W F Construction Co
- Based in
- San Francisco
- On San Francisco permits
- Aug 2008 to Dec 2024
- Last 24 months
- 1 permit filed
131 permits since 2000: 115 completed, 1 in progress, 6 never finaled, 9 expired or cancelled.
Of the 6 never-finaled permits, 3 are 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
Showing the 100 most recent of 131.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 23, 2024 | In progress issued Dec 2025 | 1547 Guerrero St | renovation of a 952 sf commercial units to vanilla shell (white box) condition including demo as noted, provide a nw accessible unisex restroom, new entry door store front, repair exterior tile at front entry, nw folding security gate, and exterior siding, fixed clear story window over nwDetails
renovation of a 952 sf commercial units to vanilla shell (white box) condition including demo as noted, provide a nw accessible unisex restroom, new entry door store front, repair exterior tile at front entry, nw folding security gate, and exterior siding, fixed clear story window over nw | $98,000 |
| Sep 23, 2024 | Completed final sign-off Nov 2024 | 1491 Palou Av | revision to pa # 202308043800: deleted bedroom. convert laundry room to storage room. all work at g/f.Details
revision to pa # 202308043800: deleted bedroom. convert laundry room to storage room. all work at g/f. | |
| Mar 14, 2024 | Completed final sign-off May 2024 | 4500 Ocean Av | revision to 202309065976. relocate full bath at g/l. relocate closet at 2nd/f. change stair orientationDetails
revision to 202309065976. relocate full bath at g/l. relocate closet at 2nd/f. change stair orientation | |
| Dec 18, 2023 | Completed final sign-off Apr 2024 | 3512 Balboa St | revision to pa# 202308154421, relocate lavatory from toilet room & relocate hand sink.Details
revision to pa# 202308154421, relocate lavatory from toilet room & relocate hand sink. | $2,000 |
| Dec 4, 2023 | Completed final sign-off Dec 2023 | 76 Ashton Av | kitchen and bathroom remodel in kind on the second floor on pa to comply with violation 202316255. no moving walls. fixtures to remain in the same location. kitchen approx 100 sq ft. bathroom approx. 35 sq. ft.Details
kitchen and bathroom remodel in kind on the second floor on pa to comply with violation 202316255. no moving walls. fixtures to remain in the same location. kitchen approx 100 sq ft. bathroom approx. 35 sq. ft. | $20,000 |
| Nov 20, 2023 | Completed final sign-off Sep 2024 | 754 36th Av | remove and replace about 50sf of wood siding in the back of the house & paint the back/rest of the house.Details
remove and replace about 50sf of wood siding in the back of the house & paint the back/rest of the house. | $3,000 |
| Nov 14, 2023 | Completed final sign-off Feb 2024 | 3521 Alemany Bl | remodel existing kitchen in kind. replace all cabinet, sink and countertop plus applicances on ground flr. remodel existing bathroom on 2nd flr in kind. no changes to all layout for kitchen a bath. replace one window in kitchen at back of house. and subpanel in garage.Details
remodel existing kitchen in kind. replace all cabinet, sink and countertop plus applicances on ground flr. remodel existing bathroom on 2nd flr in kind. no changes to all layout for kitchen a bath. replace one window in kitchen at back of house. and subpanel in garage. | $28,000 |
| Oct 13, 2023 | Completed final sign-off Oct 2024 | 1299 Alemany Bl | construct 2 bedroom, 1 study room, 2 bathroom, & install kitchentte. all work at g/f.Details
construct 2 bedroom, 1 study room, 2 bathroom, & install kitchentte. all work at g/f. | $228,000 |
| Oct 11, 2023 | Completed final sign-off Aug 2025 | 619 47th Av | renovation to (e) rec room at rear of (e) g/f. enclose (e) lightwell at 2/f. remodel (e) kitchen. renovate (e) master suite at 3/f. relocate 2nd bathroom to 3/f. minor change to 3 steps hallway next to (e) stair on g/f.Details
renovation to (e) rec room at rear of (e) g/f. enclose (e) lightwell at 2/f. remodel (e) kitchen. renovate (e) master suite at 3/f. relocate 2nd bathroom to 3/f. minor change to 3 steps hallway next to (e) stair on g/f. | $50,000 |
| Oct 3, 2023 | Completed final sign-off Oct 2024 | 1299 Alemany Bl | convert one (e) bathroom to two full bathroom. all work at 2/f.Details
convert one (e) bathroom to two full bathroom. all work at 2/f. | $40,000 |
| Oct 3, 2023 | Completed final sign-off May 2024 | 4500 Ocean Av | replace front side stucco and paint. in kindDetails
replace front side stucco and paint. in kind | $20,000 |
| Oct 2, 2023 | Completed final sign-off Jul 2024 | 415 Victoria St | remodel (e) kitchen, refinish cabinets and replace counter top. remodel 2 (e) bathrooms. no layout changes. new paint in and out. patch up damaged sheetrock inside. convert tub to shower on 3/f. no removal of wallsDetails
