Cory Steven Creath
- Listed as
- architect, designer, engineer
- Firm
- Axis Architectural
- Based in
- San Francisco
- On San Francisco permits
- Aug 2010 to Jul 2026
46 permits since 2000 (architect on 44 permits, designer on 1 permit, engineer on 1 permit): 20 completed, 2 in progress, 20 never finaled, 4 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 8, 2026 | In progress filed Jul 2026, not yet issued | 2 Turk St | change from r-1 to r-2, modifying fire escape bottom on street level.modify basement walls and doors to provide class 1 bicycle parking spaces, provide class ii bicycle parking spaces on sidewalk. installation of mechanical units on mezz. roof and level 9 roof to meet article 38 requirements.Details
change from r-1 to r-2, modifying fire escape bottom on street level.modify basement walls and doors to provide class 1 bicycle parking spaces, provide class ii bicycle parking spaces on sidewalk. installation of mechanical units on mezz. roof and level 9 roof to meet article 38 requirements. | $6,000 | |
| Dec 20, 2024 | In progress filed Dec 2024, not yet issued | 2 Turk St | Rainbow Waterproofing & Restor | basement floor- removal and in kind replacement of (e) basement partitionDetails
basement floor- removal and in kind replacement of (e) basement partition | $4,000 |
| May 3, 2023 | Never finaled issued May 2023, no final | 851 California St | Espitia General Contractors Incorporated | like for like remodel of (e) 15 guest bathrooms and upgrade one of them to bathroom rooom "351"is being modified to comply with ada requirements including roll-in shower. and "egvilanet facilitioan to elevatorDetails
like for like remodel of (e) 15 guest bathrooms and upgrade one of them to bathroom rooom "351"is being modified to comply with ada requirements including roll-in shower. and "egvilanet facilitioan to elevator | $160,000 |
| Mar 30, 2023 | Completed final sign-off Nov 2023 | 523 32nd Av | Picone Renovations | remodel kitchen & bathDetails
remodel kitchen & bath | $35,000 |
| Dec 22, 2021 | Completed final sign-off Nov 2023 | 1075 Sutter St | Espitia General Contractors Incorporated | barrier removal to upgrade current mobility guestrooms on fls 4 & 9 and to provide additional mobility & communcation guestrooms to meet dispersion conversion of (e) ground floor offices to 4 (n) room keys division of room 100 into 2 rooms (1 additional key)Details
barrier removal to upgrade current mobility guestrooms on fls 4 & 9 and to provide additional mobility & communcation guestrooms to meet dispersion conversion of (e) ground floor offices to 4 (n) room keys division of room 100 into 2 rooms (1 additional key) | $114,778 |
| Sep 12, 2020 | Completed final sign-off Mar 2022 | 50 03rd St | Bryan J. Valverde Co | conversion of (e) 4th floor fitness center into 5 (n) hotel guestrooms. (n) mechanical, electrical, and plumbing work associated with project scope.Details
conversion of (e) 4th floor fitness center into 5 (n) hotel guestrooms. (n) mechanical, electrical, and plumbing work associated with project scope. | $310,625 |
| Mar 16, 2020 | Completed final sign-off Apr 2022 | 50 03rd St | Bryan J. Valverde Co | conversion of (e) 3rd floor administrative offices to (n) fitness center & single occupancy all gender restroom. (n) mechanical, electrical & plumbing work associated with project scopeDetails
conversion of (e) 3rd floor administrative offices to (n) fitness center & single occupancy all gender restroom. (n) mechanical, electrical & plumbing work associated with project scope | $176,093 |
