Permit GraphShortlistSan Francisco building permits since 2000

Dana Pope

License
381993
Contractor
About the Contractors State License Board
State contractor license record
Listed as
authorized agent-others, contractor
Firm
D A Pope Inc
Based in
Foster City
On San Francisco permits
Feb 2000 to Oct 2026

141 permits since 2000 (contractor on 141 permits, authorized agent-others on 6 permits): 121 completed, 2 in progress, 13 never finaled, 5 expired or cancelled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. Their ranked record as a contractor is on their contractor page. How to read these records

Worked with

Every other licensed party on the 100 most recent of their permits, by the role the city lists them under, with how many of those permits each is on.

Architects
Ariane Lebrilla (9), Melissa Pesci (7), Douglas Zucker (5), Joseph Remling (5), Philip Nettle (5), Nicholas Detorres (4), George S Soskin (3), Martha Breed (3), Ingemar San Juan Gosiengfiao, Lawrence Smith, Michael Castro, Paul Hockett, Perry Stepheney, Roberto Mendoza, Sassan Pedramrazi, Stanley H Lew
Engineers
Akuavi Hine (2), David Murphy (2), Lincoln Air Eng Installed Svc, Pak Hui, Rod Massoudi, Stephen Shaffer, Wafic Hojeij
Designers
Asd

Where they worked

One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.

Most recent permits

Showing the 100 most recent of 141.

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Oct 5, 2026In progress
issued Oct 2026
1550 Bryant StD A Pope Inc9th floor: seismic bolting of existing phone booths
Details
Permit
202610059049
Permit issued
Oct 26, 2026

9th floor: seismic bolting of existing phone booths

Open the permit page

$7,500
Sep 10, 2026In progress
issued Oct 2026
1550 Bryant StD A Pope Inc4th fl/ t.i siesmic bracing of existing phone booths.
Details
Permit
202609107928
Permit issued
Oct 26, 2026

4th fl/ t.i siesmic bracing of existing phone booths.

Open the permit page

$7,500
Oct 9, 2025Completed
final sign-off Nov 2026
2001 Lombard StD A Pope Incretrofit existing building main entry with new concrete ramp for accessible main entry. remodel existing ground floor breakroom and restroom as required for accessibilty. five new private offices on second floor.
Details
Permit
202510097108
Permit issued
Nov 6, 2025
Final sign-off
Nov 9, 2026

retrofit existing building main entry with new concrete ramp for accessible main entry. remodel existing ground floor breakroom and restroom as required for accessibilty. five new private offices on second floor.

Open the permit page

$196,542
Oct 1, 2025Completed
final sign-off Sep 2026
1550 Bryant StD A Pope Inc7th/fl: ti includes seismic bolting of (e) phone booths (ada reference: 2018-0112-8516)
Details
Permit
202510016455
Permit issued
Nov 14, 2025
Final sign-off
Sep 23, 2026

7th/fl: ti includes seismic bolting of (e) phone booths (ada reference: 2018-0112-8516)

Open the permit page

$15,000
Apr 25, 2025Completed
final sign-off Apr 2025
1241 Stockton StD A Pope Increvision to permit 202408299726, ensure supply air and return are located in new office footprint.
Details
Permit
202504255236
Permit issued
Apr 25, 2025
Final sign-off
Apr 28, 2025

revision to permit 202408299726, ensure supply air and return are located in new office footprint.

Open the permit page

Aug 29, 2024Completed
final sign-off Apr 2025
1241 Stockton StD A Pope Inc1/f: ti of (e) bank. no change in occupancy, use, or area. selective interior non-structural demo. non structural partitions door/frame/hardware/sidelight; finishes and millwork; ceiling patching/repairs. deferred submittals: mep
Details
Permit
202408299726
Permit issued
Dec 13, 2024
Final sign-off
Apr 28, 2025

1/f: ti of (e) bank. no change in occupancy, use, or area. selective interior non-structural demo. non structural partitions door/frame/hardware/sidelight; finishes and millwork; ceiling patching/repairs. deferred submittals: mep

Open the permit page

$101,814
Jan 26, 2023Completed
final sign-off Sep 2023
3131 Webster StD A Pope Incfurnish and install auto door openters for 1 door to comply with abe 202211305340
Details
Permit
202301260807
Permit issued
Jul 17, 2023
Final sign-off
Sep 22, 2023

furnish and install auto door openters for 1 door to comply with abe 202211305340

Open the permit page

Oct 17, 2022Completed
final sign-off Feb 2023
1550 Bryant StD A Pope Inc6/f: new phone room (private phone room) bolting to floor only. private phone rooms by other. electriccal sprinklers and f/ls to be under separate permit.
Details
Permit
202210174517
Permit issued
Dec 7, 2022
Final sign-off
Feb 6, 2023

6/f: new phone room (private phone room) bolting to floor only. private phone rooms by other. electriccal sprinklers and f/ls to be under separate permit.

Open the permit page

$3,500
Oct 7, 2022Completed
final sign-off Feb 2023
1550 Bryant StD A Pope Inc6/fl revision to 202108045709 egress plan update to show roof deck furniture as requested by fire department for assembly permit.
Details
Permit
202210074000
Permit issued
Oct 24, 2022
Final sign-off
Feb 6, 2023

6/fl revision to 202108045709 egress plan update to show roof deck furniture as requested by fire department for assembly permit.

Open the permit page

Sep 29, 2022Completed
final sign-off May 2023
2380 Irving StD A Pope Inc1st fl: demolition of (e) non bearing interior partions (n) non bearing interior wall for future tenant office conference rooms add break/copy (e) restroom accesibility upgrade. fire alarm/sprinklers under separate permits.
Details
Permit
202209293431
Permit issued
Jan 3, 2023
Final sign-off
May 16, 2023

1st fl: demolition of (e) non bearing interior partions (n) non bearing interior wall for future tenant office conference rooms add break/copy (e) restroom accesibility upgrade. fire alarm/sprinklers under separate permits.

Open the permit page

$535,000
Sep 26, 2022Completed
final sign-off Nov 2022
1550 Bryant StD A Pope Inc9/f ti includes new non-str partitions, new millwork + new sink, existing room renovated to lactation room ref 2018-0112-8516. mep life safety fire alarm sprinklers under seperate permit if needed design build.
Details
Permit
202209263099
Permit issued
Sep 29, 2022
Final sign-off
Nov 22, 2022

9/f ti includes new non-str partitions, new millwork + new sink, existing room renovated to lactation room ref 2018-0112-8516. mep life safety fire alarm sprinklers under seperate permit if needed design build.

Open the permit page

$19,500
Aug 19, 2022Completed
final sign-off Nov 2022
1550 Bryant StD A Pope Inc8/f: rev to pa202205103842. modifty the dining area, office area and opening office ara. configuring them differently. increasing the overall occupancy count from 345 to 350. structural included.
Details
Permit
202208190889
Permit issued
Aug 29, 2022
Final sign-off
Nov 21, 2022

8/f: rev to pa202205103842. modifty the dining area, office area and opening office ara. configuring them differently. increasing the overall occupancy count from 345 to 350. structural included.

