Block 0178, lot 003
706 Jackson St
- City’s use
- Commercial Hotel
- Built
- 1907
- Stories
- 4
- Units
- 4
- Rooms
- 17 bathrooms
- Building
- 20,685 sq ft
- Lot
- 4,726 sq ft
- Zoning
- CVR
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
37 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 28, 2026 | Completed final sign-off Jun 2026 | 706 Jackson St | Crime Watch Security Systems Llc. | as buildts: per inspection notes the following changes were applied. 1) show facp at bank on plans 2) correct sequence of operations. ref pa# 2025-0725-1617.Details
as buildts: per inspection notes the following changes were applied. 1) show facp at bank on plans 2) correct sequence of operations. ref pa# 2025-0725-1617. | $100 |
| Jul 25, 2025 | Completed final sign-off Jun 2026 | 706 Jackson St | San Francisco Fire Protection | addition to existing fire alarm system in existing bldg. install 2 remote power supplies. install 88 low frequency sounders in all units potential sleeping areas to comply with sffd 1103.7.6.1. all other devices are existing and shall remain as originally installed.Details
addition to existing fire alarm system in existing bldg. install 2 remote power supplies. install 88 low frequency sounders in all units potential sleeping areas to comply with sffd 1103.7.6.1. all other devices are existing and shall remain as originally installed. | $57,200 |
| May 28, 2025 | Completed final sign-off Jun 2025 | 1001 Grant Av | Ward-Tek Inc. | to obtain final inspection for work approved undr pa#2015-0130-7139 all work is completeDetails
to obtain final inspection for work approved undr pa#2015-0130-7139 all work is complete | |
| Nov 3, 2023 | Completed final sign-off Mar 2024 | 714 Jackson St | Bai Construction | to comply with accessible business entrance program/technical infeasibility/unreasonable hardship per ordinance 51-16, abe#202311039002.Details
to comply with accessible business entrance program/technical infeasibility/unreasonable hardship per ordinance 51-16, abe#202311039002. | $10 |
| Oct 20, 2023 | Completed final sign-off Mar 2024 | 710 Jackson St | Bai Construction | comply with abe ordiance 51-16, abe 201912039073; apply for technical infeasiblityDetails
comply with abe ordiance 51-16, abe 201912039073; apply for technical infeasiblity | $10 |
| Jan 29, 2019 | Never finaled issued Jan 2019, no final | 1001 Grant Av | D Squared Construction | repair water damage intention walls. replace drywall and approx 150 sq ft. tape and paintDetails
repair water damage intention walls. replace drywall and approx 150 sq ft. tape and paint | $9,500 |
| Dec 5, 2016 | Completed final sign-off Apr 2017 | 1001 Grant Av | D Squared Construction | water damage repair for drywall. lights remove and reset. toilet and sink remove resetDetails
water damage repair for drywall. lights remove and reset. toilet and sink remove reset | $10,000 |
| Mar 17, 2015 | Never finaled issued Mar 2015, no final | 706 Jackson St | street space | ||
| Jan 30, 2015 | Never finaled issued Jan 2015, no final | 1001 Grant Av | Ward-Tek Inc. | water damage repairs main level ,hallway replace 140 sf 5/8 drywall, office #1 replace 60 sf drywall, office # 2 replace 80 sf 5/8 drywall prime & paint. finishes only, in kind.Details
water damage repairs main level ,hallway replace 140 sf 5/8 drywall, office #1 replace 60 sf drywall, office # 2 replace 80 sf 5/8 drywall prime & paint. finishes only, in kind. | $5,500 |
| May 8, 2013 | Completed final sign-off Jul 2013 | 706 Jackson St | West Coast Property Mgnt Co | to comply with ordinance 029-13 only; installation of grab bars in sro at the following location(s): 2nd & 3rd flrs. install common hall bathroom & shower rooms grab bars, bathrooms in 301,302,304,306,307,318,319,320,322,324,325Details
to comply with ordinance 029-13 only; installation of grab bars in sro at the following location(s): 2nd & 3rd flrs. install common hall bathroom & shower rooms grab bars, bathrooms in 301,302,304,306,307,318,319,320,322,324,325 | $5,000 |
| Aug 29, 2008 | Never finaled issued Aug 2008, no final | 1001 Grant Av | Bahn Fire Protection & Plumbing Inc | ground floor partial sprinkler as built plan per app #200807237429-relocate 2 add 1-orginal work on application 200510216216 showed vikking heads being used, used tyco instead- same k factorDetails
ground floor partial sprinkler as built plan per app #200807237429-relocate 2 add 1-orginal work on application 200510216216 showed vikking heads being used, used tyco instead- same k factor | $600 |
| Aug 25, 2008 | Completed final sign-off Feb 2009 | 1001 Grant Av | San Francisco Fire Protection | add 4 smoke detectors, 2 heat detectors to (e) fire alarm system for elevator recall functionsDetails
add 4 smoke detectors, 2 heat detectors to (e) fire alarm system for elevator recall functions | $3,000 |
| Jul 23, 2008 | Completed final sign-off Sep 2008 | 1001 Grant Av | install new t-bar ceiling with light fixtures @ground & basement. revision to #2007-0821-0489. relocate elevator & night deposit box. re-arrange partitions. reswing door #existing restroom at ground floor. new interior stairway & new exterior door. hvac under separate permit.Details
