Back to bathroom remodel contractors
G M Building And Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Mar 2019 to Sep 2026
- Last 24 months
- 61 permits filed
132 permits since 2000: 84 completed, 34 in progress, 7 never finaled, 7 expired or cancelled.
Of the 7 never-finaled permits, 2 are 3 to 5 years old, 5 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
83 bathroom remodel permits: 49 completed, 24 in progress, 7 never finaled, 3 expired or cancelled. Typically 0 days from filing to permit and 119 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 5, 2026 | In progress issued Jun 2026 | 1326 Larkin St | revision to 202602186110 (recommencement of 201210091530). g/f: delete sitting, 3 storage rms, and half bath. relocate 2 baths. provide office and media room. replace w/h with tankless. 2/f: delete study, bedrm, sitting, and half bath. relocate kitchen and 2 baths. provide laundry rm. revise spiralDetails
revision to 202602186110 (recommencement of 201210091530). g/f: delete sitting, 3 storage rms, and half bath. relocate 2 baths. provide office and media room. replace w/h with tankless. 2/f: delete study, bedrm, sitting, and half bath. relocate kitchen and 2 baths. provide laundry rm. revise spiral | $100,000 |
| Apr 3, 2026 | Completed final sign-off Sep 2026 | 830 Sutter St | apt 2: remodel ktichen & bathroom in-kind. new plumbing and electrical fixtures as needed.Details
apt 2: remodel ktichen & bathroom in-kind. new plumbing and electrical fixtures as needed. | $42,000 |
| Mar 9, 2026 | Completed final sign-off Jul 2026 | 489 Guerrero St | remodel unit: kitchen and bathroom all in-kind plumbing and electrical.Details
remodel unit: kitchen and bathroom all in-kind plumbing and electrical. | $35,000 |
| Feb 26, 2026 | In progress issued Mar 2026 | 1551 Larkin St | interior remodel: ground fl. remove storage & 2 offices, remodel media rm, relocate 2 bths, water heater/furnace from 2nd fl. provid media rm & laundry. 2nd/f remove 1/2 bath & media rm, relocate e bath & office, convert storage to pntry, kitchen remodel, provide 1 new window, 3rd fl:remove bedrm,Details
interior remodel: ground fl. remove storage & 2 offices, remodel media rm, relocate 2 bths, water heater/furnace from 2nd fl. provid media rm & laundry. 2nd/f remove 1/2 bath & media rm, relocate e bath & office, convert storage to pntry, kitchen remodel, provide 1 new window, 3rd fl:remove bedrm, | $100,000 |
| Jan 8, 2026 | In progress issued Jan 2026 | 1551 Larkin St | remodel kitchen and bathroom, electrical and plumbing as needed, all in kind like for like.Details
remodel kitchen and bathroom, electrical and plumbing as needed, all in kind like for like. | $39,000 |
| Dec 15, 2025 | Completed final sign-off Feb 2026 | 250 Central Av | units 250a & 252a: to comply w/ nov 202316343 remodel 2 bathrooms only. electrical and plumbing as needed.Details
units 250a & 252a: to comply w/ nov 202316343 remodel 2 bathrooms only. electrical and plumbing as needed. | $20,000 |
| Nov 7, 2025 | In progress issued Dec 2025 | 133 Blake St | interior remodel. remove fireplace on 2/f and 3/f. convert office on 3/f to be new bath. remodel bath on 3/f. remove wall between sunroom and bedroom on 3/f. remodel bath and kitchen on 2/f. remove den on 2/f and add to living room. remove wall between sunroom and kitchen on 2/f...Details
interior remodel. remove fireplace on 2/f and 3/f. convert office on 3/f to be new bath. remodel bath on 3/f. remove wall between sunroom and bedroom on 3/f. remodel bath and kitchen on 2/f. remove den on 2/f and add to living room. remove wall between sunroom and kitchen on 2/f... | $75,000 |
| Oct 30, 2025 | Completed final sign-off Nov 2025 | 782 Green St | remodel kitchen in kind new cabinets, new counter tops with sink. replace bathroom vanity only like for likeDetails
remodel kitchen in kind new cabinets, new counter tops with sink. replace bathroom vanity only like for like | $7,500 |