remodel (e) kitchen, refinish cabinets and replace counter top. remodel 2 (e) bathrooms. no layout changes. new paint in and out. patch up damaged sheetrock inside. convert tub to shower on 3/f. no removal of walls | $38,000 |
| Oct 2, 2023 | Completed final sign-off Nov 2023 | 382 Arleta Av | add bldg paper and cement siding board on top of the wooded siding on left side of the house. (facing street) about 900 sq ft, paint.Details
add bldg paper and cement siding board on top of the wooded siding on left side of the house. (facing street) about 900 sq ft, paint. | $15,000 |
| Sep 26, 2023 | Completed final sign-off Mar 2024 | 12 Fella Pl | convert (e) one bathroom to two full bathroom. replace sheet rock w/ new & replace (e) furnace/duct w/ new at g/f. relocate (e) kitchen & bathroom at ground floor.Details
convert (e) one bathroom to two full bathroom. replace sheet rock w/ new & replace (e) furnace/duct w/ new at g/f. relocate (e) kitchen & bathroom at ground floor. | $150,000 |
| Sep 15, 2023 | Completed final sign-off Apr 2024 | 1741 Polk St | recommencement and completion of work approved under pa# 2017-0113-7173Details
recommencement and completion of work approved under pa# 2017-0113-7173 | $50,000 |
| Sep 15, 2023 | Completed final sign-off Apr 2024 | 1749 Polk St | recommencement anc completion of work approved under pa# 201701137172Details
recommencement anc completion of work approved under pa# 201701137172 | $17,500 |
| Sep 6, 2023 | Completed final sign-off May 2024 | 4500 Ocean Av | construct media room & full bathroom at g/f. remodel (e) kitchen & convert (e) bathroom to 2 full bathroom at 2/f.Details
construct media room & full bathroom at g/f. remodel (e) kitchen & convert (e) bathroom to 2 full bathroom at 2/f. | $165,000 |
| Aug 22, 2023 | Completed final sign-off Mar 2024 | 1550 21st Av | construct 2 bedroom, 2 full bathroom, media room & kitchenette at g/f.Details
construct 2 bedroom, 2 full bathroom, media room & kitchenette at g/f. | $143,000 |
| Aug 15, 2023 | Completed final sign-off Apr 2024 | 3512 Balboa St | replace counters and cabinets in kind. replace light fixtures- patch wall and paint. restroom remodel and replace all fixtures in same location. wall and floor tiles.Details
replace counters and cabinets in kind. replace light fixtures- patch wall and paint. restroom remodel and replace all fixtures in same location. wall and floor tiles. | $18,000 |
| Aug 4, 2023 | Completed final sign-off Nov 2024 | 1491 Palou Av | construct 1 bedroom, family room, & 1 full bathroom. all work at g/f.Details
construct 1 bedroom, family room, & 1 full bathroom. all work at g/f. | $128,000 |
| Aug 4, 2023 | Completed final sign-off Mar 2024 | 2810 35th Av | 1/f: add 2 bedroom, media, mudroom and 1 full bath, laudry room. 2/f: remodel kitchen and bathroom. add a full bath. replace front windows (alum. clad wood). infill lightwell and courtyard.Details
1/f: add 2 bedroom, media, mudroom and 1 full bath, laudry room. 2/f: remodel kitchen and bathroom. add a full bath. replace front windows (alum. clad wood). infill lightwell and courtyard. | $350,000 |
| Jul 26, 2023 | Completed final sign-off Aug 2023 | 1528 36th Av | comply w/ complaint # 202309907, construct new hallway & install kitchenette. all work at ground flr. no structural work.Details
comply w/ complaint # 202309907, construct new hallway & install kitchenette. all work at ground flr. no structural work. | $15,000 |
| Jul 14, 2023 | Completed final sign-off Jul 2024 | 2949 19th Av | 240 sqft of repair and 800 sqft stucco repair. all in kind. front of home.Details
240 sqft of repair and 800 sqft stucco repair. all in kind. front of home. | $1,500 |
| Jul 10, 2023 | Completed final sign-off Aug 2025 | 619 47th Av | remodel 2nd and 3rd floor bathroom (1 each floor) in kind. replace tub, cabinet, toilet, light fixtures and exhaust fan tiles.Details
remodel 2nd and 3rd floor bathroom (1 each floor) in kind. replace tub, cabinet, toilet, light fixtures and exhaust fan tiles. | $30,000 |
| Jun 27, 2023 | Completed final sign-off Mar 2024 | 1550 21st Av | remodel (e) kitchen, bathroom, & construct 1 new bathroom at 2/f. relocate bathroom & closet on 3/f.Details
remodel (e) kitchen, bathroom, & construct 1 new bathroom at 2/f. relocate bathroom & closet on 3/f. | $96,000 |
| May 12, 2023 | Completed final sign-off Nov 2023 | 1473 Palou Av | construct 2 bedroom, 1 full bathroom, family room, and media room. all work at lower floor.Details
construct 2 bedroom, 1 full bathroom, family room, and media room. all work at lower floor. | $120,000 |
