Source Planning And Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Oct 2010 to Sep 2026
- Last 24 months
- 136 permits filed
811 permits since 2000: 628 completed, 52 in progress, 122 never finaled, 9 expired or cancelled.
Of the 122 never-finaled permits, 15 are 3 to 5 years old, 57 are 5 to 10 years old, 50 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
26 stairs permits: 17 completed, 1 in progress, 7 never finaled, 1 expired or cancelled. Typically 22 days from filing to permit and 145 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 26, 2026 | Completed final sign-off Aug 2026 | 88 Kearny St | 4th fl - permit revision ti permit 202510288260 for remodel of existing communication stair and a technical infeasibility @ women's restroomsDetails
4th fl - permit revision ti permit 202510288260 for remodel of existing communication stair and a technical infeasibility @ women's restrooms | $12,000 |
| Dec 11, 2025 | Completed final sign-off Mar 2026 | 4 Embarcadero Center | demo of level 28-level 29 convenience stairs & slab in-fill.Details
demo of level 28-level 29 convenience stairs & slab in-fill. | $150,000 |
| Nov 13, 2025 | Completed final sign-off Mar 2026 | 1 Embarcadero Center | 29th and 30 flr. communication stiar t.i. includes the remove of a non-egress interconnecting - stair and the infill of the slab opening. all new or revised life safety work will be design buildg and submitted separately. (bldg is fully sprinklered)Details
29th and 30 flr. communication stiar t.i. includes the remove of a non-egress interconnecting - stair and the infill of the slab opening. all new or revised life safety work will be design buildg and submitted separately. (bldg is fully sprinklered) | $198,000 |
| Oct 6, 2025 | In progress issued Oct 2025 | 101 California St | 8th fl - minor revision to pa 202412126710 for upgrading interior stair vestibule to 2 hour rated with 90 min rated doors. all other areas within previously approved design are to remain unchanged floor 8Details
8th fl - minor revision to pa 202412126710 for upgrading interior stair vestibule to 2 hour rated with 90 min rated doors. all other areas within previously approved design are to remain unchanged floor 8 | |
| Sep 10, 2025 | Completed final sign-off Jan 2026 | 1 Embarcadero Center | 32nd floor: infill former stair opening 11' x 13' with new floor slab.Details
32nd floor: infill former stair opening 11' x 13' with new floor slab. | $198,000 |
| Jun 12, 2025 | Completed final sign-off Jul 2025 | 595 Market St | to comply with nov# 202538027 - repair walls within stairway #2 from floors 4-24 due to water damage, non-structural work. inkindDetails
to comply with nov# 202538027 - repair walls within stairway #2 from floors 4-24 due to water damage, non-structural work. inkind | $20,000 |
| Aug 22, 2024 | Completed final sign-off Apr 2025 | 101 California St | ramp, stair, upper floor railing. ramp interior work in parking lot. reference: 202303103491Details
ramp, stair, upper floor railing. ramp interior work in parking lot. reference: 202303103491 | $30,000 |
| Apr 12, 2024 | Completed final sign-off Aug 2024 | 4 Embarcadero Center | 28th and 29th floors:adjacent mech & electrical etc. for reducing the rented space, refurning a portion of the 28th floor back to the owner. 28th floor have an extg communication stair which they will retain. ref arch. set pa# 202403298897Details
28th and 29th floors:adjacent mech & electrical etc. for reducing the rented space, refurning a portion of the 28th floor back to the owner. 28th floor have an extg communication stair which they will retain. ref arch. set pa# 202403298897 | $60,000 |
| Jun 21, 2023 | Completed final sign-off Aug 2024 | 4 Embarcadero Center | 29th fl - revision to pa 2023-0602-9092. reconfiguration of hallway door at stair areaDetails
29th fl - revision to pa 2023-0602-9092. reconfiguration of hallway door at stair area | |
| Feb 9, 2023 | Never finaled issued Feb 2023, no final | 1 Bush St | 18/f: demo of (e) stair on 18th floor and structural infill at slab opening, no change to (e) eress and occupancy includes required path of travel upgrares mech, elec, life safety and sprinkler under seperate permitDetails
