Block 1186, lot 012
650 Masonic Ave
- City’s use
- Multi-Family Residential
- Built
- 1923
- Stories
- 3
- Units
- 12
- Rooms
- 12 bathrooms
- Building
- 9,126 sq ft
- Lot
- 3,998 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
11 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 13, 2023 | Completed final sign-off Jan 2024 | 650 Masonic Av | Firelectric | upgrade existing fire alarm system to add powr supply and low frequency sounders to all sleeping areas of building, as per 1103.7.6.1 sffd code 3.08Details
upgrade existing fire alarm system to add powr supply and low frequency sounders to all sleeping areas of building, as per 1103.7.6.1 sffd code 3.08 | $32,500 |
| Jan 25, 2023 | Completed final sign-off Apr 2023 | 650 Masonic Av | Flores General Building | unit #12: remodel kitchen and bathroom as is, no layout change. no walls to be removed. kitchen gypboard removal, bathroom gyp and floor tile removal, no floor plywood.Details
unit #12: remodel kitchen and bathroom as is, no layout change. no walls to be removed. kitchen gypboard removal, bathroom gyp and floor tile removal, no floor plywood. | $32,000 |
| Jan 25, 2023 | Completed final sign-off Apr 2023 | 650 Masonic Av | Flores General Building | unit #2: remodel kitchen and bathroom as is, no layout change no walls to be removed. kitch gypboard removal, bathroom gypboard and floor tile, no floor plywood removal.Details
unit #2: remodel kitchen and bathroom as is, no layout change no walls to be removed. kitch gypboard removal, bathroom gypboard and floor tile, no floor plywood removal. | $32,000 |
| Jul 15, 2022 | Completed final sign-off Jan 2023 | 650 Masonic Av | Rei Build Up Construction Corp | revision to soft story 202102255361. change shear wall location based on-site exploratory work in conditions.Details
revision to soft story 202102255361. change shear wall location based on-site exploratory work in conditions. | $50,000 |
| Feb 25, 2021 | Completed final sign-off Jan 2023 | 650 Masonic Av | Rei Build Up Construction Corp | mandatory soft story retrofit per sfebc chapter 4d 2016 cebc appendix a-4.Details
mandatory soft story retrofit per sfebc chapter 4d 2016 cebc appendix a-4. | $50,000 |
| Jan 31, 2020 | Completed final sign-off Jun 2020 | 650 Masonic Av | Flores General Building | unit #4: interior remodel of apartment. removal of interior partition walls(non bearing); remodel of kitchen and bathroom.Details
unit #4: interior remodel of apartment. removal of interior partition walls(non bearing); remodel of kitchen and bathroom. | $40,900 |
| May 31, 2019 | Completed final sign-off Jul 2019 | 650 Masonic Av | Flores General Building | unit 6 - interior remodel, removal of interior partition walls. relocation of kitchen per plans. bathroom remodel. no structural changes proposed. create a bedroomDetails
unit 6 - interior remodel, removal of interior partition walls. relocation of kitchen per plans. bathroom remodel. no structural changes proposed. create a bedroom | $25,000 |
| Sep 22, 2014 | Completed final sign-off Nov 2014 | 650 Masonic Av | Leeward Construction Co. | repair damage to north garage door opening caused by vehicle, repl approx 3 2x6 studs damaged by collision, install approx. 15 sq.ft. sheathing & cement stucco. reinstall garage door new parts & hardware as necessary, repl left door jam & molding as necessary. everything in kind to match existing.Details
repair damage to north garage door opening caused by vehicle, repl approx 3 2x6 studs damaged by collision, install approx. 15 sq.ft. sheathing & cement stucco. reinstall garage door new parts & hardware as necessary, repl left door jam & molding as necessary. everything in kind to match existing. | $4,800 |
| Feb 19, 2013 | Completed final sign-off May 2013 | 650 Masonic Av | John J Sullivan & Company Inc | replace extg aluminum windows with new anderson, 100 series 26 total at street side of bldg. fiberglass casement.Details
replace extg aluminum windows with new anderson, 100 series 26 total at street side of bldg. fiberglass casement. | $10,000 |
| Feb 16, 2005 | Completed final sign-off Apr 2005 | 650 Masonic Av | removel/relocated two kitchen, wall, and one skylight. unit 7 & 11.Details
removel/relocated two kitchen, wall, and one skylight. unit 7 & 11. | $28,000 | |
| Nov 4, 2000 | Expired or cancelled expired May 2001 | 650 Masonic Av | Amko Constrution Co. Inc. | reroofingDetails
reroofing | $7,500 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.