| Mar 7, 2023 | Completed final sign-off Aug 2024 | 2949 19th Av | 2nd floor: remodel kitchen, bathroom, add half bath. 3rd floor: remodel bathroom; structural alteration to framing as required for relocation of walls due to remodel. replace sheetrock throughoutDetails
2nd floor: remodel kitchen, bathroom, add half bath. 3rd floor: remodel bathroom; structural alteration to framing as required for relocation of walls due to remodel. replace sheetrock throughout | $45,000 |
| Dec 29, 2022 | Completed final sign-off Sep 2023 | 1473 Palou Av | remodel (e) kitchen, bathroom, & replace 6 (e) windows w/ new at 2/f. upgrade (e) family room to bedroom. construct 1 family room, bedroom, & 1 full bath at g/f. remove/repair (e) staircase w/ new in-kind at rear of house.Details
remodel (e) kitchen, bathroom, & replace 6 (e) windows w/ new at 2/f. upgrade (e) family room to bedroom. construct 1 family room, bedroom, & 1 full bath at g/f. remove/repair (e) staircase w/ new in-kind at rear of house. | $118,000 |
| Dec 29, 2022 | Completed final sign-off Oct 2023 | 2311 09th Av | revision under pa # 202112104230: re-arrange bathroom & provide the fire door through rear year at g/f. replace (e) sheet rock w/ new at 2/f. to comply with his nov# 201772891 and 202297972.Details
revision under pa # 202112104230: re-arrange bathroom & provide the fire door through rear year at g/f. replace (e) sheet rock w/ new at 2/f. to comply with his nov# 201772891 and 202297972. | $20,000 |
| Dec 29, 2022 | Completed final sign-off Mar 2023 | 1133 Silliman St | legalize (e) bedroom, 1 full bathroom, & install kitchenette at g/f.Details
legalize (e) bedroom, 1 full bathroom, & install kitchenette at g/f. | $72,000 |
| Dec 29, 2022 | Completed final sign-off Jul 2023 | 170 Prague St | legalize (e) bedroom. construct 1 study room, 1 full bathroom, & install kitchenette. all work at g/f. proposed in-fill of south side window at rear of building to match existing material. no other work.Details
legalize (e) bedroom. construct 1 study room, 1 full bathroom, & install kitchenette. all work at g/f. proposed in-fill of south side window at rear of building to match existing material. no other work. | $82,000 |
| Dec 21, 2022 | Completed final sign-off Mar 2023 | 182 Sadowa St | comply w/ correction notes #202200059: legalize 1 bedroom, 1 full bathroom, 1 half bathroom & storage room at g/f. remodel (e) bathroom at 2/f.Details
comply w/ correction notes #202200059: legalize 1 bedroom, 1 full bathroom, 1 half bathroom & storage room at g/f. remodel (e) bathroom at 2/f. | $72,000 |
| Dec 20, 2022 | Completed final sign-off Jul 2023 | 736 36th Av | rev to pa# 2022-0629-7409: change sky/light sizes 1st fl: new office, change rear windows sizes, relocate tankless water heater and furnance 2nd fl: reconfigure kitchen layout per plan, change bedroom and rear window sizesDetails
rev to pa# 2022-0629-7409: change sky/light sizes 1st fl: new office, change rear windows sizes, relocate tankless water heater and furnance 2nd fl: reconfigure kitchen layout per plan, change bedroom and rear window sizes | |
| Dec 14, 2022 | Completed final sign-off May 2023 | 1774 27th Av | comply w/ complaint #201979415: legalize 1 bedroom, 2 full bathroom, family room, & media room at g/f. add 1 full bthroom at 2/f.Details
comply w/ complaint #201979415: legalize 1 bedroom, 2 full bathroom, family room, & media room at g/f. add 1 full bthroom at 2/f. | $115,000 |
| Nov 30, 2022 | Completed final sign-off Dec 2022 | 175 Granada Av | revision under pa #202112104207: replace (e) front window at 2nd floor. u-factor 0.30. install (n) electric fire place. (e) vinyl window replaced in-kind.Details
revision under pa #202112104207: replace (e) front window at 2nd floor. u-factor 0.30. install (n) electric fire place. (e) vinyl window replaced in-kind. | $4,500 |
| Nov 28, 2022 | Completed final sign-off May 2023 | 137 Hahn St | construct 1 bedroom, 1 full bath & family room at g/f plus a new kitchenette. remodel (e) kitchen, bathroom. add 1 full bathroom & replace (e) sheetrock w/ new at 2nd flr. replace partial (e) footing w/ new.Details
construct 1 bedroom, 1 full bath & family room at g/f plus a new kitchenette. remodel (e) kitchen, bathroom. add 1 full bathroom & replace (e) sheetrock w/ new at 2nd flr. replace partial (e) footing w/ new. | $120,000 |
| Nov 14, 2022 | Completed final sign-off Apr 2024 | 47 Rey St | comply to 202296266: fire damage repair. ref pa 201405155798 & 201702240044: r/r (e) kitchen,bathroom with new,replace sheet rock & electircal with new at 2/f (47 rey st).r/r 2 (e) bathroom with new,r eplace sheet rock & electrical with new at g/f (47a rey st).replace partial ceiling joist & studs.Details
