | $1,650 |
| Sep 13, 2019 | Completed final sign-off Aug 2021 | 1500 Mission St | Crown Sign Systems Inc Dba Non-Electrica | evacuation maps to be installed in predesignated areas on wall. ** maher: n/a **Details
evacuation maps to be installed in predesignated areas on wall. ** maher: n/a ** | $650 |
| Mar 21, 2019 | Never finaled filed Mar 2019, never issued | 546 Howard St | to erect a type 1-a, 62 story, mixed use condo with 165 dwelling units, hotel, office and retail with 5 story basement.Details
to erect a type 1-a, 62 story, mixed use condo with 165 dwelling units, hotel, office and retail with 5 story basement. | $449,467,000 | |
| Mar 15, 2019 | Completed final sign-off Apr 2020 | 245 01st St | Webcor Construction Lp | install evacuation signage for new 55 story highrise residential towner and 3 basement levelsDetails
install evacuation signage for new 55 story highrise residential towner and 3 basement levels | $10,000 |
| Jun 20, 2017 | Completed final sign-off Dec 2017 | 45 Lansing St | 2/f- revision to pa#201604215372, remove area of refuge from fsae as shown on sheet a2.202nDetails
2/f- revision to pa#201604215372, remove area of refuge from fsae as shown on sheet a2.202n | ||
| May 2, 2017 | Completed final sign-off Apr 2018 | 1500 Mission St | partial demolition to retain & reconfigure a portion of the former coca-cola bottling plant bldg, including the clock tower element situated near the corner of mission & 11th street. ** maher: n/a **Details
partial demolition to retain & reconfigure a portion of the former coca-cola bottling plant bldg, including the clock tower element situated near the corner of mission & 11th street. ** maher: n/a ** | $600,000 | |
| May 2, 2017 | Completed final sign-off Apr 2018 | 1580 Mission St | Evans Brothers Inc, Charles Pankow Builders Ltd | to demolish 2 stories, goodwill store building. ** maher: n/a **Details
to demolish 2 stories, goodwill store building. ** maher: n/a ** | $150,000 |
| Apr 17, 2017 | Completed final sign-off Jun 2020 | 245 01st St | Webcor Construction Lp | revision to appln #201412234418-s3 (architectural); revision to units consisting of relocating heat pumps, closets, updating title 24 & changes to amenity levels & leasing space.Details
revision to appln #201412234418-s3 (architectural); revision to units consisting of relocating heat pumps, closets, updating title 24 & changes to amenity levels & leasing space. | |
| Jun 20, 2016 | Completed final sign-off Dec 2021 | 1500 Mission St | Charles Pankow Builders Ltd | to erect 16 stories, 2 basement, office building & 39 stories, 2 basement, type ia, 550 residential units building. both buildings are over a shared two level subterranean basement parking garage. (r-2,b,a-3,i-4,s-2)Details
to erect 16 stories, 2 basement, office building & 39 stories, 2 basement, type ia, 550 residential units building. both buildings are over a shared two level subterranean basement parking garage. (r-2,b,a-3,i-4,s-2) | $400,000,000 |
| Dec 23, 2014 | Completed final sign-off Apr 2020 | 245 01st St | Webcor Construction Lp | to erect 56 stories tower, 2.5 basement, 9 stories element high rise building, with 546 units residential, retail & parking. ** maher: compliance with ordinance no# 155-13 requied; route to dph **Details
to erect 56 stories tower, 2.5 basement, 9 stories element high rise building, with 546 units residential, retail & parking. ** maher: compliance with ordinance no# 155-13 requied; route to dph ** | $175,000,000 |
| Mar 6, 2013 | Completed final sign-off Dec 2013 | 539 Bryant St | P T Electric & Gdo Company | suite 100: new lighting and electrical paritions. ref 201212206641Details
suite 100: new lighting and electrical paritions. ref 201212206641 | $50,000 |
| Feb 28, 2013 | Completed final sign-off May 2013 | 730 Harrison St | remodel of existing conference room and open work space. includes selective removal of non load bearing walls. install 1 vav box and 3 new exhaust fans.Details