Open the permit page

Aug 18, 2022Completed
final sign-off Oct 2022
1550 Bryant StD A Pope Inc2/f: t.i. new non-structural partitions and shower rooms. new or revised meps, lifesafety or fire sprinkleres will be design build if neeed and submitted separately. maher n/a
Details
Permit
202208180779
Permit issued
Aug 23, 2022
Final sign-off
Oct 28, 2022

2/f: t.i. new non-structural partitions and shower rooms. new or revised meps, lifesafety or fire sprinkleres will be design build if neeed and submitted separately. maher n/a

Open the permit page

$150,000
Jun 17, 2022Completed
final sign-off Mar 2023
1550 Bryant StD A Pope Inc(2nd fl) ti includes the demo of non-str paritions and building new non str paritions. all new revised meps and life safety work will be design build and submitted separately (bldg is fully sprinklered)
Details
Permit
202206176601
Permit issued
Aug 3, 2022
Final sign-off
Mar 7, 2023

(2nd fl) ti includes the demo of non-str paritions and building new non str paritions. all new revised meps and life safety work will be design build and submitted separately (bldg is fully sprinklered)

Open the permit page

$398,624
May 10, 2022Completed
final sign-off Nov 2022
1550 Bryant StD A Pope Inc8th fl: t.i. includes demo of non-structural partitions + building new non-structural partitions. all newer revised mep's + life safety + sprinkler work will be design-build & submitted separately. bldg is fully sprinklered.
Details
Permit
202205103842
Permit issued
Sep 30, 2022
Final sign-off
Nov 22, 2022

8th fl: t.i. includes demo of non-structural partitions + building new non-structural partitions. all newer revised mep's + life safety + sprinkler work will be design-build & submitted separately. bldg is fully sprinklered.

Open the permit page

$165,000
Oct 12, 2021Completed
final sign-off Jan 2024
170 Capp StD A Pope Inc3rd flr-demolition of (e) non-bearing partitions, new non-load bearing partitions to create new training room. private offices & open space area. modify (e)electrical & lighting system to accomodate new layout. modify (e) hvac control & distribution systems including ductwork,supply & return grilles
Details
Permit
202110120250
Permit issued
Dec 7, 2021
Final sign-off
Jan 12, 2024

3rd flr-demolition of (e) non-bearing partitions, new non-load bearing partitions to create new training room. private offices & open space area. modify (e)electrical & lighting system to accomodate new layout. modify (e) hvac control & distribution systems including ductwork,supply & return grilles

Open the permit page

$269,669
Aug 4, 2021Completed
final sign-off Feb 2023
1550 Bryant StD A Pope Inc6/f, revision to pa# 202106162596 mech only.
Details
Permit
202108045714
Permit issued
Nov 15, 2021
Final sign-off
Feb 7, 2023

6/f, revision to pa# 202106162596 mech only.

Open the permit page

$225,000
Aug 4, 2021Completed
final sign-off Dec 2022
1550 Bryant StD A Pope Inc(6/f ti/5th exit corr) ti includes demo of exterior wall and glazing at new patio; new interior ramp/stair/landing, exterior operable wall system and exterior canopy. all new or revised mep like safety and sprinker if needed will be design build and submitt sep.
Details
Permit
202108045709
Permit issued
May 2, 2022
Final sign-off
Dec 29, 2022

(6/f ti/5th exit corr) ti includes demo of exterior wall and glazing at new patio; new interior ramp/stair/landing, exterior operable wall system and exterior canopy. all new or revised mep like safety and sprinker if needed will be design build and submitt sep.

Open the permit page

$1,500,000
Jun 16, 2021Completed
final sign-off Oct 2022
1550 Bryant StD A Pope Inc6th floor: t.i. include demo of non-structural partitions & building. (n)non-structural paritions, all new or reivsed mep, life safety & sprincklers if needed will be deisgn build and submitted separately.
Details
Permit
202106162596
Permit issued
Jul 30, 2021
Final sign-off
Oct 12, 2022

6th floor: t.i. include demo of non-structural partitions & building. (n)non-structural paritions, all new or reivsed mep, life safety & sprincklers if needed will be deisgn build and submitted separately.

Open the permit page

$532,000
Jan 27, 2020Completed
final sign-off Jul 2020
1550 Bryant StD A Pope Inc7th fl, ste 760 & 770 - ti include demo of non-structural partitions and build (n) non structural partitions; mep, life safety & sprinklers will be design build & submitted separately if needed. (bldg fully sprinklered)
Details
Permit
202001272793
Permit issued
Feb 19, 2020
Final sign-off
Jul 13, 2020

7th fl, ste 760 & 770 - ti include demo of non-structural partitions and build (n) non structural partitions; mep, life safety & sprinklers will be design build & submitted separately if needed. (bldg fully sprinklered)

Open the permit page

$217,000
Sep 20, 2019Completed
final sign-off Dec 2019
501 03rd StD A Pope Increvision to 201908068027 to (e) ti. installation of interior sound proof glass windows
Details
Permit
201909202264
Permit issued
Sep 26, 2019
Final sign-off
Dec 16, 2019

revision to 201908068027 to (e) ti. installation of interior sound proof glass windows

Open the permit page

$8,000
Sep 6, 2019Completed
final sign-off May 2020
501 03rd StD A Pope Incsuite 300: interior remodel (ti) to 3rd fl - light demolition, new drywall, offices, mep reconfiguration & interior finishes.
Details
Permit
201909060892
Permit issued
Sep 6, 2019
Final sign-off
May 20, 2020

suite 300: interior remodel (ti) to 3rd fl - light demolition, new drywall, offices, mep reconfiguration & interior finishes.

Open the permit page

$450,000
Aug 6, 2019Completed
final sign-off Dec 2019
501 03rd StD A Pope Incsuite 200: demolition of e non bearing partion. new non bearing partitions to create new offices, phone rm, copy rm, open office
Details
Permit
201908068027
Permit issued
Aug 27, 2019
Final sign-off
Dec 31, 2019

suite 200: demolition of e non bearing partion. new non bearing partitions to create new offices, phone rm, copy rm, open office

Open the permit page

$400,000
Apr 23, 2019Completed
final sign-off Jul 2020
300 California StD A Pope Incdemo of 2 concrete panel of battery st. & 1 concrete panel on halleck alley, installation of new storefront in new opening on halleck ave. installation of new storefront windows in new opening on battery st. (e) risers to be re-routed to accommodate facade windows, no new hvac work
Details
Permit
201904238657
Permit issued
Jun 25, 2019
Final sign-off
Jul 1, 2020

demo of 2 concrete panel of battery st. & 1 concrete panel on halleck alley, installation of new storefront in new opening on halleck ave. installation of new storefront windows in new opening on battery st. (e) risers to be re-routed to accommodate facade windows, no new hvac work

Open the permit page

$270,000
Mar 26, 2019Completed
final sign-off Jan 2020
300 California StD A Pope Inc1/f: demo of an (e) non-structural mezzanine. terminate all ele back to source. no structural work assocated with scope. fire/life safety/ele under sep permit. maher n/a.
Details
Permit
201903266237
Permit issued
Mar 27, 2019
Final sign-off
Jan 17, 2020

1/f: demo of an (e) non-structural mezzanine. terminate all ele back to source. no structural work assocated with scope. fire/life safety/ele under sep permit. maher n/a.

