W F Construction Co
- Based in
- San Francisco
- On San Francisco permits
- Aug 2008 to Dec 2024
- Last 24 months
- 1 permit filed
131 permits since 2000: 115 completed, 1 in progress, 6 never finaled, 9 expired or cancelled.
Of the 6 never-finaled permits, 3 are 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Deck permits
7 deck permits: 6 completed, 1 expired or cancelled. Typically 45 days from filing to permit and 248 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 14, 2021 | Completed final sign-off Nov 2022 | 2123 29th Av | 1st fl - add 2 bedrooms, 2 full bath and media; 2nd fl - remodel kitchen & bathroom; add 1 full bath and den infill center patio; relocate interior stairs; add new deck at rearDetails
1st fl - add 2 bedrooms, 2 full bath and media; 2nd fl - remodel kitchen & bathroom; add 1 full bath and den infill center patio; relocate interior stairs; add new deck at rear | $120,000 |
| Sep 23, 2021 | Completed final sign-off Feb 2022 | 925 Howard St | remove and replace existing stair at rear as in kind. eliminate deck at 3rd floor. a required second means of egress. no new fire wall proposed. sfbc 1011.12.3 stairway replacement: same configuration and construction as the existing stairwaysDetails
remove and replace existing stair at rear as in kind. eliminate deck at 3rd floor. a required second means of egress. no new fire wall proposed. sfbc 1011.12.3 stairway replacement: same configuration and construction as the existing stairways | $8,000 |
| Aug 13, 2019 | Completed final sign-off Jul 2020 | 1866 23rd Av | construct 2 bedrm 2 bath & media rm at grnd flr. remodel (e) kitchen, bath rm, add 1 full bathrm & 1 powder rm at 2nd flr. rebuild (e) int staircase from 2nd to grnd flrs. construct new deck w/stairs at rear of bld (17x8 approx)Details
construct 2 bedrm 2 bath & media rm at grnd flr. remodel (e) kitchen, bath rm, add 1 full bathrm & 1 powder rm at 2nd flr. rebuild (e) int staircase from 2nd to grnd flrs. construct new deck w/stairs at rear of bld (17x8 approx) | $135,000 |
| Aug 8, 2019 | Completed final sign-off Nov 2020 | 1458 Rhode Island St | 1st fl - add 2 bedrooms, 1 office, mudroom, 2 bathroom & laundry units; relocate interior staircase; add deck at rear of bldg; 2nd fl - reconfigure interior layout with 1 master bedroom, 1 full bath, 1 powder room, 1 wic, kitchen, dining & living roomDetails
1st fl - add 2 bedrooms, 1 office, mudroom, 2 bathroom & laundry units; relocate interior staircase; add deck at rear of bldg; 2nd fl - reconfigure interior layout with 1 master bedroom, 1 full bath, 1 powder room, 1 wic, kitchen, dining & living room | $60,000 |
| May 10, 2018 | Expired or cancelled cancelled Oct 2018 | 308 Crescent Av | add (4) dormer, 2nd fl rear deck, remodel 1st fl kitchen, add (1) bath & (1) bedroom to 2nd fl, (2) bath to basement fl, add (2) bedrooms & (1) family room at basement fl. relocate stairs at basement.Details
add (4) dormer, 2nd fl rear deck, remodel 1st fl kitchen, add (1) bath & (1) bedroom to 2nd fl, (2) bath to basement fl, add (2) bedrooms & (1) family room at basement fl. relocate stairs at basement. | $180,000 |
| Jun 27, 2017 | Completed final sign-off Jan 2018 | 78 Lee Av | revision to pa 2016-0901-6639 per plans: construct new rear deck (9'0" ht) with stairs at rear of bldg; add 1 full bath room & 1 storage on (e) ground floor per plan. add 1 full bath room on (e) 2nd floor per planDetails
revision to pa 2016-0901-6639 per plans: construct new rear deck (9'0" ht) with stairs at rear of bldg; add 1 full bath room & 1 storage on (e) ground floor per plan. add 1 full bath room on (e) 2nd floor per plan | $50,000 |
| Nov 25, 2014 | Completed final sign-off Apr 2015 | 2775 38th Av | legalize rear deck on 2nd fl. add a family room, 1 bedroom and full bath on 1st fl. relocate furnace, water heater, washer and dryerDetails
legalize rear deck on 2nd fl. add a family room, 1 bedroom and full bath on 1st fl. relocate furnace, water heater, washer and dryer | $53,000 |