Chuck Voong
- Listed as
- architect, authorized agent-others, engineer
- Firm
- Ca H. Voong, Pe
- Based in
- Sf
- On San Francisco permits
- May 2019 to Aug 2026
76 permits since 2000 (engineer on 69 permits, architect on 6 permits, authorized agent-others on 2 permits): 47 completed, 15 in progress, 5 never finaled, 9 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 19, 2026 | In progress filed Aug 2026, not yet issued | 565 28th St | Jwl 888 Construction Inc | 565-567 28th st: 1/f convert (e) storage to living space (3 bed/3bath, living room).add interior stairs to 2/f.rebuild ground level deck.2/f convert bedroom to dining room, remodel (e) kitchen, add interior stairs to 1/f.rebuild 2nd level deck. 3/f no work.comply with nov 202427829 & 201895475.Details
565-567 28th st: 1/f convert (e) storage to living space (3 bed/3bath, living room).add interior stairs to 2/f.rebuild ground level deck.2/f convert bedroom to dining room, remodel (e) kitchen, add interior stairs to 1/f.rebuild 2nd level deck. 3/f no work.comply with nov 202427829 & 201895475. | $250,000 |
| Aug 14, 2026 | In progress issued Aug 2026 | 556 Waller St | Triond Remodeling Inc | 3rd floor remodel: relocate kitchen, reconfigure bedrooms and remodel 2 bathrooms add skylights.Details
3rd floor remodel: relocate kitchen, reconfigure bedrooms and remodel 2 bathrooms add skylights. | $80,000 |
| Aug 11, 2026 | In progress issued Aug 2026 | 38 Keystone Wy | Jwl 888 Construction Inc | 1st floor foundation and slab replacement; lowered finished slab by 12 inches max. remodel bathroom. install ply'd shearwalls and holdownsDetails
1st floor foundation and slab replacement; lowered finished slab by 12 inches max. remodel bathroom. install ply'd shearwalls and holdowns | $50,000 |
| Aug 10, 2026 | In progress issued Aug 2026 | 1675 York St | Triond Remodeling Inc | 3rd floor: remodel bathroom, convert existing office to playroom and add dormer.Details
3rd floor: remodel bathroom, convert existing office to playroom and add dormer. | $50,000 |
| Jul 28, 2026 | In progress issued Jul 2026 | 2126 43rd Av | Jb Construction | to comply with nov 202668802, add 3ft high concrete retaining walls at rear yard.Details
to comply with nov 202668802, add 3ft high concrete retaining walls at rear yard. | $8,000 |
| Jul 17, 2026 | In progress issued Jul 2026 | 19 Victoria St | revision to permit 201912119199, revise bathroom layout, clarification to show existing internal staircase on plan. legalize existing non-permitted stair to ground levelDetails
revision to permit 201912119199, revise bathroom layout, clarification to show existing internal staircase on plan. legalize existing non-permitted stair to ground level | ||
| Jun 25, 2026 | In progress issued Aug 2026 | 738 Shields St | 1st/f: convert portion of e) garage & enclosure entry to living space. 2nd/f: remodel kitchen reconfigure bathroom, repair dryrot interior stairs and add rear deck, add roof over stairs, replace windows all windows(front w/ aluminnum wood clad, others w/ vinyl, same operation)Details
1st/f: convert portion of e) garage & enclosure entry to living space. 2nd/f: remodel kitchen reconfigure bathroom, repair dryrot interior stairs and add rear deck, add roof over stairs, replace windows all windows(front w/ aluminnum wood clad, others w/ vinyl, same operation) | $200,000 | |
| Jun 16, 2026 | In progress filed Jun 2026, not yet issued | 667 36th Av | Triond Remodeling Inc | 2/fl- remodel kitchen and bathroom. add 2x (n) bathrooms and laundry room with (n) closets. all work is interiorDetails
2/fl- remodel kitchen and bathroom. add 2x (n) bathrooms and laundry room with (n) closets. all work is interior | $75,000 |
