Chuck Voong
- Listed as
- architect, authorized agent-others, designer, engineer
- Firm
- Ca Voong
- Based in
- Orinda
- On San Francisco permits
- Dec 2001 to Sep 2026
108 permits since 2000 (engineer on 97 permits, architect on 5 permits, authorized agent-others on 3 permits, designer on 3 permits): 70 completed, 14 in progress, 11 never finaled, 13 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 108.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 28, 2026 | In progress filed Sep 2026, not yet issued | 110 Liberty St | convert 590 sf of (e) unconditioned first floor area to living space,, which will have an office, living room & bathDetails
convert 590 sf of (e) unconditioned first floor area to living space,, which will have an office, living room & bath | $70,000 | |
| Sep 14, 2026 | In progress filed Sep 2026, not yet issued | 1459 45th Av | remodel of and addition to an existing 2-story, sfd, a two story horizontal addition is proposed at the rear of the house. also 471 sq ft of (e) garage space will be converted to living space. none of the work is visible from the street and the front elevation is no being affected.Details
remodel of and addition to an existing 2-story, sfd, a two story horizontal addition is proposed at the rear of the house. also 471 sq ft of (e) garage space will be converted to living space. none of the work is visible from the street and the front elevation is no being affected. | $135,000 | |
| Sep 14, 2026 | In progress filed Sep 2026, not yet issued | 401 Orizaba Av | revision to bpa: 202512151811 to comply with nov:202659761. 1st floor - add family room, office and 1 media room and 1 bath.Details
revision to bpa: 202512151811 to comply with nov:202659761. 1st floor - add family room, office and 1 media room and 1 bath. | $100,000 | |
| Aug 10, 2026 | Completed final sign-off Sep 2026 | 223 09th St | Kwong Associates | comply with nov#202307567. ti improvement, remodel (e) restroom to ada compliance.Details
comply with nov#202307567. ti improvement, remodel (e) restroom to ada compliance. | $8,000 |
| Jun 30, 2026 | In progress filed Jun 2026, not yet issued | 3349 21st St | rear deck replacement, remove (e) deck and replace with new deckDetails
rear deck replacement, remove (e) deck and replace with new deck | $15,000 | |
| Jun 24, 2026 | Completed final sign-off Aug 2026 | 11 Newman St | Lemus Construction Co | rear deck replacement. remove and replace deck & stairs in-kind.Details
rear deck replacement. remove and replace deck & stairs in-kind. | $15,000 |
| Jun 2, 2026 | In progress issued Sep 2026 | 2154 44th Av | vertical addition, remodel existing 1/f, reconfigure kitchen, bath and dining room. add stairway to new 2/f, add new 2/f with 3 bedrooms, 3 bathrooms and laundry.Details
vertical addition, remodel existing 1/f, reconfigure kitchen, bath and dining room. add stairway to new 2/f, add new 2/f with 3 bedrooms, 3 bathrooms and laundry. | $300,000 | |
| May 8, 2026 | In progress filed May 2026, not yet issued | 4157 23rd St | Paul Wang | administrative revision to permit 202507312097. replace front windows with aluminum wood clad windows, same operation. replace in kind. administrative revision to correct scope in pts regarding front window type. original plans specify aluminum wood clad.Details
administrative revision to permit 202507312097. replace front windows with aluminum wood clad windows, same operation. replace in kind. administrative revision to correct scope in pts regarding front window type. original plans specify aluminum wood clad. | |
| Apr 30, 2026 | In progress issued May 2026 | 755 46th Av | Kmk Construction And Design | convet 697 sf of garage space to living area with living room, bedroom, bath, laundry. remodel e kitchen and e bath. add new bath and interior stairs.Details
convet 697 sf of garage space to living area with living room, bedroom, bath, laundry. remodel e kitchen and e bath. add new bath and interior stairs. | $180,000 |
| Apr 8, 2026 | Completed final sign-off May 2026 | 245 Fillmore St | Lemus Construction Co | to comply with nov 202652593, replace back egress stairs with new, like for likeDetails
to comply with nov 202652593, replace back egress stairs with new, like for like | $12,000 |
| Apr 3, 2026 | In progress issued May 2026 | 569 28th St | Jwl 888 Construction Inc | revision 202510248124- 1st floor laundry, wet bar, and bathroom remodel. repalce 3rd floor and 2nd floor guardrails with glass railing. extended 1st floor deck.Details
revision 202510248124- 1st floor laundry, wet bar, and bathroom remodel. repalce 3rd floor and 2nd floor guardrails with glass railing. extended 1st floor deck. | $10,000 |
| Mar 27, 2026 | Completed final sign-off Sep 2026 | 239 Grant Av | H & L Construction Inc | tenant improvement 1st fl remodel existing retail space to jewelry sale. existing heating and ventilation to remain. no change of occupancy.Details
tenant improvement 1st fl remodel existing retail space to jewelry sale. existing heating and ventilation to remain. no change of occupancy. | $150,000 |
