Jennifer Devlin
- License
- C27334
- Architect
- About the California Architects Board
- Look the license up with the state (Architects Board)
- Listed as
- architect, designer
- Firm
- Ehdd
- Based in
- San Francisco
- On San Francisco permits
- Dec 2015 to Nov 2026
10 permits since 2000 (architect on 9 permits, designer on 1 permit): 7 completed, 2 in progress, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Plant Construction Co, Lp (3), Truebeck Construction (2)
- Architects
- Glennis Briggs
- Engineers
- Daniel Manhelm, David Rossi, Erik C Kneer, Jared Barrilleaux, Joon Suk Choi, Joseph Maffei, Ramez Sayed, Ryan Beaton, Steven T. Taylor, Theodore Charles Grabowsky, Victor Tam, William E Tremayne
- Attorneys
- Sidho Harjot Singh
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 0
- Commercial 2
- Other or unknown 8
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 10, 2026 | In progress filed Nov 2026, not yet issued | 2245 Post St | demolish a 2 story building,no dwelling unit,no basement-type v.(holocaust center)Details
demolish a 2 story building,no dwelling unit,no basement-type v.(holocaust center) | $160,000 | |
| Mar 20, 2026 | In progress issued May 2026 | 755 Ocean Av | Truebeck Construction | new pergola (freestanding) at an existing courtyard space between the (e) classroom building and theatre building.Details
new pergola (freestanding) at an existing courtyard space between the (e) classroom building and theatre building. | $523,000 |
| Jun 4, 2024 | Completed final sign-off Oct 2024 | 755 Ocean Av | Truebeck Construction | replacement of e gym floors, 2 telescoping bleachercs, 6 backstops with associated support and powerDetails
replacement of e gym floors, 2 telescoping bleachercs, 6 backstops with associated support and power | $500,000 |
| Nov 4, 2021 | Completed final sign-off Apr 2025 | 190 09th St | upgrades utilties & energy efficiency of the administration office of sf public library. the project includes: (1) replacement of hvac equipment on the roof and some interior hvac equipment; (2) addition of photovoltaics and batteries on the roof; (3) replacement of the roofing system.Details
upgrades utilties & energy efficiency of the administration office of sf public library. the project includes: (1) replacement of hvac equipment on the roof and some interior hvac equipment; (2) addition of photovoltaics and batteries on the roof; (3) replacement of the roofing system. | $5,768,600 | |
| Mar 8, 2019 | Completed final sign-off Oct 2019 | 50 Bowling Green Dr | to demolish 1 story recreation building. ** maher: n/a **Details
to demolish 1 story recreation building. ** maher: n/a ** | $20,000 | |
| May 14, 2018 | Completed final sign-off Jun 2021 | 50 Bowling Green Dr | erect an one story type 5 construction recreation and officeDetails
erect an one story type 5 construction recreation and office | $17,013,752 | |
| Dec 20, 2016 | Completed final sign-off Oct 2019 | 7070 California St | Plant Construction Co, Lp | renovation to classrom wing,& purpose lunchroom with small faculty lough addition. new site improvements to campus entry, lower school courtyards, faculty court yard & upper courtyard. full seismic retrofit on multipurpose rm, volunt seismic retrofit on lower classrms per city private school programDetails
renovation to classrom wing,& purpose lunchroom with small faculty lough addition. new site improvements to campus entry, lower school courtyards, faculty court yard & upper courtyard. full seismic retrofit on multipurpose rm, volunt seismic retrofit on lower classrms per city private school program | $5,500,000 |
| Mar 3, 2016 | Completed final sign-off May 2016 | 151 03rd St | Plant Construction Co, Lp | reroute catering kitchen hood exhaust to compliant discharge location on 3rd level roof. there are no kitchen equipment changes to the catering kitchen, maher n/aDetails
reroute catering kitchen hood exhaust to compliant discharge location on 3rd level roof. there are no kitchen equipment changes to the catering kitchen, maher n/a | $50,000 |
| Dec 14, 2015 | Completed final sign-off Jun 2016 | 151 03rd St | Plant Construction Co, Lp | level 1 coat check includes modifications to (e) partitions, doors, floor finishes, cubbies & lighting; 3rd st - entry replaces (e) ticket booths with exterior metal panel signage display walls; level 4 white box multipurpose space includes new theatrical grid for av/theatrical lighting & accousticDetails
level 1 coat check includes modifications to (e) partitions, doors, floor finishes, cubbies & lighting; 3rd st - entry replaces (e) ticket booths with exterior metal panel signage display walls; level 4 white box multipurpose space includes new theatrical grid for av/theatrical lighting & accoustic | $450,000 |
| Dec 9, 2015 | Expired or cancelled withdrawn Oct 2017 | 1455 Folsom St | convert industrial building to school change of use. add 2nd floor internal to envelop of existig building, not enlarging envelop (maher ordinance -extended - route to health for compliance with ordinance no.155-13)Details
convert industrial building to school change of use. add 2nd floor internal to envelop of existig building, not enlarging envelop (maher ordinance -extended - route to health for compliance with ordinance no.155-13) | $1,000,000 |