- On San Francisco permits
- Jun 2011 to Mar 2025
36 permits since 2000 (architect on 31 permits, engineer on 5 permits): 20 completed, 10 never finaled, 6 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 10, 2025 | Completed final sign-off Oct 2025 | 1763 33rd Av | to comply w/ nov 202534509: thr front setback is to be compliance after paving w/ permeable concrete slab of 100 sf all within driveway space property lineDetails
to comply w/ nov 202534509: thr front setback is to be compliance after paving w/ permeable concrete slab of 100 sf all within driveway space property line | $2,000 | |
| Dec 8, 2022 | Never finaled filed Dec 2022, never issued | 215 Market St | alteration & addition to(e) historic bldg.work on street facing facade limite to(n)windows,doors 7 mechanical louvers;work on interior sides of bldg to add horizontal addition of office & retail space;(e)basement will be partially demolished & rebuilt with(n) underground parking & bldg services.Details
alteration & addition to(e) historic bldg.work on street facing facade limite to(n)windows,doors 7 mechanical louvers;work on interior sides of bldg to add horizontal addition of office & retail space;(e)basement will be partially demolished & rebuilt with(n) underground parking & bldg services. | $9,116,204 | |
| Sep 8, 2022 | Expired or cancelled withdrawn Sep 2025 | 50 Main St | Turner Construction Co | to construct a 88-story, 808 dwelling units, type 1-a building.Details
to construct a 88-story, 808 dwelling units, type 1-a building. | $180,239,092 |
| Sep 8, 2022 | Expired or cancelled withdrawn May 2026 | 50 Main St | Turner Construction Co | to demolish existing parking garage. 2-story, 1-basement, type i.Details
to demolish existing parking garage. 2-story, 1-basement, type i. | |
| Jun 28, 2022 | Never finaled issued Aug 2022, no final | 77 Beale St | Turner Construction Co | work on unoccupied floors b3,b2, b1,1,3,10,25,30,32,33: comply with ab-017, work is for isolated exploratory demo of (e) non-structuatl bldg elements to explore, examine, & sample. any mod to (e) fireproofing or fire rated constr will be patched immediately after. no mod to (e) fire sprinkler.Details
work on unoccupied floors b3,b2, b1,1,3,10,25,30,32,33: comply with ab-017, work is for isolated exploratory demo of (e) non-structuatl bldg elements to explore, examine, & sample. any mod to (e) fireproofing or fire rated constr will be patched immediately after. no mod to (e) fire sprinkler. | $728,548 |
| Jun 13, 2022 | Never finaled issued Jun 2022, no final | 215 Market St | Turner Construction Co | interior temporary demolition of (e) elements as indicated in drawings to achieve confirmation all elements, demolished are to be re-installed as previous. no change in occupancy use or area.Details
interior temporary demolition of (e) elements as indicated in drawings to achieve confirmation all elements, demolished are to be re-installed as previous. no change in occupancy use or area. | $89,500 |
| Feb 15, 2022 | Expired or cancelled withdrawn Sep 2025 | 77 Beale St | Turner Construction Co | renovation of 77 beale aka 200 mission.replacement of facade, elevators,mechanical,electrical,plumbing, & fire protection(sprinkler system).seismic structural upgrades.groun plane redesign.Details
renovation of 77 beale aka 200 mission.replacement of facade, elevators,mechanical,electrical,plumbing, & fire protection(sprinkler system).seismic structural upgrades.groun plane redesign. | $105,596,280 |
| Oct 22, 2020 | Completed final sign-off Jan 2022 | 415 Mission St | Hathaway Dinwiddie Co. | update plumbing documents per discussions with city plumbing department and on-site conditions. ref pa # 201802050382. permit revision # 3 submission.Details
update plumbing documents per discussions with city plumbing department and on-site conditions. ref pa # 201802050382. permit revision # 3 submission. | |
| Aug 22, 2020 | Completed final sign-off Jun 2022 | 101 01st St | Hathaway Dinwiddie Co. | revision to pa #201901291468. revision include deletion of antipipated trash chute enclosure and slab penetration at level 1. deletion of trash room & teannt storage room at level p1. scope of work reduction.Details
revision to pa #201901291468. revision include deletion of antipipated trash chute enclosure and slab penetration at level 1. deletion of trash room & teannt storage room at level p1. scope of work reduction. | |
| Jan 29, 2020 | Completed final sign-off Jan 2022 | 101 01st St | Hathaway Dinwiddie Co. | revision to pa #2018-0205-0382 for black water treatment systems. updates include but not limited to equipment relocation coordination. minor tank height & revise tank water proofingDetails
