Behnam Afshar
- Listed as
- authorized agent-others, contractor, pmt consultant/expediter
- Firm
- Bai Construction
- Based in
- Orinda
- On San Francisco permits
- Mar 2014 to Oct 2026
298 permits since 2000 (contractor on 298 permits, authorized agent-others on 2 permits, pmt consultant/expediter on 1 permit): 265 completed, 3 in progress, 17 never finaled, 13 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. Their ranked record as a contractor is on their contractor page. How to read these records
Worked with
Every other licensed party on the 100 most recent of their permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Apollo Building & Roofing Group Inc.
- Architects
- Daniel Howard (16), Michael Hilliard (2), Aaron Weiss, Darren Wong, Mason Robert Kirby
- Engineers
- Darren Wong (23), Darren Wong (3), Don David (3), Daniel Barringer (2), Marc Andrew Steyer (2), Nathan Williams (2), Alan Robinson, Darren Wong, John W Lau, Michael Hom, Muthanna Omran, Peter Yu, Wei Hong Yang
- Designers
- Darren Wong
Most recent permits
Showing the 100 most recent of 298.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 13, 2026 | In progress filed Oct 2026, not yet issued | 475 Valencia St | Bai Construction | replace 2nd + 3rd floor windows in kind. windows facing valencia st.Details
replace 2nd + 3rd floor windows in kind. windows facing valencia st. | $20,000 |
| Sep 28, 2026 | In progress issued Sep 2026 | 3691 Market St | Bai Construction | replace kitchen cabinetry. remove non-bearing walls in kitchen and bathroom. reconfigure existing bathroom. install washer/dryer. replace bathroom door. kitchen sink stays at same location with new kitchen faucet. bathroom faucet and shower fixture will be replaced. no increase in plumbing fixtures.Details
replace kitchen cabinetry. remove non-bearing walls in kitchen and bathroom. reconfigure existing bathroom. install washer/dryer. replace bathroom door. kitchen sink stays at same location with new kitchen faucet. bathroom faucet and shower fixture will be replaced. no increase in plumbing fixtures. | $20,000 |
| Mar 20, 2026 | In progress issued Mar 2026 | 1556 Filbert St | Apollo Building & Roofing Group Inc., Bai Construction | unit #1, 2, 3, 4, 5 and 6: repair of fire damage,(comply w/ nov#202546362,nov#202545962), replace in kind kitchens (70 sq ft each),demolition and replace in kind existing siding in light court(1600 sq ft),replace 42 damaged windows in light well with white viny/windows,not facing street,in kind inDetails
unit #1, 2, 3, 4, 5 and 6: repair of fire damage,(comply w/ nov#202546362,nov#202545962), replace in kind kitchens (70 sq ft each),demolition and replace in kind existing siding in light court(1600 sq ft),replace 42 damaged windows in light well with white viny/windows,not facing street,in kind in | $120,000 |
| Feb 13, 2026 | Completed final sign-off Sep 2026 | 2172 Pacific Av | Bai Construction | voluntary structural strengthening in the building.Details
voluntary structural strengthening in the building. | $120,000 |
| Aug 15, 2025 | Completed final sign-off Aug 2026 | 2100 Van Ness Av | Bai Construction | voluntary strenghthening new plywood and lateral ties at roof and new lateral ties at mezzanine, legalize ada bath on the 1st floor and add power door operator in the front door.Details
voluntary strenghthening new plywood and lateral ties at roof and new lateral ties at mezzanine, legalize ada bath on the 1st floor and add power door operator in the front door. | $150,000 |
| May 22, 2025 | Completed final sign-off Aug 2025 | 2973 16th St | Bai Construction | facade repair work in accordance with approved facade survey #17622-2eDetails
facade repair work in accordance with approved facade survey #17622-2e | $10,000 |
| Jan 17, 2025 | Completed final sign-off Jan 2025 | 1047 Polk St | Bai Construction | remove sign that former tenant installed without permission. to comply with nov #202303645Details
remove sign that former tenant installed without permission. to comply with nov #202303645 | $1,000 |
| Jun 18, 2024 | Completed final sign-off Jan 2025 | 1801 Union St | Bai Construction | replace damaged rot at corner of retail store. repair exterior siding in kind.Details
