Block 3776, lot 008
574 03rd St
- City’s use
- Multi-Family Residential
- Built
- 1907
- Stories
- 3
- Units
- 104
- Rooms
- 104 bathrooms
- Building
- 58,530 sq ft
- Lot
- 21,597 sq ft
- Zoning
- SLI
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
21 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 21, 2023 | Completed final sign-off Mar 2024 | 574 03rd St | Bai Construction | repair cracks on rear wall (ritch st)Details
repair cracks on rear wall (ritch st) | $10,000 |
| Jan 24, 2020 | Completed final sign-off Mar 2021 | 574 03rd St | San Francisco Fire Protection | fire alarm, new power supply and low frequency 2021 mandate maher not reqDetails
fire alarm, new power supply and low frequency 2021 mandate maher not req | $83,500 |
| Nov 15, 2018 | Completed final sign-off Dec 2018 | 574 03rd St | San Francisco Fire Protection | replace e alarm system to new ifp-75 monitoring systemDetails
replace e alarm system to new ifp-75 monitoring system | $8,000 |
| Mar 21, 2016 | Never finaled issued Mar 2016, no final | 574 03rd St | street space | ||
| Jul 29, 2013 | Completed final sign-off Sep 2013 | 570 03rd St | Houseworks Enterprises Inc. | revision to pa# 201307161940 to include dry rot repair to post in garage. replace in kind.Details
revision to pa# 201307161940 to include dry rot repair to post in garage. replace in kind. | $500 |
| Oct 15, 2012 | Completed final sign-off Nov 2012 | 574 03rd St | American Home Renewal Inc | #326- replace 3 windows, windows shall be maunfactured by milgard ultra product line and will be fiberglass framed per sf city requirements as an alternative to wood, installation shall be insert within existing openings. u factor=0.40Details
#326- replace 3 windows, windows shall be maunfactured by milgard ultra product line and will be fiberglass framed per sf city requirements as an alternative to wood, installation shall be insert within existing openings. u factor=0.40 | $2,900 |
| Aug 14, 2012 | Completed final sign-off Oct 2012 | 574 03rd St | Clear Channel Outdoor | clear channel outdoor inc. the owner of general advertising sign located at 574 3rd st will perform customary sign maintenance to maintain structural integrity & ensure safe use of sign structure as shown on plans by vincent kevin kelly & assoc. inc. dated 8/2/12 cco sign #1500.Details
clear channel outdoor inc. the owner of general advertising sign located at 574 3rd st will perform customary sign maintenance to maintain structural integrity & ensure safe use of sign structure as shown on plans by vincent kevin kelly & assoc. inc. dated 8/2/12 cco sign #1500. | $5,000 |
| Jan 25, 2012 | Completed final sign-off Jan 2012 | 574 03rd St | Doorman Property Management | revision to 201111219393. remove installation of new windows. reduce scope of work.Details
revision to 201111219393. remove installation of new windows. reduce scope of work. | |
| Dec 28, 2011 | Completed final sign-off Feb 2012 | 574 03rd St | Doorman Property Management | comply with complaint #201176235. date 12/19/2011.Details
comply with complaint #201176235. date 12/19/2011. | $10,000 |
| Nov 21, 2011 | Completed final sign-off Jan 2012 | 574 03rd St | Doorman Property Management | unit 326:enlarging bathroom,relocating fixtures,upgrade electrical and plmg. install new window at back on 3rd floor.Details
unit 326:enlarging bathroom,relocating fixtures,upgrade electrical and plmg. install new window at back on 3rd floor. | $20,000 |
| Jul 6, 2006 | Never finaled issued Jul 2006, no final | 574 03rd St | A A A General Roofing Co | reroofing | $35,000 |
| Oct 22, 2004 | Completed final sign-off Nov 2004 | 574 03rd St | Green Oval Construction | renew expired permit 200304212775, 200312293112,200308182349Details
renew expired permit 200304212775, 200312293112,200308182349 | |
| Sep 9, 2004 | Completed final sign-off Nov 2004 | 574 03rd St | Four Star Cleaning & Restoration Inc. | fixed little fire and smoke damage on one unit. bring on or to precondition before fire. bath andDetails
fixed little fire and smoke damage on one unit. bring on or to precondition before fire. bath and | $28,000 |
| May 17, 2004 | Completed final sign-off Oct 2004 | 574 03rd St | Green Oval Construction | renew app #200304091849 for remaining workDetails
renew app #200304091849 for remaining work | $8,000 |
| Dec 29, 2003 | Expired or cancelled expired Nov 2004 | 574 03rd St | Green Oval Construction | apt#106,tear out old bathrm,install new bathtub,lavy,toilet,required plumbing. move electrical.Details
apt#106,tear out old bathrm,install new bathtub,lavy,toilet,required plumbing. move electrical. | $4,400 |
| Oct 14, 2003 | Completed final sign-off Nov 2004 | 574 03rd St | Kim Lee Constrtuction | #302-remove old sheetrock/plaster, install new sheetrock,replace new plumb/kitchen sink/bath sink/Details
#302-remove old sheetrock/plaster, install new sheetrock,replace new plumb/kitchen sink/bath sink/ | $16,000 |
| Aug 18, 2003 | Expired or cancelled expired Nov 2004 | 574 03rd St | Green Oval Construction | apt 103 apt 109 remove old sheetrock, plaster, new sheetrock, plumb, kitch sink, lavy,toilet,add tubDetails
apt 103 apt 109 remove old sheetrock, plaster, new sheetrock, plumb, kitch sink, lavy,toilet,add tub | $30,000 |
| Apr 21, 2003 | Expired or cancelled expired Nov 2004 | 574 03rd St | Green Oval Construction | remove old plaster or sheetrock-install new sheetrock, new electrical, new plumbing, new kitchen sinDetails
remove old plaster or sheetrock-install new sheetrock, new electrical, new plumbing, new kitchen sin | $145,000 |
| Apr 9, 2003 | Expired or cancelled expired Oct 2004 | 574 03rd St | Green Oval Construction | tear out 35 terracata vent pipes install each heater w/ individual venting,total of 103 units,Details
tear out 35 terracata vent pipes install each heater w/ individual venting,total of 103 units, | $25,000 |
| Jun 6, 2001 | Completed final sign-off Oct 2001 | 574 03rd St | new sheetrock &flooring, enlarge bathroom,wallheater w/vent, bathtub.Details
new sheetrock &flooring, enlarge bathroom,wallheater w/vent, bathtub. | $15,000 | |
| Mar 10, 2000 | Expired or cancelled cancelled Nov 2000 | 566 03rd St | erect non-electric, non-illilluminated, single faced wall signDetails
erect non-electric, non-illilluminated, single faced wall sign | $360 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Green Oval Construction (6), Doorman Property Management (3), San Francisco Fire Protection (2), A A A General Roofing Co, American Home Renewal Inc, Bai Construction, Clear Channel Outdoor, Four Star Cleaning & Restoration Inc., Houseworks Enterprises Inc., Kim Lee Constrtuction
- Architects
- Vincent Kevin Kelly
- Engineers
- Nathan Williams
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.