Larry Wayne Barcelon
- Listed as
- architect, authorized agent-others, engineer
- Firm
- Barcelon Jang Architecture
- Based in
- San Francisco
- On San Francisco permits
- Aug 2000 to Mar 2023
49 permits since 2000 (architect on 47 permits, authorized agent-others on 1 permit, engineer on 1 permit): 36 completed, 3 never finaled, 10 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 20, 2023 | Completed final sign-off Sep 2023 | 328 Tehama St | Ncr Construction Inc | units 408/508/608/708/808: interior ti, upgrade kitchen & bathrooms for (5)accesible units to code, replace kitchen counter tops, add removable cabinets for workspace, expand roll-in showers, change swing doors to pocket doors.Details
units 408/508/608/708/808: interior ti, upgrade kitchen & bathrooms for (5)accesible units to code, replace kitchen counter tops, add removable cabinets for workspace, expand roll-in showers, change swing doors to pocket doors. | $155,000 |
| Sep 27, 2022 | Expired or cancelled cancelled Jan 2026 | 1521 Fillmore St | g/f: t.i., full ada compliance, misc. alterations (nonstructural) for retail sales w/food preparationDetails
g/f: t.i., full ada compliance, misc. alterations (nonstructural) for retail sales w/food preparation | $25,000 | |
| May 18, 2022 | Completed final sign-off May 2022 | 385 Eddy St | Amone Corp | reduction of scope for 201905029560. removal of fsd on level 2, 3, 4, 5 & 6. total of 2 fsd's removald on each floor/level.Details
reduction of scope for 201905029560. removal of fsd on level 2, 3, 4, 5 & 6. total of 2 fsd's removald on each floor/level. | |
| Dec 22, 2021 | Completed final sign-off May 2022 | 385 Eddy St | Amone Corp | revision to permit 201905029560: added rear improvements by adding a deck (30" max.) above (e) grade and fence and replacing (e) door with accessible in-kind door.Details
revision to permit 201905029560: added rear improvements by adding a deck (30" max.) above (e) grade and fence and replacing (e) door with accessible in-kind door. | $55,000 |
| Mar 2, 2020 | Expired or cancelled cancelled Jan 2026 | 1521 Fillmore St | install accessible counter and upgrade all gender restroom to fully accessible. change of use from retail sales to cookie store with food preperations and new kitchen.Details
install accessible counter and upgrade all gender restroom to fully accessible. change of use from retail sales to cookie store with food preperations and new kitchen. | $25,000 | |
| Jan 9, 2020 | Completed final sign-off May 2022 | 385 Eddy St | Amone Corp | revision to 201905029560 n ew platfor lift change to 3 stops fro 2 stops to add a basement stop for maintenance access onlyDetails
revision to 201905029560 n ew platfor lift change to 3 stops fro 2 stops to add a basement stop for maintenance access only | $10,000 |
| Aug 23, 2019 | Completed final sign-off Jun 2021 | 1045 Capp St | Amone Corp | revision to app#201903195694. new 24" high wood decking, 4' high wood fence, new metal awning and changing 6 bath tubs to 6 roll in showers in units.Details
revision to app#201903195694. new 24" high wood decking, 4' high wood fence, new metal awning and changing 6 bath tubs to 6 roll in showers in units. | $50,000 |
| May 2, 2019 | Completed final sign-off May 2022 | 385 Eddy St | Amone Corp | the rehab includes t-24 upgrades, ada improvements, modernization or replacement of original bldg systmens (fire alarm & sprinklers- seperate permit) & equipment. energy use reduction. update grd flr & basement communication room to better support the needs of residents.Details
the rehab includes t-24 upgrades, ada improvements, modernization or replacement of original bldg systmens (fire alarm & sprinklers- seperate permit) & equipment. energy use reduction. update grd flr & basement communication room to better support the needs of residents. | $9,000,000 |
| Mar 19, 2019 | Completed final sign-off Jun 2021 | 1045 Capp St | Amone Corp | accessibility improvements, unit kitchen upgrades, window replacement (like kind, same size), light fixture replacement, exterior paint, bathroom ventilation and heating system upgrades. n/a maherDetails
accessibility improvements, unit kitchen upgrades, window replacement (like kind, same size), light fixture replacement, exterior paint, bathroom ventilation and heating system upgrades. n/a maher | $1,500,000 |