replace damaged rot at corner of retail store. repair exterior siding in kind. | $5,000 |
| Jun 14, 2024 | Completed final sign-off Oct 2024 | 603 Tennessee St | Bai Construction | unit 308: replace water damaged sheetrock. everything replace in kind, maintain existing fire rating.Details
unit 308: replace water damaged sheetrock. everything replace in kind, maintain existing fire rating. | $10,000 |
| Jun 14, 2024 | Completed final sign-off Oct 2024 | 603 Tennessee St | Bai Construction | unit 502: replace water damaged sheetrock. everything replace in kind, maintain existing fire rating.Details
unit 502: replace water damaged sheetrock. everything replace in kind, maintain existing fire rating. | $5,000 |
| Jun 14, 2024 | Completed final sign-off Oct 2024 | 603 Tennessee St | Bai Construction | unit 508: replace damaged sheetrock. everything replace in kind, maintain existing fire rating.Details
unit 508: replace damaged sheetrock. everything replace in kind, maintain existing fire rating. | $10,000 |
| Jun 14, 2024 | Completed final sign-off Oct 2024 | 603 Tennessee St | Bai Construction | unit 504: replace damaged sheetrock. replace water damaged flooring. reinstall kitchen cabinets and appliances. everything replace in kind, maintain existing fire rating.Details
unit 504: replace damaged sheetrock. replace water damaged flooring. reinstall kitchen cabinets and appliances. everything replace in kind, maintain existing fire rating. | $40,000 |
| Jun 14, 2024 | Completed final sign-off Sep 2024 | 603 Tennessee St | Bai Construction | elevator shaft: replace damaged sheetrock in elevator shaft. match (e) fire rating, min. 2 layer 5/8" thk type x gyp.Details
elevator shaft: replace damaged sheetrock in elevator shaft. match (e) fire rating, min. 2 layer 5/8" thk type x gyp. | $10,000 |
| Jun 14, 2024 | Completed final sign-off Oct 2024 | 603 Tennessee St | Bai Construction | unit 506: replace water damaged sheetrock" replace water damaged hardwood floor. reinstall kitchen cabinets and appliances. everything replace in kind, maintain existing fire rating.Details
unit 506: replace water damaged sheetrock" replace water damaged hardwood floor. reinstall kitchen cabinets and appliances. everything replace in kind, maintain existing fire rating. | $40,000 |
| Jun 14, 2024 | Completed final sign-off Oct 2024 | 603 Tennessee St | Bai Construction | unit 306: replace water damaged sheetrock and hardwood flooring. reinstall kitchen cabinets and appliances. everything replace in kind, maintain existing fire ratingDetails
unit 306: replace water damaged sheetrock and hardwood flooring. reinstall kitchen cabinets and appliances. everything replace in kind, maintain existing fire rating | $40,000 |
| Jun 13, 2024 | Completed final sign-off Oct 2024 | 603 Tennessee St | Bai Construction | unit #202: replace water damage sheet rock on the wall + ceiling. everything replace in kind, maintain existing fire rating.Details
unit #202: replace water damage sheet rock on the wall + ceiling. everything replace in kind, maintain existing fire rating. | $2,000 |
| Jun 13, 2024 | Completed final sign-off Oct 2024 | 603 Tennessee St | Bai Construction | unit 302: replace water damaged sheetrock interior. everything replace in kind, maintain existing fire rating.Details
unit 302: replace water damaged sheetrock interior. everything replace in kind, maintain existing fire rating. | $2,000 |
| Jun 13, 2024 | Completed final sign-off Oct 2024 | 603 Tennessee St | Bai Construction | unit 304: replace damaged sheetrock: replace water damaged floorig: reinstall kitchen cabinets and appliances. everything replace in kind, maintain existing fire rating.Details
unit 304: replace damaged sheetrock: replace water damaged floorig: reinstall kitchen cabinets and appliances. everything replace in kind, maintain existing fire rating. | $40,000 |
| Jun 13, 2024 | Completed final sign-off Oct 2024 | 603 Tennessee St | Bai Construction | unit #206: replace water damaged sheetrock. reinstall (e) kitchen cabinets + apppliances. replace water damaged flooring. everything replace in kind, maintain existing fire rating.Details
