Dane Bunton
- Listed as
- architect, authorized agent-others, engineer
- Firm
- Bunton Mousavi Architecture
- Based in
- San Francisco
- On San Francisco permits
- Apr 2018 to Sep 2026
58 permits since 2000 (architect on 53 permits, authorized agent-others on 4 permits, engineer on 1 permit): 30 completed, 13 in progress, 10 never finaled, 5 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 18, 2026 | In progress filed Sep 2026, not yet issued | 2175 03rd St | #1c: renovation of an (e) shell space into a medical and cosmetic skin outpatient treatment facility. including: (n) interior walls, (n) dropped ceilings, (n) mep infraucture & construction of (n) specialized treatment rooms including injector, laser, aesthetician, and consultation spaces,Details
#1c: renovation of an (e) shell space into a medical and cosmetic skin outpatient treatment facility. including: (n) interior walls, (n) dropped ceilings, (n) mep infraucture & construction of (n) specialized treatment rooms including injector, laser, aesthetician, and consultation spaces, | $500,000 | |
| Jul 27, 2026 | In progress issued Sep 2026 | 1801 Haight St | Occidental Express | obtain a place or assembly permit for existing restaurant cha cha cha located at 1801 haight st. scope is limited to a change of use from a-3 to a-2 with no change in occupany load and no physical alterations to the e building.Details
obtain a place or assembly permit for existing restaurant cha cha cha located at 1801 haight st. scope is limited to a change of use from a-3 to a-2 with no change in occupany load and no physical alterations to the e building. | |
| Jul 9, 2026 | In progress filed Jul 2026, not yet issued | 420 Folsom St | interior remodel to instal a3 fitness studio(trufusion) to accomodate a new spa center for ska thermal spa. (e) juice bar on ground floor to remain, now to serve alchol cosmetic remodel for basement level including (n) millwork, wall & ceiling finishes (n) plumbing, pools in (e) basement level floorDetails
interior remodel to instal a3 fitness studio(trufusion) to accomodate a new spa center for ska thermal spa. (e) juice bar on ground floor to remain, now to serve alchol cosmetic remodel for basement level including (n) millwork, wall & ceiling finishes (n) plumbing, pools in (e) basement level floor | $195,000 | |
| Jun 5, 2026 | In progress issued Sep 2026 | 420 Folsom St | Edri Construction Inc *See Notes* | ab17 soft demo: removal of (e) floor finishes and raised floor areas noted in plan. removal of (e) lockers and mill work. removal of (e) new structural interior partitons, interior glazing walls, doors, removal of (e) sink, water fountain and mop sink. removal of interior finishes around colums.Details
ab17 soft demo: removal of (e) floor finishes and raised floor areas noted in plan. removal of (e) lockers and mill work. removal of (e) new structural interior partitons, interior glazing walls, doors, removal of (e) sink, water fountain and mop sink. removal of interior finishes around colums. | $30,000 |
| May 29, 2026 | In progress issued Jun 2026 | 2932 21st St | Lsr Maintenance Llc | interior remodel to the front apt units.Details
interior remodel to the front apt units. | $200,000 |
| Apr 15, 2026 | Completed final sign-off May 2026 | 1010 16th St | Acg Construction Inc | revision to 202510147334, revise tbar ceiling panel to include a metal/wire mesh ceiling (non-flammable) instead of burlap fabric.Details
revision to 202510147334, revise tbar ceiling panel to include a metal/wire mesh ceiling (non-flammable) instead of burlap fabric. | |
| Mar 27, 2026 | Completed final sign-off May 2026 | 66 Kearny St | Source Planning And Construction Inc | revision to permit 202511260493. minor changes to coffee bar and equipment. revise coffee bar and equipment associated at back of the house.Details
revision to permit 202511260493. minor changes to coffee bar and equipment. revise coffee bar and equipment associated at back of the house. | |
| Mar 6, 2026 | Completed final sign-off May 2026 | 66 Kearny St | Source Planning And Construction Inc | revision to bpa# 202511260493. administrative permit to clarify that the entry door does not require panic hardware, include sign above door that states "door shall remain open during business hours."Details