| Apr 17, 2026 | Completed final sign-off Aug 2026 | 10 Coventry Ct | J Farley Construction | side stairs replacement, remove & replace stairs in bluestone treads and galvanized steel supporting structure w/ steel railing.Details
side stairs replacement, remove & replace stairs in bluestone treads and galvanized steel supporting structure w/ steel railing. | $5,000 |
| Mar 30, 2026 | Completed final sign-off Jun 2026 | 2454 Hyde St | Avis Builders And Design Corp | deck replacementDetails
deck replacement | $5,000 |
| Mar 16, 2026 | Completed final sign-off Jun 2026 | 222 Madrid St | Unique Home Design & Remodeling | rear deck replacement. remove & replace deck and staris in kind.Details
rear deck replacement. remove & replace deck and staris in kind. | $8,000 |
| Feb 11, 2026 | In progress issued Sep 2026 | 569 28th St | Jwl 888 Construction Inc | revision 202510248124- convert bedroom #2 to garage.Details
revision 202510248124- convert bedroom #2 to garage. | $10,000 |
| Jan 30, 2026 | In progress issued Sep 2026 | 4157 23rd St | Paul Wang | rev to pa# 2025-0731-2097: 2nd fl. add foundtion to 2nd fl. wallsDetails
rev to pa# 2025-0731-2097: 2nd fl. add foundtion to 2nd fl. walls | $5,000 |
| Dec 22, 2025 | Completed final sign-off Feb 2026 | 14 Aztec St | Triond Remodeling Inc | add two new skylights in between the (e) rafters to include roof framing, flashing and interior finishes.Details
add two new skylights in between the (e) rafters to include roof framing, flashing and interior finishes. | $16,000 |
| Sep 2, 2025 | Completed final sign-off Aug 2026 | 563 23rd Av | Gee Zhang Construction Inc | revision to pa #202304256410. interior layout changes to bedrooms and closets. replace garage foundation. no exterior changes.Details
revision to pa #202304256410. interior layout changes to bedrooms and closets. replace garage foundation. no exterior changes. | |
| Jul 31, 2025 | In progress issued Sep 2025 | 4157 23rd St | Paul Wang | 1st floor convert (e) storage and inclose cover patio to living space. 2nd floor remodel (e) living space and convert protion of (e) garage to living space. 3rd floor remodel kitchen, reconfigure bathrooms. replace front windows with all wood clad. replace other windows with vinyl windows. add lightDetails
1st floor convert (e) storage and inclose cover patio to living space. 2nd floor remodel (e) living space and convert protion of (e) garage to living space. 3rd floor remodel kitchen, reconfigure bathrooms. replace front windows with all wood clad. replace other windows with vinyl windows. add light | $350,000 |
| May 22, 2025 | Completed final sign-off Jun 2026 | 751 46th Av | H & L Construction Inc | 1st floor convert (e) garage and enclose cover patio to living space, 887sf. 2nd floor remodel kitchen , reconfigure bathrooms, infill lightwells, reconfigure interior stairs to 1st floor and add skylights. replace front windows with al wood clad in kind. replace all other windows with vinyl windowsDetails
1st floor convert (e) garage and enclose cover patio to living space, 887sf. 2nd floor remodel kitchen , reconfigure bathrooms, infill lightwells, reconfigure interior stairs to 1st floor and add skylights. replace front windows with al wood clad in kind. replace all other windows with vinyl windows | $250,000 |
| May 5, 2025 | In progress issued May 2025 | 32 Santa Rosa Av | Michael Mc Nulty Construction***Ask Id | revision to permit 2023-0106-9807. replace (e) garage slab and footing. replace (e) footing at kitchen.Details
revision to permit 2023-0106-9807. replace (e) garage slab and footing. replace (e) footing at kitchen. | $5,000 |
| Apr 7, 2025 | Completed final sign-off Aug 2025 | 120 Duncan St | Highq Inc | level 2 (120 ducan st): relocated kitchen. reconfigure interior walls, new bathroom. replace rear yard facing window (same size), new laundry closet. level 3 (122 ducan st): new bathroom. relocate laundry closet.Details
