Feb 2017 to Jul 2026

71 permits since 2000 (contractor on 71 permits, authorized agent-others on 1 permit): 51 completed, 5 in progress, 9 never finaled, 6 expired or cancelled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records

Most recent permits

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Jul 29, 2026In progress
issued Aug 2026
1060 Bush StRei Build Up Construction Corp, Rain Defenserepair damaged exterior concrete wall areas, including removal of deteriorated concrete, patching, and restoration to match (e)
Details
Permit
202607295738
Status
issued
Filed
Jul 29, 2026
Permit issued
Aug 5, 2026
Declared cost
$45,000
Address
1060 Bush St

repair damaged exterior concrete wall areas, including removal of deteriorated concrete, patching, and restoration to match (e)

Open the permit page

$45,000
May 4, 2026Completed
final sign-off Aug 2026
1740 Sacramento StRei Build Up Construction Corpmandatory seismic strengthening to san francisco seismic ordinance ab 107 work is limited to the basement floor only
Details
Permit
202605040602
Status
complete
Filed
May 4, 2026
Permit issued
May 5, 2026
Final sign-off
Aug 21, 2026
Declared cost
$70,000
Address
1740 Sacramento St

mandatory seismic strengthening to san francisco seismic ordinance ab 107 work is limited to the basement floor only

Open the permit page

$70,000
Feb 23, 2026Completed
final sign-off Sep 2026
642 Alvarado StRei Build Up Construction Corpto obtain final inspection for work approved under pa# 202306069350, 202101112473. all work is complete.
Details
Permit
202602236311
Status
complete
Filed
Feb 23, 2026
Permit issued
Feb 23, 2026
Final sign-off
Sep 25, 2026
Address
642 Alvarado St

to obtain final inspection for work approved under pa# 202306069350, 202101112473. all work is complete.

Open the permit page

Feb 5, 2026Completed
final sign-off Feb 2026
1753 Stockton StRei Build Up Construction Corpto obtain final inspection for work approved under pa#: 202407015589. all work is complete.
Details
Permit
202602055367
Status
complete
Filed
Feb 5, 2026
Permit issued
Feb 5, 2026
Final sign-off
Feb 11, 2026
Address
1753 Stockton St

to obtain final inspection for work approved under pa#: 202407015589. all work is complete.

Open the permit page

Nov 19, 2025In progress
issued Nov 2025
1060 Bush StRei Build Up Construction Corpvoluntary structural strengthening by installing out- of- plane tie-back at every floor level and shear connections to tansfer in-plane diaphgram shear into the existing perimeter concrete walls.
Details
Permit
202511199996
Status
issued
Filed
Nov 19, 2025
Permit issued
Nov 20, 2025
Declared cost
$90,000
Address
1060 Bush St

voluntary structural strengthening by installing out- of- plane tie-back at every floor level and shear connections to tansfer in-plane diaphgram shear into the existing perimeter concrete walls.

Open the permit page

$90,000
Nov 4, 2025Completed
final sign-off Feb 2026
1074 Union StRei Build Up Construction Corpto obtain final inspection for work approved under pa# 201806263051. all work is complete.
Details
Permit
202511048895
Status
complete
Filed
Nov 4, 2025
Permit issued
Nov 4, 2025
Final sign-off
Feb 26, 2026
Address
1074 Union St

to obtain final inspection for work approved under pa# 201806263051. all work is complete.

Open the permit page

Sep 23, 2025In progress
issued Jun 2026
660 Bush StRei Build Up Construction Corprepair rear yard retaining wall tie- beam and girt beam in kind less than 50%. no change to design nor layout. comply with nov 202313083
Details
Permit
202509235966
Status
issued
Filed
Sep 23, 2025
Permit issued
Jun 24, 2026
Declared cost
$6,000
Address
660 Bush St

repair rear yard retaining wall tie- beam and girt beam in kind less than 50%. no change to design nor layout. comply with nov 202313083

Open the permit page

$6,000
Jul 8, 2025In progress
issued May 2026
1347 Sacramento StRei Build Up Construction Corpreconfigure former laudromat on ground floor to 3-adus; provide fire sprinklers at proposed units per fs-05 hazard class nfpa 13r; provide one hour rated horizontal & vertical separation between units & uuper flrs; provide or upgrade manual fa system per sfbc & sffc sec 907 (under sep permit)
Details
Permit
202506188989
Status
issued
Filed
Jul 8, 2025
Permit issued
May 4, 2026
Declared cost
$750,000
Address
1347 Sacramento St

reconfigure former laudromat on ground floor to 3-adus; provide fire sprinklers at proposed units per fs-05 hazard class nfpa 13r; provide one hour rated horizontal & vertical separation between units & uuper flrs; provide or upgrade manual fa system per sfbc & sffc sec 907 (under sep permit)

Open the permit page

$750,000
May 1, 2025Completed
final sign-off Oct 2025
325 Berry StRei Build Up Construction Corpunit #410 in kind remodel of kitchen, cabinets, countertops and sink only. in kind remodel of primary bath, vanity with sink, floor tiles and bathtub tiles. in kind remodel of guest bath: vanity w sink an floor tiles only.
Details
Permit
202505015658
Status
complete
Filed
May 1, 2025
Permit issued
May 1, 2025
Final sign-off
Oct 23, 2025
Declared cost
$25,000
Address
325 Berry St

unit #410 in kind remodel of kitchen, cabinets, countertops and sink only. in kind remodel of primary bath, vanity with sink, floor tiles and bathtub tiles. in kind remodel of guest bath: vanity w sink an floor tiles only.

