W F Construction Co
- Based in
- San Francisco
- On San Francisco permits
- Aug 2008 to Dec 2024
- Last 24 months
- 1 permit filed
131 permits since 2000: 115 completed, 1 in progress, 6 never finaled, 9 expired or cancelled.
Of the 6 never-finaled permits, 3 are 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
24 stairs permits: 22 completed, 2 expired or cancelled. Typically 22 days from filing to permit and 222 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 14, 2024 | Completed final sign-off May 2024 | 4500 Ocean Av | revision to 202309065976. relocate full bath at g/l. relocate closet at 2nd/f. change stair orientationDetails
revision to 202309065976. relocate full bath at g/l. relocate closet at 2nd/f. change stair orientation | |
| Oct 11, 2023 | Completed final sign-off Aug 2025 | 619 47th Av | renovation to (e) rec room at rear of (e) g/f. enclose (e) lightwell at 2/f. remodel (e) kitchen. renovate (e) master suite at 3/f. relocate 2nd bathroom to 3/f. minor change to 3 steps hallway next to (e) stair on g/f.Details
renovation to (e) rec room at rear of (e) g/f. enclose (e) lightwell at 2/f. remodel (e) kitchen. renovate (e) master suite at 3/f. relocate 2nd bathroom to 3/f. minor change to 3 steps hallway next to (e) stair on g/f. | $50,000 |
| Dec 29, 2022 | Completed final sign-off Sep 2023 | 1473 Palou Av | remodel (e) kitchen, bathroom, & replace 6 (e) windows w/ new at 2/f. upgrade (e) family room to bedroom. construct 1 family room, bedroom, & 1 full bath at g/f. remove/repair (e) staircase w/ new in-kind at rear of house.Details
remodel (e) kitchen, bathroom, & replace 6 (e) windows w/ new at 2/f. upgrade (e) family room to bedroom. construct 1 family room, bedroom, & 1 full bath at g/f. remove/repair (e) staircase w/ new in-kind at rear of house. | $118,000 |
| Oct 18, 2022 | Completed final sign-off Apr 2023 | 1009 South Van Ness Av | minor repair for outside street facing stair -about 15%Details
minor repair for outside street facing stair -about 15% | $1,000 |
| Jun 29, 2022 | Completed final sign-off Jul 2023 | 736 36th Av | 1st fl: add 3 bed, media rm, 1 full bath & laundry. 2nd fl: remodel kitchen, bath, add int stairs. infill lightwell at south side.Details
1st fl: add 3 bed, media rm, 1 full bath & laundry. 2nd fl: remodel kitchen, bath, add int stairs. infill lightwell at south side. | $120,000 |
| Apr 14, 2022 | Completed final sign-off Dec 2023 | 1359 04th Av | basement: demo (e) stair, provide (n) stair & mdida rm w/ (n) toilet, 1st/f: remove wall & expand garag and (n) family rm. 2nd/f: remoddel & relocate kitchen, (n) toilet. 3rd/f: remodel (e) bedroom w/ master suite and remodel (e) bathroom to new 2 bathrooms.Details
basement: demo (e) stair, provide (n) stair & mdida rm w/ (n) toilet, 1st/f: remove wall & expand garag and (n) family rm. 2nd/f: remoddel & relocate kitchen, (n) toilet. 3rd/f: remodel (e) bedroom w/ master suite and remodel (e) bathroom to new 2 bathrooms. | $135,000 |
| Feb 2, 2022 | Completed final sign-off Oct 2022 | 110 Aptos Av | 1/f floor: add 2 bedrooms, 2 full bath and family room. 2nd fl: remodel kitchen, bedrooms and bath, add 2 full bath. relocate interior staircase. replace all front windows with in kind wood.Details
1/f floor: add 2 bedrooms, 2 full bath and family room. 2nd fl: remodel kitchen, bedrooms and bath, add 2 full bath. relocate interior staircase. replace all front windows with in kind wood. | $135,000 |
| Jan 21, 2022 | Completed final sign-off Feb 2022 | 737 Santiago St | revision under pa #202109208722: re-built (e) interior stair from 2nd floor to g/f. "revise stair layout on to ground floor".Details
revision under pa #202109208722: re-built (e) interior stair from 2nd floor to g/f. "revise stair layout on to ground floor". | |