revision to bpa# 202511260493. administrative permit to clarify that the entry door does not require panic hardware, include sign above door that states "door shall remain open during business hours." | |
| Nov 26, 2025 | Completed final sign-off May 2026 | 66 Kearny St | Source Planning And Construction Inc | project consists of an interior remodel to an existing cafe (formerly starbucks) to accomodate a new cafe for andytown coffee and roasters. scope includes: new coffee bar and equipment. equipmeent chages to back of the house. cosmetic remodel to customer area inclujding new millwork and furniture.Details
project consists of an interior remodel to an existing cafe (formerly starbucks) to accomodate a new cafe for andytown coffee and roasters. scope includes: new coffee bar and equipment. equipmeent chages to back of the house. cosmetic remodel to customer area inclujding new millwork and furniture. | $800,000 |
| Oct 14, 2025 | Completed final sign-off May 2026 | 1010 16th St | Acg Construction Inc | interior build out of an (e) ground fl space at 1010 16th st for cracked & battered. subject unit 13 "retail 1". work includes: (n) restrooms, (n) kitchen equipment, (n) coffee bar & equipment, (n) interior finishes, (n) associated plumbing & electrical.Details
interior build out of an (e) ground fl space at 1010 16th st for cracked & battered. subject unit 13 "retail 1". work includes: (n) restrooms, (n) kitchen equipment, (n) coffee bar & equipment, (n) interior finishes, (n) associated plumbing & electrical. | $900,000 |
| Aug 20, 2025 | Completed final sign-off Mar 2026 | 3821 Noriega St | Northern Sun Associates | change of use and occupancy from m to b. interior remodel to existing +/- 2000 sf market to accomodate a bar and restaurant.Details
change of use and occupancy from m to b. interior remodel to existing +/- 2000 sf market to accomodate a bar and restaurant. | $199,000 |
| Jun 30, 2025 | In progress issued May 2026 | 447 Broadway | change of use from nightclub to retail, change of occupancy from a2 to m. minor interior changes including adding grab bars to restroom.Details
change of use from nightclub to retail, change of occupancy from a2 to m. minor interior changes including adding grab bars to restroom. | $1,000 | |
| May 5, 2025 | In progress issued Sep 2025 | 1100 El Camino Del Mar | Patrick Uniacke | concrete slab on piers with 42 in perimeter wall for sf irish famine memorial plazaDetails
concrete slab on piers with 42 in perimeter wall for sf irish famine memorial plaza | $75,000 |
| Feb 28, 2025 | Completed final sign-off Jun 2025 | 1264 Folsom St | Tadashi Wood Construction Company | revision to pa# 202404301096, minor structural framing changes and electrical.Details
revision to pa# 202404301096, minor structural framing changes and electrical. | |
| Feb 11, 2025 | In progress filed Feb 2025, not yet issued | 1365 Fillmore St | minor interior improvement: equipment and customer area counter modifications add (2) hand sinks, modify restroom door, modify finishes and cove baseDetails
minor interior improvement: equipment and customer area counter modifications add (2) hand sinks, modify restroom door, modify finishes and cove base | $30,000 | |
| Nov 20, 2024 | In progress filed Nov 2024, not yet issued | 261 06th St | project consists of information required to change the use and occupancy of an existing warehouse space to a retail use for 415 e-bikes. construction consists entirely of door removal.Details
project consists of information required to change the use and occupancy of an existing warehouse space to a retail use for 415 e-bikes. construction consists entirely of door removal. | $5,000 | |
| Nov 19, 2024 | In progress filed Nov 2024, not yet issued | 1801 Haight St | comply w/ nov #202545569: place of assembly permit to existing restaurant. change occupancy group from a-3 to a-2. construction of new , raised & uncovered outdoor dining area in the (e) parking lot. addition of (n) tactile restroom & egress signage.Details
comply w/ nov #202545569: place of assembly permit to existing restaurant. change occupancy group from a-3 to a-2. construction of new , raised & uncovered outdoor dining area in the (e) parking lot. addition of (n) tactile restroom & egress signage. | ||