18/f: demo of (e) stair on 18th floor and structural infill at slab opening, no change to (e) eress and occupancy includes required path of travel upgrares mech, elec, life safety and sprinkler under seperate permit | $187,685 |
| Jun 9, 2022 | Completed final sign-off May 2023 | 135 Townsend St | t.i on 1st, 2nd & 3rd flrs. demo & construct non-structural partitions, ceilings, finishes, furniture equipment and meps. structural - addition of 2 (n) stairs btwn 1st & erd flrs. (n) openings are bracing for operable partition.Details
t.i on 1st, 2nd & 3rd flrs. demo & construct non-structural partitions, ceilings, finishes, furniture equipment and meps. structural - addition of 2 (n) stairs btwn 1st & erd flrs. (n) openings are bracing for operable partition. | $4,126,428 |
| Nov 4, 2021 | Never finaled issued Dec 2021, no final | 4 Embarcadero Center | demo of inter connecting staircase and infill slab between floors 12 & 13 no change in occupancy or useDetails
demo of inter connecting staircase and infill slab between floors 12 & 13 no change in occupancy or use | $200,000 |
| Sep 8, 2021 | Completed final sign-off Sep 2021 | 4 Embarcadero Center | construct 2 new walls with 1 maintenance access door to close off the communicating stair between floors 37th and 38th fl . stair is not part of existing means of egress. ref pa 201905090198.Details
construct 2 new walls with 1 maintenance access door to close off the communicating stair between floors 37th and 38th fl . stair is not part of existing means of egress. ref pa 201905090198. | $5,000 |
| Apr 26, 2021 | Completed final sign-off Sep 2021 | 427 Brannan St | level 2 interior tenant improvement include demolition of non-load bearing partitions & acoustical ceiling tile modification for a single tenant on 2nd floor. existing structure & exit stairs to remain. no facade/fenestration work.Details
level 2 interior tenant improvement include demolition of non-load bearing partitions & acoustical ceiling tile modification for a single tenant on 2nd floor. existing structure & exit stairs to remain. no facade/fenestration work. | $48,000 |
| Jun 27, 2019 | Never finaled issued Aug 2019, no final | 595 Market St | 17th flr (e) tenant t.i. selective demo and construction of non load-bearing walls. (e) stairs too close together providing compartmentalization of 2-hr wall separation w/ 90 min s-doors. mep, life safety srpinklers under separate permit if needed.Details
17th flr (e) tenant t.i. selective demo and construction of non load-bearing walls. (e) stairs too close together providing compartmentalization of 2-hr wall separation w/ 90 min s-doors. mep, life safety srpinklers under separate permit if needed. | $75,000 |
| Jun 27, 2019 | Never finaled issued Aug 2019, no final | 595 Market St | 15th flr (e) tenant t.i. selective demo and construction of non load-bearing walls. (e) stairs too close together providing compartmentalization of 2-hr wall separation w/ 90 min s-doors. mep, life safety srpinklers under separate permit if needed.Details
15th flr (e) tenant t.i. selective demo and construction of non load-bearing walls. (e) stairs too close together providing compartmentalization of 2-hr wall separation w/ 90 min s-doors. mep, life safety srpinklers under separate permit if needed. | $75,000 |
| May 9, 2019 | Completed final sign-off Nov 2020 | 4 Embarcadero Center | floors 37th and 38th: t.i 37th partial fl, 38th full floor work. new partitions, ceiling finishes etc: replace existing comm. stairs handrails, landlord work included restrooms 37th and 38th corridors and lobby work. mep and life safety/sprinkler under separate permit. maher n/a.Details
floors 37th and 38th: t.i 37th partial fl, 38th full floor work. new partitions, ceiling finishes etc: replace existing comm. stairs handrails, landlord work included restrooms 37th and 38th corridors and lobby work. mep and life safety/sprinkler under separate permit. maher n/a. | $1,866,000 |