| Mar 25, 2026 | Completed final sign-off May 2026 | 2051 22nd Av | new scope - 2nd floor: change kitchen layout, remove wall, upgrade ceiling joist per plan; new scope - add one story rear deck at back of the house; structural revision to bpa: 202603036809 - ground floor: replace post and beam, change bath layout, add wet barDetails
new scope - 2nd floor: change kitchen layout, remove wall, upgrade ceiling joist per plan; new scope - add one story rear deck at back of the house; structural revision to bpa: 202603036809 - ground floor: replace post and beam, change bath layout, add wet bar | $20,000 | |
| Mar 16, 2026 | In progress issued Jun 2026 | 186 Lippard Av | Bro Builders Renovations | add two 2nd floor bedrooms and bathroom at rear of the house.Details
add two 2nd floor bedrooms and bathroom at rear of the house. | $150,000 |
| Jan 23, 2026 | Completed final sign-off Aug 2026 | 563 23rd Av | A + General Construction Inc | rev to pa# 2023-0425-6410: change layout no exterior change. no structure change. change direction of opening two door in 1st fl. change the (n) kitchen location (n) living location.Details
rev to pa# 2023-0425-6410: change layout no exterior change. no structure change. change direction of opening two door in 1st fl. change the (n) kitchen location (n) living location. | $100 |
| Jan 21, 2026 | In progress issued Aug 2026 | 415 Mangels Av | Electric Current Construction Inc. | convert (e) storage space of 539 sq.ft. to living area at the basement level. partial garage conversion of 288 sq.ft to living area at g/f. infill lightwell of 36 sq.ft at the upper level. install new heat pump heating and cooling, and water heater. upgrade electric meter from 100amp to 200amp.Details
convert (e) storage space of 539 sq.ft. to living area at the basement level. partial garage conversion of 288 sq.ft to living area at g/f. infill lightwell of 36 sq.ft at the upper level. install new heat pump heating and cooling, and water heater. upgrade electric meter from 100amp to 200amp. | $170,000 |
| Dec 18, 2025 | Completed final sign-off Apr 2026 | 185 Upland Dr | Longteng Construction | kitchen remodel: replace kitchen cabinets & counter-top in-kind. renovate main bathroom & guest bathroom in-kind. upgrade main electrical box to 200 amps.Details
kitchen remodel: replace kitchen cabinets & counter-top in-kind. renovate main bathroom & guest bathroom in-kind. upgrade main electrical box to 200 amps. | $80,000 |
| Dec 15, 2025 | In progress issued Dec 2025 | 401 Orizaba Av | Marina Construction | re-configure (e) bathroom to 2 bathrooms; convert existing garage to bedroom; 3rd fl - add new full bathDetails
re-configure (e) bathroom to 2 bathrooms; convert existing garage to bedroom; 3rd fl - add new full bath | $60,000 |
| Nov 21, 2025 | In progress issued Nov 2025 | 569 28th St | Jwl 888 Construction Inc | revision to pa # 202510248124. replace (e) dryrot roof above kitchen (framing no reroof) level ceiling. combine window & sliding door to larger sliding door. replace (e) dryrot 2nd fl deck in kind. change 1st fl bedroom window to smaller window. add skylight & replace (e) skylight w/larger skylight.Details
revision to pa # 202510248124. replace (e) dryrot roof above kitchen (framing no reroof) level ceiling. combine window & sliding door to larger sliding door. replace (e) dryrot 2nd fl deck in kind. change 1st fl bedroom window to smaller window. add skylight & replace (e) skylight w/larger skylight. | $20,000 |
| Oct 24, 2025 | In progress issued Oct 2025 | 569 28th St | Jwl 888 Construction Inc | 1/f: convert (e) storage to living space (2 bed, 2 bath, media room, and wet bar), 764 sq ft. rebuild ground level deck. 2/f: remodel kitchen, reconfigure bathroom. add interior stairs to 1/f. 3/f: remodel bathroom and closet. replace front windows with all wood clad in kind. same operation. replaceDetails
1/f: convert (e) storage to living space (2 bed, 2 bath, media room, and wet bar), 764 sq ft. rebuild ground level deck. 2/f: remodel kitchen, reconfigure bathroom. add interior stairs to 1/f. 3/f: remodel bathroom and closet. replace front windows with all wood clad in kind. same operation. replace | $240,000 |
| Oct 2, 2025 | Completed final sign-off Mar 2026 | 973 York St | Professional Home Designs | existing beam replacement and rear stairs replacement. replace in kind. work in common area.Details
existing beam replacement and rear stairs replacement. replace in kind. work in common area. | $15,000 |
| Aug 18, 2025 | Completed final sign-off Nov 2025 | 62 Vernon St | Zhiwing Builders Inc | 1st floor convert the existing exercise room to media room. add wet bar and door to backkyard. 2nd /fl add bedroom and bathroom. 3rd fl/add playroom and converting sliding door to regular doors same opening.Details
1st floor convert the existing exercise room to media room. add wet bar and door to backkyard. 2nd /fl add bedroom and bathroom. 3rd fl/add playroom and converting sliding door to regular doors same opening. | $25,000 |