revision to pa #2018-0205-0382 for black water treatment systems. updates include but not limited to equipment relocation coordination. minor tank height & revise tank water proofing | |
| Jul 25, 2019 | Expired or cancelled cancelled Nov 2019 | 266 Bemis St | remove 3 ft wall that supports existing beams that overlap it with a new beam that will be 5 1/4 x 9 1/2, new beam will span approx 15'6"Details
remove 3 ft wall that supports existing beams that overlap it with a new beam that will be 5 1/4 x 9 1/2, new beam will span approx 15'6" | $4,000 | |
| Jul 23, 2019 | Never finaled filed Jul 2019, never issued | 575 Market St | the project scope to renovate portions of the ground floor of the existing building & the exterior plaza.Details
the project scope to renovate portions of the ground floor of the existing building & the exterior plaza. | $1,958,796 | |
| Jul 23, 2019 | Never finaled filed Jul 2019, never issued | 575 Market St | selective demo in plaza per ab-017. improvement under separate permit.Details
selective demo in plaza per ab-017. improvement under separate permit. | $175,083 | |
| Jul 23, 2019 | Never finaled filed Jul 2019, never issued | 555 Market St | renovate portions of ground floor of existing building & the exterior plaza and construct a new 789 sq ft one story building inn plaza.Details
renovate portions of ground floor of existing building & the exterior plaza and construct a new 789 sq ft one story building inn plaza. | $10,828,266 | |
| Jul 23, 2019 | Never finaled filed Jul 2019, never issued | 555 Market St | selective demo in plaza per ab-017. improvement under separate permit.Details
selective demo in plaza per ab-017. improvement under separate permit. | $579,495 | |
| Jul 17, 2019 | Completed final sign-off Aug 2019 | 300 16th St | Mortenson Clark A Joint Venture | nfpa 101 life safety evaluation for chase center arena.**maher n/a**Details
nfpa 101 life safety evaluation for chase center arena.**maher n/a** | |
| Jun 13, 2019 | Completed final sign-off Oct 2021 | 300 16th St | Mortenson Clark A Joint Venture | revision to pa #201606149954-s2. revise damper matrix and smoke control configuration as stated in revised smoke control amendment letter. north tower.Details
revision to pa #201606149954-s2. revise damper matrix and smoke control configuration as stated in revised smoke control amendment letter. north tower. | $25,000 |
| Jun 13, 2019 | Completed final sign-off Oct 2021 | 300 16th St | Mortenson Clark A Joint Venture | revision to pa #201606149954-s2. revise damper matrix and smoke control configuration as stated in revised smoke control amendment letter. south tower.Details
revision to pa #201606149954-s2. revise damper matrix and smoke control configuration as stated in revised smoke control amendment letter. south tower. | $25,000 |
| Apr 15, 2019 | Completed final sign-off May 2020 | 706 London St | Bobee Construction | demolish 1-story detach metal storage building.Details
demolish 1-story detach metal storage building. | $5,000 |
| Apr 15, 2019 | Completed final sign-off Jun 2021 | 706 London St | Bobee Construction | horizontal addition. new construction of an attached bedroom on the same location.Details
horizontal addition. new construction of an attached bedroom on the same location. | $7,000 |
| Apr 1, 2019 | Completed final sign-off Aug 2019 | 300 16th St | Mortenson Clark A Joint Venture | revision to 201606149949 s4 create 2 hour seperation between garage and towers ofr fire alarm purposesDetails
revision to 201606149949 s4 create 2 hour seperation between garage and towers ofr fire alarm purposes | $75,000 |
| Mar 29, 2019 | Completed final sign-off Sep 2019 | 300 16th St | Mortenson Clark A Joint Venture | ti to combine 2 lounges into one lounge mahern a revision to p.a.#2016 0614 9949 s4Details
ti to combine 2 lounges into one lounge mahern a revision to p.a.#2016 0614 9949 s4 | $10,000 |
| Jan 29, 2019 | Completed final sign-off Jun 2022 | 101 01st St | Hathaway Dinwiddie Co. | revision to pa #201811145879 for location of dumbwaiter slab penetrations & related fire rated hoistway. revised slab penetration location of trash chute, trash chute room door & tenant storage room roof structure at level p1.Details
revision to pa #201811145879 for location of dumbwaiter slab penetrations & related fire rated hoistway. revised slab penetration location of trash chute, trash chute room door & tenant storage room roof structure at level p1. | |
| Nov 15, 2018 | Completed final sign-off Feb 2019 | 1930 Ocean Av | J C General Construction | tenant improvement: change of use from retail to beauty salon. reframe, elec, plumb, flooring, finishes, equipment.Details