level 2 (120 ducan st): relocated kitchen. reconfigure interior walls, new bathroom. replace rear yard facing window (same size), new laundry closet. level 3 (122 ducan st): new bathroom. relocate laundry closet. | $130,000 |
| Mar 18, 2025 | Completed final sign-off Apr 2025 | 47 Alpha St | legalize concrete walkway, stairs, water heaters and utility housing shed on side yards, rear deck at 2nd flr. comply with nov 201315309, 202313608, 202313610, 202315561Details
legalize concrete walkway, stairs, water heaters and utility housing shed on side yards, rear deck at 2nd flr. comply with nov 201315309, 202313608, 202313610, 202315561 | $8,000 | |
| Feb 7, 2025 | Completed final sign-off May 2025 | 356 17th Av | Home Run Inc | revision to pa # 202410314167: enlarge 3/f bedroom 3 closet. all interior work.Details
revision to pa # 202410314167: enlarge 3/f bedroom 3 closet. all interior work. | |
| Jan 29, 2025 | In progress issued Mar 2025 | 1308 Valencia St | Luxury Home Remodeling Inc | interior remodel: 2nd fl kitchen remodel, add powder room near front entryDetails
interior remodel: 2nd fl kitchen remodel, add powder room near front entry | $50,000 |
| Nov 12, 2024 | Completed final sign-off Jan 2025 | 2418 30th Av | Gdh Roofing & Building Inc | structural revision to 202410173168: change e) beam at ground fl per plan, no layout change to floor planDetails
structural revision to 202410173168: change e) beam at ground fl per plan, no layout change to floor plan | $3,000 |
| Nov 8, 2024 | Completed final sign-off Mar 2025 | 1485 14th Av | Triond Remodeling Inc | remodel (e) kitchen. all interior work. remove portions of partition wall. kitchen is approx. 140 sq ft.Details
remodel (e) kitchen. all interior work. remove portions of partition wall. kitchen is approx. 140 sq ft. | $60,000 |
| Oct 11, 2024 | Completed final sign-off Feb 2025 | 186 Lippard Av | Triond Remodeling Inc | revision to pa # 202409251617: add interior footing under new post.Details
revision to pa # 202409251617: add interior footing under new post. | |
| Oct 3, 2024 | Expired or cancelled withdrawn Jan 2026 | 153 Silliman St | to comply with nov 202424227 (item 2) - replace rear stairs/landing. to comply with nov 202309103 (item 2) - replace rear stairs. rear stairs replacement. remove and replace stairs.Details
to comply with nov 202424227 (item 2) - replace rear stairs/landing. to comply with nov 202309103 (item 2) - replace rear stairs. rear stairs replacement. remove and replace stairs. | $5,000 | |
| Sep 20, 2024 | In progress issued Oct 2024 | 19 Porter St | Triond Remodeling Inc | convert portion of (e) porch (20 sf) to living space and relocate front door. add internal spiral stairs to access garage and convert (e) garage to living space.Details
convert portion of (e) porch (20 sf) to living space and relocate front door. add internal spiral stairs to access garage and convert (e) garage to living space. | $10,000 |
| Sep 13, 2024 | Completed final sign-off Apr 2025 | 2422 34th Av | H & L Construction Inc | revision to permit 202404049293. remove left side wall of internal stairs at 2/f. move shearwall to right side wall of internal stairs at 2/f.Details
revision to permit 202404049293. remove left side wall of internal stairs at 2/f. move shearwall to right side wall of internal stairs at 2/f. | |
| Sep 13, 2024 | Expired or cancelled expired Jan 2026 | 4089 25th St | Triond Remodeling Inc | remodel existing kitchen, all interior work, add kitchen island. remove living room fire place built-out (non-structural). move water heater to roofDetails
remodel existing kitchen, all interior work, add kitchen island. remove living room fire place built-out (non-structural). move water heater to roof | $50,000 |