| Dec 27, 2019 | Completed final sign-off Apr 2022 | 50 03rd St | Bryan J. Valverde Co | conversion of e basement kitchen and liquor storage room to administrative offices. new exhaust fan on 4th fl roof with ass ductwork servinbv new offices. new lec and mech scope in e phone room. updates to main entry and accessible path to travelDetails
conversion of e basement kitchen and liquor storage room to administrative offices. new exhaust fan on 4th fl roof with ass ductwork servinbv new offices. new lec and mech scope in e phone room. updates to main entry and accessible path to travel | $140,000 |
| Dec 24, 2019 | Expired or cancelled cancelled Jan 2026 | 630 Geary St | remodel of 54 units to include (n) ensuite bathrms, (n) finishes & n lighting, addition of 2 common kitchenettes & conversion of 2 sleep units to common dining space. remodel of (e) kitchenette, dining area, & laundry rm w/(n) finishes, appliances & lighting. removal & replacement of (e) elevator caDetails
remodel of 54 units to include (n) ensuite bathrms, (n) finishes & n lighting, addition of 2 common kitchenettes & conversion of 2 sleep units to common dining space. remodel of (e) kitchenette, dining area, & laundry rm w/(n) finishes, appliances & lighting. removal & replacement of (e) elevator ca | $3,000,000 | |
| Dec 11, 2019 | Never finaled issued Mar 2023, no final | 1300 Columbus Av | Elliott Pm Inc | abe#202002071852, to comply w/s.f. accessible business entrance program ord 51-16. add new accessibility ramp to meet requirements abe ordinance 51-16Details
abe#202002071852, to comply w/s.f. accessible business entrance program ord 51-16. add new accessibility ramp to meet requirements abe ordinance 51-16 | $20,000 |
| Jul 30, 2019 | Completed final sign-off Nov 2019 | 1231 Market St | Bryan J. Valverde Co | interior alteration of (e) hotel lobby, to include a lobby bar & grab and goDetails
interior alteration of (e) hotel lobby, to include a lobby bar & grab and go | $150,000 |
| Jun 10, 2019 | Never finaled issued Aug 2019, no final | 1300 Columbus Av | Angotti & Reilly Inc. | interior renovation at (e) 1st flr restaurant determine occupant loadDetails
interior renovation at (e) 1st flr restaurant determine occupant load | $480,000 |
| Oct 11, 2017 | Expired or cancelled cancelled Jan 2026 | 2180 Post St | g/f: (e) unisex bathroom to be remoded for ada barrier removal: new fixtures, finishes, replacing (e) one for one.Details
g/f: (e) unisex bathroom to be remoded for ada barrier removal: new fixtures, finishes, replacing (e) one for one. | $5,000 | |
| Sep 13, 2017 | Completed final sign-off Jan 2021 | 2038 Divisadero St | The G B Group Inc. | soft story retrofit of ground floor per sfbc chapter 34b engineering criteria fema p-807.Details
soft story retrofit of ground floor per sfbc chapter 34b engineering criteria fema p-807. | $80,000 |
| Sep 13, 2017 | Expired or cancelled withdrawn Oct 2019 | 2038 Divisadero St | add 3 units, 1 bath in each unit (3) on ground floor only per ordinance #162-16. no changes to 2nd,3rd and 4th fls. changes to egress on ground floor only. soft story retrofit under separate permit #201709137860Details
add 3 units, 1 bath in each unit (3) on ground floor only per ordinance #162-16. no changes to 2nd,3rd and 4th fls. changes to egress on ground floor only. soft story retrofit under separate permit #201709137860 | $350,000 | |
| Jun 21, 2017 | Completed final sign-off Dec 2017 | 2300 Harrison St | Source Planning And Construction Inc | adding 2 walls between (e) offices and creating 2 new offices on the 1st floor. adding kitchenette area with new sitting area. new electrical and plumbing in new kitchenette. maher naDetails
adding 2 walls between (e) offices and creating 2 new offices on the 1st floor. adding kitchenette area with new sitting area. new electrical and plumbing in new kitchenette. maher na | $100,000 |