| May 27, 2025 | Completed final sign-off Aug 2025 | 3015 San Bruno Av | remove new interior wall & one way mirror sliding window at front reception. install ada counters at reception area & retail area. permit 2018-0326-4565. new washroom: install new mop sink and hand sink at rear room. (delete ada restroom) revision to pa 2018-0326-4565Details
remove new interior wall & one way mirror sliding window at front reception. install ada counters at reception area & retail area. permit 2018-0326-4565. new washroom: install new mop sink and hand sink at rear room. (delete ada restroom) revision to pa 2018-0326-4565 | $1,500 | |
| Apr 18, 2025 | Completed final sign-off Jun 2025 | 1998 15th Av | to comply with nov 202535016 remove rebar & cmu block added to top of (e) rear yard retaining wall between retaining wall to last legal condition. add 3 ft high wood retaining wallDetails
to comply with nov 202535016 remove rebar & cmu block added to top of (e) rear yard retaining wall between retaining wall to last legal condition. add 3 ft high wood retaining wall | $5,000 | |
| Apr 11, 2025 | Completed final sign-off Jul 2025 | 150 Oak Park Dr | Triond Remodeling Inc | 2nd/fl: remodel 1 bathroom and add new bathroom. remodel (e) kitchen, 1st/fl: remodel 1 bathroom. remodel (e) kitchenette. remove (e) external stairs and configure (e) interior stairs. relocate front door from 2nd story to first story at west side. replace (e) vinyl windows at front windows atDetails
2nd/fl: remodel 1 bathroom and add new bathroom. remodel (e) kitchen, 1st/fl: remodel 1 bathroom. remodel (e) kitchenette. remove (e) external stairs and configure (e) interior stairs. relocate front door from 2nd story to first story at west side. replace (e) vinyl windows at front windows at | $200,000 |
| Mar 31, 2025 | Completed final sign-off May 2025 | 1530 Lawton St | revision to pa #202503061707. 1st floor:replace footing and beam at add wet bar change bathroom layout. 2nd floor: upgrade ceiling joist to living room per plan.Details
revision to pa #202503061707. 1st floor:replace footing and beam at add wet bar change bathroom layout. 2nd floor: upgrade ceiling joist to living room per plan. | $5,000 | |
| Jan 28, 2025 | Completed final sign-off Sep 2025 | 3237 Harrison St | Elemento Builders Inc. | install slab walking on right (south) side of home. ref: 202302031381Details
install slab walking on right (south) side of home. ref: 202302031381 | $5,000 |
| Jan 3, 2025 | Completed final sign-off Jun 2025 | 320 Kirkham St | T & W Construction Co Inc | legalize 417 sq ft of (e) as built first floor family room, bedroom, and bathroom.Details
legalize 417 sq ft of (e) as built first floor family room, bedroom, and bathroom. | $50,000 |
| Nov 19, 2024 | Completed final sign-off May 2025 | 508 18th Av | remove e wood deck off rear of house. build new wood deck in its placeDetails
remove e wood deck off rear of house. build new wood deck in its place | $15,000 | |
| Oct 31, 2024 | Completed final sign-off May 2025 | 356 17th Av | Home Run Inc | remodel existing 3rd floor bedroom. remove bedroom wall to combine bedroom 3 and office. all interior work.Details
remodel existing 3rd floor bedroom. remove bedroom wall to combine bedroom 3 and office. all interior work. | $6,000 |
| Oct 8, 2024 | Expired or cancelled withdrawn Aug 2025 | 1763 28th Av | convert (e) garage/storage space to living area with bedroom, bath, laundry, and media rooms. remodel kitchen at 2nd floor.Details
convert (e) garage/storage space to living area with bedroom, bath, laundry, and media rooms. remodel kitchen at 2nd floor. | $123,500 | |
| Sep 26, 2024 | Completed final sign-off Sep 2025 | 3237 Harrison St | Elemento Builders Inc. | install (n) deck with staircase and stucco at the rear of the propertyDetails
install (n) deck with staircase and stucco at the rear of the property | $10,000 |
| Jun 21, 2024 | Completed final sign-off Dec 2024 | 434 07th Av | H & L Construction Inc | revision to pa # 202404109677: add plans to remove & replace (e) rear stairs with new. replace stair in-kind.Details
revision to pa # 202404109677: add plans to remove & replace (e) rear stairs with new. replace stair in-kind. | $15,000 |
| Jun 4, 2024 | Completed final sign-off Jan 2025 | 963 Hayes St | Dopro Construction Inc | rear stairs and deck replacement. remove and replace deck in kind. repair (e) stairs 50%Details
rear stairs and deck replacement. remove and replace deck in kind. repair (e) stairs 50% | $40,000 |
| Apr 29, 2024 | Completed final sign-off Jan 2025 | 2371 30th Av | 1/f: game room and bathroom addition. remodel family room, no other work.Details
1/f: game room and bathroom addition. remodel family room, no other work. | $90,000 | |
| Feb 23, 2024 | Completed final sign-off May 2024 | 2278 48th Av | Vi Tang Hinh | 1fl- add two bedroom, one bath & one media room 2nd fl- remodel two bath, remove hvac between kitchen & dining room. reconfigure kitchen layoutDetails