Open the permit page

$25,000
Dec 19, 2024In progress
issued Mar 2025
2115 Hyde StRei Build Up Construction Corpproject involves (e) footing underpinning and strenghing at the lower basement
Details
Permit
202412197159
Status
issued
Filed
Dec 19, 2024
Permit issued
Mar 19, 2025
Declared cost
$50,000
Address
2115 Hyde St

project involves (e) footing underpinning and strenghing at the lower basement

Open the permit page

$50,000
Jul 30, 2024Completed
final sign-off Jun 2025
1301 La PlayaRei Build Up Construction Corprevision to permit 202211297306. installation of new steel gravity frame adjacent to existing gravity rusted steel frame.
Details
Permit
202407307561
Status
complete
Filed
Jul 30, 2024
Permit issued
Aug 1, 2024
Final sign-off
Jun 17, 2025
Declared cost
$35,000
Address
1301 La Playa

revision to permit 202211297306. installation of new steel gravity frame adjacent to existing gravity rusted steel frame.

Open the permit page

$35,000
Jul 3, 2024Completed
final sign-off Nov 2024
1329 Bay StRei Build Up Construction Corpreplacement of 11 existing wood windows at front facade on 2nd & 3rd floors with 7 nw wood or wood clad windows: replace 3 extg center windows with 1 nw picture frame windows; replace both 2 extg windows at ends with 2 nw tilt-up casement windows. replacement of 1 existing window @ 3rd floor clos
Details
Permit
202407035820
Status
complete
Filed
Jul 3, 2024
Permit issued
Aug 29, 2024
Final sign-off
Nov 4, 2024
Declared cost
$8,000
Address
1329 Bay St

replacement of 11 existing wood windows at front facade on 2nd & 3rd floors with 7 nw wood or wood clad windows: replace 3 extg center windows with 1 nw picture frame windows; replace both 2 extg windows at ends with 2 nw tilt-up casement windows. replacement of 1 existing window @ 3rd floor clos

Open the permit page

$8,000
Jul 1, 2024Expired or cancelled
expired Feb 2026
1753 Stockton StRei Build Up Construction Corpto comply with nov 202423692- repair damage wood framing and finishes- facing front of street.
Details
Permit
202407015589
Status
expired
Filed
Jul 1, 2024
Permit issued
Jul 1, 2024
Declared cost
$10,000
Address
1753 Stockton St

to comply with nov 202423692- repair damage wood framing and finishes- facing front of street.

Open the permit page

$10,000
Jun 14, 2024Completed
final sign-off Sep 2024
78 Parker AvRei Build Up Construction Corprevision to permit 202001091587. to replace shear wall with steel frame.
Details
Permit
202406144513
Status
complete
Filed
Jun 14, 2024
Permit issued
Jun 14, 2024
Final sign-off
Sep 24, 2024
Address
78 Parker Av

revision to permit 202001091587. to replace shear wall with steel frame.

Open the permit page

May 1, 2024Completed
final sign-off Oct 2024
598 Castro StRei Build Up Construction Corp, Deluxe Shotcrete & Concrete Constructionto comply w/ nov #202311345: replace less than 100 sf of non structural (e) concrete slab in kind or better limited to commercial space repair stair tread (less than 50%)
Details
Permit
202405011127
Status
complete
Filed
May 1, 2024
Permit issued
May 1, 2024
Final sign-off
Oct 17, 2024
Declared cost
$15,000
Address
598 Castro St

to comply w/ nov #202311345: replace less than 100 sf of non structural (e) concrete slab in kind or better limited to commercial space repair stair tread (less than 50%)

Open the permit page

$15,000
Jan 19, 2024Completed
final sign-off Jun 2025
1301 La PlayaRei Build Up Construction Corprevisiont to pa# 202307122008 & 202211297306, to accommodate adu wall layout only at first level.
Details
Permit
202401194287
Status
complete
Filed
Jan 19, 2024
Permit issued
Jan 19, 2024
Final sign-off
Jun 17, 2025
Address
1301 La Playa

revisiont to pa# 202307122008 & 202211297306, to accommodate adu wall layout only at first level.

Open the permit page

Sep 8, 2023Completed
final sign-off Sep 2024
642 Alvarado StRei Build Up Construction Corpsoft story strengthening for first level using wood shear wall.
Details
Permit
202309086175
Status
complete
Filed
Sep 8, 2023
Permit issued
Sep 8, 2023
Final sign-off
Sep 30, 2024
Declared cost
$120,000
Address
642 Alvarado St

soft story strengthening for first level using wood shear wall.