| Oct 29, 2025 | In progress filed Oct 2025, not yet issued | 423 Laguna St | remodel 2 bathrooms in kind. no change to floor layout. no change to wall layout. no structural work. maintain all (e) fire rating.Details
remodel 2 bathrooms in kind. no change to floor layout. no change to wall layout. no structural work. maintain all (e) fire rating. | $25,000 |
| Oct 29, 2025 | In progress filed Oct 2025, not yet issued | 421 Laguna St | remodel 2 bathrooms in kind. no change to floor layout. no change to wall layout. no structural work. maintain all (e) fire rating.Details
remodel 2 bathrooms in kind. no change to floor layout. no change to wall layout. no structural work. maintain all (e) fire rating. | $25,000 |
| Oct 8, 2025 | Completed final sign-off May 2026 | 1522 Waller St | 3rd/f front unit: n) bath, remodel e) kitchen w/wall removal, convert closet to laundry, remove fireplace. 3rd/f rear unit: remodel 2 e) baths, remodel kitchen w/wall removal, convert toilet to laundry, widen bedroom closet door, removel fireplace. 2nd/f unit: remodel 2 e) baths & kitchen remodel w/Details
3rd/f front unit: n) bath, remodel e) kitchen w/wall removal, convert closet to laundry, remove fireplace. 3rd/f rear unit: remodel 2 e) baths, remodel kitchen w/wall removal, convert toilet to laundry, widen bedroom closet door, removel fireplace. 2nd/f unit: remodel 2 e) baths & kitchen remodel w/ | $89,000 |
| Sep 10, 2025 | Completed final sign-off Dec 2025 | 169 Fair Oaks St | unit 9: remodel in kind kitchen and bathroom all electrical and plumbing as neededDetails
unit 9: remodel in kind kitchen and bathroom all electrical and plumbing as needed | $35,000 |
| Sep 3, 2025 | In progress issued Sep 2025 | 200 04th Av | revision to pa# 202405242971 & 202412106484: remodel 5 bathrooms on 3/f; change 5 windows for egress; provide rated walls as shown; show reinforced floor joists and reduce beam span with new walsl and posts; replace wall heaters to furnace and tank to tankless water heaters; new drywall throughout,Details
revision to pa# 202405242971 & 202412106484: remodel 5 bathrooms on 3/f; change 5 windows for egress; provide rated walls as shown; show reinforced floor joists and reduce beam span with new walsl and posts; replace wall heaters to furnace and tank to tankless water heaters; new drywall throughout, | $200,000 |
| Sep 2, 2025 | In progress issued Sep 2025 | 1111 Church St | remodel kitchen and 2 bathroom in kind. electrical and plumbing as needed.Details
remodel kitchen and 2 bathroom in kind. electrical and plumbing as needed. | $48,500 |
| Aug 7, 2025 | In progress issued Aug 2025 | 507 Fell St | revision to pa# 202507281763: non structural interior remodel. g/f: convert (e) bedroom to office and remodel (e) bath. 2/f: remodel (e) kitchen in kind. provide (n) 1/2 bath. 3/f: remodel (e) bath. provide (n) laundry. provide closet at one bedroom. new bath, new walk in closet for one bedroom.Details
revision to pa# 202507281763: non structural interior remodel. g/f: convert (e) bedroom to office and remodel (e) bath. 2/f: remodel (e) kitchen in kind. provide (n) 1/2 bath. 3/f: remodel (e) bath. provide (n) laundry. provide closet at one bedroom. new bath, new walk in closet for one bedroom. | $60,000 |
| Jul 30, 2025 | Completed final sign-off Aug 2025 | 3381 21st St | revision to 202406114239. unit 3381 2nd fl remove non bearing wall between bedroom 1 and bedroom 2 at 2nd fl. convert powder room into bathroom. convert hallway bath to master bath. 1st fl convert poweder room into closet. convert 2 bath into 1 bathroom.Details
revision to 202406114239. unit 3381 2nd fl remove non bearing wall between bedroom 1 and bedroom 2 at 2nd fl. convert powder room into bathroom. convert hallway bath to master bath. 1st fl convert poweder room into closet. convert 2 bath into 1 bathroom. | $3,600 |