| Aug 6, 2024 | Completed final sign-off Jan 2026 | 133 Palm Av | proposed (n) rear deck addition - 96 sq ft.Details
proposed (n) rear deck addition - 96 sq ft. | $15,000 | |
| Jul 30, 2024 | Completed final sign-off Dec 2024 | 401 Eddy St | comply w/ planning enforcement case 2024-003692enf & comply w/ nov 202423640. removal of refrigerator and compressor installed without permit, legalize metal security grid and metal security gate installed without a permit.Details
comply w/ planning enforcement case 2024-003692enf & comply w/ nov 202423640. removal of refrigerator and compressor installed without permit, legalize metal security grid and metal security gate installed without a permit. | $5,000 | |
| Jul 23, 2024 | Completed final sign-off Oct 2024 | 857 Washington St | H & L Construction Inc | no change to floor plan. replace jewerlry cases in kind only.Details
no change to floor plan. replace jewerlry cases in kind only. | $30,000 |
| Jul 12, 2024 | Completed final sign-off Aug 2025 | 428 Corbett Av | Triond Remodeling Inc, William Gregory Clause | 3/f: remodel existing kitchen and bathroom.Details
3/f: remodel existing kitchen and bathroom. | $65,000 |
| Jun 21, 2024 | Completed final sign-off Dec 2024 | 434 07th Av | H & L Construction Inc | revision to pa # 202404109677: add plans to remove & replace (e) rear stairs with new. replace stair in-kind.Details
revision to pa # 202404109677: add plans to remove & replace (e) rear stairs with new. replace stair in-kind. | $15,000 |
| May 20, 2024 | Completed final sign-off Oct 2024 | 32 Bradford St | Triond Remodeling Inc | reference permit# 202404129887: replace kitchen penninsula with kitchen island. all interior work. add (2) beams to support roof/ceiling.Details
reference permit# 202404129887: replace kitchen penninsula with kitchen island. all interior work. add (2) beams to support roof/ceiling. | |
| Apr 29, 2024 | Completed final sign-off Sep 2024 | 1250 Clay St | Triond Remodeling Inc | remodel (e) bathroom. remodel in kind. convert closet space to laundry closet. ventless dryer.Details
remodel (e) bathroom. remodel in kind. convert closet space to laundry closet. ventless dryer. | $15,000 |
| Apr 9, 2024 | Completed final sign-off May 2024 | 378 06th Av | Lemus Construction Co | side stairs replacement remove and replace stairs replace in kindDetails
side stairs replacement remove and replace stairs replace in kind | $10,000 |
| Apr 4, 2024 | Completed final sign-off Apr 2025 | 2422 34th Av | H & L Construction Inc | convert (e) rear of garage to living space. 1st fl: convert portion of garage to a 2 bedroom, family room & 2 full bath. 2nd fl: re-configure (e) bedroom & bath. infill lightwell. add (n) stairs to 1st fl. remove (e) kitchen. replace rear windows in kindDetails
convert (e) rear of garage to living space. 1st fl: convert portion of garage to a 2 bedroom, family room & 2 full bath. 2nd fl: re-configure (e) bedroom & bath. infill lightwell. add (n) stairs to 1st fl. remove (e) kitchen. replace rear windows in kind | $250,000 |
| Mar 15, 2024 | Completed final sign-off Mar 2025 | 2211 21st Av | Triond Remodeling Inc | voluntary structural strengthening. add shear walls and hold-downs.Details
voluntary structural strengthening. add shear walls and hold-downs. | $10,000 |
| Feb 12, 2024 | In progress issued Mar 2024 | 28 Hill St | Trinity Building Co Llc | ref 202211086104-revision to (e) permit to inlcude adding sliding door at office at 1st floor. remodel kitchen and adding sliding door at family room at second floor. remodel master bathroom at third floor.Details