| Feb 21, 2019 | Never finaled issued Dec 2019, no final | 909 Montgomery St | 1st fl suite 103 (e) tenat space to include construction f non-load bearing partitions (n) doors/frames etc. new mezz and stairs(structural) demo permit 201808318868Details
1st fl suite 103 (e) tenat space to include construction f non-load bearing partitions (n) doors/frames etc. new mezz and stairs(structural) demo permit 201808318868 | $320,000 |
| Feb 28, 2018 | Completed final sign-off Jun 2021 | 101 Vallejo St | revision to app#201707202428 to correct downspout tie ins. correction notice #201841311. redsign stairs from steel to wood and extend depth of sump pit.Details
revision to app#201707202428 to correct downspout tie ins. correction notice #201841311. redsign stairs from steel to wood and extend depth of sump pit. | |
| Jul 31, 2017 | Completed final sign-off Nov 2017 | 101 California St | 40th fl: removing stairs (communication stair) and infilling floor. maher naDetails
40th fl: removing stairs (communication stair) and infilling floor. maher na | |
| Mar 23, 2016 | Completed final sign-off Mar 2017 | 595 Market St | barrier removal project - adding a platform lift & compliant stair in place of (2) existing non-compliant stairs.Details
barrier removal project - adding a platform lift & compliant stair in place of (2) existing non-compliant stairs. | $200,000 |
| Mar 4, 2015 | Never finaled issued Mar 2015, no final | 71 Stevenson St | 19th & 20th flrs: revision to 201502057618 and 201502057621; (n) communicating stair. sprinkler/smoke/alarm deferred.Details
19th & 20th flrs: revision to 201502057618 and 201502057621; (n) communicating stair. sprinkler/smoke/alarm deferred. | $125,000 |
| Jan 28, 2014 | Completed final sign-off Sep 2017 | 1656 Post St | remove existing partitions, doors and some shelving, add new elevator, main electrical, phone room for new ground transformer in sidewalk, scope includes new partition, doors and stair as well as replacing some rotted beams & plywood decking.Details
remove existing partitions, doors and some shelving, add new elevator, main electrical, phone room for new ground transformer in sidewalk, scope includes new partition, doors and stair as well as replacing some rotted beams & plywood decking. | $350,000 |
| Apr 11, 2013 | Expired or cancelled cancelled Jan 2020 | 130 08th St | basement & floors 1, 2, & 3 - demolition of int walls, partial floor structure, plumbing fixtures, millwork & finishes, construction of new toilet rooms, stairs, new elevator, hvac & elec systems & lighting. all upgrades are base bldg only including front door & mech equipment on roof.Details
basement & floors 1, 2, & 3 - demolition of int walls, partial floor structure, plumbing fixtures, millwork & finishes, construction of new toilet rooms, stairs, new elevator, hvac & elec systems & lighting. all upgrades are base bldg only including front door & mech equipment on roof. | $1,000,000 |
| Nov 21, 2012 | Completed final sign-off Dec 2013 | 120 Kearny St | interior t.i. on 6 & 7 floors only. reference pa#2011-06-29-9168. niew interior partitions, new communication stair, new flooring, new carpet & paint. re-working (e) ceiling. mechanical, electrical & plumbing are deferred submittals. sprinklers are deferred submittal.Details
interior t.i. on 6 & 7 floors only. reference pa#2011-06-29-9168. niew interior partitions, new communication stair, new flooring, new carpet & paint. re-working (e) ceiling. mechanical, electrical & plumbing are deferred submittals. sprinklers are deferred submittal. | $2,000,000 |
| Nov 8, 2012 | Never finaled issued Nov 2012, no final | 71 Stevenson St | 2nd & 3rd floor:two floor tenant improvement on floors 2 and 3 to do. minor demo and construction of non load bearing partitions doors, and finishes. sructural work included to remove concrete slab and install new inter connecting non egress stair. mech,el, ls, sp on seperate permit.Details
2nd & 3rd floor:two floor tenant improvement on floors 2 and 3 to do. minor demo and construction of non load bearing partitions doors, and finishes. sructural work included to remove concrete slab and install new inter connecting non egress stair. mech,el, ls, sp on seperate permit. | $475,000 |