| May 11, 2017 | Never finaled filed May 2017, never issued | 835 Hyde St | adding 3 new rooms by splitting 3 guest suites, 3 new bathrooms and remodel 3 existing bathrooms; adding door automatic opener; new reception desk (accessible)Details
adding 3 new rooms by splitting 3 guest suites, 3 new bathrooms and remodel 3 existing bathrooms; adding door automatic opener; new reception desk (accessible) | $90,000 | |
| Jan 25, 2017 | Never finaled filed Jan 2017, never issued | 3715 California St | adu at ground floor only. add 3 (n) units to (e) blgd per ordinance no. 162-16.each unit has 1 bedroom,1 bathroom, 1 kitchen. n/a for maher. add unit per ordinance no. 155-13.Details
adu at ground floor only. add 3 (n) units to (e) blgd per ordinance no. 162-16.each unit has 1 bedroom,1 bathroom, 1 kitchen. n/a for maher. add unit per ordinance no. 155-13. | $300,000 | |
| Jan 25, 2017 | Expired or cancelled cancelled Oct 2019 | 4540 California St | add unit per ordinance no. 162-16. adu at ground floor only. add 3 (n) units to (e) blgd per ordinance no. 162-16 unit #1 & #2 has 1 bedroom,1 bathroom, 1 kitchen. unit#3 2 bedroo,1 bath & 1 kitchen.Details
add unit per ordinance no. 162-16. adu at ground floor only. add 3 (n) units to (e) blgd per ordinance no. 162-16 unit #1 & #2 has 1 bedroom,1 bathroom, 1 kitchen. unit#3 2 bedroo,1 bath & 1 kitchen. | $300,000 | |
| Nov 2, 2016 | Completed final sign-off Jul 2018 | 5 Embarcadero Center | Hathaway Dinwiddie Co. | bathroom shower conversion in 78 rooms, selective wall & floor relocation, selective electrical relocation, convert 1 balcony suite to accessible suite. n/a ordinance #155-13Details
bathroom shower conversion in 78 rooms, selective wall & floor relocation, selective electrical relocation, convert 1 balcony suite to accessible suite. n/a ordinance #155-13 | $542,000 |
| Sep 16, 2016 | Never finaled issued Apr 2018, no final | 600 Oak St | added dwelling units (adu) @ ground floor only. renovation to add 5 (n) units to (e) building. refer to application #2016-0909-7252 for soft story retrofit drawings by structural engineer. adu per ordinance 162-16. sprinkler/life safety/mep deferred.Details
added dwelling units (adu) @ ground floor only. renovation to add 5 (n) units to (e) building. refer to application #2016-0909-7252 for soft story retrofit drawings by structural engineer. adu per ordinance 162-16. sprinkler/life safety/mep deferred. | $250,000 | |
| Aug 26, 2016 | Completed final sign-off Mar 2017 | 240 Cumberland St | Liang's Remodeling Inc. | unit #307: reno. of bath., new kit. fixtures & cabinetry. new windows & doors (not visible from st) - no increase (e) opening sizes. new non-bearing partitions. new lighting & elect outlets, no increase to bld sf. no change to bld envelope. (n) home office w/ mech. convert closet to laundryDetails
unit #307: reno. of bath., new kit. fixtures & cabinetry. new windows & doors (not visible from st) - no increase (e) opening sizes. new non-bearing partitions. new lighting & elect outlets, no increase to bld sf. no change to bld envelope. (n) home office w/ mech. convert closet to laundry | $30,000 |
| Aug 17, 2016 | Never finaled issued Sep 2016, no final | 5 Embarcadero Center | Hathaway Dinwiddie Co. | remodel 2 model rooms on the 9th and 16th fl. 1 tub to shower conversion, add 2 barndoors, enlarge e opening to 32"Details
remodel 2 model rooms on the 9th and 16th fl. 1 tub to shower conversion, add 2 barndoors, enlarge e opening to 32" | $20,000 |