install new t-bar ceiling with light fixtures @ground & basement. revision to #2007-0821-0489. relocate elevator & night deposit box. re-arrange partitions. reswing door #existing restroom at ground floor. new interior stairway & new exterior door. hvac under separate permit. | $15,000 | |
| Jul 16, 2008 | Completed final sign-off Sep 2008 | 1001 Grant Av | at basement and 1st fl: remove existing fancoils, heatpumps & furnace, install four new high efficiency heatpumps w/ fancoil, install exhaust fans for bathroom, and elevator machine rm for control of temperature. reuse existing duct as much as possible and install new duct.Details
at basement and 1st fl: remove existing fancoils, heatpumps & furnace, install four new high efficiency heatpumps w/ fancoil, install exhaust fans for bathroom, and elevator machine rm for control of temperature. reuse existing duct as much as possible and install new duct. | $50,000 | |
| Jun 25, 2008 | Never finaled issued Jun 2008, no final | 1001 Grant Av | street space | ||
| Aug 21, 2007 | Expired or cancelled cancelled Jan 2026 | 1001 Grant Av | interior reovation,add atm machine,new ada elevator replace storefront gazing by same type ,size &configuration.Details
interior reovation,add atm machine,new ada elevator replace storefront gazing by same type ,size &configuration. | ||
| Aug 21, 2007 | Completed final sign-off Sep 2008 | 1001 Grant Av | Shek Chung Ma | interior renovation; add atm machine, (n) ada elevator, repl storefront glazing by same type, size & configuration mep under separate permitDetails
interior renovation; add atm machine, (n) ada elevator, repl storefront glazing by same type, size & configuration mep under separate permit | $300,000 |
| Aug 2, 2007 | Never finaled issued Aug 2007, no final | 1001 Grant Av | interior demoa; teller counters, nonbearing partitions, tbar ceilings and fixtures, un used ducts on ground floor and basement floorsDetails
interior demoa; teller counters, nonbearing partitions, tbar ceilings and fixtures, un used ducts on ground floor and basement floors | $20,000 | |
| Dec 23, 2005 | Never finaled issued Dec 2005, no final | 706 Jackson St | street space | ||
| Nov 22, 2005 | Never finaled issued Nov 2005, no final | 706 Jackson St | streetspace | ||
| Oct 21, 2005 | Completed final sign-off Nov 2005 | 1001 Grant Av | Bahn Fire Protection & Plumbing Inc | as built drawing for sprinkler system layout.Details
as built drawing for sprinkler system layout. | $3,500 |
| Oct 17, 2005 | Never finaled issued Oct 2005, no final | 706 Jackson St | street space permit | ||
| Aug 12, 2005 | Never finaled issued Aug 2005, no final | 706 Jackson St | street space | ||
| Jul 11, 2005 | Completed final sign-off Nov 2005 | 1001 Grant Av | Bahn Fire Protection & Plumbing Inc | renew 200209055752 to complete workDetails
renew 200209055752 to complete work | $3,400 |
| Jun 14, 2005 | Never finaled issued Jun 2005, no final | 706 Jackson St | street space permit | ||
| Apr 13, 2005 | Never finaled issued Apr 2005, no final | 706 Jackson St | streetspace | ||
| Jan 13, 2005 | Never finaled issued Jan 2005, no final | 706 Jackson St | street space | ||
| Nov 12, 2004 | Never finaled issued Nov 2004, no final | 706 Jackson St | streetspace | ||
| Nov 12, 2004 | Completed final sign-off Nov 2005 | 1001 Grant Av | San Francisco Fire Protection | renew app 200403098111Details
renew app 200403098111 | $3,000 |
| Oct 28, 2004 | Never finaled issued Oct 2004, no final | 1001 Grant Av | street space | ||
| Sep 9, 2004 | Never finaled issued Sep 2004, no final | 706 Jackson St | street space permit | ||
| Jun 8, 2004 | Never finaled issued Jun 2004, no final | 706 Jackson St | street space | ||
| Mar 10, 2004 | Never finaled issued Mar 2004, no final | 706 Jackson St | street space | ||
| Mar 9, 2004 | Expired or cancelled expired Nov 2007 | 1001 Grant Av | renew appln #200307018525 | ||
| Jul 1, 2003 | Expired or cancelled expired Nov 2007 | 1001 Grant Av | San Francisco Fire Protection | (e) fire alarm system to remain & reuse with bldg. fire sprinkler system on seperate workDetails
(e) fire alarm system to remain & reuse with bldg. fire sprinkler system on seperate work | $3,000 |
| Sep 5, 2002 | Never finaled issued Mar 2003, no final | 1001 Grant Av | Htb Plumbing & Fire | complete building fire sprinkler system including city water connection,main riser,flr distributionDetails
complete building fire sprinkler system including city water connection,main riser,flr distribution | $68,000 |
| Jun 8, 2000 | Expired or cancelled expired Jan 2001 | 1001 Grant Av | A Better Image/G.W. Laine | to erect electrical sign |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- San Francisco Fire Protection (4), Bahn Fire Protection & Plumbing Inc (3), Bai Construction (2), D Squared Construction (2), Ward-Tek Inc. (2), A Better Image/G.W. Laine, Crime Watch Security Systems Llc., Htb Plumbing & Fire, Shek Chung Ma, West Coast Property Mgnt Co
- Architects
- Daniel Howard (2), Van Thai Ly
- Engineers
- Matthew Wang
- Designers
- Michael Williams, Michelle Lopez
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.