Open the permit page

$50,000
Feb 20, 2019Completed
final sign-off Feb 2019
500 Washington StD A Pope Incsuite 450: electrical design drawings for pa 201811065128. ref ew201901308459. add (n) led fixtures, outlets and power dishwasher. title 24 compliance. maher n/a.
Details
Permit
201902203357
Permit issued
Feb 20, 2019
Final sign-off
Feb 26, 2019

suite 450: electrical design drawings for pa 201811065128. ref ew201901308459. add (n) led fixtures, outlets and power dishwasher. title 24 compliance. maher n/a.

Open the permit page

$100,000
Jan 28, 2019Completed
final sign-off Jul 2019
357 Tehama StD A Pope Incunit 3, 3rd flr. interior remodel of (e) live-work unit
Details
Permit
201901281368
Permit issued
Jan 30, 2019
Final sign-off
Jul 3, 2019

unit 3, 3rd flr. interior remodel of (e) live-work unit

Open the permit page

$100,000
Nov 6, 2018Completed
final sign-off Feb 2019
500 Washington StD A Pope Incsuite 450. tenant improvement. remove of non-structural parititons, (n) finishes, millwork, plumbing and electrical. mep, fire, life safety and sprinkler under separate permit. restroom: barrier removal/relocate artitions.
Details
Permit
201811065128
Permit issued
Dec 3, 2018
Final sign-off
Feb 26, 2019

suite 450. tenant improvement. remove of non-structural parititons, (n) finishes, millwork, plumbing and electrical. mep, fire, life safety and sprinkler under separate permit. restroom: barrier removal/relocate artitions.

Open the permit page

$200,000
Aug 24, 2018Never finaled
issued Aug 2018, no final
909 Montgomery StD A Pope Incdemolition of extg interior office non-structural bearing walls. new transformer and electrical panel and stub ups for plumbing for market ready suite 105. ab-017.
Details
Permit
201808248250
Permit issued
Aug 24, 2018

demolition of extg interior office non-structural bearing walls. new transformer and electrical panel and stub ups for plumbing for market ready suite 105. ab-017.

Open the permit page

$75,000
Aug 8, 2018Completed
final sign-off Oct 2018
1550 Bryant StD A Pope Inc1st flr suite 154 - ti demo of non structural partitions and build new non str partitions. all new or revise mep/life safety/fire sprinkers under sep permit. bld is fully sprinklered
Details
Permit
201808086816
Permit issued
Aug 15, 2018
Final sign-off
Oct 15, 2018

1st flr suite 154 - ti demo of non structural partitions and build new non str partitions. all new or revise mep/life safety/fire sprinkers under sep permit. bld is fully sprinklered

Open the permit page

$30,000
Jul 20, 2018Completed
final sign-off Nov 2018
501 03rd StD A Pope Incfurther voluntary seismic strengthening and ada upgrades
Details
Permit
201807205142
Permit issued
Aug 23, 2018
Final sign-off
Nov 13, 2018

further voluntary seismic strengthening and ada upgrades

Open the permit page

$80,000
May 18, 2018Completed
final sign-off Jul 2020
300 California StD A Pope Incamep ti - scope of project includes 2 single use ada shower and toilet room facilities. new partitoins, glazing, door/frames, ceilings, lighting, power, millwork, sinks inlcuded. no strucutral work associated with this work, fire under separate permits
Details
Permit
201805189535
Permit issued
Jul 11, 2018
Final sign-off
Jul 9, 2020

amep ti - scope of project includes 2 single use ada shower and toilet room facilities. new partitoins, glazing, door/frames, ceilings, lighting, power, millwork, sinks inlcuded. no strucutral work associated with this work, fire under separate permits

Open the permit page

$300,000
May 18, 2018Completed
final sign-off Jul 2020
300 California StD A Pope Incdemolish part of concrte panel on halleck streets to accommodate new hollow metal doors. demolish part of corridor walls and add new and 1 hr rated wall at corridor, new finishes and lighting throughout corridor, new finsihes and lighting throughout corridor. new fire smoke detector and fsd.no mahe
Details
Permit
201805189531
Permit issued
Jun 13, 2018
Final sign-off
Jul 9, 2020

demolish part of concrte panel on halleck streets to accommodate new hollow metal doors. demolish part of corridor walls and add new and 1 hr rated wall at corridor, new finishes and lighting throughout corridor, new finsihes and lighting throughout corridor. new fire smoke detector and fsd.no mahe

Open the permit page

$250,000
May 3, 2018Completed
final sign-off Jul 2018
1050 Sansome StD A Pope Increvision to 201801188925 addition of 5 offices, new tenant at ground floor
Details
Permit
201805038130
Permit issued
May 3, 2018
Final sign-off
Jul 10, 2018

revision to 201801188925 addition of 5 offices, new tenant at ground floor

Open the permit page

$40,000
Jan 18, 2018Completed
final sign-off Sep 2018
1050 Sansome StD A Pope Inc3/f: commercial t.i.: non-structural demo. new non-load bvearing partitions, new mechanical, electrical and plumbing to tie into (e) utilities. replacement of rooftop mechanical unit. well building certification.
Details
Permit
201801188906
Permit issued
Feb 1, 2018
Final sign-off
Sep 13, 2018

3/f: commercial t.i.: non-structural demo. new non-load bvearing partitions, new mechanical, electrical and plumbing to tie into (e) utilities. replacement of rooftop mechanical unit. well building certification.

Open the permit page

$558,800
Jan 18, 2018Completed
final sign-off Jul 2018
1050 Sansome StD A Pope Inc1st fl - market ready prep for showing to market in hopes of leasing including partitions, lighting, restrooms, counters, millwork
Details
Permit
201801188925
Permit issued
Feb 22, 2018
Final sign-off
Jul 10, 2018

1st fl - market ready prep for showing to market in hopes of leasing including partitions, lighting, restrooms, counters, millwork

Open the permit page

$145,000
Jan 12, 2018Completed
final sign-off May 2018
1550 Bryant StD A Pope Inc2nd floor: t.i. includes ada barrier removal only. building is fully sprinklered. n/a for maher
Details
Permit
201801128516
Permit issued
Jan 18, 2018
Final sign-off
May 7, 2018

2nd floor: t.i. includes ada barrier removal only. building is fully sprinklered. n/a for maher

Open the permit page

$4,000
Aug 31, 2017Completed
final sign-off Nov 2017
300 California StD A Pope Increvision to app#201705247498. revised ceiling scope and additional interior partitions and revised electrical & mechanical work. n/a for maher.
Details
Permit
201708316541
Permit issued
Sep 22, 2017
Final sign-off
Nov 6, 2017

revision to app#201705247498. revised ceiling scope and additional interior partitions and revised electrical & mechanical work. n/a for maher.