| Dec 18, 2015 | Completed final sign-off Jan 2017 | 5 Embarcadero Center | Marchetti Group | remodel and upgrade of (e) buffet and lounge on the 17th flo. select demolition of partial height walls, expansion of existing ramp to make it compliant with current code. new light fixtures and plumbing fixtures. new floor and wall finishes. relocation and addition of outletsDetails
remodel and upgrade of (e) buffet and lounge on the 17th flo. select demolition of partial height walls, expansion of existing ramp to make it compliant with current code. new light fixtures and plumbing fixtures. new floor and wall finishes. relocation and addition of outlets | $88,000 |
| Jun 29, 2015 | Never finaled issued Aug 2015, no final | 33 Powell St | Reno Contracting Inc. | new electrical vault at basement level providing new electrical transformer with the proper opening and new manholes at the sidewalk level and new paving to match existing as required. no changes to exterior envelope.Details
new electrical vault at basement level providing new electrical transformer with the proper opening and new manholes at the sidewalk level and new paving to match existing as required. no changes to exterior envelope. | $50,000 |
| Jun 15, 2015 | Never finaled issued Jun 2015, no final | 33 Powell St | Reno Contracting Inc. | revision to app#201410017815. add another five blocking detail for hotels fire rated wall. n/a for the maher.Details
revision to app#201410017815. add another five blocking detail for hotels fire rated wall. n/a for the maher. | |
| Jun 9, 2015 | Never finaled issued Jun 2015, no final | 33 Powell St | Reno Contracting Inc. | basement & 1st fl: revision to voluntary seismic pa#201407282323 and 201410017815. revision to column and beam detail shown on sheets s2.1,s2.2,s3.1,s3.2,s2.2a,s2.3a and s4.2. n/a ordinance #155-13Details
basement & 1st fl: revision to voluntary seismic pa#201407282323 and 201410017815. revision to column and beam detail shown on sheets s2.1,s2.2,s3.1,s3.2,s2.2a,s2.3a and s4.2. n/a ordinance #155-13 | |
| Jun 5, 2015 | Never finaled issued Jun 2015, no final | 33 Powell St | Reno Contracting Inc. | revision to appl #2014.1001.7815 - add a fire blocking detail for hotels fire rated walls. n/a maher ordinanceDetails
revision to appl #2014.1001.7815 - add a fire blocking detail for hotels fire rated walls. n/a maher ordinance | |
| Apr 29, 2015 | Completed final sign-off Aug 2016 | 5 Embarcadero Center | Hathaway Dinwiddie Co. | new accessible loading & walkway & detectable warnings, new automatic revolving door with new swinging doors to replace extg entry, limited regrading & nw curb cuts, nw railing & gates at extg exit stairs from bsmnt. nw landscaping(potted plants), nw decorative lghtg. new signage on seperate permit.Details
new accessible loading & walkway & detectable warnings, new automatic revolving door with new swinging doors to replace extg entry, limited regrading & nw curb cuts, nw railing & gates at extg exit stairs from bsmnt. nw landscaping(potted plants), nw decorative lghtg. new signage on seperate permit. | $1,025,000 |
| Apr 14, 2015 | Completed final sign-off Jul 2016 | 1800 Sutter St | Lombardi Contracting Corpration | 1st thru 4th flrs: conversion of 2 (e) mtg rms & 1 fitness ctr into 3 (n) king guestrooms. conversion of 2 e guestrooms into fitness ctr & mtg rm w/(n) toilet rooms. nw mobility guestroom #609 under barrier removal permit 201502178527 will not be built 1 of 3 (n) king rooms under this permit willDetails
1st thru 4th flrs: conversion of 2 (e) mtg rms & 1 fitness ctr into 3 (n) king guestrooms. conversion of 2 e guestrooms into fitness ctr & mtg rm w/(n) toilet rooms. nw mobility guestroom #609 under barrier removal permit 201502178527 will not be built 1 of 3 (n) king rooms under this permit will | $100,000 |