1fl- add two bedroom, one bath & one media room 2nd fl- remodel two bath, remove hvac between kitchen & dining room. reconfigure kitchen layout | $60,888 |
| Nov 16, 2023 | Completed final sign-off Oct 2024 | 430 Ralston St | H & L Construction Inc | portion of (e) garage to 2 bedrooms. family room and 2-3 fixture bathroom and 2nd flr: infill lightwell (15sqft) add new stairs to 1st flr. reconfigure (e) bedrooms and bathroom. remodel (e) kitchen. replace rear and side window w/new windowsDetails
portion of (e) garage to 2 bedrooms. family room and 2-3 fixture bathroom and 2nd flr: infill lightwell (15sqft) add new stairs to 1st flr. reconfigure (e) bedrooms and bathroom. remodel (e) kitchen. replace rear and side window w/new windows | $190,000 |
| Nov 6, 2023 | Completed final sign-off Feb 2024 | 1308 Valencia St | California Building And Remodeling | build new rear deck in backyard less than 36" height.Details
build new rear deck in backyard less than 36" height. | $15,000 |
| Nov 3, 2023 | Completed final sign-off Apr 2024 | 1623 42nd Av | H & L Construction Inc | 2/f: kitchen remodel - remove and replace (e) kitchen cabinets, sink, dishwasher, stove and install recessed lights. update 2/f bath. 1/f: add new bath. all interior work.Details
2/f: kitchen remodel - remove and replace (e) kitchen cabinets, sink, dishwasher, stove and install recessed lights. update 2/f bath. 1/f: add new bath. all interior work. | $45,000 |
| Aug 4, 2023 | In progress issued Jul 2024 | 1560 Plymouth Av | Bay Remodeling Kitchen & Bath Inc | convert (e) covered, unenclosed porch to living space w/ bathroom & closet. (e) shed porch roof to be modified to hip roof.Details
convert (e) covered, unenclosed porch to living space w/ bathroom & closet. (e) shed porch roof to be modified to hip roof. | $55,475 |
| Jun 9, 2023 | Never finaled issued Jun 2023, no final | 32 Santa Rosa Av | H & L Construction Inc | rev to pa# 2023-0106-9807; adjust position of 2 sliding doors, add new window dinning room (2nd fl.) not street facingDetails
rev to pa# 2023-0106-9807; adjust position of 2 sliding doors, add new window dinning room (2nd fl.) not street facing | $860 |
| May 17, 2023 | Completed final sign-off Feb 2024 | 3231 Moraga St | Triond Remodeling Inc | remodel (e) kitchen. increase wall openings into kitchen. update home electrical. replace living room, dining room, kitchen, and bedroom windows in-kind. add new skylight at kitchen. all work within existing building envelope.Details
remodel (e) kitchen. increase wall openings into kitchen. update home electrical. replace living room, dining room, kitchen, and bedroom windows in-kind. add new skylight at kitchen. all work within existing building envelope. | $20,000 |
| Mar 6, 2023 | Never finaled issued Mar 2023, no final | 2611 Phelps St | H & L Construction Inc | 1st fl: reconfigure (e) garage to add 2 bedroom, 1 bath, storage. replace rear (e) window w/ new. 2nd fl: no workDetails
1st fl: reconfigure (e) garage to add 2 bedroom, 1 bath, storage. replace rear (e) window w/ new. 2nd fl: no work | $60,000 |
| Feb 3, 2023 | Completed final sign-off Sep 2025 | 3237 Harrison St | convert 798sf (e) garage to living space. replace existing perimeter foundation. 2nd floor kitchen remodel, decrease ceiling height. 3rd fl convert (e) room to bedrm, bathrm, closet. replace windows in-kind at rear. add lights.Details
convert 798sf (e) garage to living space. replace existing perimeter foundation. 2nd floor kitchen remodel, decrease ceiling height. 3rd fl convert (e) room to bedrm, bathrm, closet. replace windows in-kind at rear. add lights. | $50,000 | |
| Dec 6, 2022 | Completed final sign-off Apr 2024 | 1522 Felton St | Vi Tang Hinh | add (2) bedrooms, (2) full bath at g/f. remodel 2/f bath and kitchen, add (1) bath. add one g/f deck at back of the house.Details
add (2) bedrooms, (2) full bath at g/f. remodel 2/f bath and kitchen, add (1) bath. add one g/f deck at back of the house. | $283,000 |
| Nov 4, 2022 | Completed final sign-off Jul 2026 | 257 Joost Av | Cs Construction Co | 1/f: interior remodel, add shower to (e) bath. relocate sump pump. 2/f: kitchen remodel, add powder room. 3/f: bathroom remodel. add laundry closet.Details
1/f: interior remodel, add shower to (e) bath. relocate sump pump. 2/f: kitchen remodel, add powder room. 3/f: bathroom remodel. add laundry closet. | $125,000 |
| Oct 31, 2022 | Never finaled filed Oct 2022, never issued | 1270 Thomas Av | remove(e)garage & game room from 1278 thomas that encroach into 127o thomas. demo only.Details
remove(e)garage & game room from 1278 thomas that encroach into 127o thomas. demo only. | ||
| Oct 28, 2022 | Completed final sign-off Jan 2025 | 2695 23rd Av | revision to bpa#2022002097686. replace foundation on north side, replace partial foundation on west/east side. replace slab. no excavation., revise this note to reflect 1' maximum excavation, dmj 10/28/2022;lower slab by 1 maxDetails