| Dec 3, 2018 | Completed final sign-off Nov 2022 | 321 Clementina St | Ncr Construction Inc | replacement of existing vinyl windows with new aluminum windows, like kind, same sizeDetails
replacement of existing vinyl windows with new aluminum windows, like kind, same size | $109,200 |
| Aug 24, 2017 | Completed final sign-off Oct 2017 | 345 Hermann St | D.F.P.F Corp Dba Fine Line Construction | revision to pa #201504012572. revised items include change to accessible patio doors, add communication features to units. add handrails, change in exit only gate. eliminate automatic door push pad, key pad, & intercom. add level landing at door & add accessible trash chute & fire rated enclosureDetails
revision to pa #201504012572. revised items include change to accessible patio doors, add communication features to units. add handrails, change in exit only gate. eliminate automatic door push pad, key pad, & intercom. add level landing at door & add accessible trash chute & fire rated enclosure | $5,000 |
| Aug 21, 2017 | Completed final sign-off Dec 2018 | 1 Bush St | Gci, Inc | demolition of interior partitions, glazing, millwork, finishes, doors. e ceiling and lighting to remain. e mep and sprinkler modification sep permit. path of travel not req per ab-107Details
demolition of interior partitions, glazing, millwork, finishes, doors. e ceiling and lighting to remain. e mep and sprinkler modification sep permit. path of travel not req per ab-107 | $10,000 |
| Feb 13, 2017 | Completed final sign-off Aug 2017 | 255 Woodside Av | D.F.P.F Corp Dba Fine Line Construction | revision to pa#201503201474, revise full scope of work in #501 to remain, revise total unit count from 110 to 109 due to #224 has been converted from a dwelling to an office for management at the bldg.Details
revision to pa#201503201474, revise full scope of work in #501 to remain, revise total unit count from 110 to 109 due to #224 has been converted from a dwelling to an office for management at the bldg. | |
| Jan 31, 2017 | Never finaled issued Mar 2017, no final | 255 Woodside Av | D.F.P.F Corp Dba Fine Line Construction | revision to pa #201503201474 - new electrical room for switch gear replacement.Details
revision to pa #201503201474 - new electrical room for switch gear replacement. | |
| Jun 21, 2016 | Completed final sign-off Aug 2017 | 255 Woodside Av | D.F.P.F Corp Dba Fine Line Construction | revision to ref pa 2015 0320 1474: new window replacement detail and elevation attachedDetails
revision to ref pa 2015 0320 1474: new window replacement detail and elevation attached | |
| Feb 19, 2016 | Expired or cancelled cancelled Jan 2026 | 230 04th St | ground floor social service office expansion including selective demolition, new walls, roof, doors, windows & paint.Details
ground floor social service office expansion including selective demolition, new walls, roof, doors, windows & paint. | $125,000 | |
| Jan 11, 2016 | Completed final sign-off Aug 2017 | 255 Woodside Av | D.F.P.F Corp Dba Fine Line Construction | rev. to 201503201474 -to provide 1 ada parking space.Details
rev. to 201503201474 -to provide 1 ada parking space. | |
| Jun 22, 2015 | Completed final sign-off Sep 2015 | 230 04th St | Ncr Construction Inc | ground floor office remodel including selective demolition, new interior walls, doors, windows and paint. mep, sprinklers separate permits.Details
ground floor office remodel including selective demolition, new interior walls, doors, windows and paint. mep, sprinklers separate permits. | $5,000 |
| Apr 1, 2015 | Completed final sign-off Oct 2017 | 345 Hermann St | D.F.P.F Corp Dba Fine Line Construction | mohcd rad program. unit renovation(kitchen & bathroom).conversion of 3 ada units/2 audio/visual units.window replacement.new addition @ g/f entrance on duboce ave.seismic upgrades/electrical/mechan & elevator upgrades. fire sprinklr & fire alarm sym will be under separate permit.(deferred)Details
mohcd rad program. unit renovation(kitchen & bathroom).conversion of 3 ada units/2 audio/visual units.window replacement.new addition @ g/f entrance on duboce ave.seismic upgrades/electrical/mechan & elevator upgrades. fire sprinklr & fire alarm sym will be under separate permit.(deferred) | $6,701,351 |