| Mar 11, 2015 | Never finaled issued Jan 2016, no final | 33 Powell St | Reno Contracting Inc. | erect a double faced projecting non-electric sign.(maher ordinance - extended ordinance no.155-13 n/a)Details
erect a double faced projecting non-electric sign.(maher ordinance - extended ordinance no.155-13 n/a) | $7,000 |
| Mar 11, 2015 | Never finaled issued Jan 2016, no final | 28 Cyril Magnin St | Reno Contracting Inc. | erect a double faced projecting non-electric sign. (maher ordinance -extended - ordinance 155-13 n/a)Details
erect a double faced projecting non-electric sign. (maher ordinance -extended - ordinance 155-13 n/a) | $7,000 |
| Feb 23, 2015 | Never finaled issued Jul 2015, no final | 33 Powell St | Reno Contracting Inc. | non structural sign. n/a for maher ordinance.Details
non structural sign. n/a for maher ordinance. | $600 |
| Feb 23, 2015 | Never finaled issued Jul 2015, no final | 33 Powell St | Reno Contracting Inc. | non structural sign. n/a for maher ordinance.Details
non structural sign. n/a for maher ordinance. | $200 |
| Feb 23, 2015 | Never finaled issued Jul 2015, no final | 33 Powell St | Reno Contracting Inc. | non structural sign. n/a for maher ordinance.Details
non structural sign. n/a for maher ordinance. | $300 |
| Jan 13, 2015 | Completed final sign-off Feb 2015 | 5 The Embarcadero | Hathaway Dinwiddie Co. | revision appl. #2014.0829.5081. replace guestroom entry door was to be enlarged from 2'-8" to 3'-0". but guest room #1656 entry door is to remain the existing size 2'-8" due to the (e) structural column. maher n/a.Details
revision appl. #2014.0829.5081. replace guestroom entry door was to be enlarged from 2'-8" to 3'-0". but guest room #1656 entry door is to remain the existing size 2'-8" due to the (e) structural column. maher n/a. | |
| Dec 17, 2014 | Completed final sign-off Jun 2016 | 5 The Embarcadero | Hathaway Dinwiddie Co. | remodel of hotel, bar, flex space, platform w/ (n) reception & concierge desk & @ the 3rd floor level/ new occupant loads-mep, removal & replace selected floor finishes, new wall finishes gyp board ceiling,new doors, operable walls & lighting. sprinklers & fire alarm sep. permitDetails
remodel of hotel, bar, flex space, platform w/ (n) reception & concierge desk & @ the 3rd floor level/ new occupant loads-mep, removal & replace selected floor finishes, new wall finishes gyp board ceiling,new doors, operable walls & lighting. sprinklers & fire alarm sep. permit | $1,800,000 |
| Dec 8, 2014 | Completed final sign-off Jan 2017 | 5 Embarcadero Center | Hathaway Dinwiddie Co. | 3rd fl atrium: demolition of extg hyatt regency embarcadero interior non structural walls, ceilings and finishes at flex-space and platform areas as shown in attached plans. n/a ordinance #155-13Details
3rd fl atrium: demolition of extg hyatt regency embarcadero interior non structural walls, ceilings and finishes at flex-space and platform areas as shown in attached plans. n/a ordinance #155-13 | $30,000 |
| Dec 4, 2014 | Never finaled issued Dec 2014, no final | 33 Powell St | Reno Contracting Inc. | demolition of hotel interior non-structural walls and ceiling. only basement, 2nd-6th floor. first flr and mezzanine to remain. sprinkler and exits to remain. no change in number of units. all ti & accessibility work under pa#201410017815. building remain vacant until ti work completed. per ab-017.Details
demolition of hotel interior non-structural walls and ceiling. only basement, 2nd-6th floor. first flr and mezzanine to remain. sprinkler and exits to remain. no change in number of units. all ti & accessibility work under pa#201410017815. building remain vacant until ti work completed. per ab-017. | $125,000 |