remodel of existing conference room and open work space. includes selective removal of non load bearing walls. install 1 vav box and 3 new exhaust fans. | $392,000 | |
| Dec 20, 2012 | Completed final sign-off Dec 2013 | 539 Bryant St | Taylor Construction Development Inc | 1st floor/suite #100-demo some (e) walls, construct new walls, new kitchen, new lighting. the scope work also include upgrade to existing common restrooms that are outside the tenant space to make fully compliant. this includes demo, new walls, fixutre, lighting & ceiling.Details
1st floor/suite #100-demo some (e) walls, construct new walls, new kitchen, new lighting. the scope work also include upgrade to existing common restrooms that are outside the tenant space to make fully compliant. this includes demo, new walls, fixutre, lighting & ceiling. | $450,000 |
| Feb 22, 2012 | Completed final sign-off Apr 2013 | 2235 03rd St | Nibbi Bros Assoc Inc. | interior build out of childcare space including classrooms, restrms, kitchen, office, conference rm and break rm spaces. this also includ construtn of exterior space for a paved exit path grassed area. ref. to approved #200907092309.Details
interior build out of childcare space including classrooms, restrms, kitchen, office, conference rm and break rm spaces. this also includ construtn of exterior space for a paved exit path grassed area. ref. to approved #200907092309. | |
| Feb 3, 2012 | Expired or cancelled cancelled Jan 2026 | 178 Townsend St | James E Roberts-Obayashi Corporation | mechanical work only, change of use under #2006.08.29.0851. spa udner separate pa #2011.04.08.3769 & 2012.02.03.3540.Details
mechanical work only, change of use under #2006.08.29.0851. spa udner separate pa #2011.04.08.3769 & 2012.02.03.3540. | |
| Feb 3, 2012 | Expired or cancelled cancelled Nov 2022 | 178 Townsend St | James E Roberts-Obayashi Corporation | provide spa on roof deck shown on issued site permit & final addenda drawing under pa #2011.04.08.3769. mechanical under separate permit. (change of use under #2006.08.29.0851).Details
provide spa on roof deck shown on issued site permit & final addenda drawing under pa #2011.04.08.3769. mechanical under separate permit. (change of use under #2006.08.29.0851). | |
| Jul 15, 2011 | Completed final sign-off May 2013 | 1395 Van Ness Av | Lusardi Construction Co | exterior improvements for level 1 and 2 of existing car dealership. new stone facade and glazingDetails
exterior improvements for level 1 and 2 of existing car dealership. new stone facade and glazing | $110,000 |
| Apr 27, 2011 | Completed final sign-off May 2013 | 1395 Van Ness Av | Lusardi Construction Co | window replacement on levels 3-6Details
window replacement on levels 3-6 | $65,000 |
| Apr 8, 2011 | Completed final sign-off Dec 2012 | 2225 03rd St | Nibbi Bros Assoc Inc. | rev to pa# 2009/07/09/2309 from 2007 cbc to 2010 cbc; eleminate rescue window requirement @ 1st-3rd level. reconfiguration of a sleeping area to locate barn door on portal side of sleeping area. reconfiguration of master bedrm in 2 bedrm units to have a 3'-9" hinged door & remaining wall to be 50%Details
rev to pa# 2009/07/09/2309 from 2007 cbc to 2010 cbc; eleminate rescue window requirement @ 1st-3rd level. reconfiguration of a sleeping area to locate barn door on portal side of sleeping area. reconfiguration of master bedrm in 2 bedrm units to have a 3'-9" hinged door & remaining wall to be 50% | |
| Apr 8, 2011 | Completed final sign-off Jul 2012 | 178 Townsend St | James E Roberts-Obayashi Corporation | rev to pa# 2006/08/29/0851 from 2007 cbc to 2010 cbc; eleminate rescue window requirement @ 1st-3rd level. reconfiguration of a sleeping area to locate barn door on portal side of sleeping area. reconfiguration of master bedrm in 2 bedrm units to have a 3'-9" hinged door & remaining wall to be 0.Details
rev to pa# 2006/08/29/0851 from 2007 cbc to 2010 cbc; eleminate rescue window requirement @ 1st-3rd level. reconfiguration of a sleeping area to locate barn door on portal side of sleeping area. reconfiguration of master bedrm in 2 bedrm units to have a 3'-9" hinged door & remaining wall to be 0. | |