unit #206: replace water damaged sheetrock. reinstall (e) kitchen cabinets + apppliances. replace water damaged flooring. everything replace in kind, maintain existing fire rating. | $40,000 |
| Jun 13, 2024 | Completed final sign-off Oct 2024 | 603 Tennessee St | Bai Construction | unit #208: replace water damaged sheetrock on wall. everything replace in kind, maintain existing fire rating.Details
unit #208: replace water damaged sheetrock on wall. everything replace in kind, maintain existing fire rating. | $5,000 |
| Jun 13, 2024 | Completed final sign-off Oct 2024 | 603 Tennessee St | Bai Construction | unit #204: replace water damage sheetrock, reinstall existing kitchen cabinets, replace water damaged flooring. reinstall kitchen appliances. everything replace in kind, maintain existing fire rating.Details
unit #204: replace water damage sheetrock, reinstall existing kitchen cabinets, replace water damaged flooring. reinstall kitchen appliances. everything replace in kind, maintain existing fire rating. | $30,000 |
| Jun 6, 2024 | Completed final sign-off Aug 2024 | 549 Fell St | Bai Construction | permeation grouting on sidewall. the work associated to nov 202419295Details
permeation grouting on sidewall. the work associated to nov 202419295 | $20,000 |
| Mar 22, 2024 | Completed final sign-off Sep 2024 | 361 14th St | Bai Construction | revision to permit 202401224369. bigger foundations.Details
revision to permit 202401224369. bigger foundations. | $10,000 |
| Mar 7, 2024 | Expired or cancelled cancelled Nov 2024 | 3864 24th St | Bai Construction | rev to pa 201807275807 soft-story retrofit in compliance with ccsf soft-story ordinance 66-13Details
rev to pa 201807275807 soft-story retrofit in compliance with ccsf soft-story ordinance 66-13 | |
| Feb 2, 2024 | Completed final sign-off Apr 2024 | 1103 Page St | Bai Construction | revision to pa 202312072137 add new concrete footing under plywood shear walls in the ground floorDetails
revision to pa 202312072137 add new concrete footing under plywood shear walls in the ground floor | $10,000 |
| Jan 22, 2024 | Completed final sign-off Sep 2024 | 361 14th St | Bai Construction | commencement of work not startede under previously approved permit application pa# 201705197089.Details
commencement of work not startede under previously approved permit application pa# 201705197089. | |
| Jan 10, 2024 | Completed final sign-off Jun 2024 | 361 14th St | Bai Construction | replace windows (14) non street facing- replace stucco in kindDetails
replace windows (14) non street facing- replace stucco in kind | $5,000 |
| Dec 7, 2023 | Completed final sign-off Apr 2024 | 1103 Page St | Bai Construction | commencement of work not started under previously approved permit 201709148304.Details
commencement of work not started under previously approved permit 201709148304. | $70,000 |
| Nov 21, 2023 | Completed final sign-off Mar 2024 | 574 03rd St | Bai Construction | repair cracks on rear wall (ritch st)Details
repair cracks on rear wall (ritch st) | $10,000 |
| Nov 3, 2023 | Completed final sign-off Mar 2024 | 714 Jackson St | Bai Construction | to comply with accessible business entrance program/technical infeasibility/unreasonable hardship per ordinance 51-16, abe#202311039002.Details
to comply with accessible business entrance program/technical infeasibility/unreasonable hardship per ordinance 51-16, abe#202311039002. | $10 |
| Oct 20, 2023 | Completed final sign-off Mar 2024 | 710 Jackson St | Bai Construction | comply with abe ordiance 51-16, abe 201912039073; apply for technical infeasiblityDetails
comply with abe ordiance 51-16, abe 201912039073; apply for technical infeasiblity | $10 |
| Sep 25, 2023 | Completed final sign-off May 2024 | 3210 Geary Bl | Bai Construction | to comply with abe program per ord 51-16. abe 201903265601. install exterior liftDetails
to comply with abe program per ord 51-16. abe 201903265601. install exterior lift | $10,000 |
| Sep 12, 2023 | Never finaled filed Sep 2023, never issued | 83 Noe St | Bai Construction | legalization of 1st floor into a "converted adu" per government code section 65852.2(a) through (d). (n) window @ south wall, demo (e) interior stair from 1st floor to 2nd floor. (n) 1-hr rated floor/ceiling fire separation @ (e) stair opening. (n) landing & stair @ (e) front eero window.Details