comply to 202296266: fire damage repair. ref pa 201405155798 & 201702240044: r/r (e) kitchen,bathroom with new,replace sheet rock & electircal with new at 2/f (47 rey st).r/r 2 (e) bathroom with new,r eplace sheet rock & electrical with new at g/f (47a rey st).replace partial ceiling joist & studs. | $120,000 |
| Oct 18, 2022 | Completed final sign-off Apr 2023 | 1009 South Van Ness Av | minor repair for outside street facing stair -about 15%Details
minor repair for outside street facing stair -about 15% | $1,000 |
| Oct 18, 2022 | Completed final sign-off May 2023 | 49 Borica St | legalize 2 (e) bedroom, 1 bathroom, study room & construct 2 bathroom at the g/f. remodel (e) kitchen, 2 bathroom, & replace existing sheet rock w/ new at 2nd flr.Details
legalize 2 (e) bedroom, 1 bathroom, study room & construct 2 bathroom at the g/f. remodel (e) kitchen, 2 bathroom, & replace existing sheet rock w/ new at 2nd flr. | $160,000 |
| Oct 12, 2022 | Completed final sign-off Aug 2023 | 170 Prague St | kitchen remodel, add wet bar, remodel bath, new hallway to rear bedroom,add bath. interior work only, no changes visible from street or expansion of building envelopeDetails
kitchen remodel, add wet bar, remodel bath, new hallway to rear bedroom,add bath. interior work only, no changes visible from street or expansion of building envelope | $35,000 |
| Sep 7, 2022 | Completed final sign-off Apr 2023 | 73 Teddy Av | legalize 1 bedroom, bathroom & add kitchenette. all work at lower floor.Details
legalize 1 bedroom, bathroom & add kitchenette. all work at lower floor. | $28,000 |
| Jul 20, 2022 | Completed final sign-off Jul 2024 | 2418 21st Av | 1/f: add 1 den, office, media and 1.5 bathroom. 2/f & 3/f: complete interior remodel. front window alum clad wood.Details
1/f: add 1 den, office, media and 1.5 bathroom. 2/f & 3/f: complete interior remodel. front window alum clad wood. | $190,000 |
| Jun 29, 2022 | Completed final sign-off Jul 2023 | 736 36th Av | 1st fl: add 3 bed, media rm, 1 full bath & laundry. 2nd fl: remodel kitchen, bath, add int stairs. infill lightwell at south side.Details
1st fl: add 3 bed, media rm, 1 full bath & laundry. 2nd fl: remodel kitchen, bath, add int stairs. infill lightwell at south side. | $120,000 |
| May 9, 2022 | Completed final sign-off Sep 2022 | 58 Tingley St | construct 2 bedroom, 1 full bathroom, & media room at g/f. remodel (e) kitchen, bathroom, & replace (e) sheetrock w/ new at 2nd floor.Details
construct 2 bedroom, 1 full bathroom, & media room at g/f. remodel (e) kitchen, bathroom, & replace (e) sheetrock w/ new at 2nd floor. | $105,000 |
| Apr 28, 2022 | Completed final sign-off Jun 2022 | 619 San Jose Av | replace left side siding from wood siding to cement boad about 800 sq ftDetails
replace left side siding from wood siding to cement boad about 800 sq ft | $15,000 |
| Apr 15, 2022 | Completed final sign-off Sep 2022 | 507 12th Av | remodel 3rd floor only bathroom in kind. no layout changes.Details
remodel 3rd floor only bathroom in kind. no layout changes. | $7,000 |
| Apr 14, 2022 | Completed final sign-off Dec 2023 | 1359 04th Av | basement: demo (e) stair, provide (n) stair & mdida rm w/ (n) toilet, 1st/f: remove wall & expand garag and (n) family rm. 2nd/f: remoddel & relocate kitchen, (n) toilet. 3rd/f: remodel (e) bedroom w/ master suite and remodel (e) bathroom to new 2 bathrooms.Details
basement: demo (e) stair, provide (n) stair & mdida rm w/ (n) toilet, 1st/f: remove wall & expand garag and (n) family rm. 2nd/f: remoddel & relocate kitchen, (n) toilet. 3rd/f: remodel (e) bedroom w/ master suite and remodel (e) bathroom to new 2 bathrooms. | $135,000 |
| Mar 29, 2022 | Completed final sign-off Jan 2023 | 229 10th Av | replace windows at front in kind with aluminum-clad wood. (cener fix, casement on sie) same size, same location, total 3 windowsDetails
replace windows at front in kind with aluminum-clad wood. (cener fix, casement on sie) same size, same location, total 3 windows | $1,000 |
| Mar 25, 2022 | Completed final sign-off Aug 2022 | 3045 Jackson St | unit #301: remodel (e) bathroom in kind. remove shower stall replace with washer/dryer & install recessed light.Details
unit #301: remodel (e) bathroom in kind. remove shower stall replace with washer/dryer & install recessed light. | $32,000 |
| Mar 3, 2022 | Completed final sign-off Jan 2023 | 229 10th Av | 2/f: kitchen remodel. 3/f: bathroom remodel.Details
2/f: kitchen remodel. 3/f: bathroom remodel. | $25,000 |
| Feb 25, 2022 | Completed final sign-off Nov 2022 | 2123 29th Av | revision to pa# 202112144413. revise foundation footings along property line.Details
revision to pa# 202112144413. revise foundation footings along property line. | $5,000 |