| Oct 3, 2024 | Completed final sign-off Oct 2025 | 317 Cortland Av | Vega Construction Company | rev 202112234993- modification of layout and mep scope for cannabis retail. frame new storage and office. install new lights and install new electric panel.Details
rev 202112234993- modification of layout and mep scope for cannabis retail. frame new storage and office. install new lights and install new electric panel. | |
| Aug 16, 2024 | In progress filed Aug 2024, not yet issued | 657 Howard St | Rossi Builders Inc. | revision to pa# 2023-1212-2341 change in occupancy of flex & lounge spaces. assembly permitDetails
revision to pa# 2023-1212-2341 change in occupancy of flex & lounge spaces. assembly permit | |
| Jun 13, 2024 | In progress issued Jul 2024 | 324 South Van Ness Av | plumbing modification to comply with plumbing inspection.Details
plumbing modification to comply with plumbing inspection. | $1,000 | |
| May 15, 2024 | Completed final sign-off Jan 2025 | 390 09th St | Rossi Builders Inc. | voluntary seismic upgrade. add power door operator to restroom 1, replace (e) restroom signage, replace (e) stair handrails and guardrailsDetails
voluntary seismic upgrade. add power door operator to restroom 1, replace (e) restroom signage, replace (e) stair handrails and guardrails | $250,000 |
| Apr 30, 2024 | In progress issued Jan 2025 | 1264 Folsom St | Tadashi Wood Construction Company, Climbing Construction Inc. | (prop h) change of use from auto repair to fitness center. install (n) climbing walls on the main level. modify (e) level bathroom to make it ada compliant. hvac modificationDetails
(prop h) change of use from auto repair to fitness center. install (n) climbing walls on the main level. modify (e) level bathroom to make it ada compliant. hvac modification | $124,000 |
| Mar 26, 2024 | Completed final sign-off Apr 2024 | 870 Harrison St | establish art studio use at (e) ground fl. commercial space, no construction proposedDetails
establish art studio use at (e) ground fl. commercial space, no construction proposed | $15 | |
| Mar 15, 2024 | Completed final sign-off May 2024 | 16 Guerrero St | Buzzer 9 Development Inc | change of use and occupancy to convert a ground floor retail store to a hair studio . add (1) new sinkDetails
change of use and occupancy to convert a ground floor retail store to a hair studio . add (1) new sink | $3,000 |
| Mar 15, 2024 | Completed final sign-off Sep 2024 | 657 Howard St | Rossi Builders Inc. | revision 202312122341- mechanical/hvac design change to (e) units and duct runsDetails
revision 202312122341- mechanical/hvac design change to (e) units and duct runs | |
| Dec 12, 2023 | Completed final sign-off Sep 2024 | 657 Howard St | Rossi Builders Inc. | the project consists of an interior remodel to an (e) 4464 sf art gallery to accommodate the goethe institut, a german culture language institute. the scope includes modification of interior elements, hvac & lighting. this is phase 2 of 2. refe ti phase 1- 202301120086.Details
the project consists of an interior remodel to an (e) 4464 sf art gallery to accommodate the goethe institut, a german culture language institute. the scope includes modification of interior elements, hvac & lighting. this is phase 2 of 2. refe ti phase 1- 202301120086. | $235,048 |
| Sep 7, 2023 | Completed final sign-off Apr 2024 | 188 Octavia St | Rossi Builders Inc. | project consists of a ti in an (e) commercial space for adventurous sports. project to include modifications to (e) layout, plumbing, lighting & hvac. new element include: lightning and outlets, millwork, plumbing, hvac and large exercise equipment.Details
project consists of a ti in an (e) commercial space for adventurous sports. project to include modifications to (e) layout, plumbing, lighting & hvac. new element include: lightning and outlets, millwork, plumbing, hvac and large exercise equipment. | $283,587 |
| Aug 23, 2023 | Never finaled issued Sep 2023, no final | 3655 Lawton St | C D R Construction | revision to pa# 202208301598. removal of previously approved skylights, roof access hatch + alteration of window operation. update to title-24 forms based on revision to remove heating element from mechanical system + altered hood specs.Details