legalization of 1st floor into a "converted adu" per government code section 65852.2(a) through (d). (n) window @ south wall, demo (e) interior stair from 1st floor to 2nd floor. (n) 1-hr rated floor/ceiling fire separation @ (e) stair opening. (n) landing & stair @ (e) front eero window. | $150,000 |
| Jul 13, 2023 | Never finaled filed Jul 2023, never issued | 1103 Page St | Bai Construction | shoring permit. excavate for 2 new adu units. ref adu permit 201908279922.Details
shoring permit. excavate for 2 new adu units. ref adu permit 201908279922. | $10,000 |
| Jan 26, 2023 | Completed final sign-off Aug 2023 | 1105 Larkin St | Bai Construction | facade repair. brick crack repair.Details
facade repair. brick crack repair. | $20,000 |
| Oct 7, 2022 | Completed final sign-off Nov 2023 | 1105 Larkin St | Bai Construction | repair fire escape balcony in the front of the building. comply with complaint # 202185045Details
repair fire escape balcony in the front of the building. comply with complaint # 202185045 | $25,000 |
| Jul 15, 2022 | Never finaled issued Jul 2022, no final | 1304 Lombard St | Bai Construction | revision 201706098942: seismic retrofit soft story. comply with sfebc 4d mandatory seismic retrofit per 2012 cebc appendix a4Details
revision 201706098942: seismic retrofit soft story. comply with sfebc 4d mandatory seismic retrofit per 2012 cebc appendix a4 | |
| Jul 14, 2022 | Completed final sign-off Aug 2022 | 1328 Hyde St | Bai Construction | unit #2: one bathroom remodel. replace bath fixtures only. kitchen sink replacement. all in-kind.Details
unit #2: one bathroom remodel. replace bath fixtures only. kitchen sink replacement. all in-kind. | $10,000 |
| Jul 8, 2022 | Completed final sign-off Aug 2022 | 3000 Baker St | Bai Construction | replace (e) beams ith new wood beam on the second floorDetails
replace (e) beams ith new wood beam on the second floor | $20,000 |
| Jul 8, 2022 | Completed final sign-off Jan 2023 | 176 Julian Av | Bai Construction | seismic retrofit of soft story comply w/ sfebc chapter 4d mandatory seismic retrofit per 2019 cebe appendex a4Details
seismic retrofit of soft story comply w/ sfebc chapter 4d mandatory seismic retrofit per 2019 cebe appendex a4 | $80,000 |
| Jul 8, 2022 | Completed final sign-off Oct 2022 | 3235 16th St | Bai Construction | technicial infeasibility. replace lockset. new doorbell. modify interior seating. abe# 201902115108.Details
technicial infeasibility. replace lockset. new doorbell. modify interior seating. abe# 201902115108. | $1,000 |
| Jun 28, 2022 | Expired or cancelled cancelled Jan 2026 | 2171 Pacific Av | Bai Construction | (e) 2 decks replace in-kind. update cost of construction. work previously completed.Details
(e) 2 decks replace in-kind. update cost of construction. work previously completed. | $61,800 |
| Apr 28, 2022 | Completed final sign-off Aug 2022 | 1105 Larkin St | Bai Construction | response to nov #202185048 (partial compliance) repair balcony facing larkin st with new plans after demo. demo phase for this permit only. this is to remove unsafe conditions (separate for repair work- mh).Details
response to nov #202185048 (partial compliance) repair balcony facing larkin st with new plans after demo. demo phase for this permit only. this is to remove unsafe conditions (separate for repair work- mh). | $5,000 |
| Mar 8, 2022 | Completed final sign-off Mar 2022 | 115 Henry St | Bai Construction | bathroom remodel. no change to location of fixtures. only replace (e) fixtures. (n) flooring, tiles. no wall or layout changes.Details
bathroom remodel. no change to location of fixtures. only replace (e) fixtures. (n) flooring, tiles. no wall or layout changes. | $2,000 |
| Feb 4, 2022 | Completed final sign-off Apr 2022 | 70 Liberty St | Bai Construction | rev to pa202106233080: revise shear walls and concrete footings.Details
rev to pa202106233080: revise shear walls and concrete footings. | |
| Feb 4, 2022 | Completed final sign-off Mar 2022 | 115 Henry St | Bai Construction | replace 1 set of kitchen cabinets, countertop, sink, appliances- replace (e) light fixtures, replace flooring. non structuralDetails