Open the permit page

$120,000
Jul 12, 2023Completed
final sign-off Jun 2025
1301 La PlayaRei Build Up Construction Corprevision to pa 2022-0720-8927 to accomodate site conditions
Details
Permit
202307122008
Status
complete
Filed
Jul 12, 2023
Permit issued
Aug 2, 2023
Final sign-off
Jun 17, 2025
Address
1301 La Playa

revision to pa 2022-0720-8927 to accomodate site conditions

Open the permit page

Jun 7, 2023Completed
final sign-off Nov 2024
1301 La PlayaRei Build Up Construction Corp, N C Blanch Companyrev to pa# 2023-0404-5048: to comply w/ nov 202304913, remove 28 decorative balconies at west facade. patch and repair exterior cement plaster wall finish where balconies were removed.
Details
Permit
202306079460
Status
complete
Filed
Jun 7, 2023
Permit issued
Jun 14, 2023
Final sign-off
Nov 20, 2024
Declared cost
$10,000
Address
1301 La Playa

rev to pa# 2023-0404-5048: to comply w/ nov 202304913, remove 28 decorative balconies at west facade. patch and repair exterior cement plaster wall finish where balconies were removed.

Open the permit page

$10,000
Jun 6, 2023Expired or cancelled
expired Feb 2026
642 Alvarado StRei Build Up Construction Corprevisions to adu pa#202101112473: 1. expand units a, b & c and revise interior layouts; 2. revise interior layouts at units d, e, f, g, h, & i for existing conditions encoutnered during construction; 3. revise west side-yard layout for existing conditions; and associated structural changes.
Details
Permit
202306069350
Status
expired
Filed
Jun 6, 2023
Permit issued
Nov 1, 2023
Declared cost
$50,000
Address
642 Alvarado St

revisions to adu pa#202101112473: 1. expand units a, b & c and revise interior layouts; 2. revise interior layouts at units d, e, f, g, h, & i for existing conditions encoutnered during construction; 3. revise west side-yard layout for existing conditions; and associated structural changes.

Open the permit page

$50,000
May 10, 2023Completed
final sign-off May 2024
1329 Bay StRei Build Up Construction Corprev to pa202212098016: scope limited to voluntary seismic strengthening for all floor using wood shear walls and simpson moment frame per ab-094
Details
Permit
202305107494
Status
complete
Filed
May 10, 2023
Permit issued
Oct 3, 2023
Final sign-off
May 8, 2024
Declared cost
$75,000
Address
1329 Bay St

rev to pa202212098016: scope limited to voluntary seismic strengthening for all floor using wood shear walls and simpson moment frame per ab-094

Open the permit page

$75,000
Apr 13, 2023Never finaled
issued May 2023, no final
244 Divisadero StRei Build Up Construction Corpslope of work is limited to replacing and re-framing the roof framing members damaged due to fire to comply with address nov#: 202295196
Details
Permit
202304135677
Status
issued
Filed
Apr 13, 2023
Permit issued
May 22, 2023
Declared cost
$25,000
Address
244 Divisadero St

slope of work is limited to replacing and re-framing the roof framing members damaged due to fire to comply with address nov#: 202295196

Open the permit page

$25,000
Apr 4, 2023Completed
final sign-off Nov 2024
1301 La PlayaRei Build Up Construction Corp, N C Blanch Companyto comply w/ #202304913, repair (e) balcony only on the west side of the building and install water proofing. repair no more than 50% of the existing balcony.all 28 balconies
Details
Permit
202304045048
Status
complete
Filed
Apr 4, 2023
Permit issued
Apr 4, 2023
Final sign-off
Nov 20, 2024
Declared cost
$50,000
Address
1301 La Playa

to comply w/ #202304913, repair (e) balcony only on the west side of the building and install water proofing. repair no more than 50% of the existing balcony.all 28 balconies

Open the permit page

$50,000
Dec 20, 2022Never finaled
issued May 2023, no final
775 Geary StRei Build Up Construction Corpstructural revision to permit 201612215550. clarification of structural support for relocated fire escaped drop down ladder that is previously permitted under 201612215550.
Details
Permit
202212208755
Status
issued
Filed
Dec 20, 2022
Permit issued
May 22, 2023
Declared cost
$7,000
Address
775 Geary St

structural revision to permit 201612215550. clarification of structural support for relocated fire escaped drop down ladder that is previously permitted under 201612215550.

Open the permit page

$7,000
Dec 9, 2022Completed
final sign-off Apr 2024
1329 Bay StRei Build Up Construction Corpvoluntary seismic soft-story retrofit per sfebc 2019.
Details
Permit
202212098016
Status
complete
Filed
Dec 9, 2022
Permit issued
May 9, 2023
Final sign-off
Apr 29, 2024
Declared cost
$60,000
Address
1329 Bay St

voluntary seismic soft-story retrofit per sfebc 2019.

