Bobee Construction
- Based in
- San Francisco
- On San Francisco permits
- May 2017 to Sep 2021
- Last 24 months
- 0 permits filed
9 permits since 2000: 5 completed, 4 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 7, 2021 | Expired or cancelled cancelled Jan 2026 | 89 Belle Av | unit a, 2/f: interior remodel. add 2 new bathrooms. remodel kitchen, add new laundry and new water heater. add 2 windows at front.Details
unit a, 2/f: interior remodel. add 2 new bathrooms. remodel kitchen, add new laundry and new water heater. add 2 windows at front. | $100,000 |
| Aug 10, 2021 | Expired or cancelled expired Oct 2024 | 89 Belle Av | to correct unit number of permit 202108096039 from unit 1 to unit b.Details
to correct unit number of permit 202108096039 from unit 1 to unit b. | |
| Aug 9, 2021 | Expired or cancelled expired Oct 2024 | 89 Belle Av | apt 1: removel 2 bathrooms in-kind. replace 7 windows in-kind ; replace 2 garage doors in-kind. 2 windows at front facade to be wood aluminum clad. replacement fenestration max. u-factor = 0.40. lighting h.e. & per cec 150.0(k).Details
apt 1: removel 2 bathrooms in-kind. replace 7 windows in-kind ; replace 2 garage doors in-kind. 2 windows at front facade to be wood aluminum clad. replacement fenestration max. u-factor = 0.40. lighting h.e. & per cec 150.0(k). | $23,000 |
| Aug 6, 2020 | Expired or cancelled expired Oct 2024 | 89 Belle Av | to comply with nov 201774933: replace interior sheetrock ~800 sqft at bedroom, living room, bathroom, kitchen in unit #2. repair damaged wood in unit #2 (left side of interior stairs). wood repair work are wall studs & subfloor in kitchen & living room. all work in kind.Details
to comply with nov 201774933: replace interior sheetrock ~800 sqft at bedroom, living room, bathroom, kitchen in unit #2. repair damaged wood in unit #2 (left side of interior stairs). wood repair work are wall studs & subfloor in kitchen & living room. all work in kind. | $30,000 |
| Apr 15, 2019 | Completed final sign-off May 2020 | 706 London St | demolish 1-story detach metal storage building.Details
demolish 1-story detach metal storage building. | $5,000 |
| Apr 15, 2019 | Completed final sign-off Jun 2021 | 706 London St | horizontal addition. new construction of an attached bedroom on the same location.Details
horizontal addition. new construction of an attached bedroom on the same location. | $7,000 |
| Aug 31, 2018 | Completed final sign-off Oct 2018 | 706 London St | replace garage door.Details
replace garage door. | $1,200 |
| Aug 17, 2018 | Completed final sign-off Oct 2018 | 706 London St | remodel 2/f kitchen & bathroom by r/r (e) cabinetss, siks,f aucts. repair bacyard stairs less than 50%. repair is in-kind.Details
remodel 2/f kitchen & bathroom by r/r (e) cabinetss, siks,f aucts. repair bacyard stairs less than 50%. repair is in-kind. | $6,500 |
| May 16, 2017 | Completed final sign-off Jul 2017 | 619 Moscow St | horizontal extension -repair siding. new stairs at rear.Details
horizontal extension -repair siding. new stairs at rear. | $2,080 |