ref 202211086104-revision to (e) permit to inlcude adding sliding door at office at 1st floor. remodel kitchen and adding sliding door at family room at second floor. remodel master bathroom at third floor. | |
| Nov 13, 2023 | Completed final sign-off Aug 2024 | 872 Lombard St | Lemus Construction Co | rear stair replacement. remove and replace e stairs. replace in kind.Details
rear stair replacement. remove and replace e stairs. replace in kind. | $20,000 |
| Nov 10, 2023 | Completed final sign-off Feb 2025 | 400 France Av | Bayward Builders | remodel 2nd fl. bathroom, remodel/reconfigure 1st fl. to new bedroom, bathroom, den and laundry roof. replace (e) vinly rock siding with stuccoDetails
remodel 2nd fl. bathroom, remodel/reconfigure 1st fl. to new bedroom, bathroom, den and laundry roof. replace (e) vinly rock siding with stucco | $100,000 |
| Nov 8, 2023 | Completed final sign-off Jan 2025 | 1435 Newcomb Av | revision to pa 202303274467 reconfigure bathroom. reconfigure kitchen; 2nd floor remove skylight and add door. new window casement in the front. new roof deck @ light well. new deck.Details
revision to pa 202303274467 reconfigure bathroom. reconfigure kitchen; 2nd floor remove skylight and add door. new window casement in the front. new roof deck @ light well. new deck. | ||
| Nov 8, 2023 | Expired or cancelled expired Jul 2026 | 257 Joost Av | Cs Construction Co | revision to approved drawings for pa#: 202211045955; add new beam to 1st floorDetails
revision to approved drawings for pa#: 202211045955; add new beam to 1st floor | $4,000 |
| Nov 3, 2023 | Completed final sign-off Apr 2024 | 1623 42nd Av | H & L Construction Inc | 2/f: kitchen remodel - remove and replace (e) kitchen cabinets, sink, dishwasher, stove and install recessed lights. update 2/f bath. 1/f: add new bath. all interior work.Details
2/f: kitchen remodel - remove and replace (e) kitchen cabinets, sink, dishwasher, stove and install recessed lights. update 2/f bath. 1/f: add new bath. all interior work. | $45,000 |
| Aug 24, 2023 | Expired or cancelled expired Jul 2026 | 257 Joost Av | Cs Construction Co | 2nd floor - horizontal addition add stairs from 2nd floor to 1st floor at east (right) side of house. convert 1st floor storage to bedroom and bathroom. no work within 22.5ft front right of wayDetails
2nd floor - horizontal addition add stairs from 2nd floor to 1st floor at east (right) side of house. convert 1st floor storage to bedroom and bathroom. no work within 22.5ft front right of way | $25,000 |
| Apr 25, 2023 | Completed final sign-off Aug 2026 | 563 23rd Av | Gee Zhang Construction Inc, Boman Deign & Construction Inc | 1/f: reconfigure (e) to (1)bedroom, (1)bath, move garage door, enlarge (e)window; 2/f: relocate kitchen, add bath, reconfig bedrooms, add skylight, add stairs to 1/f, remove (e)stairs/infill; replace (4)windows w/newDetails
1/f: reconfigure (e) to (1)bedroom, (1)bath, move garage door, enlarge (e)window; 2/f: relocate kitchen, add bath, reconfig bedrooms, add skylight, add stairs to 1/f, remove (e)stairs/infill; replace (4)windows w/new | $150,000 |
| Mar 27, 2023 | Completed final sign-off Jan 2025 | 1435 Newcomb Av | Vi Tang Hinh | 1st fl: reconfigure e to 2 bedrm, 1 bath and kitchenette. replace windows and add sliding doors at rear. 2nd fl relocate kitchen, add bath. relocate bedrooms. remove fireplace. add skylight, add deck in rear. infill 1st floor lightwellDetails
1st fl: reconfigure e to 2 bedrm, 1 bath and kitchenette. replace windows and add sliding doors at rear. 2nd fl relocate kitchen, add bath. relocate bedrooms. remove fireplace. add skylight, add deck in rear. infill 1st floor lightwell | $80,000 |
| Jan 6, 2023 | Never finaled issued Apr 2023, no final | 32 Santa Rosa Av | H & L Construction Inc | to comply with nov# 202300898. interior remodel downstairs, kitchen, bathroom, move stairway. 2/f: replace window with sliding door, not street visible. remove exterior rear stairs/deckDetails