revision to bpa#2022002097686. replace foundation on north side, replace partial foundation on west/east side. replace slab. no excavation., revise this note to reflect 1' maximum excavation, dmj 10/28/2022;lower slab by 1 max | $10,000 | |
| Oct 11, 2022 | Completed final sign-off Oct 2022 | 175 Beaumont Av | Lemus Construction Co | remove and replace rear egress staircase with new at same location.Details
remove and replace rear egress staircase with new at same location. | $7,000 |
| Sep 30, 2022 | Completed final sign-off Jan 2023 | 1600 10th Av | Lemus Construction Co | remove and replace rear egress exterior staircase with new at same location.Details
remove and replace rear egress exterior staircase with new at same location. | $20,000 |
| Aug 26, 2022 | Never finaled issued Nov 2022, no final | 2632 Moraga St | D S Management Inc Dba Metrocon Builders | retaining wall on three sides of the rear yard. total reteaining wall length 77ft. new concrete patio. height of retaining wall varies from 2ft to 4ft-6in.Details
retaining wall on three sides of the rear yard. total reteaining wall length 77ft. new concrete patio. height of retaining wall varies from 2ft to 4ft-6in. | $15,000 |
| Jul 18, 2022 | Completed final sign-off Jan 2023 | 1722 29th Av | F C Company | 2/f: kitchen remodel. r/r (e) kitchen cabs,sink,d/w, stove & add island. install new recess lights.reconfig 1 bath to 2 baths.infill bathroom lightwell.replce front & rear windows in-kind. 1/f: reconfig garage to add 1 b3ed, 1 bathroom, family room.Details
2/f: kitchen remodel. r/r (e) kitchen cabs,sink,d/w, stove & add island. install new recess lights.reconfig 1 bath to 2 baths.infill bathroom lightwell.replce front & rear windows in-kind. 1/f: reconfig garage to add 1 b3ed, 1 bathroom, family room. | $120,000 |
| Jul 18, 2022 | Never finaled issued Sep 2022, no final | 5940 California St | Connemara Fine Trim Inc Dba Highland Bui | front wall dry rot repair as necessary to match existing in-kind. repair to occur at all levels, six locations per level.Details
front wall dry rot repair as necessary to match existing in-kind. repair to occur at all levels, six locations per level. | $5,000 |
| Jul 15, 2022 | Completed final sign-off Sep 2022 | 280 Broad St | Lemus Construction Co | replace foundation with new at front right corner (westside ) stair replacement facing street has been filed under pa #202206176600Details
replace foundation with new at front right corner (westside ) stair replacement facing street has been filed under pa #202206176600 | $6,136 |
| Jul 15, 2022 | Completed final sign-off Sep 2022 | 435 17th Av | Lemus Construction Co | remove and replace rear egress with new replacement will be inkind at same location. and repair wall dryrot damage as necessary.Details
remove and replace rear egress with new replacement will be inkind at same location. and repair wall dryrot damage as necessary. | $15,000 |
| Jun 17, 2022 | Completed final sign-off Sep 2022 | 280 Broad St | Lemus Construction Co | remove and replace front entry concrete staircase and landing with new rebuilt guardrail waalls and repoair dry rot damage as necessary. repairs and replacement will be in kind.Details
remove and replace front entry concrete staircase and landing with new rebuilt guardrail waalls and repoair dry rot damage as necessary. repairs and replacement will be in kind. | $34,900 |
| May 16, 2022 | Completed final sign-off Dec 2023 | 170 Junipero Serra Bl | Trinity Building Co Llc | revision to permit 202112013399 revised foundation work. addition of simpson strong wall roof framing plan revision.Details
revision to permit 202112013399 revised foundation work. addition of simpson strong wall roof framing plan revision. | $5,000 |
| Apr 5, 2022 | Completed final sign-off Jul 2022 | 2543 30th Av | Lemus Construction Co | remove and replace siding at backyard wall with new, inkind, approx. 200 sq ft. repair dryrot damage as necessary. remove egress staircase to facilitate construction work and replace with new.Details
remove and replace siding at backyard wall with new, inkind, approx. 200 sq ft. repair dryrot damage as necessary. remove egress staircase to facilitate construction work and replace with new. | $15,000 |
| Mar 8, 2022 | Completed final sign-off May 2022 | 1443 19th Av | Lemus Construction Co | revision to 202201125862. remove & replace egress staircase with new, not exact, partial siding replacement, and dry rot damage repair. install hardieplank siding, rear wall. not visible from st.Details
revision to 202201125862. remove & replace egress staircase with new, not exact, partial siding replacement, and dry rot damage repair. install hardieplank siding, rear wall. not visible from st. | $5,000 |
| Jan 26, 2022 | Never finaled issued Jan 2022, no final | 1766 11th Av | revision to pa# 202106172674. remove 2 (e) piers at garage level & increase footing on 2 (e) piers. strengthen longitudinal beam.Details