| Feb 2, 2022 | Completed final sign-off Oct 2022 | 110 Aptos Av | 1/f floor: add 2 bedrooms, 2 full bath and family room. 2nd fl: remodel kitchen, bedrooms and bath, add 2 full bath. relocate interior staircase. replace all front windows with in kind wood.Details
1/f floor: add 2 bedrooms, 2 full bath and family room. 2nd fl: remodel kitchen, bedrooms and bath, add 2 full bath. relocate interior staircase. replace all front windows with in kind wood. | $135,000 |
| Jan 21, 2022 | Completed final sign-off Feb 2022 | 737 Santiago St | revision under pa #202109208722: re-built (e) interior stair from 2nd floor to g/f. "revise stair layout on to ground floor".Details
revision under pa #202109208722: re-built (e) interior stair from 2nd floor to g/f. "revise stair layout on to ground floor". | |
| Dec 14, 2021 | Completed final sign-off Nov 2022 | 2123 29th Av | 1st fl - add 2 bedrooms, 2 full bath and media; 2nd fl - remodel kitchen & bathroom; add 1 full bath and den infill center patio; relocate interior stairs; add new deck at rearDetails
1st fl - add 2 bedrooms, 2 full bath and media; 2nd fl - remodel kitchen & bathroom; add 1 full bath and den infill center patio; relocate interior stairs; add new deck at rear | $120,000 |
| Dec 10, 2021 | Completed final sign-off Dec 2022 | 175 Granada Av | revise (e) framing after field verification. ref. permit 202110080156.Details
revise (e) framing after field verification. ref. permit 202110080156. | |
| Oct 8, 2021 | Completed final sign-off Dec 2022 | 175 Granada Av | kitchen remodel: remove and replace (e) kitchen cabinets, sink, dishwasher, stove. add island and install new recessed lights in kitchen. update (e) bathrooms. infill 2/f stair. downstairs new 2 bedrooms. add bath and living room. replace 2 windows at rear.Details
kitchen remodel: remove and replace (e) kitchen cabinets, sink, dishwasher, stove. add island and install new recessed lights in kitchen. update (e) bathrooms. infill 2/f stair. downstairs new 2 bedrooms. add bath and living room. replace 2 windows at rear. | $100,000 |
| Sep 23, 2021 | Completed final sign-off Feb 2022 | 925 Howard St | remove and replace existing stair at rear as in kind. eliminate deck at 3rd floor. a required second means of egress. no new fire wall proposed. sfbc 1011.12.3 stairway replacement: same configuration and construction as the existing stairwaysDetails
remove and replace existing stair at rear as in kind. eliminate deck at 3rd floor. a required second means of egress. no new fire wall proposed. sfbc 1011.12.3 stairway replacement: same configuration and construction as the existing stairways | $8,000 |
| Sep 20, 2021 | Completed final sign-off Feb 2022 | 737 Santiago St | construct 1 new bathroom at g/f. remodel (e) kitchen , add 1 half bath, & re-built (e) interior stair in-kind at 2nd floor.Details
construct 1 new bathroom at g/f. remodel (e) kitchen , add 1 half bath, & re-built (e) interior stair in-kind at 2nd floor. | $42,000 |
| Sep 17, 2021 | Completed final sign-off Jan 2022 | 286 Talbert St | redo front house stucco wall about 460sf.Details
redo front house stucco wall about 460sf. | $15,000 |
| Mar 2, 2021 | Completed final sign-off Jun 2021 | 1254 Plymouth Av | remodel upstair kitchen in kind, replace cabinets sink and all appliances.Details
remodel upstair kitchen in kind, replace cabinets sink and all appliances. | $9,500 |
| Feb 19, 2021 | Never finaled issued Jun 2021, no final | 29 Castle Manor Av | infill right side lightwell. rmeodel (e) kitchen and add a new bathroomon 2/f of (e) building.Details
infill right side lightwell. rmeodel (e) kitchen and add a new bathroomon 2/f of (e) building. | $10,000 |
| Oct 28, 2020 | Completed final sign-off Jun 2021 | 2263 34th Av | construct 2 bedrooms, 1 full bath & media room at ground floor. remodel (e) kitchen, bathroom. add 1 new bathroom & replace (e) sheet rock w/ new at 2nd floor. remove infill central patio at 2nd floor.Details
construct 2 bedrooms, 1 full bath & media room at ground floor. remodel (e) kitchen, bathroom. add 1 new bathroom & replace (e) sheet rock w/ new at 2nd floor. remove infill central patio at 2nd floor. | $120,000 |
| Oct 2, 2020 | Completed final sign-off Oct 2020 | 50 Lomita Av | replace siding all rear side of house, hardie siding boards. not visible to street, siding only.Details
replace siding all rear side of house, hardie siding boards. not visible to street, siding only. | $30,000 |
| Sep 25, 2020 | Completed final sign-off Oct 2020 | 1017 Stockton St | repair leak/ remodel all 4 showe rroom on 2nd & 3rd floor. 2 on each floor. no electrical work involved. all works in kind.Details