| Jul 30, 2025 | Completed final sign-off Jul 2026 | 280 Fair Oaks St | 1/f: revision to 202503182432. convert laundry and living to master bedroom. convert hallway bathroom to master bathroom. new hallway bathroom. reconfigure (e) kitchen/dining layout, bedroom #2 to living room. new patio and replace windows on side of bldg. 2/f: revision to 202503182434.Details
1/f: revision to 202503182432. convert laundry and living to master bedroom. convert hallway bathroom to master bathroom. new hallway bathroom. reconfigure (e) kitchen/dining layout, bedroom #2 to living room. new patio and replace windows on side of bldg. 2/f: revision to 202503182434. | $160,000 |
| Jul 28, 2025 | In progress issued Jul 2025 | 507 Fell St | renovate kitchen & 2 bathrooms in-kind. upgrade electrical & plumbing as needed. repair deck at rear to comply with nov2007-97995 #2Details
renovate kitchen & 2 bathrooms in-kind. upgrade electrical & plumbing as needed. repair deck at rear to comply with nov2007-97995 #2 | $65,000 |
| Jul 17, 2025 | In progress issued Jul 2025 | 1326 Larkin St | renovate kitchen in kind. remodel (2) existing bathrooms in kind. electrical and plumbing as needed. no removal of wallsDetails
renovate kitchen in kind. remodel (2) existing bathrooms in kind. electrical and plumbing as needed. no removal of walls | $65,000 |
| Jul 17, 2025 | In progress issued Jul 2025 | 1328 Larkin St | remodel kitchen and (2) bathrooms in kind. plumbing and electrical as needed. no removal of wallsDetails
remodel kitchen and (2) bathrooms in kind. plumbing and electrical as needed. no removal of walls | $65,000 |
| May 28, 2025 | Completed final sign-off May 2026 | 1524 Waller St | renovate kitchen in kind. renovate 2 bathrooms. electrial and plumbing as needed.Details
renovate kitchen in kind. renovate 2 bathrooms. electrial and plumbing as needed. | $38,500 |
| May 16, 2025 | Completed final sign-off Jun 2025 | 764 Chestnut St | revision to pa #200904095976 & 202410183313 1st fl: reconfiguration of master bathroom & remove partition walls btwn storage and garage area. 2nd fl: change from laundry to powder room & reconfiguration of bathroom, laundry at closet area. 3rd fl: return the room back its original use as bedroomDetails
revision to pa #200904095976 & 202410183313 1st fl: reconfiguration of master bathroom & remove partition walls btwn storage and garage area. 2nd fl: change from laundry to powder room & reconfiguration of bathroom, laundry at closet area. 3rd fl: return the room back its original use as bedroom | |
| Mar 11, 2025 | Completed final sign-off Jul 2025 | 203 Oak St | apt 2: remodel 1 kitchen & 1 bathrooms, all work in-kind. plumbing & electrical as needed. replace 8 (e) windows in-kind with aluminium wood clad.Details
apt 2: remodel 1 kitchen & 1 bathrooms, all work in-kind. plumbing & electrical as needed. replace 8 (e) windows in-kind with aluminium wood clad. | $45,000 |
| Mar 11, 2025 | Completed final sign-off Jul 2025 | 203 Oak St | apt 1: remodel 1 kitchen & 2 bathrooms, all work in-kind. plumbing & electrical as needed. replace 8 (e) windows in-kind with wood clad or alumimun clad windows.Details
apt 1: remodel 1 kitchen & 2 bathrooms, all work in-kind. plumbing & electrical as needed. replace 8 (e) windows in-kind with wood clad or alumimun clad windows. | $65,000 |
| Mar 10, 2025 | Completed final sign-off May 2025 | 500 Leavenworth St | unit #101: to comply with nov #202432468. renovate kitchen and bathroom in like kind, plumbing as needed/electrical as needed.Details
unit #101: to comply with nov #202432468. renovate kitchen and bathroom in like kind, plumbing as needed/electrical as needed. | $35,000 |
| Nov 1, 2024 | In progress issued Nov 2024 | 214 04th Av | remodel ktichen & bathroom in-kind. remove cabinet lath & plaster. electrical and plumbing fixtures as neededDetails
remodel ktichen & bathroom in-kind. remove cabinet lath & plaster. electrical and plumbing fixtures as needed | $45,000 |
