Block 0579, lot 005
2140 Pacific Av
13 permits filed for this property since 2000.
CompletedIn progressNever finaledExpired or cancelled
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 18, 2025 | In progress | 2140 Pacific Av | unit 604-revision 202501108128- remove two non structural walls and adding one hallway wall. installing replacmenet cabinetry and 10 canned lights, (n) sink and disposal in (e) location. adding a hallway wall. | $30,000 | |
| Jan 10, 2025 | In progress | 2140 Pacific Av | unit 604: hallway bathroom: replace sink, toilet, install led canned lights, remove bathtub, retile shower, tile walls + floor of bathroom, paint, install gfci outlet. primary bathroom: replace sink, replace tub , replace toilet, shower. install led canned lights, tile walls and floor. | $6,000 | |
| Nov 21, 2024 | Completed | 2140 Pacific Av | Crime Watch Security Sys Llc | upgrade e) fire alarm system to comply w/ sffc sec 1103.7.6.1 to meet 75db in all sleeping areas | $91,100 |
| Nov 4, 2019 | Never finaled | 2140 Pacific Av | street space | ||
| Sep 3, 2019 | Never finaled | 2140 Pacific Av | street space | ||
| Mar 8, 2019 | Completed | 2140 Pacific Av | Bai Construction | voluntary installation of 2 new steel braced frames at basement. | $40,000 |
| Oct 11, 2018 | Never finaled | 2140 Pacific Av | street space only | ||
| Jul 20, 2016 | Never finaled | 2140 Pacific Av | Mid-Peninsula Roofing Inc | reroofing | $16,000 |
| Dec 4, 2014 | Completed | 2140 Pacific Av | unit #304: 1) kitchen remodel: replace kitchen cabinets, countertops, backsplash and all appliances and 2 bathrooms remodeled, replace pedestal sink, all tile and one bathtub. changing lighting in 2 bedrooms, kitchen, living room and both bathrooms. n/a for the maher. | $30,000 | |
| Apr 22, 2014 | Completed | 2140 Pacific Av | work in #204: comply complaint #201465172. remodel kitchen, install new cabinets, countertop, tile on backsplash, new sink and sink fixture installed and remodel bathrooms (2) replace all tile and pedestal sinks, new shower valves. kitchen lighting min. 50% high effical, bath high | $45,000 | |
| Mar 6, 2012 | Completed | 2140 Pacific Av | Make Ready Maintenance Inc | #202- remodel kitchen, remove & replace cabinets, retile kitchen floor. | $5,000 |
| Jan 2, 2007 | Never finaled | 2140 Pacific Av | street space | ||
| Nov 9, 2006 | Completed | 2140 Pacific Av | On-Site Maintenance | work @ unit# 404. kitchen / bath remodel in kind. no structural change. sinks, faucets, shower valve cabinet, counter top, electrical code upgrade. no window, door or light work. flourescent lighting. | $8,000 |