Open the permit page

$60,000
Nov 29, 2022Completed
final sign-off Jun 2025
1301 La PlayaRei Build Up Construction Corpreconfigure (e) garages, storage and utility spaces on ground flr to install (9) (n) adus per ordinance 162-16. provide 1-hr horizontal separation between ground flr and 2nd flr. maintain v-b construction type at ground flr, all load bearing walls shall be 1-hr rated assemblies. sprinklers to be...
Details
Permit
202211297306
Status
complete
Filed
Nov 29, 2022
Permit issued
Sep 8, 2023
Final sign-off
Jun 17, 2025
Declared cost
$900,000
Address
1301 La Playa

reconfigure (e) garages, storage and utility spaces on ground flr to install (9) (n) adus per ordinance 162-16. provide 1-hr horizontal separation between ground flr and 2nd flr. maintain v-b construction type at ground flr, all load bearing walls shall be 1-hr rated assemblies. sprinklers to be...

Open the permit page

$900,000
Nov 21, 2022Completed
final sign-off May 2023
2090 BroadwayRei Build Up Construction Corprev to pa# 2022-0408-1912; to revise the structureal detail to strenghthen the concrete wall footing with (n) concrete deep beam spanning between (e) concrete pile cap foundation, application of shotcrete to (e) footing no longer required
Details
Permit
202211216963
Status
complete
Filed
Nov 21, 2022
Permit issued
Nov 23, 2022
Final sign-off
May 9, 2023
Address
2090 Broadway

rev to pa# 2022-0408-1912; to revise the structureal detail to strenghthen the concrete wall footing with (n) concrete deep beam spanning between (e) concrete pile cap foundation, application of shotcrete to (e) footing no longer required

Open the permit page

Nov 21, 2022Completed
final sign-off Aug 2023
2898 Jackson StRei Build Up Construction Corpseismic retrofit in accordance with sfebc mandatory soft story program using iebc appendix a4. retrofit work is perfomred on floor level a,b,c,d
Details
Permit
202211216968
Status
complete
Filed
Nov 21, 2022
Permit issued
Mar 8, 2023
Final sign-off
Aug 24, 2023
Declared cost
$85,000
Address
2898 Jackson St

seismic retrofit in accordance with sfebc mandatory soft story program using iebc appendix a4. retrofit work is perfomred on floor level a,b,c,d

Open the permit page

$85,000
Nov 1, 2022Completed
final sign-off Feb 2026
1074 Union StRei Build Up Construction Corprevision to soft story retrofit pa# 201806263051. replace the property concrete drilled piers to conventional foundation system
Details
Permit
202211015679
Status
complete
Filed
Nov 1, 2022
Permit issued
Oct 30, 2023
Final sign-off
Feb 26, 2026
Address
1074 Union St

revision to soft story retrofit pa# 201806263051. replace the property concrete drilled piers to conventional foundation system

Open the permit page

Oct 26, 2022Completed
final sign-off Feb 2024
320 14th StRei Build Up Construction Corpcommercial: revision to original soft story permit # 201809140254 and 201809140253. revising shear wall locations and adding details per site conditions. relate to app#202210255142
Details
Permit
202210265180
Status
complete
Filed
Oct 26, 2022
Permit issued
Oct 31, 2022
Final sign-off
Feb 7, 2024
Address
320 14th St

commercial: revision to original soft story permit # 201809140254 and 201809140253. revising shear wall locations and adding details per site conditions. relate to app#202210255142

Open the permit page

Oct 25, 2022Completed
final sign-off Feb 2024
320 14th StRei Build Up Construction Corp(residential) revision to original soft story permit # 201809140254 & 201809140253. revising shear wall location & adding details per site conditions.
Details
Permit
202210255142
Status
complete
Filed
Oct 25, 2022
Permit issued
Oct 31, 2022
Final sign-off
Feb 7, 2024
Address
320 14th St

(residential) revision to original soft story permit # 201809140254 & 201809140253. revising shear wall location & adding details per site conditions.

Open the permit page

Oct 11, 2022Never finaled
issued Jan 2023, no final
1074 Union StRei Build Up Construction Corprelocate (e) mech room at 1/f. repair (e) tradesman's path for access
Details
Permit
202210114151
Status
issued
Filed
Oct 11, 2022
Permit issued
Jan 24, 2023
Declared cost
$15,000
Address
1074 Union St

relocate (e) mech room at 1/f. repair (e) tradesman's path for access

Open the permit page

$15,000
Aug 5, 2022Completed
final sign-off Apr 2023
70 Hancock StRei Build Up Construction Corpreplacing (e) damaged footing with new concrete foundation at rear building.
Details
Permit
202208050031
Status
complete
Filed
Aug 5, 2022
Permit issued
Aug 12, 2022
Final sign-off
Apr 4, 2023
Declared cost
$50,000
Address
70 Hancock St

replacing (e) damaged footing with new concrete foundation at rear building.

Open the permit page

$50,000
Jul 20, 2022Completed
final sign-off Mar 2024
1301 La PlayaRei Build Up Construction Corpseismic soft story retrofit.
Details
Permit
202207208927
Status
complete
Filed
Jul 20, 2022
Permit issued
Mar 27, 2023
Final sign-off
Mar 20, 2024
Declared cost
$110,000
Address
1301 La Playa

seismic soft story retrofit.