Open the permit page

Aug 21, 2017Completed
final sign-off Nov 2017
1050 Sansome StD A Pope Inc2/f- interior improvements including non-structural partition walls and finishes.
Details
Permit
201708215421
Permit issued
Sep 5, 2017
Final sign-off
Nov 8, 2017

2/f- interior improvements including non-structural partition walls and finishes.

Open the permit page

$250,000
Jun 20, 2017Completed
final sign-off Apr 2018
200 Green StD A Pope Incconstruction of non-structural partitions, doors, frames, hardware, millwork, drywall, ceiling and finishes.
Details
Permit
201706209842
Permit issued
Jun 26, 2017
Final sign-off
Apr 27, 2018

construction of non-structural partitions, doors, frames, hardware, millwork, drywall, ceiling and finishes.

Open the permit page

$369,042
May 24, 2017Completed
final sign-off Nov 2017
300 California StD A Pope Inc3rd flr: demo (e) non bearing walls, glazing, millwork, finishes, doors, frames hardware, ceiling grid, tile, light fixtures and non compliant restrooms. new non structural interior partitions, doors and frames. maher na
Details
Permit
201705247498
Permit issued
May 30, 2017
Final sign-off
Nov 6, 2017

3rd flr: demo (e) non bearing walls, glazing, millwork, finishes, doors, frames hardware, ceiling grid, tile, light fixtures and non compliant restrooms. new non structural interior partitions, doors and frames. maher na

Open the permit page

$385,000
May 9, 2017Completed
final sign-off Dec 2017
300 California StD A Pope Increvise and upgrade path of travel to comply w cbc 2016 ii 2 new accessible parking stalls to comply with cbc 2016 section 11b 502 iii. new passenger drop-off & loading zone accessible. to complu w/ cbc2016, section 11b-503.iv provide new tactile throughout path of travel to comply w/ cbc2016. n/a
Details
Permit
201705096027
Permit issued
Sep 22, 2017
Final sign-off
Dec 18, 2017

revise and upgrade path of travel to comply w cbc 2016 ii 2 new accessible parking stalls to comply with cbc 2016 section 11b 502 iii. new passenger drop-off & loading zone accessible. to complu w/ cbc2016, section 11b-503.iv provide new tactile throughout path of travel to comply w/ cbc2016. n/a

Open the permit page

$130,000
Jan 23, 2017Completed
final sign-off Mar 2017
1050 Sansome StD A Pope Inc4th floor: t.i. work includes selective demo and new non-structural walls.
Details
Permit
201701237708
Permit issued
Jan 25, 2017
Final sign-off
Mar 23, 2017

4th floor: t.i. work includes selective demo and new non-structural walls.

Open the permit page

$38,000
Dec 28, 2016Completed
final sign-off Feb 2017
1550 Bryant StD A Pope Inc4th flr: ti- upgrade lights add additional outlets maher na
Details
Permit
201612286009
Permit issued
Jan 3, 2017
Final sign-off
Feb 28, 2017

4th flr: ti- upgrade lights add additional outlets maher na

Open the permit page

$35,000
Apr 22, 2016Completed
final sign-off Jun 2016
724 Battery StD A Pope Incgeneral t.i. with minor demolition and electrical. no plumbing, extg lighting is extg to remain except for removal of a couple track lights.
Details
Permit
201604225509
Permit issued
Apr 27, 2016
Final sign-off
Jun 6, 2016

general t.i. with minor demolition and electrical. no plumbing, extg lighting is extg to remain except for removal of a couple track lights.

Open the permit page

$51,500
Mar 18, 2016Completed
final sign-off Jul 2016
340 Bryant StD A Pope Inc4th floor full floor tenant improvement including non-structural demolition, construction of non-structural partitions, interior finishes, doors, casework, light fixtures & plumbing fixtures. life safety & mep under separate permit.
Details
Permit
201603182423
Permit issued
Mar 25, 2016
Final sign-off
Jul 29, 2016

4th floor full floor tenant improvement including non-structural demolition, construction of non-structural partitions, interior finishes, doors, casework, light fixtures & plumbing fixtures. life safety & mep under separate permit.

Open the permit page

$610,148
Mar 16, 2016Completed
final sign-off Jul 2016
340 Bryant StD A Pope Inc3rd flr: full floor tenant improvement including non structural demolition, construction of non-structural partitions,interior finishes,doors, casework, light fixtures & plumbing fixtures, l/s & mep under separate permit.
Details
Permit
201603162144
Permit issued
Mar 25, 2016
Final sign-off
Jul 29, 2016

3rd flr: full floor tenant improvement including non structural demolition, construction of non-structural partitions,interior finishes,doors, casework, light fixtures & plumbing fixtures, l/s & mep under separate permit.

Open the permit page

$1,212,827
Mar 16, 2016Completed
final sign-off Jul 2016
340 Bryant StD A Pope Inc2nd flr: full floor tenant improvement including non structural demolition, construction of non-structural partitions,interior finishes,doors, casework, light fixtures & plumbing fixtures, l/s & mep under separate permit.
Details
Permit
201603162146
Permit issued
Mar 25, 2016
Final sign-off
Jul 29, 2016

2nd flr: full floor tenant improvement including non structural demolition, construction of non-structural partitions,interior finishes,doors, casework, light fixtures & plumbing fixtures, l/s & mep under separate permit.

Open the permit page

$1,064,833
Feb 29, 2016Completed
final sign-off Mar 2016
1050 Sansome StD A Pope Increvision to 2015 0309 0298 / 2015 0811 3957: replace (e) outlets & lighting fixtures to comply with title 24 requirements
Details
Permit
201602290790
Permit issued
Feb 29, 2016
Final sign-off
Mar 8, 2016

revision to 2015 0309 0298 / 2015 0811 3957: replace (e) outlets & lighting fixtures to comply with title 24 requirements

Open the permit page

Feb 5, 2016Completed
final sign-off Jun 2016
410 Townsend StD A Pope Inc1-4 floors: project consist only of barrier removal. demolition of extg drinking fountain of floors 1-4 and upgrading to ada compliance. extg mep, life safty and sprinkler modification are under seperate permit.
Details
Permit
201602058930
Permit issued
Mar 25, 2016
Final sign-off
Jun 3, 2016

1-4 floors: project consist only of barrier removal. demolition of extg drinking fountain of floors 1-4 and upgrading to ada compliance. extg mep, life safty and sprinkler modification are under seperate permit.