replace 1 set of kitchen cabinets, countertop, sink, appliances- replace (e) light fixtures, replace flooring. non structural | $10,000 |
| Jan 25, 2022 | Completed final sign-off Aug 2022 | 2017 Mission St | Bai Construction | install (n) roll up gate of entrance. not to be solid and meeting section 145.1 to be 75 percent open to perpendicular view.Details
install (n) roll up gate of entrance. not to be solid and meeting section 145.1 to be 75 percent open to perpendicular view. | $5,000 |
| Dec 20, 2021 | Expired or cancelled withdrawn Nov 2023 | 3216 Geary Bl | Bai Construction | to comply with accessible building entrance ordinance 51-16. revision to 202101072249. revise location of exterior liftDetails
to comply with accessible building entrance ordinance 51-16. revision to 202101072249. revise location of exterior lift | |
| Nov 30, 2021 | Completed final sign-off May 2022 | 746 Broadway | Bai Construction | to comply w/ accessible building entrance program per ordinance 51-61, reslope recessed entry & install power door operatorDetails
to comply w/ accessible building entrance program per ordinance 51-61, reslope recessed entry & install power door operator | $10,000 |
| Sep 15, 2021 | Completed final sign-off Feb 2022 | 1328 Hyde St | Bai Construction | fire/water damage repair: apt 2: new sheetrock on ceiling.apt 4: sheetrock ceiling & walls. new electrical, plugs, receptacles. apt 6: new sheetrock ceilings & walls.replace 3 windows, inkind and retain (e) look of wood windows.Details
fire/water damage repair: apt 2: new sheetrock on ceiling.apt 4: sheetrock ceiling & walls. new electrical, plugs, receptacles. apt 6: new sheetrock ceilings & walls.replace 3 windows, inkind and retain (e) look of wood windows. | $10,000 |
| Sep 3, 2021 | Completed final sign-off Apr 2022 | 2632 Larkin St | Bai Construction | revision to pa 201709158747. seismic revision of soft story comply with sfebc 4d. mandatory seismic retrofit per 2019 cebc appendix a4.Details
revision to pa 201709158747. seismic revision of soft story comply with sfebc 4d. mandatory seismic retrofit per 2019 cebc appendix a4. | |
| Aug 30, 2021 | Completed final sign-off Sep 2021 | 5102 Diamond Heights Bl | Bai Construction | repair (e) wing wall between 5102 and 5104 in kind. remove damaged wood molding and paint.Details
repair (e) wing wall between 5102 and 5104 in kind. remove damaged wood molding and paint. | $10,000 |
| Jul 27, 2021 | Never finaled issued Jul 2021, no final | 5094 Diamond Heights Bl | Bai Construction | renew application no. 2018-0222-2043. commencement of work not started under previously approved permit appl. no. 2018-0222-2043Details
renew application no. 2018-0222-2043. commencement of work not started under previously approved permit appl. no. 2018-0222-2043 | $30,000 |
| Jun 21, 2021 | Never finaled issued Jun 2021, no final | 5110 Diamond Heights Bl | Bai Construction | recommencement and completion of work approved under permit application 2018-0222-2045. 50% of work remaining.Details
recommencement and completion of work approved under permit application 2018-0222-2045. 50% of work remaining. | |
| Jun 14, 2021 | Completed final sign-off Jul 2021 | 1304 Lombard St | Bai Construction | revision to 201706098942 relocate simpson strong walls on gr flDetails
revision to 201706098942 relocate simpson strong walls on gr fl | |
| Jan 11, 2021 | Completed final sign-off Feb 2021 | 1351 Powell St | Bai Construction | revision to pa# 201912028448. revised shear wall and footing in the g/fDetails
revision to pa# 201912028448. revised shear wall and footing in the g/f | $8,000 |
| Jan 7, 2021 | Completed final sign-off Jan 2022 | 3216 Geary Bl | Bai Construction | install security gate and pedestrian door.Details
install security gate and pedestrian door. | $25,000 |
| Jan 7, 2021 | Expired or cancelled cancelled Jul 2024 | 3216 Geary Bl | Bai Construction | to comply with accessible business entrance ordinance 51-16: install new exterior platform lift.Details
to comply with accessible business entrance ordinance 51-16: install new exterior platform lift. | $15,000 |
| Nov 10, 2020 | Never finaled issued Feb 2021, no final | 1342 Jones St | Bai Construction | repair (e) rear retaining wall facing rear yard.Details
