Permit GraphShortlistSan Francisco building permits since 2000

Block 0472, lot 038

1329 Bay St

City’s use
Multi-Family Residential
Built
1928
Stories
2
Units
2
Rooms
2 bathrooms
Building
3,350 sq ft
Lot
2,809 sq ft
Zoning
RM1
Construction type
D

From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map

Permits filed here

9 permits filed for this property since 2000.

CompletedIn progressNever finaledExpired or cancelled
FiledOutcomeAddressContractorWork described on the permitDeclared cost
Jul 3, 2024Completed
final sign-off Nov 2024
1329 Bay StRei Build Up Construction Corpreplacement of 11 existing wood windows at front facade on 2nd & 3rd floors with 7 nw wood or wood clad windows: replace 3 extg center windows with 1 nw picture frame windows; replace both 2 extg windows at ends with 2 nw tilt-up casement windows. replacement of 1 existing window @ 3rd floor clos
Details
Permit
202407035820
Status
complete
Filed
Jul 3, 2024
Permit issued
Aug 29, 2024
Final sign-off
Nov 4, 2024
Declared cost
$8,000
Address
1329 Bay St

replacement of 11 existing wood windows at front facade on 2nd & 3rd floors with 7 nw wood or wood clad windows: replace 3 extg center windows with 1 nw picture frame windows; replace both 2 extg windows at ends with 2 nw tilt-up casement windows. replacement of 1 existing window @ 3rd floor clos

Open the permit page

$8,000
May 10, 2023Completed
final sign-off May 2024
1329 Bay StRei Build Up Construction Corprev to pa202212098016: scope limited to voluntary seismic strengthening for all floor using wood shear walls and simpson moment frame per ab-094
Details
Permit
202305107494
Status
complete
Filed
May 10, 2023
Permit issued
Oct 3, 2023
Final sign-off
May 8, 2024
Declared cost
$75,000
Address
1329 Bay St

rev to pa202212098016: scope limited to voluntary seismic strengthening for all floor using wood shear walls and simpson moment frame per ab-094

Open the permit page

$75,000
Feb 10, 2023Completed
final sign-off Aug 2024
1329 Bay StFlores General Buildingremodel (2) bathrooms and kitchen moving no walls.
Details
Permit
202302101798
Status
complete
Filed
Feb 10, 2023
Permit issued
Feb 10, 2023
Final sign-off
Aug 7, 2024
Declared cost
$30,000
Address
1329 Bay St

remodel (2) bathrooms and kitchen moving no walls.

Open the permit page

$30,000
Jan 17, 2023Completed
final sign-off Aug 2024
1331 Bay StFlores General Buildingremodel 2 baths and kitchen. no layout change. moving no walls.
Details
Permit
202301170225
Status
complete
Filed
Jan 17, 2023
Permit issued
Feb 10, 2023
Final sign-off
Aug 23, 2024
Declared cost
$27,000
Address
1331 Bay St

remodel 2 baths and kitchen. no layout change. moving no walls.

Open the permit page

$27,000
Dec 9, 2022Completed
final sign-off Apr 2024
1329 Bay StRei Build Up Construction Corpvoluntary seismic soft-story retrofit per sfebc 2019.
Details
Permit
202212098016
Status
complete
Filed
Dec 9, 2022
Permit issued
May 9, 2023
Final sign-off
Apr 29, 2024
Declared cost
$60,000
Address
1329 Bay St

voluntary seismic soft-story retrofit per sfebc 2019.

Open the permit page

$60,000
Jul 18, 2022Never finaled
filed Jul 2022, never issued
1329 Bay Staddition of new square footage to existing 4th floor; renovation of 3rd floor stair with infill of existing light well; new roof deck with two exits, extend existing stair to roof deck.
Details
Permit
202207188719
Status
approved
Filed
Jul 18, 2022
Declared cost
$239,700
Address
1329 Bay St

addition of new square footage to existing 4th floor; renovation of 3rd floor stair with infill of existing light well; new roof deck with two exits, extend existing stair to roof deck.

Open the permit page

$239,700
Mar 30, 2022Completed
final sign-off May 2022
1329 Bay StFlores General Buildingmake corrections on nov#202288184: make repairs on garage plaster ceiling less than 50%
Details
Permit
202203301220
Status
complete
Filed
Mar 30, 2022
Permit issued
Mar 30, 2022
Final sign-off
May 27, 2022
Declared cost
$2,500
Address
1329 Bay St

make corrections on nov#202288184: make repairs on garage plaster ceiling less than 50%

Open the permit page

$2,500
Nov 19, 2020Completed
final sign-off Feb 2021
1329 Bay StConnor Daly Corporationto comply with nov202054631: remove and replace (e) shower stall, same as (e).
Details
Permit
202011199299
Status
complete
Filed
Nov 19, 2020
Permit issued
Nov 20, 2020
Final sign-off
Feb 17, 2021
Declared cost
$1,200
Address
1329 Bay St

to comply with nov202054631: remove and replace (e) shower stall, same as (e).

Open the permit page

$1,200
Sep 21, 2000Completed
final sign-off Dec 2000
1329 Bay Strepair as necessary 2 wet rot damaged rear decks, repalced damaged t&g decking w/1x6 sq edge redwood
Details
Permit
200009211174
Status
complete
Filed
Sep 21, 2000
Permit issued
Sep 21, 2000
Final sign-off
Dec 19, 2000
Declared cost
$3,600
Address
1329 Bay St

repair as necessary 2 wet rot damaged rear decks, repalced damaged t&g decking w/1x6 sq edge redwood

Open the permit page

$3,600

Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

Contractors
Flores General Building (3), Rei Build Up Construction Corp (3), Connor Daly Corporation
Architects
Jeff Burris, Serina Calhoun
Engineers
Ali Afrasiabi (2)

Find contractors for work like this

Starts from the last permit filed here; change it to describe your own project. Results cover two-family buildings like this one.