| Nov 7, 2014 | Completed final sign-off Jan 2017 | 5 Embarcadero Center | Hathaway Dinwiddie Co. | interior improvements to meeting space and related restrooms on the basement level, ground floor level, 2nd level and 3rd level.Details
interior improvements to meeting space and related restrooms on the basement level, ground floor level, 2nd level and 3rd level. | $80,000 |
| Nov 6, 2014 | Never finaled issued Nov 2014, no final | 5 Embarcadero Center | Hathaway Dinwiddie Co. | remodel guest room 1637 consisting of alteration to guest bath to provide for accessibilityDetails
remodel guest room 1637 consisting of alteration to guest bath to provide for accessibility | $30,000 |
| Jul 28, 2014 | Never finaled issued Dec 2014, no final | 33 Powell St | Angotti & Reilly Inc., Reno Contracting Inc. | voluntary seismic upgrade from basement to underside of 2nd floor. plus plywood sheathing at floors 2-6. (n) public bathrooms in basement. ** maher: compliance with ordinance no# 155-13 not required **Details
voluntary seismic upgrade from basement to underside of 2nd floor. plus plywood sheathing at floors 2-6. (n) public bathrooms in basement. ** maher: compliance with ordinance no# 155-13 not required ** | $1,200,000 |
| Jun 24, 2014 | Completed final sign-off Aug 2015 | 5 Embarcadero Center | Hathaway Dinwiddie Co. | 15/f: selective demolitoin - partition, bathroom vnity, toilet, some finishes, light fixtures, new finishes, light fixtures, bathroom fixtures, floor & wall finishes for guessroom #1543. alteration of guessroom does not have to comply w/ h.c. accessibility because hotel count already complies.Details
15/f: selective demolitoin - partition, bathroom vnity, toilet, some finishes, light fixtures, new finishes, light fixtures, bathroom fixtures, floor & wall finishes for guessroom #1543. alteration of guessroom does not have to comply w/ h.c. accessibility because hotel count already complies. | $20,000 |
| May 9, 2014 | Never finaled issued May 2015, no final | 33 Powell St | Reno Contracting Inc. | exterior minor alteration to (e) powell hotel work on powell street elevation includes: new entrance, new 10 windows, removing fire escape ladder exterior work on cyril magnin st elevation includes new entrance, replacement of 5 windows in kind, removing decorative towers, fire escape ladderDetails
exterior minor alteration to (e) powell hotel work on powell street elevation includes: new entrance, new 10 windows, removing fire escape ladder exterior work on cyril magnin st elevation includes new entrance, replacement of 5 windows in kind, removing decorative towers, fire escape ladder | $270,000 |
| May 22, 2013 | Completed final sign-off Apr 2017 | 2770 Taylor St | 3rd floor -revision to pa #2013.02.27.1093: addition of approx 1,000 sq ft dining space to the new restruant & addition of 1 ada lavatory in each restroom. new occupant load calculation- sffd assembly permit req., one new skylight at existing roof opening.Details
3rd floor -revision to pa #2013.02.27.1093: addition of approx 1,000 sq ft dining space to the new restruant & addition of 1 ada lavatory in each restroom. new occupant load calculation- sffd assembly permit req., one new skylight at existing roof opening. | $100,000 | |
| Aug 20, 2010 | Completed final sign-off Nov 2012 | 3015 Van Ness Av | Make Ready Maintenance Inc | to comply with nov# 201031750, dated 1/22/10, expand unit #3 to ground floor with kitchen. new self closing, self latching door assemblies. new gyp board at garage. new wall between garage & hallway.Details
to comply with nov# 201031750, dated 1/22/10, expand unit #3 to ground floor with kitchen. new self closing, self latching door assemblies. new gyp board at garage. new wall between garage & hallway. | $35,000 |