| Nov 19, 2010 | Completed final sign-off Nov 2012 | 2225 03rd St | Nibbi Bros Assoc Inc. | remove and dispose of approx. 2,000 tons of soil. no building work. pa# 2009.09.08.6370 for referenceDetails
remove and dispose of approx. 2,000 tons of soil. no building work. pa# 2009.09.08.6370 for reference | $6,000 |
| Sep 14, 2010 | Completed final sign-off Dec 2017 | 45 Lansing St | to erect 39 stories, 320 units residential condominiums building.Details
to erect 39 stories, 320 units residential condominiums building. | $75,000,000 | |
| Aug 19, 2010 | Expired or cancelled cancelled Jan 2026 | 178 Townsend St | breakout existing concrete slab. remove and dispose of contaminated soil. +/- 4000 cubic yds. no change to exterior of building. no exterior of work.Details
breakout existing concrete slab. remove and dispose of contaminated soil. +/- 4000 cubic yds. no change to exterior of building. no exterior of work. | $75,000 | |
| Apr 5, 2010 | Completed final sign-off Aug 2010 | 10 United Nations Pz | Gci, Inc | united nations plaza. tenant improvement ( approx. 7,741 sqft). selective demolition of existing interior wall and new construction of class rooms, open office and restrooms. no sturtural work. no exterior work.Details
united nations plaza. tenant improvement ( approx. 7,741 sqft). selective demolition of existing interior wall and new construction of class rooms, open office and restrooms. no sturtural work. no exterior work. | $615,000 |
| Jan 6, 2009 | Expired or cancelled cancelled Jan 2026 | 45 Lansing St | this application formally establishes a permanent record of the dept of city plannings previous approval for a density of 217 units & provides 4 additional balconies, i each on floors 32 thru 35. these changes are reflected on bpn 2005-0908-2369s4 on fileDetails
this application formally establishes a permanent record of the dept of city plannings previous approval for a density of 217 units & provides 4 additional balconies, i each on floors 32 thru 35. these changes are reflected on bpn 2005-0908-2369s4 on file | $1,000 | |
| Aug 19, 2008 | Expired or cancelled withdrawn Mar 2009 | 178 Townsend St | structural permit for earthquake retrofit and for base building. vertical addition, residential conversion under seperate pa# 2006-0829-0851sDetails
structural permit for earthquake retrofit and for base building. vertical addition, residential conversion under seperate pa# 2006-0829-0851s | $2,000,000 | |
| Aug 31, 2007 | Completed final sign-off Jan 2008 | 500 Howard St | Cannon Constructors North Inc | 4th floor-first time tenant. t.i. for interior office space on level 4. work proposed will take about 1/3 of the floor area on that floor. mep, sprinkler and fire alarm under separate permit.Details
4th floor-first time tenant. t.i. for interior office space on level 4. work proposed will take about 1/3 of the floor area on that floor. mep, sprinkler and fire alarm under separate permit. | $500,000 |
| Jul 5, 2006 | Completed final sign-off Nov 2007 | 400 Beale St | James J Reilly Contracting | comply complaint 200006075 bid-insp. vestibule added at north end of the residental garage to revise exiting plan.Details
comply complaint 200006075 bid-insp. vestibule added at north end of the residental garage to revise exiting plan. | $8,000 |
| Jul 21, 2005 | Expired or cancelled expired Feb 2009 | 333 01st St | Howard S Wright Construction Co. | revised mail room & added storage. sprinklers under separate permit.Details
revised mail room & added storage. sprinklers under separate permit. | $50,000 |
| Aug 5, 2003 | Completed final sign-off Aug 2005 | 355 01st St | rev to 200012117629s; redesign kitchen layouts in certain unitsDetails
rev to 200012117629s; redesign kitchen layouts in certain units | $30,000 | |
| Jul 24, 2003 | Never finaled issued Aug 2003, no final | 333 01st St | rev. appl#200012117630 change 1-hr partition, ul-u493 to 1-hr. partition u458Details
rev. appl#200012117630 change 1-hr partition, ul-u493 to 1-hr. partition u458 | $10,000 |