tenant improvement: change of use from retail to beauty salon. reframe, elec, plumb, flooring, finishes, equipment. | $15,000 |
| Nov 14, 2018 | Completed final sign-off Nov 2022 | 101 01st St | Hathaway Dinwiddie Co. | revision to app#201303132060(s3) and 201605056637. add dumbwaiter at levels p1 & 1. add provisions for tenant trash chute. add tenant storage room. adjust parking layout at levels p2 and p1. n/a for maherDetails
revision to app#201303132060(s3) and 201605056637. add dumbwaiter at levels p1 & 1. add provisions for tenant trash chute. add tenant storage room. adjust parking layout at levels p2 and p1. n/a for maher | $250,000 |
| Apr 17, 2018 | Never finaled issued Jun 2018, no final | 101 01st St | Clark/Hathaway Dinwiddie A Joint Venture | added tenant low mid-rise elevator stops on levels 3,4 & 6. reference pa# 201301132080 & 201605056637.Details
added tenant low mid-rise elevator stops on levels 3,4 & 6. reference pa# 201301132080 & 201605056637. | $500,000 |
| Mar 23, 2018 | Never finaled issued Feb 2020, no final | 726 Joost Av | vertical & horizontal addition. conversion of (e) basement area in living space. proposed 2 story addition with 3 new bedrooms, 2 new bathrms, new study room & kitchen remodel. new front balcony & new foundation.Details
vertical & horizontal addition. conversion of (e) basement area in living space. proposed 2 story addition with 3 new bedrooms, 2 new bathrms, new study room & kitchen remodel. new front balcony & new foundation. | $252,900 | |
| Dec 26, 2017 | Completed final sign-off Aug 2018 | 239 Peabody St | Zhong Art Construction Inc | basement interior remodel to add play room with half bathroom and relocation of (e) water heater and enclose (e) laundry room. approx remodel area: 469.91 sq ft. new window at rear.Details
basement interior remodel to add play room with half bathroom and relocation of (e) water heater and enclose (e) laundry room. approx remodel area: 469.91 sq ft. new window at rear. | $50,000 |
| Dec 18, 2017 | Expired or cancelled cancelled Jan 2026 | 586 39th Av | legalize interior kitchen remodel with (n) cabinets, same layout. new full bath and storage area in basement to be converted to office room. approx remodel 182 sq ft.Details
legalize interior kitchen remodel with (n) cabinets, same layout. new full bath and storage area in basement to be converted to office room. approx remodel 182 sq ft. | $65,000 | |
| Apr 18, 2017 | Never finaled issued Sep 2017, no final | 300 16th St | Mortenson Clark A Joint Venture | altered site permit to revise site permit #2016-0614-9949. revise gate house location and modification to north east corner retail area.Details
altered site permit to revise site permit #2016-0614-9949. revise gate house location and modification to north east corner retail area. | |
| Jun 14, 2016 | Completed final sign-off Jul 2020 | 300 16th St | Mortenson Clark A Joint Venture | construct (n) 11-story office buildingDetails
construct (n) 11-story office building | $145,665,213 |
| Jun 14, 2016 | Completed final sign-off Oct 2020 | 300 16th St | Mortenson Clark A Joint Venture | construct (n) professional sports arena: includes gate house, theatre/auditorium, parking garage, team offices, gymnasiums, restaurants & retailDetails
construct (n) professional sports arena: includes gate house, theatre/auditorium, parking garage, team offices, gymnasiums, restaurants & retail | $537,958,646 |
| Jun 14, 2016 | Completed final sign-off Jul 2020 | 300 16th St | Mortenson Clark A Joint Venture | construct (n) 11-story office buildingDetails
construct (n) 11-story office building | $6,283,099 |
| May 5, 2016 | Completed final sign-off Apr 2018 | 101 01st St | Clark/Hathaway Dinwiddie A Joint Venture | revision to architectural and mep addendum reference pa#201303132080 s-3. ** maher: n/a **Details
revision to architectural and mep addendum reference pa#201303132080 s-3. ** maher: n/a ** | |
| Mar 13, 2013 | Completed final sign-off Jul 2021 | 101 01st St | Clark/Hathaway Dinwiddie A Joint Venture | to erect 63 stories with 3 basements, office, retail, parking building.Details
to erect 63 stories with 3 basements, office, retail, parking building. | $272,000,000 |
| Jun 14, 2011 | Expired or cancelled expired Jun 2013 | 237 Laidley St | revision to appn. 200907011813; structural revisions, eliminate shear wall along grid e and add detail to support post, framing changesDetails
revision to appn. 200907011813; structural revisions, eliminate shear wall along grid e and add detail to support post, framing changes |