repair (e) rear retaining wall facing rear yard. | $20,000 |
| Nov 3, 2020 | Completed final sign-off Jun 2021 | 258 Red Rock Wy | Bai Construction | less than 50% repair of front existing wood decks (2)Details
less than 50% repair of front existing wood decks (2) | $20,000 |
| Nov 3, 2020 | Completed final sign-off Apr 2021 | 1301 Stockton St | Bai Construction | revision to pa #201809140258 - relocate new steel columns and ada bathroomDetails
revision to pa #201809140258 - relocate new steel columns and ada bathroom | |
| Sep 21, 2020 | Expired or cancelled withdrawn Jun 2022 | 279 Downey St | Bai Construction | seismic retrofit of soft story comply with sfebc 4d mandotory seismic retrofit per 2016 cebc appendeix a4.Details
seismic retrofit of soft story comply with sfebc 4d mandotory seismic retrofit per 2016 cebc appendeix a4. | $90,000 |
| Aug 13, 2020 | Completed final sign-off Apr 2021 | 1301 Stockton St | Bai Construction | at broadway sidewalk, repair and strengthening extg access to basement. replace glass block with new concrete. at stockton sidewalk remove access to basement and provide new structural slab at openingDetails
at broadway sidewalk, repair and strengthening extg access to basement. replace glass block with new concrete. at stockton sidewalk remove access to basement and provide new structural slab at opening | $15,000 |
| Jul 31, 2020 | Completed final sign-off Feb 2021 | 2900 Pacific Av | Bai Construction | revision to pa 2017-1024-2074, adding moment frame in place of shearwallDetails
revision to pa 2017-1024-2074, adding moment frame in place of shearwall | $10,000 |
| Jul 13, 2020 | Completed final sign-off Oct 2020 | 1301 Stockton St | Bai Construction | additional structural details for soft story retrofit under construction (issued permit #2018-0914-0258).Details
additional structural details for soft story retrofit under construction (issued permit #2018-0914-0258). | $8,000 |
| Jul 10, 2020 | Expired or cancelled withdrawn May 2021 | 1304 Lombard St | Bai Construction | revision to pa# 201706098942. change location of shear walls & steel frames.Details
revision to pa# 201706098942. change location of shear walls & steel frames. | $10,000 |
| Jul 6, 2020 | Completed final sign-off Feb 2026 | 96 Toledo Wy | Bai Construction | revision to pa# 2018-0309-3353. relocate steel moment frames in the first floorDetails
revision to pa# 2018-0309-3353. relocate steel moment frames in the first floor | $10,000 |
| Jun 29, 2020 | Completed final sign-off Dec 2020 | 552 Waller St | Bai Construction | replace portion of extg foundation adg. to 556 waller streetDetails
replace portion of extg foundation adg. to 556 waller street | $20,000 |
| May 14, 2020 | Never finaled issued Aug 2020, no final | 556 Waller St | Bai Construction | revision to pa 201709158557. revise foundation detailsDetails
revision to pa 201709158557. revise foundation details | |
| Mar 13, 2020 | Completed final sign-off Jun 2020 | 298 Red Rock Wy | Bai Construction | rev 201802222040: add/ repairing 298 a + b red rock way comply with nov 201070072.Details
rev 201802222040: add/ repairing 298 a + b red rock way comply with nov 201070072. | $10,000 |
| Mar 4, 2020 | Completed final sign-off Nov 2020 | 3232 Geary Bl | Bai Construction | accessible business entrance program per ordinance 51-16. install additional power door activators.Details
accessible business entrance program per ordinance 51-16. install additional power door activators. | $500 |
| Mar 4, 2020 | Completed final sign-off Jan 2022 | 3216 Geary Bl | Bai Construction | accessible business entrance program per ordinance 51-16. install warning striping.Details
accessible business entrance program per ordinance 51-16. install warning striping. | $300 |
| Mar 3, 2020 | Completed final sign-off Oct 2020 | 1301 Stockton St | Bai Construction | replace (e) footing with new concrete footing in the 1st fl and repair wood stair in the basement levelDetails
replace (e) footing with new concrete footing in the 1st fl and repair wood stair in the basement level | $45,000 |