| Dec 14, 2021 | Completed final sign-off Nov 2022 | 2123 29th Av | 1st fl - add 2 bedrooms, 2 full bath and media; 2nd fl - remodel kitchen & bathroom; add 1 full bath and den infill center patio; relocate interior stairs; add new deck at rearDetails
1st fl - add 2 bedrooms, 2 full bath and media; 2nd fl - remodel kitchen & bathroom; add 1 full bath and den infill center patio; relocate interior stairs; add new deck at rear | $120,000 |
| Oct 8, 2021 | Completed final sign-off Dec 2022 | 175 Granada Av | kitchen remodel: remove and replace (e) kitchen cabinets, sink, dishwasher, stove. add island and install new recessed lights in kitchen. update (e) bathrooms. infill 2/f stair. downstairs new 2 bedrooms. add bath and living room. replace 2 windows at rear.Details
kitchen remodel: remove and replace (e) kitchen cabinets, sink, dishwasher, stove. add island and install new recessed lights in kitchen. update (e) bathrooms. infill 2/f stair. downstairs new 2 bedrooms. add bath and living room. replace 2 windows at rear. | $100,000 |
| Sep 23, 2021 | Completed final sign-off Feb 2022 | 925 Howard St | remove and replace existing stair at rear as in kind. eliminate deck at 3rd floor. a required second means of egress. no new fire wall proposed. sfbc 1011.12.3 stairway replacement: same configuration and construction as the existing stairwaysDetails
remove and replace existing stair at rear as in kind. eliminate deck at 3rd floor. a required second means of egress. no new fire wall proposed. sfbc 1011.12.3 stairway replacement: same configuration and construction as the existing stairways | $8,000 |
| Sep 20, 2021 | Completed final sign-off Feb 2022 | 737 Santiago St | construct 1 new bathroom at g/f. remodel (e) kitchen , add 1 half bath, & re-built (e) interior stair in-kind at 2nd floor.Details
construct 1 new bathroom at g/f. remodel (e) kitchen , add 1 half bath, & re-built (e) interior stair in-kind at 2nd floor. | $42,000 |
| Dec 12, 2019 | Completed final sign-off Nov 2020 | 343 Girard St | interior renovation:1st fl. reconfigure the interior staircase to 2nd fl, remodel the extg bedroom, add 1 entertainment, convert 1 powder into 3 fixture bathroom. 2nd floor relocate the extg 3-fixture bathrooms & kitchen, remodel the extg bedroom, add 2 3-fixture bathroom, eliminate rear staircase.Details
interior renovation:1st fl. reconfigure the interior staircase to 2nd fl, remodel the extg bedroom, add 1 entertainment, convert 1 powder into 3 fixture bathroom. 2nd floor relocate the extg 3-fixture bathrooms & kitchen, remodel the extg bedroom, add 2 3-fixture bathroom, eliminate rear staircase. | $60,000 |
| Aug 13, 2019 | Completed final sign-off Jul 2020 | 1866 23rd Av | construct 2 bedrm 2 bath & media rm at grnd flr. remodel (e) kitchen, bath rm, add 1 full bathrm & 1 powder rm at 2nd flr. rebuild (e) int staircase from 2nd to grnd flrs. construct new deck w/stairs at rear of bld (17x8 approx)Details
construct 2 bedrm 2 bath & media rm at grnd flr. remodel (e) kitchen, bath rm, add 1 full bathrm & 1 powder rm at 2nd flr. rebuild (e) int staircase from 2nd to grnd flrs. construct new deck w/stairs at rear of bld (17x8 approx) | $135,000 |
| Aug 8, 2019 | Completed final sign-off Nov 2020 | 1458 Rhode Island St | 1st fl - add 2 bedrooms, 1 office, mudroom, 2 bathroom & laundry units; relocate interior staircase; add deck at rear of bldg; 2nd fl - reconfigure interior layout with 1 master bedroom, 1 full bath, 1 powder room, 1 wic, kitchen, dining & living roomDetails
1st fl - add 2 bedrooms, 1 office, mudroom, 2 bathroom & laundry units; relocate interior staircase; add deck at rear of bldg; 2nd fl - reconfigure interior layout with 1 master bedroom, 1 full bath, 1 powder room, 1 wic, kitchen, dining & living room | $60,000 |