repair leak/ remodel all 4 showe rroom on 2nd & 3rd floor. 2 on each floor. no electrical work involved. all works in kind. | $16,000 |
| Feb 13, 2020 | Completed final sign-off Mar 2020 | 3374 Sacramento St | remodel 2nd floor bathroom, convert tub into shower(84x60). no alteration of walls.Details
remodel 2nd floor bathroom, convert tub into shower(84x60). no alteration of walls. | $12,000 |
| Dec 12, 2019 | Completed final sign-off Nov 2020 | 343 Girard St | interior renovation:1st fl. reconfigure the interior staircase to 2nd fl, remodel the extg bedroom, add 1 entertainment, convert 1 powder into 3 fixture bathroom. 2nd floor relocate the extg 3-fixture bathrooms & kitchen, remodel the extg bedroom, add 2 3-fixture bathroom, eliminate rear staircase.Details
interior renovation:1st fl. reconfigure the interior staircase to 2nd fl, remodel the extg bedroom, add 1 entertainment, convert 1 powder into 3 fixture bathroom. 2nd floor relocate the extg 3-fixture bathrooms & kitchen, remodel the extg bedroom, add 2 3-fixture bathroom, eliminate rear staircase. | $60,000 |
| Nov 26, 2019 | Completed final sign-off Oct 2020 | 1542 26th Av | revision to pa 2019-0530-1958 & 2019-1017-4716 re-arrange 1 bathroom @ ground floorDetails
revision to pa 2019-0530-1958 & 2019-1017-4716 re-arrange 1 bathroom @ ground floor | |
| Nov 4, 2019 | Completed final sign-off Jul 2023 | 43 Cole St | adu (unit a&b) per ord 162-16 on 1st flr per plans. unit a eliminated (e) garage to create a bedroom, kitchen, living/offic & full bath. unit b: convert (e) storage & mech rm into a bedroom, kitchen/living & full bath.Details
adu (unit a&b) per ord 162-16 on 1st flr per plans. unit a eliminated (e) garage to create a bedroom, kitchen, living/offic & full bath. unit b: convert (e) storage & mech rm into a bedroom, kitchen/living & full bath. | $60,000 |
| Oct 31, 2019 | Completed final sign-off Dec 2022 | 274 Naples St | comply w/ complaint# 20196481. add one adu per ord# 95-17, legalize kitchen at ground flr.Details
comply w/ complaint# 20196481. add one adu per ord# 95-17, legalize kitchen at ground flr. | $10,000 |
| Oct 17, 2019 | Completed final sign-off Oct 2020 | 1542 26th Av | revision to pa 201905301958. relcoate 2 bath rms at ground flr. add bath tub in bath rm 1. convert half bath to full bath at 2nd flr.Details
revision to pa 201905301958. relcoate 2 bath rms at ground flr. add bath tub in bath rm 1. convert half bath to full bath at 2nd flr. | $8,000 |
| Sep 18, 2019 | Completed final sign-off Dec 2019 | 1142 Jackson St | convert dining room into bedroom at unit 5 and unit 6Details
convert dining room into bedroom at unit 5 and unit 6 | $3,000 |
| Aug 13, 2019 | Completed final sign-off Jul 2020 | 1866 23rd Av | construct 2 bedrm 2 bath & media rm at grnd flr. remodel (e) kitchen, bath rm, add 1 full bathrm & 1 powder rm at 2nd flr. rebuild (e) int staircase from 2nd to grnd flrs. construct new deck w/stairs at rear of bld (17x8 approx)Details
construct 2 bedrm 2 bath & media rm at grnd flr. remodel (e) kitchen, bath rm, add 1 full bathrm & 1 powder rm at 2nd flr. rebuild (e) int staircase from 2nd to grnd flrs. construct new deck w/stairs at rear of bld (17x8 approx) | $135,000 |
| Aug 8, 2019 | Completed final sign-off Nov 2020 | 1458 Rhode Island St | 1st fl - add 2 bedrooms, 1 office, mudroom, 2 bathroom & laundry units; relocate interior staircase; add deck at rear of bldg; 2nd fl - reconfigure interior layout with 1 master bedroom, 1 full bath, 1 powder room, 1 wic, kitchen, dining & living roomDetails
1st fl - add 2 bedrooms, 1 office, mudroom, 2 bathroom & laundry units; relocate interior staircase; add deck at rear of bldg; 2nd fl - reconfigure interior layout with 1 master bedroom, 1 full bath, 1 powder room, 1 wic, kitchen, dining & living room | $60,000 |
| Jul 29, 2019 | Completed final sign-off Oct 2019 | 167 Mangels Av | revision to 201907035050 page s-3 framing per plan, changes to holddownsDetails
revision to 201907035050 page s-3 framing per plan, changes to holddowns | |
| Jul 25, 2019 | Completed final sign-off Jan 2021 | 1458 Rhode Island St | remodel upstair bathroom in kind. no wall demolition.Details
remodel upstair bathroom in kind. no wall demolition. | $12,000 |
| Jul 11, 2019 | Completed final sign-off Sep 2020 | 619 02nd Av | 1st fl - add one ent, 1 full bath, 1 bedrm, wet bar & 1 laundry rm. 2nd flr - reconfig int layout w/liv rm, dining, kitche, pwder, m bed, m bath & wic. 3rd flr - add 2 bed, 1 full bath & laundry. roof- add 1 dormer to create legal ceiling ht for bathDetails
1st fl - add one ent, 1 full bath, 1 bedrm, wet bar & 1 laundry rm. 2nd flr - reconfig int layout w/liv rm, dining, kitche, pwder, m bed, m bath & wic. 3rd flr - add 2 bed, 1 full bath & laundry. roof- add 1 dormer to create legal ceiling ht for bath | $90,000 |