revision to pa# 202106172674. remove 2 (e) piers at garage level & increase footing on 2 (e) piers. strengthen longitudinal beam. | $3,000 | |
| Jan 12, 2022 | Completed final sign-off May 2022 | 1443 19th Av | Lemus Construction Co | remove & replace rear egress stairs with new. replacement will be in-kind.Details
remove & replace rear egress stairs with new. replacement will be in-kind. | $31,000 |
| Dec 17, 2021 | Expired or cancelled cancelled May 2025 | 990 Rhode Island St | Alef Construction Corp | 1st floor: enclosed existing rear patio to den. add sfolding/sliding door, 2nd floor: - vertical addition - add 3 bedrooms, 2 bathrooms and loft.Details
1st floor: enclosed existing rear patio to den. add sfolding/sliding door, 2nd floor: - vertical addition - add 3 bedrooms, 2 bathrooms and loft. | $120,000 |
| Oct 15, 2021 | Completed final sign-off Jun 2022 | 2216 15th St | Lemus Construction Co | remove and replace exterior side dryrot stairs. replace in kind. not facing street.Details
remove and replace exterior side dryrot stairs. replace in kind. not facing street. | $20,000 |
| Sep 29, 2021 | Completed final sign-off Aug 2022 | 1001 Minnesota St | Cookline Construction Inc | expansion of (e) restaurant into adj space. (n) bar & bar equip; (n) ada & non-ada unisex washrooms as req; (n) aux kitchen w/ type ii hood; (e) kitchen remodel w/ (n) type 1 hood; (n) non-load bearing walls; (n) finishes, fixtures & equip;(n) unfixed tables & chairs.Details
expansion of (e) restaurant into adj space. (n) bar & bar equip; (n) ada & non-ada unisex washrooms as req; (n) aux kitchen w/ type ii hood; (e) kitchen remodel w/ (n) type 1 hood; (n) non-load bearing walls; (n) finishes, fixtures & equip;(n) unfixed tables & chairs. | $300,000 |
| Jul 2, 2021 | Expired or cancelled expired Jan 2026 | 158 Precita Av | Fulcrum Point Construction | rev to pa202011209351: additoinal retaining walls to be replace due to (e) fialing concrete conditions.Details
rev to pa202011209351: additoinal retaining walls to be replace due to (e) fialing concrete conditions. | $42,000 |
| Jul 2, 2021 | Expired or cancelled expired Feb 2024 | 3229 Santiago St | Level 21 Construction Company | revision to pa 2021-0420-8903 - lower (e) slab @ 1st floor, add sliding glass doors to 2nd floor; reconfigure bathroom. remove (e) stairs @ rear yard.Details
revision to pa 2021-0420-8903 - lower (e) slab @ 1st floor, add sliding glass doors to 2nd floor; reconfigure bathroom. remove (e) stairs @ rear yard. | $10,000 |
| Jun 7, 2021 | Expired or cancelled cancelled Jan 2026 | 9 Heather Av | rear deck dry rot replacement, remove/replace/enlarge deckDetails
rear deck dry rot replacement, remove/replace/enlarge deck | $15,000 | |
| Jun 4, 2021 | Completed final sign-off Sep 2022 | 2139 14th Av | Cabrillo Construction Co. Inc. | in kind replace of rear deck, hardie plank lap siding at rear building. slidng doores and windwos at rear of building.Details
in kind replace of rear deck, hardie plank lap siding at rear building. slidng doores and windwos at rear of building. | $6,000 |
| Jun 2, 2021 | Completed final sign-off Apr 2022 | 150 Staples Av | Maximo Construction | convert storage space to living space with bath, laundry, bedroom & office. replace existing stairs at rear, remove existing stairs at side. remodel kitchen.Details
convert storage space to living space with bath, laundry, bedroom & office. replace existing stairs at rear, remove existing stairs at side. remodel kitchen. | $100,000 |
| Mar 17, 2021 | Completed final sign-off Nov 2021 | 343 Woolsey St | front stair - dryrot replacement facing woosley st. remove & replace dryrot stairs. replace in kind.Details
front stair - dryrot replacement facing woosley st. remove & replace dryrot stairs. replace in kind. | $12,000 | |
| Jan 25, 2021 | Completed final sign-off Aug 2021 | 986 Dolores St | Lemus Construction Co | remove and replace dry rot stairs in kind at side of the building.Details
remove and replace dry rot stairs in kind at side of the building. | $20,000 |
| Dec 21, 2020 | Completed final sign-off Feb 2021 | 1409 Kansas St | Lemus Construction Co | remove and replace deteriorated foundation at bay window. repair in kind.Details
remove and replace deteriorated foundation at bay window. repair in kind. | $7,000 |
| Oct 26, 2020 | Completed final sign-off Jan 2023 | 710 Laguna Honda Bl | H & L Construction Inc | 2nd fl. move kitchen to (e) bedroom 3, convert (e) kitchen to (n) bedroom, add bath to master bedroom, install (n) recessed lights at 1st fl. add 2(n) bedrooms, 2 (n) bath, family room, game room and laundry room, install (n) recessed lights, replace windows with new vynl windowsDetails
2nd fl. move kitchen to (e) bedroom 3, convert (e) kitchen to (n) bedroom, add bath to master bedroom, install (n) recessed lights at 1st fl. add 2(n) bedrooms, 2 (n) bath, family room, game room and laundry room, install (n) recessed lights, replace windows with new vynl windows | $100,000 |