Open the permit page

$6,000
Dec 8, 2015Completed
final sign-off Jun 2016
410 Townsend StD A Pope Incproject consist of barrier removal. domo of existing 4th fl restroom finishes and accessories. finsihes and accessories upgraded. mech,elec, life safety, sprinkler sep permit. n/a ordinance #155-13
Details
Permit
201512084479
Permit issued
Mar 25, 2016
Final sign-off
Jun 3, 2016

project consist of barrier removal. domo of existing 4th fl restroom finishes and accessories. finsihes and accessories upgraded. mech,elec, life safety, sprinkler sep permit. n/a ordinance #155-13

Open the permit page

$70,000
Nov 18, 2015Completed
final sign-off Mar 2016
1050 Sansome StD A Pope Inc1st/2nd flrs: inspector required additional detail per revised s2.2 plan showing downturned slab edge as per details 1&2/s2.2 dtd. 7-31-15 revision plan, (rev to 201503090298)
Details
Permit
201511182980
Permit issued
Nov 18, 2015
Final sign-off
Mar 8, 2016

1st/2nd flrs: inspector required additional detail per revised s2.2 plan showing downturned slab edge as per details 1&2/s2.2 dtd. 7-31-15 revision plan, (rev to 201503090298)

Open the permit page

$7,500
Nov 17, 2015Never finaled
issued Nov 2015, no final
1 Lombard StD A Pope Incti add (5) light fixtures, seven outlets. ref pa 2015-1106-1977. n/a ordinance #155-13
Details
Permit
201511172885
Permit issued
Nov 17, 2015

ti add (5) light fixtures, seven outlets. ref pa 2015-1106-1977. n/a ordinance #155-13

Open the permit page

$15,022
Nov 6, 2015Completed
final sign-off Dec 2015
1 Lombard StD A Pope Inc2nd flr, ste 200: this project involves modification of (e) tenant space to inclue selective demo and construction of non-load bearing partitions,new ceiling grid & tile,new light fixtures,new office doors & frames & new finishes; maher n/a
Details
Permit
201511061977
Permit issued
Nov 6, 2015
Final sign-off
Dec 23, 2015

2nd flr, ste 200: this project involves modification of (e) tenant space to inclue selective demo and construction of non-load bearing partitions,new ceiling grid & tile,new light fixtures,new office doors & frames & new finishes; maher n/a

Open the permit page

$62,320
Sep 15, 2015Completed
final sign-off Apr 2016
1550 Bryant StD A Pope Inctenant improvement. upgrade lighting systems and power outlets. ref 201509025936
Details
Permit
201509157023
Permit issued
Nov 10, 2015
Final sign-off
Apr 13, 2016

tenant improvement. upgrade lighting systems and power outlets. ref 201509025936

Open the permit page

$67,000
Sep 2, 2015Completed
final sign-off Apr 2016
1550 Bryant StD A Pope Inc7th fl.( suite 750) t.i. includes the demo of non-structural partitions and build back of non-structural partitions. all new or revised m.e.p., life safety, and sprinklers drawings to be submitted under separate permit if needed (building is fully sprinklered).
Details
Permit
201509025936
Permit issued
Sep 9, 2015
Final sign-off
Apr 13, 2016

7th fl.( suite 750) t.i. includes the demo of non-structural partitions and build back of non-structural partitions. all new or revised m.e.p., life safety, and sprinklers drawings to be submitted under separate permit if needed (building is fully sprinklered).

Open the permit page

$106,000
Aug 11, 2015Completed
final sign-off Mar 2016
1050 Sansome StD A Pope Inc1st and 2nd floor - replace existing outlets and lighting fixtures to comply with title 24 requirements. ref pa 201503090298
Details
Permit
201508113957
Permit issued
Jan 28, 2016
Final sign-off
Mar 8, 2016

1st and 2nd floor - replace existing outlets and lighting fixtures to comply with title 24 requirements. ref pa 201503090298

Open the permit page

$22,000
Jul 28, 2015Completed
final sign-off Nov 2015
1050 Sansome StD A Pope Increvision to 201503049904. revision to 5th and 6th fl permit - interconnecting stairs
Details
Permit
201507282651
Permit issued
Jul 28, 2015
Final sign-off
Nov 3, 2015

revision to 201503049904. revision to 5th and 6th fl permit - interconnecting stairs

Open the permit page

$110,000
Jul 13, 2015Completed
final sign-off Jun 2017
1050 Sansome StD A Pope Incprovide one (1) new exterior window, new canopy, new bldg entry door. replace glazing in 2nd floor windows.
Details
Permit
201507131362
Permit issued
Jun 13, 2016
Final sign-off
Jun 29, 2017

provide one (1) new exterior window, new canopy, new bldg entry door. replace glazing in 2nd floor windows.

Open the permit page

$200,000
Jul 9, 2015Completed
final sign-off Nov 2015
1550 Bryant StD A Pope Inc4th floor: electrical tenant improvement. additonal outlets, upgrade lighting. ref 201506300268
Details
Permit
201507091069
Permit issued
Oct 21, 2015
Final sign-off
Nov 18, 2015

4th floor: electrical tenant improvement. additonal outlets, upgrade lighting. ref 201506300268

Open the permit page

$62,000
Jun 30, 2015Completed
final sign-off Nov 2015
1550 Bryant StD A Pope Inc4th floor suite #450: t.i. includes demo of non-structural partitions and bldg new non-structural partitions. all new or revised hvac, electrical, plmg, life safety and sprinklers will be design built and submitted for permit separately, bldg is fully sprinklered. n/a for maher.
Details
Permit
201506300268
Permit issued
Jul 6, 2015
Final sign-off
Nov 18, 2015

4th floor suite #450: t.i. includes demo of non-structural partitions and bldg new non-structural partitions. all new or revised hvac, electrical, plmg, life safety and sprinklers will be design built and submitted for permit separately, bldg is fully sprinklered. n/a for maher.

Open the permit page

$200,000
Jun 15, 2015Never finaled
issued Aug 2015, no final
410 Townsend StD A Pope Incground floor: project consist of demolition of extg ground floor restroom finishes and water closet relocation. finishes will be upgraded mep, life safty, and sprinkler are not included in this permit. n/a for maher.
Details
Permit
201506158931
Permit issued
Aug 6, 2015

ground floor: project consist of demolition of extg ground floor restroom finishes and water closet relocation. finishes will be upgraded mep, life safty, and sprinkler are not included in this permit. n/a for maher.