Open the permit page

$110,000
Jul 15, 2022Completed
final sign-off Jan 2023
650 Masonic AvRei Build Up Construction Corprevision to soft story 202102255361. change shear wall location based on-site exploratory work in conditions.
Details
Permit
202207158564
Status
complete
Filed
Jul 15, 2022
Permit issued
Jul 20, 2022
Final sign-off
Jan 10, 2023
Declared cost
$50,000
Address
650 Masonic Av

revision to soft story 202102255361. change shear wall location based on-site exploratory work in conditions.

Open the permit page

$50,000
Jun 17, 2022Completed
final sign-off May 2023
10 Glendale StRei Build Up Construction Corprevision to soft story permit number 201703242316. comply with nov# 201992502.
Details
Permit
202206176612
Status
complete
Filed
Jun 17, 2022
Permit issued
Nov 17, 2022
Final sign-off
May 30, 2023
Address
10 Glendale St

revision to soft story permit number 201703242316. comply with nov# 201992502.

Open the permit page

Apr 8, 2022Completed
final sign-off May 2023
2090 BroadwayRei Build Up Construction Corpto comply with nov# 202180822. add shotcrete to repair & stregthen (e) concrete wall in the area of work noted on structural drawings.
Details
Permit
202204081912
Status
complete
Filed
Apr 8, 2022
Permit issued
Jun 14, 2022
Final sign-off
May 9, 2023
Declared cost
$40,000
Address
2090 Broadway

to comply with nov# 202180822. add shotcrete to repair & stregthen (e) concrete wall in the area of work noted on structural drawings.

Open the permit page

$40,000
Mar 22, 2022Never finaled
issued Mar 2022, no final
775 Geary StRei Build Up Construction Corprevision to bpa# 201612215550-s1. adjustments needed in path of travel due to site conditions found during construction & storage areas.
Details
Permit
202203220543
Status
issued
Filed
Mar 22, 2022
Permit issued
Mar 29, 2022
Address
775 Geary St

revision to bpa# 201612215550-s1. adjustments needed in path of travel due to site conditions found during construction & storage areas.

Open the permit page

Mar 1, 2022Completed
final sign-off Nov 2022
40 Tiffany AvRei Build Up Construction Corprevision to pa# 201911268203. relocate steel moment frame. substitute handy panels with high strength wood shearwall by simpson.
Details
Permit
202203018939
Status
complete
Filed
Mar 1, 2022
Permit issued
Mar 31, 2022
Final sign-off
Nov 23, 2022
Address
40 Tiffany Av

revision to pa# 201911268203. relocate steel moment frame. substitute handy panels with high strength wood shearwall by simpson.

Open the permit page

Feb 24, 2022Never finaled
issued May 2022, no final
1801 California StHalyard Inc, Rei Build Up Construction Corprevision to pa 201811206437. architectural layout to accomodate (e) conditions. revision to structural scope. no change to mechanical, sprinkler system filed under separate pa 202104208973. new exterior ground floor windows - change deisgn to wood casement.
Details
Permit
202202248628
Status
issued
Filed
Feb 24, 2022
Permit issued
May 16, 2022
Address
1801 California St

revision to pa 201811206437. architectural layout to accomodate (e) conditions. revision to structural scope. no change to mechanical, sprinkler system filed under separate pa 202104208973. new exterior ground floor windows - change deisgn to wood casement.

Open the permit page

Jul 29, 2021Completed
final sign-off Dec 2023
126 Haight StRei Build Up Construction Corprev to pa202006269210 - elevator enclosure. reconfigure stair to garage. ref pa201605207974.
Details
Permit
202107295343
Status
complete
Filed
Jul 29, 2021
Permit issued
Apr 6, 2022
Final sign-off
Dec 14, 2023
Address
126 Haight St

rev to pa202006269210 - elevator enclosure. reconfigure stair to garage. ref pa201605207974.

Open the permit page

Mar 18, 2021Completed
final sign-off Jun 2022
532 Roosevelt WyRei Build Up Construction Corpnew metal balcony and stairs to easement for the unit's 2nd mean of egress. ref app#201907226485 remodel scope of work.
Details
Permit
202103186842
Status
complete
Filed
Mar 18, 2021
Permit issued
Apr 28, 2021
Final sign-off
Jun 29, 2022
Declared cost
$6,000
Address
532 Roosevelt Wy

new metal balcony and stairs to easement for the unit's 2nd mean of egress. ref app#201907226485 remodel scope of work.

Open the permit page

$6,000
Mar 17, 2021Completed
final sign-off May 2022
569 Minna StRei Build Up Construction Corprevision to soft story pa# 201606220632. to accommodate site condition.
Details
Permit
202103176725
Status
complete
Filed
Mar 17, 2021
Permit issued
Jun 10, 2021
Final sign-off
May 27, 2022
Declared cost
$30,000
Address
569 Minna St

revision to soft story pa# 201606220632. to accommodate site condition.