to comply with nov# 202300898. interior remodel downstairs, kitchen, bathroom, move stairway. 2/f: replace window with sliding door, not street visible. remove exterior rear stairs/deck | $75,000 |
| Nov 30, 2022 | Completed final sign-off Jan 2024 | 1506 Masonic Av | Tredway Made Inc | revision to pa#202208180853. new furnaces added to 2nd and 3rd floor units. new windows/door at rear wall of 3rd floor unit. remove interior wall between kitchen and living room at 3rd floor unit.Details
revision to pa#202208180853. new furnaces added to 2nd and 3rd floor units. new windows/door at rear wall of 3rd floor unit. remove interior wall between kitchen and living room at 3rd floor unit. | $30,000 |
| Oct 31, 2022 | Never finaled filed Oct 2022, never issued | 1278 Thomas Av | remove(e)garage & game room that encroach into adjacent lot. demo only.Details
remove(e)garage & game room that encroach into adjacent lot. demo only. | $25,000 | |
| Oct 24, 2022 | Never finaled issued May 2023, no final | 1485 Sanchez St | Bhogal Brothers Construction Inc | 1/f: remodel kitchen/laundry room & bathroom remodel, infill bsement access, deck addition; 2/f: primary bath remodel, remodel bedroom #4, replace windows & (2) skylights, add ev charger & upgrade electrical panel to 250 ampDetails
1/f: remodel kitchen/laundry room & bathroom remodel, infill bsement access, deck addition; 2/f: primary bath remodel, remodel bedroom #4, replace windows & (2) skylights, add ev charger & upgrade electrical panel to 250 amp | $125,000 |
| Sep 26, 2022 | Completed final sign-off Aug 2023 | 3624 Ortega St | convert part of (e) garage to one bedroom, family room, one full bathroom and laundryDetails
convert part of (e) garage to one bedroom, family room, one full bathroom and laundry | $100,000 | |
| Sep 12, 2022 | Completed final sign-off May 2024 | 2106 22nd St | Alef Construction Corp | to comply with nov# 202058444. legalize as-built backyard deck and shed. planning variance under 2020-011542var.Details
to comply with nov# 202058444. legalize as-built backyard deck and shed. planning variance under 2020-011542var. | $10,000 |
| Mar 17, 2022 | Completed final sign-off Dec 2022 | 710 Laguna Honda Bl | H & L Construction Inc | rear yard- infill 6"-12" max and level area. slope sides of yard toward the center. replace extg 4 pane front window with new 3-pane al. clad window. complaint #202179900Details
rear yard- infill 6"-12" max and level area. slope sides of yard toward the center. replace extg 4 pane front window with new 3-pane al. clad window. complaint #202179900 | $5,000 |
| Feb 28, 2022 | Completed final sign-off May 2023 | 2166 25th Av | F C Company | kitchen remodel. remove and replace (e) kitchen cabinets, sink, dishwasher, stove, add island, and install recessed lights. convert (e) window to sliding door. add rear deck in master bedroom.Details
kitchen remodel. remove and replace (e) kitchen cabinets, sink, dishwasher, stove, add island, and install recessed lights. convert (e) window to sliding door. add rear deck in master bedroom. | $60,000 |
| Feb 11, 2022 | Expired or cancelled cancelled Jan 2026 | 1278 Thomas Av | remove & replace (e) kitchen cabinets, sink,dishwasher,stove & install (n) recessed lights. update & reconfigure (e) 2nd flr bathrms & convert (e) powder rm to full bath @ 1st flr.Details
remove & replace (e) kitchen cabinets, sink,dishwasher,stove & install (n) recessed lights. update & reconfigure (e) 2nd flr bathrms & convert (e) powder rm to full bath @ 1st flr. | $60,000 | |
| Dec 10, 2021 | Completed final sign-off Dec 2022 | 175 Granada Av | W F Construction Co | revise (e) framing after field verification. ref. permit 202110080156.Details