| Sep 25, 2024 | Completed final sign-off Dec 2024 | 2785 Green St | unit #3 renovate kitchen & bathroom in kind. plubming & electrical as needed and under separate trades permits.Details
unit #3 renovate kitchen & bathroom in kind. plubming & electrical as needed and under separate trades permits. | $39,500 |
| Sep 9, 2024 | Completed final sign-off Jan 2025 | 1035 Pine St | apt 401: remodel kitchen & bathroom in-kind. electrical & plumbing as needed. no change to floor layout. no change to wall layout. no structural work.Details
apt 401: remodel kitchen & bathroom in-kind. electrical & plumbing as needed. no change to floor layout. no change to wall layout. no structural work. | $32,000 |
| Aug 2, 2024 | Completed final sign-off Oct 2024 | 1803 Broadway | apt 301: renovate one kitchen only. remove and replace vanity on bathroom only. plumbing & electrical as - needed. non structuralDetails
apt 301: renovate one kitchen only. remove and replace vanity on bathroom only. plumbing & electrical as - needed. non structural | $39,000 |
| Jul 17, 2024 | In progress issued Jul 2024 | 210 04th Av | remodel 1 kitchen and 1 bathroom in kind remove latch and plaster as needed (in kitchen and bath) upgrade electrical and plumbing as needed no wall removalDetails
remodel 1 kitchen and 1 bathroom in kind remove latch and plaster as needed (in kitchen and bath) upgrade electrical and plumbing as needed no wall removal | $45,000 |
| Jul 17, 2024 | In progress issued Jul 2024 | 208 04th Av | renovate 1 kitchen and 1 bathroom in kind remove latch and plaster as needed (in kitchen and bath) upgrade electrical and plumbing no wall removalDetails
renovate 1 kitchen and 1 bathroom in kind remove latch and plaster as needed (in kitchen and bath) upgrade electrical and plumbing no wall removal | $45,000 |
| Jul 11, 2024 | In progress issued Jul 2024 | 558 Guerrero St | rev pa202405081736: interior rmeodel on 2/f. relocate (e0 kitchen, rmeodel 2 (e) bathrooms, provide (n) bedroom at location of (e) kitchen. provide plywood stiffening.Details
rev pa202405081736: interior rmeodel on 2/f. relocate (e0 kitchen, rmeodel 2 (e) bathrooms, provide (n) bedroom at location of (e) kitchen. provide plywood stiffening. | |
| Jul 3, 2024 | Completed final sign-off Mar 2025 | 1624 Bay St | remodel (e) bathrooms and kitchens in both units. new plan configuration and 2nd and 3rd floors, for open floor plans. add master bedrooms on the ground floor. (ref bpa# 202404109691 and 202404109690)Details
remodel (e) bathrooms and kitchens in both units. new plan configuration and 2nd and 3rd floors, for open floor plans. add master bedrooms on the ground floor. (ref bpa# 202404109691 and 202404109690) | $150,000 |
| Jun 11, 2024 | In progress issued Jun 2024 | 95 Grand View Av | unit #1: remodel kitchen and bathroom in kind. plumbing and electrical as needed. (no moving walls)Details
unit #1: remodel kitchen and bathroom in kind. plumbing and electrical as needed. (no moving walls) | $35,000 |
| Jun 11, 2024 | Completed final sign-off Oct 2024 | 1803 Broadway | unit #1: remodel (1) kitchen in kind. electrical as needed. plumbing -replace bathroom vanity in bathroom only - no other work at bathroom. replace (12) front windows at living room and dining room and 3 non street visible windows at back.Details
unit #1: remodel (1) kitchen in kind. electrical as needed. plumbing -replace bathroom vanity in bathroom only - no other work at bathroom. replace (12) front windows at living room and dining room and 3 non street visible windows at back. | $65,000 |
| Jun 5, 2024 | Completed final sign-off Sep 2024 | 3167 Sacramento St | revision to (e) pa# 202403016966: remodeling the (e) kitchen and bathroom. adding a new full bathroom. new plan configuration which includes removing a load bearing wall and adding new roof joists.Details
revision to (e) pa# 202403016966: remodeling the (e) kitchen and bathroom. adding a new full bathroom. new plan configuration which includes removing a load bearing wall and adding new roof joists. | $50,000 |
