Bobee Construction
- Based in
- San Francisco
- On San Francisco permits
- May 2017 to Sep 2021
- Last 24 months
- 0 permits filed
9 permits since 2000: 5 completed, 4 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
3 stairs permits: 2 completed, 1 expired or cancelled. Typically 14 days from filing to permit and 54 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 6, 2020 | Expired or cancelled expired Oct 2024 | 89 Belle Av | to comply with nov 201774933: replace interior sheetrock ~800 sqft at bedroom, living room, bathroom, kitchen in unit #2. repair damaged wood in unit #2 (left side of interior stairs). wood repair work are wall studs & subfloor in kitchen & living room. all work in kind.Details
to comply with nov 201774933: replace interior sheetrock ~800 sqft at bedroom, living room, bathroom, kitchen in unit #2. repair damaged wood in unit #2 (left side of interior stairs). wood repair work are wall studs & subfloor in kitchen & living room. all work in kind. | $30,000 |
| Aug 17, 2018 | Completed final sign-off Oct 2018 | 706 London St | remodel 2/f kitchen & bathroom by r/r (e) cabinetss, siks,f aucts. repair bacyard stairs less than 50%. repair is in-kind.Details
remodel 2/f kitchen & bathroom by r/r (e) cabinetss, siks,f aucts. repair bacyard stairs less than 50%. repair is in-kind. | $6,500 |
| May 16, 2017 | Completed final sign-off Jul 2017 | 619 Moscow St | horizontal extension -repair siding. new stairs at rear.Details
horizontal extension -repair siding. new stairs at rear. | $2,080 |