| Mar 20, 2015 | Never finaled issued Nov 2015, no final | 255 Woodside Av | D.F.P.F Corp Dba Fine Line Construction | mohcd-rad program. unit renovation (kitchen & bathroom) conversion of 6 ada unit & 2 audio/visual units. window replacement new enclosed entry lobby, electrical, mechanical, elevator upgrades.Details
mohcd-rad program. unit renovation (kitchen & bathroom) conversion of 6 ada unit & 2 audio/visual units. window replacement new enclosed entry lobby, electrical, mechanical, elevator upgrades. | $10,400,000 |
| Mar 20, 2015 | Completed final sign-off Sep 2017 | 25 Sanchez St | D.F.P.F Corp Dba Fine Line Construction | mohcd-rad program. unit renovation (kitchen & bathroom) conversion of 5 ada unit & 2 audio/visual units. window replacement new offices, renovation of community room, electrical, mechanical, structural upgrades.Details
mohcd-rad program. unit renovation (kitchen & bathroom) conversion of 5 ada unit & 2 audio/visual units. window replacement new offices, renovation of community room, electrical, mechanical, structural upgrades. | $8,300,000 |
| Jun 25, 2014 | Completed final sign-off Jun 2015 | 2624 15th Av | New Improvement Construction | seismic upgrade, add family room, bathroom, wet bar at ground floor, remodel upper floor.Details
seismic upgrade, add family room, bathroom, wet bar at ground floor, remodel upper floor. | $30,000 |
| Feb 7, 2014 | Expired or cancelled expired Nov 2019 | 210 Taylor St | Cahill Contractors Inc | trailers on extg parking lot. trailers will be 1 story tall and house offices and an after school program while current bldg is under construction. temporary "e" occupancy for 18-month temporary re-location. ref. 201311041051Details
trailers on extg parking lot. trailers will be 1 story tall and house offices and an after school program while current bldg is under construction. temporary "e" occupancy for 18-month temporary re-location. ref. 201311041051 | $131,000 |
| Nov 4, 2013 | Completed final sign-off Aug 2015 | 217 Eddy St | Nibbi Bros Assoc Inc. | rehab of (e) bldg due to fire damage.change of use from "b" after school program to "e" day care; new mep & seismic & new finishes & resid. unit upgrades incl fixtrs on flrs b-6. new elev. sidewalk repl on eddy + taylor st, new base. & 1st flr layout. storefront and elev penthouse under sep permit.Details
rehab of (e) bldg due to fire damage.change of use from "b" after school program to "e" day care; new mep & seismic & new finishes & resid. unit upgrades incl fixtrs on flrs b-6. new elev. sidewalk repl on eddy + taylor st, new base. & 1st flr layout. storefront and elev penthouse under sep permit. | $10,825,065 |
| Nov 4, 2013 | Completed final sign-off Feb 2016 | 2266 Cecilia Av | Seth Bernstein | remodel 2nd fl kitchen & bath, reconfigure e stair, add 1/2 bath. remodel 3rd fl master bath, closet and study. new non ouccupied and non combustible roof garden. replace windows in kind with dual glazed insulated windows. windows at front elevation along cecilia ave to be wood frames,others aluminuDetails
remodel 2nd fl kitchen & bath, reconfigure e stair, add 1/2 bath. remodel 3rd fl master bath, closet and study. new non ouccupied and non combustible roof garden. replace windows in kind with dual glazed insulated windows. windows at front elevation along cecilia ave to be wood frames,others aluminu | $40,000 |
| Oct 1, 2013 | Completed final sign-off Jan 2014 | 730 Polk St | Blair Burke General Contractors Inc | subdivide existing breakroom into office and kitchenetteDetails
subdivide existing breakroom into office and kitchenette | $5,000 |
| Mar 25, 2013 | Expired or cancelled cancelled Jan 2026 | 217 Eddy St | erect an electric projecting single faced (e) awning/marqueeDetails
erect an electric projecting single faced (e) awning/marquee | $5,000 | |
| Mar 25, 2013 | Expired or cancelled cancelled Jan 2026 | 217 Eddy St | erect an electric projecting single faced (e) awning/marqueeDetails
erect an electric projecting single faced (e) awning/marquee | $5,000 | |
| Mar 25, 2013 | Never finaled issued Oct 2013, no final | 217 Eddy St | Nibbi Bros Assoc Inc. | 1. replace extg aluminum windows with new aluminum clad replacement windows, double hung @ flrs 2-6. 2. install new facade ar residential entry including new stucco, vicinity map on graphic on glass. entry door & storefront 3. modify existing elevator penthouse. elevator under seperate permitDetails