| May 30, 2024 | In progress issued May 2024 | 202 04th Av | remodel kitchen and bathroom in kind. remove less than 50% lath and plaster. provide 5/8 fire rate sheet rock as needed. electrical and plumbing as needed.Details
remodel kitchen and bathroom in kind. remove less than 50% lath and plaster. provide 5/8 fire rate sheet rock as needed. electrical and plumbing as needed. | $45,000 |
| May 30, 2024 | In progress issued May 2024 | 206 04th Av | renovate (e) bathroom and kitchen in-kind. remove lathe & plaster 50% as needed to upgrade electricla and plumbing as needed.Details
renovate (e) bathroom and kitchen in-kind. remove lathe & plaster 50% as needed to upgrade electricla and plumbing as needed. | $45,000 |
| May 30, 2024 | Completed final sign-off Nov 2024 | 1111 Jones St | apt 6: renovate (e) bathroom and kitchen in-kind.upgrade electrical and plumbing as needed.Details
apt 6: renovate (e) bathroom and kitchen in-kind.upgrade electrical and plumbing as needed. | $45,000 |
| May 24, 2024 | In progress issued May 2024 | 204 04th Av | to comply w/ nov# 201935741: remodel unit kitchen and bathroom in kind. remove lath and plaster less than 50% provide 5/8 fire rate sheetrock as needed. plumbing and electrical as needed.Details
to comply w/ nov# 201935741: remodel unit kitchen and bathroom in kind. remove lath and plaster less than 50% provide 5/8 fire rate sheetrock as needed. plumbing and electrical as needed. | $45,000 |
| May 24, 2024 | In progress issued May 2024 | 200 04th Av | remodel kitchen and bathroom in kind. remove lath and plaster less than 50% - provide 5/8 fire rated sheetrock as needed. plumbing and electrical as needed.Details
remodel kitchen and bathroom in kind. remove lath and plaster less than 50% - provide 5/8 fire rated sheetrock as needed. plumbing and electrical as needed. | $45,000 |
| May 13, 2024 | In progress issued May 2024 | 173 Fair Oaks St | unit 2. remodel two bathrooms in kind. remove tub and install shower, replace toilets, sinks, all plumbing as needed.Details
unit 2. remodel two bathrooms in kind. remove tub and install shower, replace toilets, sinks, all plumbing as needed. | $29,000 |
| May 13, 2024 | In progress issued May 2024 | 167 Fair Oaks St | remodel 1 kitchen, 1 bathroom, electrical as needed. unit 5.Details
remodel 1 kitchen, 1 bathroom, electrical as needed. unit 5. | $39,000 |
| May 8, 2024 | In progress issued May 2024 | 558 Guerrero St | remodel (1) kitchen and bathroom in kind. plumbing and electrical as needed.Details
remodel (1) kitchen and bathroom in kind. plumbing and electrical as needed. | $37,000 |
| Apr 24, 2024 | Completed final sign-off Jul 2024 | 3167 Sacramento St | bathroom and kitchen remodel in kind - remove kitchen cabinets and replace in kind. replace countertop in kind. replace bathroom vanity in kind. no wall layout change. no floor layout change. no structural work.Details
bathroom and kitchen remodel in kind - remove kitchen cabinets and replace in kind. replace countertop in kind. replace bathroom vanity in kind. no wall layout change. no floor layout change. no structural work. | $25,000 |
| Apr 10, 2024 | Completed final sign-off Mar 2025 | 1624 Bay St | kitchen and bathroom remodel in kind. plumbing and electrical as needed.Details
kitchen and bathroom remodel in kind. plumbing and electrical as needed. | $35,000 |
| Apr 10, 2024 | Completed final sign-off Mar 2025 | 1626 Bay St | (1)kitchen and (1)bathroom remodel in kind. plumbing and electrical as needed.Details
(1)kitchen and (1)bathroom remodel in kind. plumbing and electrical as needed. | $35,000 |
| Mar 19, 2024 | Completed final sign-off May 2024 | 1111 Jones St | 1 kitchen and 1 bathroom remodel inkind. plumbing and electrical as needed.Details
1 kitchen and 1 bathroom remodel inkind. plumbing and electrical as needed. | $35,000 |