| Feb 25, 2020 | Completed final sign-off Nov 2020 | 3240 Geary Bl | Bai Construction | accessible business entrance program per ordinance 51-16. install poweder door operator actuators.Details
accessible business entrance program per ordinance 51-16. install poweder door operator actuators. | $500 |
| Feb 25, 2020 | Completed final sign-off Feb 2021 | 3222 Geary Bl | Bai Construction | accessible business entrance program per ordinance 51-16. install threshold and reslope path of traval.Details
accessible business entrance program per ordinance 51-16. install threshold and reslope path of traval. | $200 |
| Feb 25, 2020 | Completed final sign-off Nov 2020 | 3226 Geary Bl | Bai Construction | accessible business entrance program per ordinance 51-16. apply for technical infeasibility. restripe stairs, add powder door activators.Details
accessible business entrance program per ordinance 51-16. apply for technical infeasibility. restripe stairs, add powder door activators. | $500 |
| Feb 25, 2020 | Completed final sign-off Nov 2020 | 3244 Geary Bl | Bai Construction | accessible business entrance program per ordinance 51-16. install new power door operator & kick plate.Details
accessible business entrance program per ordinance 51-16. install new power door operator & kick plate. | $3,000 |
| Feb 25, 2020 | Completed final sign-off Nov 2020 | 3236 Geary Bl | Bai Construction | accessible business entrance program per ordinance 51-16. install poweder door operator.Details
accessible business entrance program per ordinance 51-16. install poweder door operator. | $500 |
| Feb 10, 2020 | Completed final sign-off Dec 2020 | 2865 Jackson St | Bai Construction | revision to 201711073366. revise moment frame shear transfer details at 2nd fl framing. revise wouthwest shearwall 2nd and 1st fl framing. replace moment frames at garage doors with hardy panels. revise grade beam at moment frame at partial foundation planDetails
revision to 201711073366. revise moment frame shear transfer details at 2nd fl framing. revise wouthwest shearwall 2nd and 1st fl framing. replace moment frames at garage doors with hardy panels. revise grade beam at moment frame at partial foundation plan | $10,000 |
| Jan 24, 2020 | Completed final sign-off Sep 2020 | 1441 Montgomery St | Bai Construction | revision to 201710302676: seismic retrofit of soft story comply with sfebc 4d mandatory seismic retrofit per 2016 cebc appendix a4Details
revision to 201710302676: seismic retrofit of soft story comply with sfebc 4d mandatory seismic retrofit per 2016 cebc appendix a4 | |
| Dec 27, 2019 | Completed final sign-off Jun 2020 | 1730 Vallejo St | Bai Construction | repair wood deck in the rear of the building to comply with nov 201906282Details
repair wood deck in the rear of the building to comply with nov 201906282 | $35,000 |
| Dec 18, 2019 | Completed final sign-off Mar 2020 | 58 Liberty St | Bai Construction | rev to pa#201906143495: temporary shoring in the crawl space of ground floor. no excavationDetails
rev to pa#201906143495: temporary shoring in the crawl space of ground floor. no excavation | $8,000 |
| Dec 2, 2019 | Never finaled issued Jun 2020, no final | 1351 Powell St | Bai Construction | (commercial) revision to app#201706028273. mandatory retrofit 2016 cebc appendix a-4Details
(commercial) revision to app#201706028273. mandatory retrofit 2016 cebc appendix a-4 | $60,000 |
| Dec 2, 2019 | Completed final sign-off Feb 2021 | 1351 Powell St | Bai Construction | (residential) revision to app#201706028274. mandatory retrofit 2016 cebc appendix a-4Details
(residential) revision to app#201706028274. mandatory retrofit 2016 cebc appendix a-4 | $120,000 |
| Nov 21, 2019 | Completed final sign-off Oct 2020 | 1301 Stockton St | Bai Construction | portion of (e) wood floor framing over electrical basement space to be removed & replaced w (n) light weight concrete fill over metal deck. hss steel members will be used to span over (e) opening & bear directly on (e) below grade brick walls. portion of (e) wood floor framing to be removed/ replaceDetails
portion of (e) wood floor framing over electrical basement space to be removed & replaced w (n) light weight concrete fill over metal deck. hss steel members will be used to span over (e) opening & bear directly on (e) below grade brick walls. portion of (e) wood floor framing to be removed/ replace | $70,000 |