1. replace extg aluminum windows with new aluminum clad replacement windows, double hung @ flrs 2-6. 2. install new facade ar residential entry including new stucco, vicinity map on graphic on glass. entry door & storefront 3. modify existing elevator penthouse. elevator under seperate permit | $150,000 |
| Aug 21, 2012 | Expired or cancelled cancelled Jan 2020 | 1280 Laguna St | remodel (e) manager's unit on ground floor for office use. (e) dwelling unit will be converted to office use through planning section 317.. office will be used for services to the tenants of the building. remove (e) walls, kitchenette,and bath tub, provide (n) walls, finishes and casework.Details
remodel (e) manager's unit on ground floor for office use. (e) dwelling unit will be converted to office use through planning section 317.. office will be used for services to the tenants of the building. remove (e) walls, kitchenette,and bath tub, provide (n) walls, finishes and casework. | $25,000 | |
| Mar 6, 2012 | Completed final sign-off Dec 2013 | 390 Clementina St | Andrew Chekene Enterprises/ Dba Ac Enter | lobby remodel & expansion at the ground foor, including selective demolition, new finish, upgrades, lighting & electrical upgrades. replacement of entry doors & new entry at office expansion.Details
lobby remodel & expansion at the ground foor, including selective demolition, new finish, upgrades, lighting & electrical upgrades. replacement of entry doors & new entry at office expansion. | $50,000 |
| Feb 7, 2012 | Completed final sign-off Nov 2014 | 3155 Scott St | D.F.P.F Corp Dba Fine Line Construction | remodel basement & 1st floors. upgrade seismic. ada, elec, mech system. 4 new ada units on 2nd floor. 3 new bathrooms on 3rd floor. new lula elevator for floors b-2. replace roofing. new exterior upgrades. new windows. (e) tourist hotel will be a future residential apartment for youth housing.Details
remodel basement & 1st floors. upgrade seismic. ada, elec, mech system. 4 new ada units on 2nd floor. 3 new bathrooms on 3rd floor. new lula elevator for floors b-2. replace roofing. new exterior upgrades. new windows. (e) tourist hotel will be a future residential apartment for youth housing. | $1,940,000 |
| Jan 6, 2012 | Completed final sign-off Jul 2012 | 1400 Geary Bl | Gonsalves & Stronck Construction Co. | basement, aka "a" level - revision to app#201112080346. change the lay out of the women's restroom.Details
basement, aka "a" level - revision to app#201112080346. change the lay out of the women's restroom. | |
| Dec 8, 2011 | Completed final sign-off Sep 2012 | 1400 Geary Bl | Gonsalves & Stronck Construction Co. | basement level (aka as 'a' level - remodel existing basement office space, provide new ceilings, & flooring, new conference room, break room & casework.Details
basement level (aka as 'a' level - remodel existing basement office space, provide new ceilings, & flooring, new conference room, break room & casework. | $85,000 |
| Jan 6, 2011 | Completed final sign-off May 2013 | 801 Howard St | D.F.P.F Corp Dba Fine Line Construction | new elevator and shaft to floors 1-9. new 2 hr rated elevator lobby on floors 2-9.Details
new elevator and shaft to floors 1-9. new 2 hr rated elevator lobby on floors 2-9. | $1,000,000 |
| Sep 7, 2010 | Completed final sign-off Mar 2011 | 4 Embarcadero Center | Gci, Inc | single floor office tenant improvement. new non strucural partitions, doors, frame, hardware, lighting, ceiling, finishesDetails
single floor office tenant improvement. new non strucural partitions, doors, frame, hardware, lighting, ceiling, finishes | $1,400,000 |
| May 13, 2010 | Completed final sign-off Jun 2013 | 1095 Mission St | Ncr Construction Inc | replace (e) sidewalk over basement & associated substructue in-kind.Details
replace (e) sidewalk over basement & associated substructue in-kind. | $600,000 |
| Jan 21, 2010 | Completed final sign-off May 2014 | 1095 Mission St | Ncr Construction Inc | replace building interior finishes and residential windows in kind. upgrade unit kitchenettes & heaters, create a basement community room and recycling area.Details