Open the permit page

$70,000
May 11, 2015Completed
final sign-off Apr 2016
1550 Bryant StD A Pope Inc9th flr: revision to 201504073017, reducing the scope of work on electrical only, arch. 201503191272; maher n/a.
Details
Permit
201505115894
Permit issued
May 11, 2015
Final sign-off
Apr 13, 2016

9th flr: revision to 201504073017, reducing the scope of work on electrical only, arch. 201503191272; maher n/a.

Open the permit page

Apr 27, 2015Completed
final sign-off Feb 2016
1050 Sansome StD A Pope Incvoluntary seismic upgrade.
Details
Permit
201504274695
Permit issued
May 5, 2015
Final sign-off
Feb 2, 2016

voluntary seismic upgrade.

Open the permit page

$198,000
Apr 7, 2015Completed
final sign-off Nov 2015
1550 Bryant StD A Pope Inc9th floor: ti- includes revision/retrofit of (e) lighting fixtures. maher - not req'd
Details
Permit
201504073017
Permit issued
Apr 15, 2015
Final sign-off
Nov 20, 2015

9th floor: ti- includes revision/retrofit of (e) lighting fixtures. maher - not req'd

Open the permit page

$86,000
Mar 19, 2015Completed
final sign-off Nov 2015
1550 Bryant StD A Pope Inc9th flr: ti includes the demo of nonstructural partitions and build new non structural partitions. all new or revised hvac, elect, plumb, and life safety work will be submitted seperately. bld is fully sprinkled maher - not req'd
Details
Permit
201503191272
Permit issued
Mar 26, 2015
Final sign-off
Nov 20, 2015

9th flr: ti includes the demo of nonstructural partitions and build new non structural partitions. all new or revised hvac, elect, plumb, and life safety work will be submitted seperately. bld is fully sprinkled maher - not req'd

Open the permit page

$240,000
Mar 12, 2015Never finaled
issued Mar 2015, no final
1050 Sansome StD A Pope Incti for 5th & 6th - electrical only ref pa# 2015 0304 9904
Details
Permit
201503120719
Permit issued
Mar 13, 2015

ti for 5th & 6th - electrical only ref pa# 2015 0304 9904

Open the permit page

$104,000
Mar 11, 2015Completed
final sign-off Nov 2015
1050 Sansome StD A Pope Incti 5th & 6th fl: 2 new a/c units - roof top. 2 new split system a/c units. 1 exhaust fan ref pa# 2015 0304 9904
Details
Permit
201503110514
Permit issued
Apr 27, 2015
Final sign-off
Nov 3, 2015

ti 5th & 6th fl: 2 new a/c units - roof top. 2 new split system a/c units. 1 exhaust fan ref pa# 2015 0304 9904

Open the permit page

$60,000
Mar 9, 2015Completed
final sign-off Mar 2016
1050 Sansome StD A Pope Increnovate lobby. add new bike room, demolish floor at 2nd floor to create 2 story lobby, new restrooms finishes at 2nd floor. also provide new finishes, mep and structural work in 2 story lobby area.
Details
Permit
201503090298
Permit issued
May 21, 2015
Final sign-off
Mar 8, 2016

renovate lobby. add new bike room, demolish floor at 2nd floor to create 2 story lobby, new restrooms finishes at 2nd floor. also provide new finishes, mep and structural work in 2 story lobby area.

Open the permit page

$500,000
Mar 4, 2015Completed
final sign-off Nov 2015
1050 Sansome StD A Pope Inct.i. to 5th and 6th floors , includes new walls, lifhting. electrical, plmg and mechanical deferred submittals
Details
Permit
201503049904
Permit issued
Mar 11, 2015
Final sign-off
Nov 3, 2015

t.i. to 5th and 6th floors , includes new walls, lifhting. electrical, plmg and mechanical deferred submittals

Open the permit page

$550,500
Dec 23, 2014Completed
final sign-off Jan 2015
1050 Sansome StD A Pope Inci.t. data room at basement floor, new walls as shown per note #1; new door as shown per note #3 and me as required.
Details
Permit
201412234377
Permit issued
Dec 23, 2014
Final sign-off
Jan 29, 2015

i.t. data room at basement floor, new walls as shown per note #1; new door as shown per note #3 and me as required.

Open the permit page

$8,600
Dec 16, 2014Completed
final sign-off Apr 2015
1550 Bryant StD A Pope Inc8th flr: construction of new break area including cabinetry plumbing and lighting; mep to be design built under separate permit. building fully sprinklered; maher n/a
Details
Permit
201412163775
Permit issued
Dec 29, 2014
Final sign-off
Apr 9, 2015

8th flr: construction of new break area including cabinetry plumbing and lighting; mep to be design built under separate permit. building fully sprinklered; maher n/a

Open the permit page

$15,000
Nov 20, 2014Completed
final sign-off Feb 2015
1050 Sansome StD A Pope Incdemolition of 2nd and 3rd floors, non structural partiton walls
Details
Permit
201411202158
Permit issued
Nov 20, 2014
Final sign-off
Feb 9, 2015

demolition of 2nd and 3rd floors, non structural partiton walls

Open the permit page

$30,000
Oct 21, 2014Completed
final sign-off Nov 2014
1550 Bryant StD A Pope Inc5th floor suite #500: t.i. to include selective demo nonstruction of non-load bearings partitions. mep & life safety under separate permit. maher n/a.
Details
Permit
201410219478
Permit issued
Oct 22, 2014
Final sign-off
Nov 21, 2014

5th floor suite #500: t.i. to include selective demo nonstruction of non-load bearings partitions. mep & life safety under separate permit. maher n/a.

Open the permit page

$40,000
Sep 18, 2014Completed
final sign-off Oct 2015
1550 Bryant StD A Pope Incflrs: 8 and 9- construction of communication stair between 2 existing "b" occupancy floors (8th and 9th flrs) maher n/a
Details
Permit
201409186640
Permit issued
Dec 17, 2014
Final sign-off
Oct 19, 2015

flrs: 8 and 9- construction of communication stair between 2 existing "b" occupancy floors (8th and 9th flrs) maher n/a

Open the permit page

$176,000
Jun 20, 2014Completed
final sign-off Mar 2016
1550 Bryant StD A Pope Inc8th floor:phase iii meps for 201402289570
Details
Permit
201406208981
Permit issued
Aug 14, 2014
Final sign-off
Mar 3, 2016

8th floor:phase iii meps for 201402289570

Open the permit page

$240,000
Jun 4, 2014Expired or cancelled
expired May 2022
1550 Bryant StD A Pope Inct.i. includes demo of portion existing concrete slab for new communication stair between existing 8/f & 9/f tenant suites. permit for new stair and 9/f t.i. submitted seperately. ti on both floors separate permit. building fully sprinklers. n/a ordinance #155-13
Details
Permit
201406047437
Permit issued
Jun 20, 2014

t.i. includes demo of portion existing concrete slab for new communication stair between existing 8/f & 9/f tenant suites. permit for new stair and 9/f t.i. submitted seperately. ti on both floors separate permit. building fully sprinklers. n/a ordinance #155-13