| Oct 23, 2020 | Expired or cancelled cancelled Aug 2022 | 1506 Masonic Av | 2nd/3rd flrs - renovate top 2 units. remodel kitchens & (e) bathrooms add new bathroom, replace non-street visible windows and doors in-kind, upgrade electrical and mechanical systems. lower floor unit to remain unmodified. no new footprint or floor area proposed.Details
2nd/3rd flrs - renovate top 2 units. remodel kitchens & (e) bathrooms add new bathroom, replace non-street visible windows and doors in-kind, upgrade electrical and mechanical systems. lower floor unit to remain unmodified. no new footprint or floor area proposed. | $120,000 | |
| Oct 20, 2020 | Never finaled filed Oct 2020, never issued | 436 Rolph St | legalize (e) two bedroom and one bath addition at the rear of the residence.Details
legalize (e) two bedroom and one bath addition at the rear of the residence. | $20,000 | |
| Sep 10, 2020 | Never finaled filed Sep 2020, never issued | 866 Pacheco St | Knab Builder | replace existing front retaining wall with 4 feet concrete retaining wall; add drainage system to driveway and front porch area; add concrete slab to front porch area; add 42 inch fence between sidewalk and front area and 72 inch privacy fence to enclose the front porch area.Details
replace existing front retaining wall with 4 feet concrete retaining wall; add drainage system to driveway and front porch area; add concrete slab to front porch area; add 42 inch fence between sidewalk and front area and 72 inch privacy fence to enclose the front porch area. | $10,000 |
| Aug 14, 2020 | Never finaled issued Aug 2020, no final | 696 05th Av | Astorga Construction Inc | revision to app#202002285677. 1st floor convert dining to bedroom. remodel kitchen. install new recessed lights to both units. add ceiling. fans and skylight at unit 2Details
revision to app#202002285677. 1st floor convert dining to bedroom. remodel kitchen. install new recessed lights to both units. add ceiling. fans and skylight at unit 2 | $40,000 |
| Jul 1, 2020 | Completed final sign-off Nov 2021 | 371 Holyoke St | H & L Construction Inc | 2/f: kitchen remodel. remove and replace exisiting ki8tchen cabinets, sink, dishwasher, stove, add island, and install new recessed lights in kitchen, dining room and living room. reconfigure (e) bedrooms and bathrooms. infill (e) deck/lightwell that abuts a neighbor's blind wall. 1/f: remodel (e)Details
2/f: kitchen remodel. remove and replace exisiting ki8tchen cabinets, sink, dishwasher, stove, add island, and install new recessed lights in kitchen, dining room and living room. reconfigure (e) bedrooms and bathrooms. infill (e) deck/lightwell that abuts a neighbor's blind wall. 1/f: remodel (e) | $125,000 |
| Mar 16, 2020 | Never finaled issued Mar 2022, no final | 436 Rolph St | Wl Construction Group | reconfigure & convert existing garage,family room & bedroom to 2 bedrooms,2 bath adu per ordinance #95-17Details
reconfigure & convert existing garage,family room & bedroom to 2 bedrooms,2 bath adu per ordinance #95-17 | $20,000 |
| Mar 9, 2020 | Expired or cancelled withdrawn Mar 2022 | 355 Hermann St | Dunros Construction | kitchen remodel with new skylight.Details
kitchen remodel with new skylight. | $32,000 |
| Feb 28, 2020 | Completed final sign-off May 2021 | 696 05th Av | Astorga Construction Inc | 1st floor: bath room remodel: add sink in powder room. 2nd floor:convert extg bedroom to m. bath and closet. reconfigure extg bathroom and add sink to powder rm. remodel kitchen, remofe and replace kitchen cabinets, sink, dishwasher, stove, add island & install recessed lights convert extg toDetails
1st floor: bath room remodel: add sink in powder room. 2nd floor:convert extg bedroom to m. bath and closet. reconfigure extg bathroom and add sink to powder rm. remodel kitchen, remofe and replace kitchen cabinets, sink, dishwasher, stove, add island & install recessed lights convert extg to | $50,000 |
| Oct 22, 2019 | Completed final sign-off Jun 2021 | 1097 Green St | Cej Construction Llc | unit 10: 4th fl: kitchen remodel, replace kitchen cabinets, sink,stove, install recessed lights. 2 bath remodel, remove replace e toilets, sinks, remove e tub and replace with new shower, add shower at existing powder roomDetails
unit 10: 4th fl: kitchen remodel, replace kitchen cabinets, sink,stove, install recessed lights. 2 bath remodel, remove replace e toilets, sinks, remove e tub and replace with new shower, add shower at existing powder room | $40,000 |
| Oct 1, 2019 | Completed final sign-off Nov 2019 | 1558 Clay St | Lemus Construction Co | remove and replace rear egress stairs with new. replacement will be inkind, same location and dimensionDetails
remove and replace rear egress stairs with new. replacement will be inkind, same location and dimension | $20,000 |
| Sep 10, 2019 | Completed final sign-off Jul 2020 | 866 Pacheco St | Knab Builder | renovate extg kitchen in place, renovate extg 2nd floor bath in place. add new master bath on 2nd floor. replace extg 2 kitchen windows, one unit to be replaced by patio door. replace extg water heater.Details