| Mar 5, 2024 | Completed final sign-off Jul 2024 | 3163 Sacramento St | rev to pa# 2024-0301-6885; renovate full kitchen full (1) bathroom remove lather and plaster kitchen and living room ceilingDetails
rev to pa# 2024-0301-6885; renovate full kitchen full (1) bathroom remove lather and plaster kitchen and living room ceiling | $25,000 |
| Mar 5, 2024 | Completed final sign-off Jul 2024 | 3165 Sacramento St | renovate one kitchen & one full bathroom. all work in-kind. all plumbing and electrical. remove lathe & plaster in kitchen and living room; ceiling. replace with 5/8" type x gyp. no structural work or wall modfications.Details
renovate one kitchen & one full bathroom. all work in-kind. all plumbing and electrical. remove lathe & plaster in kitchen and living room; ceiling. replace with 5/8" type x gyp. no structural work or wall modfications. | $45,000 |
| Mar 1, 2024 | Completed final sign-off Jul 2024 | 3163 Sacramento St | replace kitchen countertops and backsplash only, and replace shower tile in 2 bathrooms. electrical and plumbing as required. not full bath remodel.Details
replace kitchen countertops and backsplash only, and replace shower tile in 2 bathrooms. electrical and plumbing as required. not full bath remodel. | $35,000 |
| Mar 1, 2024 | Completed final sign-off Aug 2024 | 3167 Sacramento St | renovate kitchen and bathroom in kind. plumbing and electrical as needed. no removal of walls.Details
renovate kitchen and bathroom in kind. plumbing and electrical as needed. no removal of walls. | $36,000 |
| Sep 22, 2023 | Completed final sign-off Oct 2023 | 378 Golden Gate Av | units #544 and #432: comply w/ nov # 202313460; replace 2 kitchen cabinets in kind with new counter top replace 2 bathrooms vanities with new one plumbing as neededDetails
units #544 and #432: comply w/ nov # 202313460; replace 2 kitchen cabinets in kind with new counter top replace 2 bathrooms vanities with new one plumbing as needed | $36,000 |
| Aug 7, 2023 | Completed final sign-off Oct 2023 | 10 Brooklyn Pl | unit# 1: interior remodel, provide new hallway bath, relocate existing hallway bathroom, relocated kitchen, provde closets for 2 existing bedrooms, electrical and plumbing as needed.Details
unit# 1: interior remodel, provide new hallway bath, relocate existing hallway bathroom, relocated kitchen, provde closets for 2 existing bedrooms, electrical and plumbing as needed. | $48,000 |
| Jun 2, 2023 | Completed final sign-off Oct 2023 | 698 Vermont St | the interior remodel of an (e) commercial space, including the construction of 8'-0" non-load bearing walls and ceilings within the 12'-0" ceiling space, a new bathroom, a new kitchenette, new lighting,new switche, new outlets. pony wall & changing room removed from proposed designDetails
the interior remodel of an (e) commercial space, including the construction of 8'-0" non-load bearing walls and ceilings within the 12'-0" ceiling space, a new bathroom, a new kitchenette, new lighting,new switche, new outlets. pony wall & changing room removed from proposed design | $200,000 |
| May 22, 2023 | Never finaled issued May 2023, no final | 500 Leavenworth St | unit 408 renovate bathroom new shower pan- new tile, toilet faucetDetails
unit 408 renovate bathroom new shower pan- new tile, toilet faucet | $9,700 |
| Feb 2, 2023 | Never finaled issued Feb 2023, no final | 2480 Washington St | to comply with nov: 202287775: model # dbf110- up to 180 ft- fantech dbf dry booster: add 4 booster kit exisitng laundry room: remove plastic from roof, repair at bathroom basement room.Details
to comply with nov: 202287775: model # dbf110- up to 180 ft- fantech dbf dry booster: add 4 booster kit exisitng laundry room: remove plastic from roof, repair at bathroom basement room. | $1,000 |
| Feb 2, 2023 | Completed final sign-off May 2023 | 698 Bush St | #501. renovate 1 kitchen and 1 bathroom in kind. plumbing and electrical as needed. non structural.Details
#501. renovate 1 kitchen and 1 bathroom in kind. plumbing and electrical as needed. non structural. | $17,500 |