| Jul 3, 2019 | Completed final sign-off Oct 2019 | 167 Mangels Av | remodel kitchen on 2nd floor and remove 1 bedroomDetails
remodel kitchen on 2nd floor and remove 1 bedroom | $20,000 |
| Jun 14, 2019 | Completed final sign-off Jan 2020 | 3169 Sacramento St | to replace (e) damage retaining wall with new retaining wall; new retaining wall to match (e) in height. to comply with nov#201963511Details
to replace (e) damage retaining wall with new retaining wall; new retaining wall to match (e) in height. to comply with nov#201963511 | $20,000 |
| May 30, 2019 | Completed final sign-off Oct 2020 | 1542 26th Av | construct bedrm, 3 bathrm, media rm & laundry area at ground floor. relocate (e) kitchen, remodel (e) bath & convert (e) kitchen space to office, (e) breakfast rm to kitchen at 2nd flrDetails
construct bedrm, 3 bathrm, media rm & laundry area at ground floor. relocate (e) kitchen, remodel (e) bath & convert (e) kitchen space to office, (e) breakfast rm to kitchen at 2nd flr | $110,000 |
| Jan 30, 2019 | Completed final sign-off Dec 2019 | 392 Capp St | remodl (e) kitchen, 2 bathrooms, construct 1 new full bathroom. replace (e) sheet rock w/new & re-wire electric/lighting @ 2nd floorDetails
remodl (e) kitchen, 2 bathrooms, construct 1 new full bathroom. replace (e) sheet rock w/new & re-wire electric/lighting @ 2nd floor | $52,000 |
| Jan 30, 2019 | Completed final sign-off Dec 2019 | 390 Capp St | remodel (e) kitchen, 2 bathrooms, construct one new full bathroom. replace (e) sheet rock w/new & re-wire electrical/lightings at 3rd flDetails
remodel (e) kitchen, 2 bathrooms, construct one new full bathroom. replace (e) sheet rock w/new & re-wire electrical/lightings at 3rd fl | $52,000 |
| Nov 5, 2018 | Expired or cancelled cancelled Feb 2019 | 400 Plymouth Av | replace exterior plastic siding with james hardie cement boardsDetails
replace exterior plastic siding with james hardie cement boards | $15,000 |
| Oct 9, 2018 | Completed final sign-off Mar 2019 | 2750 34th Av | relocate (e) kitchen, bath rm, add one new bathrm & convert (e) kitchen space to family rm, r&r new sheet rock at 1st flr, remodel (e) bath & r&r new sheetrock on 2nd flrDetails
relocate (e) kitchen, bath rm, add one new bathrm & convert (e) kitchen space to family rm, r&r new sheet rock at 1st flr, remodel (e) bath & r&r new sheetrock on 2nd flr | $72,000 |
| Oct 4, 2018 | Never finaled issued Oct 2018, no final | 25 Exeter St | replace 1 front window (facing street) with aluminum wood clad, in kind. u factor .32Details
replace 1 front window (facing street) with aluminum wood clad, in kind. u factor .32 | $950 |
| Aug 9, 2018 | Completed final sign-off Apr 2019 | 1449 10th Av | 1/f: add a bedroom, a media rm, a family rm, a 3-fxiture bath, a powder rm, a laundry rm, a sun room, & storage rm. 2/f: reconfigure interior layout. add a bedroom & a full bath. add open visual interior staircase to connect both floors; replace water heater & furnaceDetails
1/f: add a bedroom, a media rm, a family rm, a 3-fxiture bath, a powder rm, a laundry rm, a sun room, & storage rm. 2/f: reconfigure interior layout. add a bedroom & a full bath. add open visual interior staircase to connect both floors; replace water heater & furnace | $60,000 |
| May 18, 2018 | Completed final sign-off Aug 2018 | 1679 38th Av | repair all front stucco in-kind. at areas of wood paneling on second floor and roof end, remove and replace with stucco to match. all windows and trim to remain. selective replacement of wood trim if necessary. no other work under this permit.Details
repair all front stucco in-kind. at areas of wood paneling on second floor and roof end, remove and replace with stucco to match. all windows and trim to remain. selective replacement of wood trim if necessary. no other work under this permit. | $7,500 |
| May 10, 2018 | Expired or cancelled cancelled Oct 2018 | 308 Crescent Av | add (4) dormer, 2nd fl rear deck, remodel 1st fl kitchen, add (1) bath & (1) bedroom to 2nd fl, (2) bath to basement fl, add (2) bedrooms & (1) family room at basement fl. relocate stairs at basement.Details
add (4) dormer, 2nd fl rear deck, remodel 1st fl kitchen, add (1) bath & (1) bedroom to 2nd fl, (2) bath to basement fl, add (2) bedrooms & (1) family room at basement fl. relocate stairs at basement. | $180,000 |
| Mar 22, 2018 | Completed final sign-off Oct 2018 | 1566 27th Av | to comply with nov 201837182 - remove wet bar on ground floor that was built without permitDetails
to comply with nov 201837182 - remove wet bar on ground floor that was built without permit | $250 |