renovate extg kitchen in place, renovate extg 2nd floor bath in place. add new master bath on 2nd floor. replace extg 2 kitchen windows, one unit to be replaced by patio door. replace extg water heater. | $76,000 |
| Sep 3, 2019 | Completed final sign-off May 2020 | 1434 46th Av | Trinity Building Co Llc | rev to pa# 201905130404Details
rev to pa# 201905130404 | $3,500 |
| Aug 15, 2019 | Expired or cancelled cancelled Apr 2026 | 2 Dunsmuir St | in compliance with nov# 201959542 & 201959472. legalize (e) as-built rear single story addition bedroom & bathroom @ ground floor.Details
in compliance with nov# 201959542 & 201959472. legalize (e) as-built rear single story addition bedroom & bathroom @ ground floor. | $40,000 | |
| Jul 29, 2019 | Completed final sign-off Oct 2019 | 167 Mangels Av | W F Construction Co | revision to 201907035050 page s-3 framing per plan, changes to holddownsDetails
revision to 201907035050 page s-3 framing per plan, changes to holddowns | |
| Jul 11, 2019 | Completed final sign-off Nov 2022 | 2553 Bryant St | revision to pa 201906123241. remove and replace front dryrot stairs, replace in- with terrazzo.Details
revision to pa 201906123241. remove and replace front dryrot stairs, replace in- with terrazzo. | $2,000 | |
| Jul 8, 2019 | Expired or cancelled cancelled Jan 2026 | 3967 18th St | add 2 (n) skylightsDetails
add 2 (n) skylights | $5,000 | |
| Jun 28, 2019 | Completed final sign-off Aug 2020 | 39 Sutro Heights Av | Jones Bros Construction & Design Inc | unit 39, 2nd flr. living, dining and (e) bathroom remodel. (n) bathroom addition. no exterior work.Details
unit 39, 2nd flr. living, dining and (e) bathroom remodel. (n) bathroom addition. no exterior work. | $100,000 |
| Jun 19, 2019 | Completed final sign-off May 2020 | 1434 46th Av | Trinity Building Co Llc | in revision to app#201905130404 adding a new concrete slab in garageDetails
in revision to app#201905130404 adding a new concrete slab in garage | $2,000 |
| Apr 19, 2019 | Completed final sign-off Aug 2020 | 785 Cole St | Trinity Building Co Llc | add required structural modifications discovered after demolition to pa 2019-0131-1787Details
add required structural modifications discovered after demolition to pa 2019-0131-1787 | $2,500 |
| Apr 5, 2019 | Completed final sign-off Jun 2019 | 483 Naples St | Lemus Construction Co | front stair dryrot replacement. remove and replace dryrot stair treads, joist and stringer. replace in kindDetails
front stair dryrot replacement. remove and replace dryrot stair treads, joist and stringer. replace in kind | $6,000 |
| Mar 1, 2019 | Completed final sign-off Nov 2022 | 2553 Bryant St | Trinity Building Co Llc | renovation & addition to (e) duplex by vertical & horizontal additions to increase square footage of both units. (n) exterior materials, windows & doors for entire home.Details
renovation & addition to (e) duplex by vertical & horizontal additions to increase square footage of both units. (n) exterior materials, windows & doors for entire home. | $250,000 |
| Nov 15, 2018 | Completed final sign-off Apr 2020 | 1882 Great Hy | G&C Construction Services Inc. | revision to 201811054954 to provide footing separation at property lineDetails
revision to 201811054954 to provide footing separation at property line | $3,000 |
| Nov 15, 2018 | Completed final sign-off Apr 2020 | 1878 Great Hy | G&C Construction Services Inc. | revision to 201811054953 to provide footing separation at property lineDetails
revision to 201811054953 to provide footing separation at property line | $3,000 |
| Aug 10, 2018 | Completed final sign-off Feb 2019 | 657 Naples St | Lemus Construction Co | replace dry rot damaged siding w/new, including windows at back yard wall facade. also replace dry rot damaged deck with new, in-kind, same location. no work visible from street.Details
replace dry rot damaged siding w/new, including windows at back yard wall facade. also replace dry rot damaged deck with new, in-kind, same location. no work visible from street. | $25,000 |
| Mar 22, 2018 | Completed final sign-off Oct 2018 | 1566 27th Av | W F Construction Co | to comply with nov 201837182 - remove wet bar on ground floor that was built without permitDetails
to comply with nov 201837182 - remove wet bar on ground floor that was built without permit | $250 |
| Feb 21, 2018 | Expired or cancelled withdrawn Feb 2018 | 1566 27th Av | W F Construction Co | revision to pa #201712116008. add a skylight at bathroom behind kitchen on 2nd fl (24" x 24"). enclose opening from hallway to kitchen per plan.Details
revision to pa #201712116008. add a skylight at bathroom behind kitchen on 2nd fl (24" x 24"). enclose opening from hallway to kitchen per plan. | |
| Jan 25, 2018 | Expired or cancelled cancelled Jan 2026 | 2620 Judah St | first fl interior remodel of office space and bathroom additionDetails
first fl interior remodel of office space and bathroom addition | $50,000 |