revision to pa# 202208301598. removal of previously approved skylights, roof access hatch + alteration of window operation. update to title-24 forms based on revision to remove heating element from mechanical system + altered hood specs. | |
| Jun 27, 2023 | Completed final sign-off Jul 2024 | 1769 Fulton St | A G G General Contractor | revision to pa 2022-0804-9913 demo shed in backyard, replace with trash enclosure; plan/layout modifications. replace lighting. add moment frame accommodate facade changesDetails
revision to pa 2022-0804-9913 demo shed in backyard, replace with trash enclosure; plan/layout modifications. replace lighting. add moment frame accommodate facade changes | $20,000 |
| Apr 4, 2023 | Never finaled issued Apr 2023, no final | 2814 Clay St | G B U Construction Development, Jj Construction & Design Inc. | revision to pa# 202106182818, revise plams to move exterior garage wall on west side of building at basement lvl.Details
revision to pa# 202106182818, revise plams to move exterior garage wall on west side of building at basement lvl. | $5,000 |
| Jan 30, 2023 | Completed final sign-off Mar 2023 | 78 Rotteck St | J L Construction | revisions to pa# 201812319396 to comply w/ nov 201758241, minor field revisions to exterior windows and doors, add meter change side finish from wood siding to stucco.Details
revisions to pa# 201812319396 to comply w/ nov 201758241, minor field revisions to exterior windows and doors, add meter change side finish from wood siding to stucco. | |
| Jan 12, 2023 | Never finaled issued Sep 2023, no final | 657 Howard St | Rossi Builders Inc. | 1/f: interior t.i., minor modification to walls, hvac, lighting, & plumbing. phase 1 of 2.Details
1/f: interior t.i., minor modification to walls, hvac, lighting, & plumbing. phase 1 of 2. | $269,208 |
| Jan 10, 2023 | Completed final sign-off Apr 2024 | 679 Chenery St | Buzzer 9 Development Inc | revision to permit #202205043540 & #202210315571. 3/f: interior layout change. add (3) dormers to roof.Details
revision to permit #202205043540 & #202210315571. 3/f: interior layout change. add (3) dormers to roof. | $10,000 |
| Jan 10, 2023 | Never finaled filed Jan 2023, never issued | 2845 Geary Bl | replace (e) vinyl copy/brand sign in (e) blade sign w/new graphic "mary modern". no structural change. to comply w/bid nov#202294722 dated 11/15/2022Details
replace (e) vinyl copy/brand sign in (e) blade sign w/new graphic "mary modern". no structural change. to comply w/bid nov#202294722 dated 11/15/2022 | $800 | |
| Dec 7, 2022 | Never finaled filed Dec 2022, never issued | 2845 Geary Bl | add security screen to exterior window and door. complaint @ 202296954Details
add security screen to exterior window and door. complaint @ 202296954 | $2,000 | |
| Nov 23, 2022 | Never finaled issued Feb 2023, no final | 2814 Clay St | G B U Construction Development, Jj Construction & Design Inc. | revision to 202106182818. plan revision included structural and add elevator in legalized uduDetails
revision to 202106182818. plan revision included structural and add elevator in legalized udu | |
| Oct 31, 2022 | Completed final sign-off Apr 2024 | 679 Chenery St | Buzzer 9 Development Inc | new exterior stair at rear of property, convert roof at rear to habitable deck on 2nd floor, add guardrails around deck, replace window with door. add (1) new dormer to roof at chenery street side. minor modifications to rear exterior window frame materials.Details
new exterior stair at rear of property, convert roof at rear to habitable deck on 2nd floor, add guardrails around deck, replace window with door. add (1) new dormer to roof at chenery street side. minor modifications to rear exterior window frame materials. | $20,000 |
| Oct 31, 2022 | Completed final sign-off Apr 2024 | 679 Chenery St | Buzzer 9 Development Inc | revision to 202205043540. modify 2nd fl height & structure, minor layout chenge to accomodate modify roof joist depths and fl joist depthsDetails
revision to 202205043540. modify 2nd fl height & structure, minor layout chenge to accomodate modify roof joist depths and fl joist depths | |
| Oct 31, 2022 | Completed final sign-off Feb 2024 | 2731 Mission St | remodel (e) bar (interior). structural work to extend bar and demo part of wall behind bar.Details