| Nov 4, 2019 | Completed final sign-off Jan 2020 | 3666 20th St | Bai Construction | rev to pa# 201709148298; add new concrete footing in the basement level soft story retrofit per sfbc chapter 4d.Details
rev to pa# 201709148298; add new concrete footing in the basement level soft story retrofit per sfbc chapter 4d. | $5,000 |
| Sep 13, 2019 | Completed final sign-off Aug 2020 | 3250 Geary Bl | Bai Construction | provide accessible toilet roomDetails
provide accessible toilet room | $31,684 |
| Aug 30, 2019 | Completed final sign-off Aug 2020 | 3250 Geary Bl | Bai Construction | accessibility upgrades only. including compliance with abe ord. 51-61 andDetails
accessibility upgrades only. including compliance with abe ord. 51-61 and | $7,856 |
| Jul 31, 2019 | Completed final sign-off Feb 2021 | 1342 Jones St | Bai Construction | soft story retrofit per sfebc chapter 4d. 2016 cebc appendix a-4Details
soft story retrofit per sfebc chapter 4d. 2016 cebc appendix a-4 | $90,000 |
| Jul 8, 2019 | Expired or cancelled cancelled Jan 2026 | 460 Fell St | Bai Construction | relocate garage door flush to front wall. | $5,000 |
| Jul 8, 2019 | Expired or cancelled cancelled Jan 2026 | 460 Fell St | Bai Construction | relocate garage door towards front elevation, no change to size of openingDetails
relocate garage door towards front elevation, no change to size of opening | $5,000 |
| Jun 14, 2019 | Completed final sign-off Mar 2020 | 58 Liberty St | Bai Construction | soft story retrofit per sfebc chapter 4d 2016 cebc appendix a-4Details
soft story retrofit per sfebc chapter 4d 2016 cebc appendix a-4 | $100,000 |
| May 16, 2019 | Completed final sign-off Aug 2019 | 3423 19th St | Bai Construction | revision to pa 2017-1117-4246 devise existing property line foundations to existing brick foundation; remove holding & foundations revised as existing brick foundation, add plywood @ east property line wall, revise 9'-0" long shearwallDetails
revision to pa 2017-1117-4246 devise existing property line foundations to existing brick foundation; remove holding & foundations revised as existing brick foundation, add plywood @ east property line wall, revise 9'-0" long shearwall | |
| May 10, 2019 | Completed final sign-off Feb 2020 | 1355 Stockton St | Bai Construction | add 2 baths, add new walls and infill new floor inthe 1st floor.Details
add 2 baths, add new walls and infill new floor inthe 1st floor. | $120,000 |
| Apr 16, 2019 | Completed final sign-off Dec 2019 | 1355 Stockton St | Bai Construction | rev to pa# 201712126287: relocate steel moment frames and shear wallsDetails
rev to pa# 201712126287: relocate steel moment frames and shear walls | |
| Mar 22, 2019 | Completed final sign-off Apr 2019 | 797 Corbett Av | Bai Construction | to address complaint 201937921 - replace three garage doors for soft sory retrofit (approved under bpa 201612296176). no other work.Details
to address complaint 201937921 - replace three garage doors for soft sory retrofit (approved under bpa 201612296176). no other work. | $2,000 |
| Mar 11, 2019 | Completed final sign-off Oct 2019 | 3500 Fulton St | Bai Construction | soft story retrofit per sfebc chapter 4d engineering criteria: asce 41-13Details
soft story retrofit per sfebc chapter 4d engineering criteria: asce 41-13 | $50,000 |
| Mar 8, 2019 | Completed final sign-off May 2019 | 425 39th Av | Bai Construction | repair dryrot damage at rear of building.Details
repair dryrot damage at rear of building. | $15,000 |
| Mar 8, 2019 | Completed final sign-off Dec 2019 | 2140 Pacific Av | Bai Construction | voluntary installation of 2 new steel braced frames at basement.Details
voluntary installation of 2 new steel braced frames at basement. | $40,000 |
| Feb 26, 2019 | Completed final sign-off Feb 2019 | 400 Broadway | Bai Construction | administrative permit to correct unit count to 82 residential guest rooms & 36 tourist rooms (118 total guest rooms) & 1 dwelling unit.Details
administrative permit to correct unit count to 82 residential guest rooms & 36 tourist rooms (118 total guest rooms) & 1 dwelling unit. |