| Feb 21, 2018 | Expired or cancelled withdrawn Feb 2018 | 1566 27th Av | revision to pa #201712116008. add a skylight at bathroom behind kitchen on 2nd fl (24" x 24"). enclose opening from hallway to kitchen per plan.Details
revision to pa #201712116008. add a skylight at bathroom behind kitchen on 2nd fl (24" x 24"). enclose opening from hallway to kitchen per plan. | |
| Dec 11, 2017 | Completed final sign-off Apr 2018 | 1566 27th Av | reconfigure 2 bathrooms and kitchen. infill existing lightwell. adjacent wall is a blind wallDetails
reconfigure 2 bathrooms and kitchen. infill existing lightwell. adjacent wall is a blind wall | $56,000 |
| Nov 10, 2017 | Completed final sign-off Jul 2018 | 1712 Hyde St | revision to app#201611031819 to rebuild extg damaged stairs at rear. to be replaced with complying exit stair n/a for maherDetails
revision to app#201611031819 to rebuild extg damaged stairs at rear. to be replaced with complying exit stair n/a for maher | |
| Nov 3, 2017 | Completed final sign-off Feb 2018 | 1331 Stockton St | add cement board siding on top of wood siding for exterior wall in light well around 350 sq. ft. with 1-hr raing. (not visible from street) to abate partial complaint # 20173931Details
add cement board siding on top of wood siding for exterior wall in light well around 350 sq. ft. with 1-hr raing. (not visible from street) to abate partial complaint # 20173931 | $3,500 |
| Oct 12, 2017 | Completed final sign-off Dec 2019 | 2832 Bryant St | construct (1) bedroom, (1) bath adu unit @ 1st floor per ord #162-16Details
construct (1) bedroom, (1) bath adu unit @ 1st floor per ord #162-16 | $65,000 |
| Sep 20, 2017 | Completed final sign-off Aug 2019 | 1142 Jackson St | apartment renovation at unit #3 on the 3rd fl - remodel (e) kitchen, bedrooms & bathroom. convert one bathroom into two bathrooms. convert living rm into bedrm, remove fireplace in living rm. replace water heater & furnace. maher naDetails
apartment renovation at unit #3 on the 3rd fl - remodel (e) kitchen, bedrooms & bathroom. convert one bathroom into two bathrooms. convert living rm into bedrm, remove fireplace in living rm. replace water heater & furnace. maher na | $30,000 |
| Jul 11, 2017 | Completed final sign-off Jun 2018 | 211 Morningside Dr | remodel kitchen and 2.5 bathrooms, add two (n) bathrooms, relocate interior stair, add 3 (n) windows and a skylight, relocate a window on 2/f, expand family room, add a (n) bedroom & a full bath on 1/f, relocate washer/dryer to garage, relocate furnace to crawl space.Details
remodel kitchen and 2.5 bathrooms, add two (n) bathrooms, relocate interior stair, add 3 (n) windows and a skylight, relocate a window on 2/f, expand family room, add a (n) bedroom & a full bath on 1/f, relocate washer/dryer to garage, relocate furnace to crawl space. | $80,000 |
| Jul 11, 2017 | Expired or cancelled cancelled Feb 2024 | 1 Anzavista Av | add unit per ordinance# 162-16 on basement floor with 1 bedroom, kitchen, living room & 1 full bathroom per plan.Details
add unit per ordinance# 162-16 on basement floor with 1 bedroom, kitchen, living room & 1 full bathroom per plan. | $50,000 |
| Jul 3, 2017 | Completed final sign-off Sep 2017 | 2830 Bryant St | unit 2830: renovate extg bathroom. add new bathroom. replace extg windows in kind on 2nd floor per plan.Details
unit 2830: renovate extg bathroom. add new bathroom. replace extg windows in kind on 2nd floor per plan. | $35,000 |
| Jun 27, 2017 | Completed final sign-off Jan 2018 | 78 Lee Av | revision to pa 2016-0901-6639 per plans: construct new rear deck (9'0" ht) with stairs at rear of bldg; add 1 full bath room & 1 storage on (e) ground floor per plan. add 1 full bath room on (e) 2nd floor per planDetails
revision to pa 2016-0901-6639 per plans: construct new rear deck (9'0" ht) with stairs at rear of bldg; add 1 full bath room & 1 storage on (e) ground floor per plan. add 1 full bath room on (e) 2nd floor per plan | $50,000 |
| Jun 20, 2017 | Expired or cancelled cancelled Feb 2024 | 1365 Oak St | add (1) dwelling unit on basement with (1) storage room, (1) bedroom, (1) full bathroom, kitchen & living room per plan per ord #162-16. separate sprinkler permit.Details
add (1) dwelling unit on basement with (1) storage room, (1) bedroom, (1) full bathroom, kitchen & living room per plan per ord #162-16. separate sprinkler permit. | $60,000 |
| Apr 25, 2017 | Completed final sign-off Mar 2018 | 1923 San Jose Av | 1)add one powder room and laundry room on 1st floor per plan. 2)turn extg storage rooms into media room and home office with closet per plan.Details
1)add one powder room and laundry room on 1st floor per plan. 2)turn extg storage rooms into media room and home office with closet per plan. | $25,000 |