Open the permit page

$1,000
May 29, 2014Completed
final sign-off Jun 2014
1550 Bryant StD A Pope Inc4th floor #400/490 - revision to appl #2014.0417.3490: modify duct work hvac no new units. n/a maher ordinance 155-13
Details
Permit
201405296966
Permit issued
Jun 4, 2014
Final sign-off
Jun 25, 2014

4th floor #400/490 - revision to appl #2014.0417.3490: modify duct work hvac no new units. n/a maher ordinance 155-13

Open the permit page

Apr 17, 2014Completed
final sign-off Jun 2014
1550 Bryant StD A Pope Inc#400 & #490- t.i. includes build out of a few full height non-structural partitions, doors/frames & glazing, all new or revised hvac, electrical, plumbing and life safety, work will be submitted seperately. bldg is fully sprinklered. n/a to ordinance #155-13.
Details
Permit
201404173490
Permit issued
Apr 24, 2014
Final sign-off
Jun 25, 2014

#400 & #490- t.i. includes build out of a few full height non-structural partitions, doors/frames & glazing, all new or revised hvac, electrical, plumbing and life safety, work will be submitted seperately. bldg is fully sprinklered. n/a to ordinance #155-13.

Open the permit page

$250,000
Mar 24, 2014Completed
final sign-off Jun 2014
725 Folsom StD A Pope Incground floor:t.i. includes demo of non structural partitions and building new non structural partitions. all new or revised hvac, electrical, plmbg and life safety work wil be design build and sumitted seperately. fully sprinklered.
Details
Permit
201403241533
Permit issued
Apr 3, 2014
Final sign-off
Jun 6, 2014

ground floor:t.i. includes demo of non structural partitions and building new non structural partitions. all new or revised hvac, electrical, plmbg and life safety work wil be design build and sumitted seperately. fully sprinklered.

Open the permit page

$75,000
Feb 28, 2014Completed
final sign-off Aug 2015
1550 Bryant StD A Pope Inc8th floor t.i. includes building new non-structural partitions, new raised floor area & kitchen. (all new or revised hvac, electrical, plumbing & life safety work will be design build & submitted for permit separately). building fully sprinklered, demo included.
Details
Permit
201402289570
Permit issued
Jun 26, 2014
Final sign-off
Aug 14, 2015

8th floor t.i. includes building new non-structural partitions, new raised floor area & kitchen. (all new or revised hvac, electrical, plumbing & life safety work will be design build & submitted for permit separately). building fully sprinklered, demo included.

Open the permit page

$750,000
Feb 18, 2014Completed
final sign-off Apr 2015
1550 Bryant StD A Pope Inc8th fl new non structural paritions, interior doors, glazing. new or revised hvac, elec, plumbing, life safety design build, submitted separately. building fully sprinlered. glass partitions under separate permit with structural.
Details
Permit
201402188702
Permit issued
Feb 24, 2014
Final sign-off
Apr 9, 2015

8th fl new non structural paritions, interior doors, glazing. new or revised hvac, elec, plumbing, life safety design build, submitted separately. building fully sprinlered. glass partitions under separate permit with structural.

Open the permit page

$750,000
Feb 3, 2014Completed
final sign-off Apr 2014
1550 Bryant StD A Pope Inc8th floor: interior demo only. ab-017 will remain unoccupied until t. i. permit is approved. n/a for maher ordinance #155-13
Details
Permit
201402037592
Permit issued
Feb 3, 2014
Final sign-off
Apr 11, 2014

8th floor: interior demo only. ab-017 will remain unoccupied until t. i. permit is approved. n/a for maher ordinance #155-13

Open the permit page

$11,000
Nov 5, 2013Completed
final sign-off Feb 2014
1550 Bryant StD A Pope Inc7/f- removal of section of partition and interior glazing at existing elevator lobby, if applicable, all new or modified hvac, electrical and life safety work will be design build and submitted seperately
Details
Permit
201311051159
Permit issued
Jan 28, 2014
Final sign-off
Feb 4, 2014

7/f- removal of section of partition and interior glazing at existing elevator lobby, if applicable, all new or modified hvac, electrical and life safety work will be design build and submitted seperately

Open the permit page

$5,000
Oct 11, 2013Never finaled
issued Oct 2013, no final
300 California StD A Pope Incaddition of access controls to the existing all glass entry doors, new card reader and door. secuirty hardware to be tied to fire life safety system and retain existing accessible entry clearance
Details
Permit
201310119086
Permit issued
Oct 11, 2013

addition of access controls to the existing all glass entry doors, new card reader and door. secuirty hardware to be tied to fire life safety system and retain existing accessible entry clearance

Open the permit page

$32,000
Jun 26, 2013Completed
final sign-off Feb 2014
1550 Bryant StD A Pope Inc9th floor-revision to pa# 2013-0522-7681-revision include lighting (title 24); changes include lighting plan a2.09 power and signal a.3.09 compliance with ord 155-13 not required
Details
Permit
201306260586
Permit issued
Feb 3, 2014
Final sign-off
Feb 4, 2014

9th floor-revision to pa# 2013-0522-7681-revision include lighting (title 24); changes include lighting plan a2.09 power and signal a.3.09 compliance with ord 155-13 not required

Open the permit page

$15,000
Jun 13, 2013Completed
final sign-off Jul 2013
1550 Bryant StD A Pope Inc3rd floor-ti include demolition of non structural partitions, new non structural partitions, relocate doors, new or revised hvac, electrical, plumbing & life safety work will be design build & submitted seperately. building fully sprinklered
Details
Permit
201306139429
Permit issued
Jun 25, 2013
Final sign-off
Jul 10, 2013

3rd floor-ti include demolition of non structural partitions, new non structural partitions, relocate doors, new or revised hvac, electrical, plumbing & life safety work will be design build & submitted seperately. building fully sprinklered

Open the permit page

$35,000
Jun 11, 2013Completed
final sign-off Oct 2013
1550 Bryant StD A Pope Inc8th floor-multi-tenant floor-interior demo, no disabled access upgrades, per ab-017. arch, mep, sprinkler & fire alarm under separate applications. maintain life safety and sprinkler systems operational.
Details
Permit
201306119153
Permit issued
Jun 25, 2013
Final sign-off
Oct 10, 2013

8th floor-multi-tenant floor-interior demo, no disabled access upgrades, per ab-017. arch, mep, sprinkler & fire alarm under separate applications. maintain life safety and sprinkler systems operational.