Open the permit page

$30,000
Feb 25, 2021Completed
final sign-off Jan 2023
650 Masonic AvRei Build Up Construction Corpmandatory soft story retrofit per sfebc chapter 4d 2016 cebc appendix a-4.
Details
Permit
202102255361
Status
complete
Filed
Feb 25, 2021
Permit issued
Jun 14, 2022
Final sign-off
Jan 10, 2023
Declared cost
$50,000
Address
650 Masonic Av

mandatory soft story retrofit per sfebc chapter 4d 2016 cebc appendix a-4.

Open the permit page

$50,000
Dec 8, 2020Completed
final sign-off Sep 2022
1454 Union StRei Build Up Construction Corpreplace (e) masonry footing concrete footing.
Details
Permit
202012080489
Status
complete
Filed
Dec 8, 2020
Permit issued
Mar 29, 2021
Final sign-off
Sep 26, 2022
Declared cost
$40,000
Address
1454 Union St

replace (e) masonry footing concrete footing.

Open the permit page

$40,000
Nov 21, 2020Never finaled
issued Mar 2021, no final
563 Webster StAxel8 Construction, Rei Build Up Construction Corpbarrier removal only in compliance with oridinance no 51-16 at commercial tenant space: 801 hayes st.
Details
Permit
202011219471
Status
issued
Filed
Nov 21, 2020
Permit issued
Mar 24, 2021
Declared cost
$18,000
Address
563 Webster St

barrier removal only in compliance with oridinance no 51-16 at commercial tenant space: 801 hayes st.

Open the permit page

$18,000
Nov 18, 2020Never finaled
issued Dec 2020, no final
775 Geary StRei Build Up Construction Corprevision to pa 201612215550. adu heating systems changed to electric resistance heaters compliant w/ ca energy code exceptions 3 & 4 of section 140.4 g
Details
Permit
202011189174
Status
issued
Filed
Nov 18, 2020
Permit issued
Dec 30, 2020
Address
775 Geary St

revision to pa 201612215550. adu heating systems changed to electric resistance heaters compliant w/ ca energy code exceptions 3 & 4 of section 140.4 g

Open the permit page

Sep 30, 2020Completed
final sign-off May 2021
1359 Hayes StRei Build Up Construction Corprev to soft story 201709229294: as-built revisions required by bid r.p.
Details
Permit
202009305519
Status
complete
Filed
Sep 30, 2020
Permit issued
Dec 11, 2020
Final sign-off
May 4, 2021
Address
1359 Hayes St

rev to soft story 201709229294: as-built revisions required by bid r.p.

Open the permit page

Sep 14, 2020Completed
final sign-off May 2024
181 Bartlett StRei Build Up Construction Corpprovide (4) adu's at existing ground floor per ordinance 162-16. soft story under separate permit #2103.0819.4619
Details
Permit
202009144149
Status
complete
Filed
Sep 14, 2020
Permit issued
Mar 4, 2022
Final sign-off
May 31, 2024
Declared cost
$150,000
Address
181 Bartlett St

provide (4) adu's at existing ground floor per ordinance 162-16. soft story under separate permit #2103.0819.4619

Open the permit page

$150,000
Aug 26, 2020Completed
final sign-off Feb 2024
3875 18th StRei Build Up Construction Corpsoft demolition of non-structural component for adu site permit #201702280856
Details
Permit
202008262658
Status
complete
Filed
Aug 26, 2020
Permit issued
Aug 26, 2020
Final sign-off
Feb 21, 2024
Declared cost
$35,000
Address
3875 18th St

soft demolition of non-structural component for adu site permit #201702280856

Open the permit page

$35,000
Jul 27, 2020Never finaled
issued Jul 2020, no final
1610 Golden Gate AvRei Build Up Construction Corpsoft demolition permit for adu permit #202001293033
Details
Permit
202007270794
Status
issued
Filed
Jul 27, 2020
Permit issued
Jul 27, 2020
Declared cost
$10,000
Address
1610 Golden Gate Av

soft demolition permit for adu permit #202001293033

Open the permit page

$10,000
Jul 21, 2020Expired or cancelled
expired Sep 2022
1364 Page StRei Build Up Construction Corprevision to pa#201608225703 for approved adu & soft story upgrade pa#201606160142 to perform temporary utilizing permeation grouting to perform excavation & concrete work.
Details
Permit
202007210569
Status
expired
Filed
Jul 21, 2020
Permit issued
Sep 18, 2020
Declared cost
$50,000
Address
1364 Page St

revision to pa#201608225703 for approved adu & soft story upgrade pa#201606160142 to perform temporary utilizing permeation grouting to perform excavation & concrete work.