remodel (e) bar (interior). structural work to extend bar and demo part of wall behind bar. | $15,000 | |
| Oct 6, 2022 | Completed final sign-off Oct 2022 | 2845 Geary Bl | revision to 202208049921: change structuctural to reflect correct psi at concrete.Details
revision to 202208049921: change structuctural to reflect correct psi at concrete. | ||
| Sep 7, 2022 | Completed final sign-off Mar 2024 | 114 Precita Av | to comply with nov# 202057191, remove (e) dilpitated stairs (exterior) from ext. patio off unit 114 & replace w/steel ladder. replace (e) concrete exterior steps between 116 & 118 in kind.Details
to comply with nov# 202057191, remove (e) dilpitated stairs (exterior) from ext. patio off unit 114 & replace w/steel ladder. replace (e) concrete exterior steps between 116 & 118 in kind. | $1,000 | |
| Sep 1, 2022 | Completed final sign-off Jun 2023 | 392 Fulton St | Kobuksan Construction | interior ti to convert donut shop to resturant and barDetails
interior ti to convert donut shop to resturant and bar | $75,000 |
| Aug 30, 2022 | Never finaled issued Nov 2022, no final | 3655 Lawton St | C D R Construction | expand (e) coffee shop and bakery (3655 lawton street) into adjacent commercial space (3645 lawton street) interior remodel/ti and cosmetic facade improvement.Details
expand (e) coffee shop and bakery (3655 lawton street) into adjacent commercial space (3645 lawton street) interior remodel/ti and cosmetic facade improvement. | $50,000 |
| Aug 26, 2022 | Expired or cancelled cancelled Jan 2026 | 1769 Fulton St | installation of 1 projecting double-faced non-illuminated blade sign "piqueos"Details
installation of 1 projecting double-faced non-illuminated blade sign "piqueos" | $2,500 | |
| Aug 26, 2022 | Expired or cancelled cancelled Jan 2026 | 1769 Fulton St | installation of 1 projecting single faced non-illuminated wall sign "piqueos"Details
installation of 1 projecting single faced non-illuminated wall sign "piqueos" | $2,500 | |
| Aug 26, 2022 | Completed final sign-off Jul 2024 | 1769 Fulton St | demolition of (e) restaurant: interior walls. ab-017. t.i. ref pa202208049913 for t.i. non-structural work only. back yard patio excluded (under separate permit)Details
demolition of (e) restaurant: interior walls. ab-017. t.i. ref pa202208049913 for t.i. non-structural work only. back yard patio excluded (under separate permit) | $15,000 | |
| Aug 26, 2022 | Never finaled filed Aug 2022, never issued | 1769 Fulton St | excavate rear backyard to level with main building interior for ada compliance. 48cy. ref t.i. pa202208049913.Details
excavate rear backyard to level with main building interior for ada compliance. 48cy. ref t.i. pa202208049913. | $25,000 | |
| Aug 4, 2022 | Completed final sign-off Jul 2024 | 1769 Fulton St | A G G General Contractor | remodel of (e) restaurant from b to a-2: cosmetic remodel to interior, move bar, add exit passage way. renovate restaurants. retaining walls & (n) fence & trellis @ rear patio. exterior improvement to facade.Details
remodel of (e) restaurant from b to a-2: cosmetic remodel to interior, move bar, add exit passage way. renovate restaurants. retaining walls & (n) fence & trellis @ rear patio. exterior improvement to facade. | $100,000 |
| May 4, 2022 | Completed final sign-off Apr 2024 | 679 Chenery St | Buzzer 9 Development Inc | interior remodel to existing mixed use building. minor exterior improvements to include window and siding replacment. add dormer. 1/f ti under separate permitDetails
interior remodel to existing mixed use building. minor exterior improvements to include window and siding replacment. add dormer. 1/f ti under separate permit | $50,000 |
| Dec 7, 2021 | Completed final sign-off Feb 2023 | 2279 Mission St | Gene Catania Construction | change of use to restaurant (b occupancy). interior remodel to accomodate full service restaurant. commercial kitchen, modification to restrooms.Details
change of use to restaurant (b occupancy). interior remodel to accomodate full service restaurant. commercial kitchen, modification to restrooms. | $50,000 |