Open the permit page

$30,000
Jun 4, 2013Completed
final sign-off Dec 2014
28 Geary StD A Pope Incsuite #500-interior office improvements-new carpet, paint, new interior non structural partitions, new millwork, cabinets, new interior doors. (e) lighting to remain, no structural work. re-work (e) mechanical & electrical. m.e. will be deferred submittal
Details
Permit
201306048676
Permit issued
Jun 25, 2013
Final sign-off
Dec 26, 2014

suite #500-interior office improvements-new carpet, paint, new interior non structural partitions, new millwork, cabinets, new interior doors. (e) lighting to remain, no structural work. re-work (e) mechanical & electrical. m.e. will be deferred submittal

Open the permit page

$97,000
May 22, 2013Completed
final sign-off Aug 2013
1550 Bryant StD A Pope Inc9th floor t.i. includes bldg full height non-sttructural partition, new doors, frames, interior, glazing, relocation of light fixtures & selected new lights, all new or modified hvac, electrical, plumbing & life safety work will be design build under separate permit (bldg fully sprinklered).
Details
Permit
201305227681
Permit issued
Jun 3, 2013
Final sign-off
Aug 5, 2013

9th floor t.i. includes bldg full height non-sttructural partition, new doors, frames, interior, glazing, relocation of light fixtures & selected new lights, all new or modified hvac, electrical, plumbing & life safety work will be design build under separate permit (bldg fully sprinklered).

Open the permit page

$175,000
Apr 23, 2013Completed
final sign-off Apr 2013
1550 Bryant StD A Pope Incelectrical, mechanical title 24 work associated with bldg pa# 2013-0319-2501
Details
Permit
201304235259
Permit issued
Apr 23, 2013
Final sign-off
Apr 25, 2013

electrical, mechanical title 24 work associated with bldg pa# 2013-0319-2501

Open the permit page

$3,000
Mar 19, 2013Completed
final sign-off Apr 2013
1550 Bryant StD A Pope Inc6th floor suite # 600: t. i. include the demo of non-structural partitions. all new or revised hvac, electrical, plmg and life safety work will be design build and submitted for permit seperately. bldg is fully sprinklered.
Details
Permit
201303192501
Permit issued
Mar 26, 2013
Final sign-off
Apr 25, 2013

6th floor suite # 600: t. i. include the demo of non-structural partitions. all new or revised hvac, electrical, plmg and life safety work will be design build and submitted for permit seperately. bldg is fully sprinklered.

Open the permit page

$38,000
Mar 12, 2013Completed
final sign-off Apr 2013
1550 Bryant StD A Pope Inc7th floor-suite #735-build out full height non structural partitions. new doors & frames, interior glazing. demo of (e) ceiling & relocate lights. all new or revised hvac, electrical, plumbing & life safety work will be design build & under seperate permit. building fully sprinklered
Details
Permit
201303121968
Permit issued
Mar 18, 2013
Final sign-off
Apr 22, 2013

7th floor-suite #735-build out full height non structural partitions. new doors & frames, interior glazing. demo of (e) ceiling & relocate lights. all new or revised hvac, electrical, plumbing & life safety work will be design build & under seperate permit. building fully sprinklered

Open the permit page

$35,000
Jan 8, 2013Completed
final sign-off Feb 2013
1550 Bryant StD A Pope Inc4th fl. ste 470. ti include building out, full height, non structural partitions, new doors/frames, interior glazing. demo of existing ceiling and relocation of light fixtures; all new or modified hvac, electrical, plumbing, and life safety work will be design build and submitted separately.
Details
Permit
201301087448
Permit issued
Jan 11, 2013
Final sign-off
Feb 15, 2013

4th fl. ste 470. ti include building out, full height, non structural partitions, new doors/frames, interior glazing. demo of existing ceiling and relocation of light fixtures; all new or modified hvac, electrical, plumbing, and life safety work will be design build and submitted separately.

Open the permit page

$55,000
Jan 8, 2013Completed
final sign-off Mar 2013
1550 Bryant StD A Pope Inc5th fl. ste 525, 535, 545. ti include building out, full height, non structural partitions, new door/frames, interior glazing. demo of existing ceiling and relocation of light fixtures; all new or modified hvac, electrical, plumbing, and life safety work will be design build and submitted separately
Details
Permit
201301087446
Permit issued
Jan 11, 2013
Final sign-off
Mar 13, 2013

5th fl. ste 525, 535, 545. ti include building out, full height, non structural partitions, new door/frames, interior glazing. demo of existing ceiling and relocation of light fixtures; all new or modified hvac, electrical, plumbing, and life safety work will be design build and submitted separately

Open the permit page

$89,000
Nov 29, 2012Expired or cancelled
cancelled Jan 2014
300 California StD A Pope Inc3rd floor suite 300 - demolition & construction of non-load bearing partitions, relocation of light fixtures & demo of exisitng acoustic ceiling grid & tile, new doors, new finishes. mechanical & electrical under separate permit.
Details
Permit
201211295089
Permit issued
Dec 20, 2012

3rd floor suite 300 - demolition & construction of non-load bearing partitions, relocation of light fixtures & demo of exisitng acoustic ceiling grid & tile, new doors, new finishes. mechanical & electrical under separate permit.

Open the permit page

$125,000
Oct 26, 2012Completed
final sign-off May 2013
848 Battery StD A Pope Increvision to app#201208157467 to clarify framing at gathering steps per bldg inspectors request and submit as an addition to extg permit.
Details
Permit
201210262946
Permit issued
Nov 13, 2012
Final sign-off
May 9, 2013

revision to app#201208157467 to clarify framing at gathering steps per bldg inspectors request and submit as an addition to extg permit.

Open the permit page

Aug 15, 2012Completed
final sign-off May 2013
840 Battery StD A Pope Incdemolition on existing office-non structural interior walls include wm outlets.relocation of existing lights.new partitions, electrical,server rm,lights, millwork and finishes and new communication stair
Details
Permit
201208157467
Permit issued
Aug 20, 2012
Final sign-off
May 9, 2013

demolition on existing office-non structural interior walls include wm outlets.relocation of existing lights.new partitions, electrical,server rm,lights, millwork and finishes and new communication stair

Open the permit page

$750,000
Jul 18, 2012Completed
final sign-off Oct 2012
2622 Ocean AvD A Pope Incchange of use from m-retail to b-medical office-new ceiling, lights, plumbing & finishes.
Details
Permit
201207185118
Permit issued
Aug 16, 2012
Final sign-off
Oct 12, 2012

change of use from m-retail to b-medical office-new ceiling, lights, plumbing & finishes.

Open the permit page

$62,000
Jun 21, 2012Completed
final sign-off Sep 2012
170 Maiden LnD A Pope Inc5th floor-t.i. to consist of demolition non bearing partitions, new partitions, electrical, hvac, plumbing, acoustical ceilings, sprinkler & finishes. m.e.p under seperate permits. all work on 5th floor.
Details
Permit
201206213184
Permit issued
Jul 6, 2012
Final sign-off
Sep 6, 2012

5th floor-t.i. to consist of demolition non bearing partitions, new partitions, electrical, hvac, plumbing, acoustical ceilings, sprinkler & finishes. m.e.p under seperate permits. all work on 5th floor.

Open the permit page

$420,000