Open the permit page

$50,000
Jun 6, 2020Completed
final sign-off Nov 2024
40 Tiffany AvRei Build Up Construction Corp, S L M Development Inc.add 2 adu's at ground floor storage and garage per ordinance 162-16. soft story under seperate permit #2019. 1126.8203
Details
Permit
202006068213
Status
complete
Filed
Jun 6, 2020
Permit issued
Sep 29, 2021
Final sign-off
Nov 6, 2024
Declared cost
$150,000
Address
40 Tiffany Av

add 2 adu's at ground floor storage and garage per ordinance 162-16. soft story under seperate permit #2019. 1126.8203

Open the permit page

$150,000
Feb 7, 2020Completed
final sign-off Sep 2022
1610 Golden Gate AvRei Build Up Construction Corprevision to app#201905079941. seismic strengthening per s.f. mandatory soft story program in accordance with iebc appendix a-4. taraget story ground floor. new shear walls, new grade beams. currently adu app#202001293033. comply w/ n.o.v 201715545
Details
Permit
202002073844
Status
complete
Filed
Feb 7, 2020
Permit issued
Jun 30, 2021
Final sign-off
Sep 28, 2022
Declared cost
$85,000
Address
1610 Golden Gate Av

revision to app#201905079941. seismic strengthening per s.f. mandatory soft story program in accordance with iebc appendix a-4. taraget story ground floor. new shear walls, new grade beams. currently adu app#202001293033. comply w/ n.o.v 201715545

Open the permit page

$85,000
Jan 30, 2020Completed
final sign-off Aug 2020
3875 18th StRei Build Up Construction Corprevision to pa #2019-1119-7672: include steel frame dimension per site condition and holdown sizes
Details
Permit
202001303167
Status
complete
Filed
Jan 30, 2020
Permit issued
Feb 10, 2020
Final sign-off
Aug 6, 2020
Address
3875 18th St

revision to pa #2019-1119-7672: include steel frame dimension per site condition and holdown sizes

Open the permit page

Jan 29, 2020Completed
final sign-off Feb 2023
1610 Golden Gate AvRei Build Up Construction Corpconvert (e) garace spaces into (4) adu's per ordinance 162-16 for a building total of 19
Details
Permit
202001293033
Status
complete
Filed
Jan 29, 2020
Permit issued
Aug 10, 2021
Final sign-off
Feb 3, 2023
Declared cost
$120,000
Address
1610 Golden Gate Av

convert (e) garace spaces into (4) adu's per ordinance 162-16 for a building total of 19

Open the permit page

$120,000
Jan 22, 2020Completed
final sign-off Jan 2020
330 Divisadero StRei Build Up Construction Corprevision to original permit #201908148815 to include wood sheer wall schedule
Details
Permit
202001222521
Status
complete
Filed
Jan 22, 2020
Permit issued
Jan 22, 2020
Final sign-off
Jan 28, 2020
Address
330 Divisadero St

revision to original permit #201908148815 to include wood sheer wall schedule

Open the permit page

Jan 17, 2020Completed
final sign-off Jun 2021
1760 Golden Gate AvRei Build Up Construction Corprevision to 201702240069, structural scope as follows: strengthen 2nd fl framing, install new load bearing wall and spread footing, new concrete slab on grade, new opening thru rear wall at gr level
Details
Permit
202001172239
Status
complete
Filed
Jan 17, 2020
Permit issued
Jan 30, 2020
Final sign-off
Jun 3, 2021
Address
1760 Golden Gate Av

revision to 201702240069, structural scope as follows: strengthen 2nd fl framing, install new load bearing wall and spread footing, new concrete slab on grade, new opening thru rear wall at gr level

Open the permit page

Nov 20, 2019Completed
final sign-off Feb 2020
330 Divisadero StRei Build Up Construction Corprev to pa# 201908148815; support (e) brick wall at basement. add (n) steel braces frames and columns
Details
Permit
201911207759
Status
complete
Filed
Nov 20, 2019
Permit issued
Nov 20, 2019
Final sign-off
Feb 3, 2020
Declared cost
$40,000
Address
330 Divisadero St

rev to pa# 201908148815; support (e) brick wall at basement. add (n) steel braces frames and columns

Open the permit page

$40,000
Sep 25, 2019Expired or cancelled
expired Aug 2025
563 Webster StAxel8 Construction, Rei Build Up Construction Corpcommercial: seismic retrofit in accordance w/ sf mandatory soft story program w/ iebc app 4a. target story is ground flr and basement (n) shear wall, (n) moment frame, (n) foundation strengthenging.
Details
Permit
201909252705
Status
expired
Filed
Sep 25, 2019
Permit issued
Apr 7, 2021
Declared cost
$15,300
Address
563 Webster St

commercial: seismic retrofit in accordance w/ sf mandatory soft story program w/ iebc app 4a. target story is ground flr and basement (n) shear wall, (n) moment frame, (n) foundation strengthenging.

Open the permit page

$15,300
Sep 14, 2018Completed
final sign-off Feb 2024
320 14th StRei Build Up Construction Corpcommercial - soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. residential soft story under pa 2018-0914-0253
Details
Permit
201809140254
Status
complete
Filed
Sep 14, 2018
Permit issued
Oct 25, 2022
Final sign-off
Feb 7, 2024
Declared cost
$59,855
Address
320 14th St

commercial - soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. residential soft story under pa 2018-0914-0253

Open the permit page

$59,855
Sep 14, 2018Completed
final sign-off Feb 2024
320 14th StRei Build Up Construction Corpresidential - soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. commercial soft story under pa 2018-0914-0254
Details
Permit
201809140253
Status
complete
Filed
Sep 14, 2018
Permit issued
Oct 25, 2022
Final sign-off
Feb 7, 2024
Declared cost
$119,711
Address
320 14th St

residential - soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. commercial soft story under pa 2018-0914-0254