revise (e) framing after field verification. ref. permit 202110080156. | |
| Dec 1, 2021 | Completed final sign-off Dec 2023 | 170 Junipero Serra Bl | Trinity Building Co Llc | interior remodel including 4 existing bathroom remodels, 1 new bathroom, new interior finishes, new lighting/electrical fixtures, new radiant heating throughout.Details
interior remodel including 4 existing bathroom remodels, 1 new bathroom, new interior finishes, new lighting/electrical fixtures, new radiant heating throughout. | $500,000 |
| Oct 8, 2021 | Completed final sign-off Dec 2022 | 175 Granada Av | W F Construction Co | kitchen remodel: remove and replace (e) kitchen cabinets, sink, dishwasher, stove. add island and install new recessed lights in kitchen. update (e) bathrooms. infill 2/f stair. downstairs new 2 bedrooms. add bath and living room. replace 2 windows at rear.Details
kitchen remodel: remove and replace (e) kitchen cabinets, sink, dishwasher, stove. add island and install new recessed lights in kitchen. update (e) bathrooms. infill 2/f stair. downstairs new 2 bedrooms. add bath and living room. replace 2 windows at rear. | $100,000 |
| Sep 3, 2021 | Expired or cancelled cancelled Jan 2026 | 1148 Irving St | add ada bathroom and update 2 powder rooms. remove portion of center wall, add beam and install lights. interior remodel only.Details
add ada bathroom and update 2 powder rooms. remove portion of center wall, add beam and install lights. interior remodel only. | $80,000 | |
| Aug 30, 2021 | Completed final sign-off Dec 2021 | 1710 41st Av | H & L Construction Inc | kitchen remodel: remove/replace existing kitchen cabinets, sink, dishwasher, stove, add island and install new recessed lights in kitchen. interior remodel only.Details
kitchen remodel: remove/replace existing kitchen cabinets, sink, dishwasher, stove, add island and install new recessed lights in kitchen. interior remodel only. | $20,000 |
| Jul 7, 2021 | Never finaled issued Apr 2022, no final | 1644 Post St | Kwong Associates | 1st fl: interior remodel, kitchen and bath remodel. add recessed lights. 2nd and 3rd fl: int remodel, kitchen bath convert panty to bath, bedrm to lr, lr to bdrm. add recessed lightsDetails
1st fl: interior remodel, kitchen and bath remodel. add recessed lights. 2nd and 3rd fl: int remodel, kitchen bath convert panty to bath, bedrm to lr, lr to bdrm. add recessed lights | $200,000 |
| Jun 17, 2021 | Never finaled issued Aug 2021, no final | 1766 11th Av | infill ground fl unde e sunroom. one new bath, 1 family rm. remodel kitchen, bath, and add 1 storage at 2nd flDetails
infill ground fl unde e sunroom. one new bath, 1 family rm. remodel kitchen, bath, and add 1 storage at 2nd fl | $10,888 | |
| May 26, 2021 | Completed final sign-off Oct 2022 | 4021 Mission St | Mcmahon Construction | remodel bath on 2nd floor. convert 1st floor space to living space containing bedroom. replace wood siding at rear wall.Details
remodel bath on 2nd floor. convert 1st floor space to living space containing bedroom. replace wood siding at rear wall. | $75,000 |
| Apr 14, 2021 | Expired or cancelled cancelled Nov 2024 | 731 16th Av | remove and replace (e) beam, post and brace at rear of building and replace with new beam and strong wall.Details
remove and replace (e) beam, post and brace at rear of building and replace with new beam and strong wall. | $10,000 | |
| Feb 16, 2021 | Completed final sign-off Aug 2022 | 500 Upland Dr | Cs Construction Co | family room and bathroom addition - convert portions of (e) garage to family room and bathroom, convert (e) window to double french door, add (n) windows and install recess lightsDetails