| Oct 24, 2020 | Completed final sign-off Sep 2021 | 2500 Mason St | J.M. Stitt Construction Inc. | interior remodeling: convert (e) banquest hall into breakfast buffet, modfity commericial kitchen. modification to mechanical, electrical, plumbing & structural systems. maher n/aDetails
interior remodeling: convert (e) banquest hall into breakfast buffet, modfity commericial kitchen. modification to mechanical, electrical, plumbing & structural systems. maher n/a | $80,000 |
| Oct 24, 2020 | Expired or cancelled cancelled Jan 2026 | 114 Precita Av | existing backyard is overgrown and unusable. the (e) "balcony" doesn't have guardrails and is unsafe. clearing and grubbing to create 3 tiers, using 3'-6" high pressure treated wood. include interlocking brick pavers, new electrical conduit for hot tub. new fences to be constructed with redwood.Details
existing backyard is overgrown and unusable. the (e) "balcony" doesn't have guardrails and is unsafe. clearing and grubbing to create 3 tiers, using 3'-6" high pressure treated wood. include interlocking brick pavers, new electrical conduit for hot tub. new fences to be constructed with redwood. | $41,000 | |
| Sep 28, 2020 | Expired or cancelled withdrawn May 2023 | 114 Precita Av | An Dun Construction | to comply with nov# 202057191. revision to pa# 201904238662. remove (e) dilapidated wood exit stair from exterior patio off of bedroom# 1 in unit# 114 & replace with a fixed steel ladder. remove (e) dilapidated concrete stair from exterior patio off of unit# 116 and replace with fixed steel ladder.Details
to comply with nov# 202057191. revision to pa# 201904238662. remove (e) dilapidated wood exit stair from exterior patio off of bedroom# 1 in unit# 114 & replace with a fixed steel ladder. remove (e) dilapidated concrete stair from exterior patio off of unit# 116 and replace with fixed steel ladder. | $900 |
| Sep 16, 2020 | Expired or cancelled withdrawn Apr 2022 | 3147 16th St | interior remodel to convert 2 existing restrooms into 2 accessible restrooms, one for #3147 & #3151. relocate exisitng meters inside until 3149 to be in a common location to both units.Details
interior remodel to convert 2 existing restrooms into 2 accessible restrooms, one for #3147 & #3151. relocate exisitng meters inside until 3149 to be in a common location to both units. | $10,000 | |
| Sep 26, 2019 | Completed final sign-off Feb 2023 | 1874 Donner Av | per adu ordinance# 95-17, convert ground floor into legal adu (2 bedroom & 1 bath). ground floor is previously used as living space separate from main unit on 2nd & 3rd floor.Details
per adu ordinance# 95-17, convert ground floor into legal adu (2 bedroom & 1 bath). ground floor is previously used as living space separate from main unit on 2nd & 3rd floor. | $75,000 | |
| Apr 23, 2019 | Never finaled issued Aug 2019, no final | 114 Precita Av | An Dun Construction | remodel (e) 3-story 3-unit res bldg. convert 1st flr unit fr studio to 2 bed,2 baths.add bath in units 2&3.cosmetic upgrades to all units, voluntary seismic upgrades,voluntary elec&plumb upgrades.add 1-2 windows per unit for daylite purpose only.add skylite,roof repl,hvac upgrades. sprinkler deferreDetails
remodel (e) 3-story 3-unit res bldg. convert 1st flr unit fr studio to 2 bed,2 baths.add bath in units 2&3.cosmetic upgrades to all units, voluntary seismic upgrades,voluntary elec&plumb upgrades.add 1-2 windows per unit for daylite purpose only.add skylite,roof repl,hvac upgrades. sprinkler deferre | $186,000 |
| Jan 31, 2019 | Never finaled issued Jan 2019, no final | 1198 Valencia St | Baba Builders Co | space 105: revision to pa#201804257379 to show detail for soffit connection. n/a for maherDetails
space 105: revision to pa#201804257379 to show detail for soffit connection. n/a for maher | |
| Apr 25, 2018 | Completed final sign-off Dec 2021 | 1198 Valencia St | Baba Builders Co | (suite# 105) first time t.i. remodel & conversion of (e) 995 sq ft commercial space to limited service restaurant (coffee shop with pastries). mechanical, electrical & plumbing modification. no exterior or site work. signage added to exterior facadeDetails
(suite# 105) first time t.i. remodel & conversion of (e) 995 sq ft commercial space to limited service restaurant (coffee shop with pastries). mechanical, electrical & plumbing modification. no exterior or site work. signage added to exterior facade | $50,000 |