Open the permit page

$119,711
Jun 26, 2018Expired or cancelled
expired Nov 2025
1074 Union StRei Build Up Construction Corpseismic retrofit per prdinance 2016 cebc appendix a-4 for soft story
Details
Permit
201806263051
Status
expired
Filed
Jun 26, 2018
Permit issued
Aug 12, 2022
Declared cost
$100,000
Address
1074 Union St

seismic retrofit per prdinance 2016 cebc appendix a-4 for soft story

Open the permit page

$100,000
May 17, 2018Completed
final sign-off May 2021
1359 Hayes StRei Build Up Construction Corpadd three new accessory dwelling units to the front garage per ordinance 162-16.3
Details
Permit
201805179444
Status
complete
Filed
May 17, 2018
Permit issued
Jul 1, 2019
Final sign-off
May 20, 2021
Declared cost
$60,000
Address
1359 Hayes St

add three new accessory dwelling units to the front garage per ordinance 162-16.3

Open the permit page

$60,000
Dec 15, 2017Never finaled
issued May 2022, no final
765 Geary StRei Build Up Construction Corpbuild an exit access stairway to existing rear yard exit
Details
Permit
201712156632
Status
issued
Filed
Dec 15, 2017
Permit issued
May 16, 2022
Declared cost
$35,000
Address
765 Geary St

build an exit access stairway to existing rear yard exit

Open the permit page

$35,000
Sep 22, 2017Completed
final sign-off May 2021
1359 Hayes StRei Build Up Construction Corpsoft story retrofit per sfebc chapter 4d per engineering criteria 2016 cebc appendix a-4.
Details
Permit
201709229294
Status
complete
Filed
Sep 22, 2017
Permit issued
Sep 19, 2019
Final sign-off
May 4, 2021
Declared cost
$120,000
Address
1359 Hayes St

soft story retrofit per sfebc chapter 4d per engineering criteria 2016 cebc appendix a-4.

Open the permit page

$120,000
Sep 15, 2017Expired or cancelled
cancelled Sep 2023
560 Scott StRei Build Up Construction Corpsoft story upgrade in compliance with mandatory ord per sfbc ch 4d cebc a4
Details
Permit
201709158459
Status
cancelled
Filed
Sep 15, 2017
Permit issued
Nov 1, 2019
Declared cost
$70,000
Address
560 Scott St

soft story upgrade in compliance with mandatory ord per sfbc ch 4d cebc a4

Open the permit page

$70,000
Aug 22, 2017Completed
final sign-off Sep 2021
3638 19th StRei Build Up Construction Corp, S F Garage Company Inc.soft story retrofit per sfebc chapter 4d per engineering creteria 2016 cebc appendix a-4. install (n) moment frames & (n) shearwalls. maher na
Details
Permit
201708225599
Status
complete
Filed
Aug 22, 2017
Permit issued
Aug 23, 2017
Final sign-off
Sep 30, 2021
Declared cost
$40,000
Address
3638 19th St

soft story retrofit per sfebc chapter 4d per engineering creteria 2016 cebc appendix a-4. install (n) moment frames & (n) shearwalls. maher na

Open the permit page

$40,000
Jul 24, 2017Completed
final sign-off Oct 2022
3474 17th StAxel8 Construction, Rei Build Up Construction Corp(3) new adu units to be added to (e) ground flr per ordinance #162-16.**maher n/a**
Details
Permit
201707242759
Status
complete
Filed
Jul 24, 2017
Permit issued
Sep 19, 2019
Final sign-off
Oct 12, 2022
Declared cost
$150,000
Address
3474 17th St

(3) new adu units to be added to (e) ground flr per ordinance #162-16.**maher n/a**

Open the permit page

$150,000
Feb 28, 2017Completed
final sign-off Jul 2024
3875 18th StSft Construction Corp, Rei Build Up Construction Corpsite permit to add 5 accessory dwelling units per ordinance no# 162-16. ** maher: n/a **
Details
Permit
201702280256
Status
complete
Filed
Feb 28, 2017
Permit issued
Jun 25, 2020
Final sign-off
Jul 30, 2024
Declared cost
$200,000
Address
3875 18th St

site permit to add 5 accessory dwelling units per ordinance no# 162-16. ** maher: n/a **

Open the permit page

$200,000
Feb 24, 2017Completed
final sign-off Jun 2021
1760 Golden Gate AvRei Build Up Construction Corpadd 2 new accessory dwelling units. convert 3 garage spaces into 2 new -adu's per ord 162-16. refer to 2015-03-17-1054 for soft story retrofit per sfbc chapter 34b,2012 iebc a-4.
Details
Permit
201702240069
Status
complete
Filed
Feb 24, 2017
Permit issued
Dec 12, 2019
Final sign-off
Jun 3, 2021
Declared cost
$68,000
Address
1760 Golden Gate Av

add 2 new accessory dwelling units. convert 3 garage spaces into 2 new -adu's per ord 162-16. refer to 2015-03-17-1054 for soft story retrofit per sfbc chapter 34b,2012 iebc a-4.