family room and bathroom addition - convert portions of (e) garage to family room and bathroom, convert (e) window to double french door, add (n) windows and install recess lights | $45,000 |
| Jan 26, 2021 | Completed final sign-off Mar 2022 | 165 Stonecrest Dr | F Liu Construction | demolish wall between extg dinging and extg kitchen and demolish wall between extg hallway and extg dining room. remodel kitchen include new cabinetry, plumbing and electrical island with sink, wet bar, demo extg windows and install sliding door and windows.Details
demolish wall between extg dinging and extg kitchen and demolish wall between extg hallway and extg dining room. remodel kitchen include new cabinetry, plumbing and electrical island with sink, wet bar, demo extg windows and install sliding door and windows. | $50,000 |
| Jan 26, 2021 | Completed final sign-off Apr 2022 | 251 Harvard St | Cs Construction Co | kitchen remodel - remodel & replace existing cabinets, sink, dishwasher, stove, add island & install recessed lights. remodel & update 2 existing bathrooms. add recessed lights.Details
kitchen remodel - remodel & replace existing cabinets, sink, dishwasher, stove, add island & install recessed lights. remodel & update 2 existing bathrooms. add recessed lights. | $60,000 |
| Jan 13, 2021 | Completed final sign-off Aug 2021 | 1648 Post St | Kwong Associates | a.d.a. bathroom improvements. remove existing 3 inch step at entrance and scope to comply with ada requirementsDetails
a.d.a. bathroom improvements. remove existing 3 inch step at entrance and scope to comply with ada requirements | $25,000 |
| Nov 20, 2020 | Expired or cancelled expired Feb 2024 | 158 Precita Av | Fulcrum Point Construction | add retaining walls to replace staircase between properties.Details
add retaining walls to replace staircase between properties. | $30,000 |
| Sep 4, 2020 | Completed final sign-off Apr 2021 | 2454 30th Av | Vector Construction Inc. | kitchen remodel- replace (e) cabinets, sink, dw, stove. add island, (n) lights. update bathroom. horizontal addition: convert 6 sq ft of (e) lightwell to living space. interior remodel. no changes to exterior.Details
kitchen remodel- replace (e) cabinets, sink, dw, stove. add island, (n) lights. update bathroom. horizontal addition: convert 6 sq ft of (e) lightwell to living space. interior remodel. no changes to exterior. | $50,000 |
| Mar 2, 2020 | Expired or cancelled withdrawn May 2021 | 589 Missouri St | common area - remove & replace (e) center beam & post @ basement level. basement level voluntary seismic strengthening.Details
common area - remove & replace (e) center beam & post @ basement level. basement level voluntary seismic strengthening. | $40,000 | |
| Jul 22, 2019 | Completed final sign-off Sep 2019 | 340 Ritch St | Ams Construction | #2 full bath addition at main floor no exterior/structural workDetails
#2 full bath addition at main floor no exterior/structural work | $19,000 |
| Jun 12, 2019 | Completed final sign-off May 2020 | 1434 46th Av | Trinity Building Co Llc | revision to pa 2019-0513-0404 revised structural concrete details. new footings being added because they do not exist as was assumed with original structural drawings. replace existing slabDetails
revision to pa 2019-0513-0404 revised structural concrete details. new footings being added because they do not exist as was assumed with original structural drawings. replace existing slab | $10,000 |
| May 3, 2019 | Completed final sign-off Oct 2019 | 88 Francis St | Lemus Construction Co | front stairs dry rot replacement/repair fracing francis st. remove and replace dry rot stair treads of stringer. replace in-kindDetails
front stairs dry rot replacement/repair fracing francis st. remove and replace dry rot stair treads of stringer. replace in-kind | $22,000 |