replace building interior finishes and residential windows in kind. upgrade unit kitchenettes & heaters, create a basement community room and recycling area. | $2,100,000 |
| Mar 18, 2009 | Expired or cancelled cancelled Jan 2026 | 380 Clementina St | D.F.P.F Corp Dba Fine Line Construction | convert housekeeping pad for generator located at ground level, rear of buildingDetails
convert housekeeping pad for generator located at ground level, rear of building | $1,000 |
| Mar 18, 2008 | Completed final sign-off Jul 2009 | 390 Clementina St | D.F.P.F Corp Dba Fine Line Construction | miscellaneous demolition. new 1st floor staff toilet room (unisex). replace (e) emergency generator on ground 200703085757Details
miscellaneous demolition. new 1st floor staff toilet room (unisex). replace (e) emergency generator on ground 200703085757 | $75,000 |
| Mar 18, 2008 | Completed final sign-off Jul 2009 | 390 Clementina St | D.F.P.F Corp Dba Fine Line Construction | misc demolition. replace e kitchenettes at res units. replace existing bathroom roof ventilation fans. replace e water shutoff valves at 1st flr. reroof building, replace e finishes at res units. repaint exterior of bldg.Details
misc demolition. replace e kitchenettes at res units. replace existing bathroom roof ventilation fans. replace e water shutoff valves at 1st flr. reroof building, replace e finishes at res units. repaint exterior of bldg. | $2,500,000 |
| Mar 6, 2008 | Completed final sign-off Jun 2008 | 684 Ellis St | D.F.P.F Corp Dba Fine Line Construction | as built mechanival plans.minor revisions to mechanical. refer to permit # 2006.04.10.8584Details
as built mechanival plans.minor revisions to mechanical. refer to permit # 2006.04.10.8584 | $460 |
| Nov 26, 2007 | Completed final sign-off Jul 2009 | 390 Clementina St | D.F.P.F Corp Dba Fine Line Construction | 2nd floor: additoin & renovations, including new storfront, bathroom accessibility improvements & infill area under roof overhang, selective demo, new finishes, lighting upgrades, electrical plumbing.Details
2nd floor: additoin & renovations, including new storfront, bathroom accessibility improvements & infill area under roof overhang, selective demo, new finishes, lighting upgrades, electrical plumbing. | $75,000 |
| Nov 26, 2007 | Completed final sign-off May 2009 | 390 Clementina St | D.F.P.F Corp Dba Fine Line Construction | replace windows to all residential units in kind.Details
replace windows to all residential units in kind. | $400,000 |
| Apr 10, 2006 | Completed final sign-off Jun 2008 | 684 Ellis St | D.F.P.F Corp Dba Fine Line Construction | rehab. incl. selective demolition, new accessible units, (n) accessible entry, voluntary seismic upgrade, new basement offices, mechanical, electrical & plumbing modifications, partial sidewalk replacement. sprinklers & fire alarm.Details
rehab. incl. selective demolition, new accessible units, (n) accessible entry, voluntary seismic upgrade, new basement offices, mechanical, electrical & plumbing modifications, partial sidewalk replacement. sprinklers & fire alarm. | |
| Jul 28, 2005 | Completed final sign-off Jan 2006 | 519 Ellis St | D.F.P.F Corp Dba Fine Line Construction | revision as built changes to permitted work, pa# 2004/03/08/8033, construction 98% complete. all revisionsDetails
revision as built changes to permitted work, pa# 2004/03/08/8033, construction 98% complete. all revisions | |
| Jan 28, 2005 | Completed final sign-off Jan 2005 | 88 06th St | Lem Construction Inc. | "as built" corrected drawing to approve fire alarm permit application 200403047805 horns shown atDetails
"as built" corrected drawing to approve fire alarm permit application 200403047805 horns shown at | |
| Nov 4, 2003 | Expired or cancelled expired Mar 2007 | 88 06th St | rev. appl#200103063601 per (e)conditions & changes during construction.attaching as built architectuDetails
rev. appl#200103063601 per (e)conditions & changes during construction.attaching as built architectu | ||
| Aug 9, 2000 | Expired or cancelled expired Dec 2007 | 883 Sacramento St | seismic retrofit, addition to (e) 3rd floor (horizontal addition)Details
seismic retrofit, addition to (e) 3rd floor (horizontal addition) | $750,000 |