| Aug 9, 2018 | Completed final sign-off Apr 2019 | 1449 10th Av | 1/f: add a bedroom, a media rm, a family rm, a 3-fxiture bath, a powder rm, a laundry rm, a sun room, & storage rm. 2/f: reconfigure interior layout. add a bedroom & a full bath. add open visual interior staircase to connect both floors; replace water heater & furnaceDetails
1/f: add a bedroom, a media rm, a family rm, a 3-fxiture bath, a powder rm, a laundry rm, a sun room, & storage rm. 2/f: reconfigure interior layout. add a bedroom & a full bath. add open visual interior staircase to connect both floors; replace water heater & furnace | $60,000 |
| May 10, 2018 | Expired or cancelled cancelled Oct 2018 | 308 Crescent Av | add (4) dormer, 2nd fl rear deck, remodel 1st fl kitchen, add (1) bath & (1) bedroom to 2nd fl, (2) bath to basement fl, add (2) bedrooms & (1) family room at basement fl. relocate stairs at basement.Details
add (4) dormer, 2nd fl rear deck, remodel 1st fl kitchen, add (1) bath & (1) bedroom to 2nd fl, (2) bath to basement fl, add (2) bedrooms & (1) family room at basement fl. relocate stairs at basement. | $180,000 |
| Nov 10, 2017 | Completed final sign-off Jul 2018 | 1712 Hyde St | revision to app#201611031819 to rebuild extg damaged stairs at rear. to be replaced with complying exit stair n/a for maherDetails
revision to app#201611031819 to rebuild extg damaged stairs at rear. to be replaced with complying exit stair n/a for maher | |
| Jul 11, 2017 | Completed final sign-off Jun 2018 | 211 Morningside Dr | remodel kitchen and 2.5 bathrooms, add two (n) bathrooms, relocate interior stair, add 3 (n) windows and a skylight, relocate a window on 2/f, expand family room, add a (n) bedroom & a full bath on 1/f, relocate washer/dryer to garage, relocate furnace to crawl space.Details
remodel kitchen and 2.5 bathrooms, add two (n) bathrooms, relocate interior stair, add 3 (n) windows and a skylight, relocate a window on 2/f, expand family room, add a (n) bedroom & a full bath on 1/f, relocate washer/dryer to garage, relocate furnace to crawl space. | $80,000 |
| Jun 27, 2017 | Completed final sign-off Jan 2018 | 78 Lee Av | revision to pa 2016-0901-6639 per plans: construct new rear deck (9'0" ht) with stairs at rear of bldg; add 1 full bath room & 1 storage on (e) ground floor per plan. add 1 full bath room on (e) 2nd floor per planDetails
revision to pa 2016-0901-6639 per plans: construct new rear deck (9'0" ht) with stairs at rear of bldg; add 1 full bath room & 1 storage on (e) ground floor per plan. add 1 full bath room on (e) 2nd floor per plan | $50,000 |
| Feb 29, 2016 | Expired or cancelled cancelled Jan 2026 | 100 Orsi Cr | remove illegal kitchen from lower floor. seal stairwayDetails
remove illegal kitchen from lower floor. seal stairway | $1,500 |
| Nov 27, 2013 | Completed final sign-off Jun 2014 | 2055 Thomas Av | remove & replace (e) internal wooden stair w/ new. remove & replace (e) tub w/ new. remove & replace (e) shower stall w/ new. remove & relocate lavatory sink & toilet at second floor. to comply with cec150(k) 10Details
remove & replace (e) internal wooden stair w/ new. remove & replace (e) tub w/ new. remove & replace (e) shower stall w/ new. remove & relocate lavatory sink & toilet at second floor. to comply with cec150(k) 10 | $8,500 |
| Nov 8, 2013 | Completed final sign-off May 2014 | 1274 28th Av | repair of exterior stair steps in kind, less than 50%Details
repair of exterior stair steps in kind, less than 50% | $1,500 |
| Oct 29, 2013 | Completed final sign-off Dec 2013 | 2519 26th Av | repair of front entrance stair in-kind, less than 50% in front of building.Details
repair of front entrance stair in-kind, less than 50% in front of building. | $2,100 |