| Jan 9, 2023 | Completed final sign-off Apr 2023 | 378 Golden Gate Av | to comply with complaint 202298017: replace shower fiber glass pan rremove shower wall to repair water damage on bathroom repair in kindDetails
to comply with complaint 202298017: replace shower fiber glass pan rremove shower wall to repair water damage on bathroom repair in kind | $7,000 |
| Mar 25, 2022 | Completed final sign-off Mar 2022 | 1616 Ocean Av | to comply with nov 201903975. to address interior work not referenced on pa 202106011375. removal of counter. space to remain vacant. bath work refernced on pa 202106212891 to be done by future tenant/landlord.Details
to comply with nov 201903975. to address interior work not referenced on pa 202106011375. removal of counter. space to remain vacant. bath work refernced on pa 202106212891 to be done by future tenant/landlord. | $601 |
| Mar 24, 2022 | Completed final sign-off Aug 2022 | 1755 Van Ness Av | #402: addition of new office, remodel and relocate e kitchen. remodel e bath.Details
#402: addition of new office, remodel and relocate e kitchen. remodel e bath. | $50,000 |
| Oct 19, 2021 | Expired or cancelled withdrawn Nov 2024 | 698 Bush St | unit 403: renovate kitchen and bath in kind.Details
unit 403: renovate kitchen and bath in kind. | $29,000 |
| Oct 18, 2021 | Completed final sign-off Mar 2022 | 638 De Haro St | renovate bathroom in kind. no change. no structural work.Details
renovate bathroom in kind. no change. no structural work. | $10,000 |
| Jun 16, 2021 | Never finaled issued Jun 2021, no final | 101 Sanchez St | unit #789: renovate kitchen and bathroom. all inkind bathroom. plmg and electrical as neededDetails
unit #789: renovate kitchen and bathroom. all inkind bathroom. plmg and electrical as needed | $36,800 |
| Jun 16, 2021 | Never finaled issued Jun 2021, no final | 960 Green St | renovate bathroom due to fire damage on the house. inkind bathroom on garage location.Details
renovate bathroom due to fire damage on the house. inkind bathroom on garage location. | $18,000 |
| Apr 2, 2021 | Never finaled issued Jun 2021, no final | 1936 Bush St | #1: remodel of unit 1 to move a non-bearing wall to enlarge the kitchen & make second bedroom. enlarge (n) bathroom into a non-used portion of the existing hallway.Details
#1: remodel of unit 1 to move a non-bearing wall to enlarge the kitchen & make second bedroom. enlarge (n) bathroom into a non-used portion of the existing hallway. | $35,000 |
| Mar 12, 2021 | Completed final sign-off May 2022 | 76 Waller St | revision to no plan pa# 202003106704. remodel (e) kitchen & (e) bathroom. add (n) office.Details
revision to no plan pa# 202003106704. remodel (e) kitchen & (e) bathroom. add (n) office. | $80,000 |
| Mar 10, 2021 | Completed final sign-off Jun 2021 | 1035 Pacific Av | remodel kitchen and bathroom. plumbing, electrical as needed. no layout change.Details
remodel kitchen and bathroom. plumbing, electrical as needed. no layout change. | $20,000 |
| Mar 10, 2021 | Completed final sign-off Jul 2021 | 2323 Franklin St | remodel kitchen and 2 bathrooms at unit 202. plumbing and electrical as needed. no layout change.Details
remodel kitchen and 2 bathrooms at unit 202. plumbing and electrical as needed. no layout change. | $35,000 |
| Mar 10, 2021 | Completed final sign-off Jul 2021 | 2323 Franklin St | unit 302; remodel kitchen and 2 bathrooms. plumbing and electrical as needed. no layout change.Details
unit 302; remodel kitchen and 2 bathrooms. plumbing and electrical as needed. no layout change. | $25,000 |
| Feb 11, 2021 | Completed final sign-off Apr 2021 | 240 Chattanooga St | apt 1 & 4: remodel kitchen and bathroom in kind. upgrade/replace electrical and plumbing fixutres as needed.Details
apt 1 & 4: remodel kitchen and bathroom in kind. upgrade/replace electrical and plumbing fixutres as needed. | $35,000 |
| Feb 11, 2021 | Completed final sign-off Mar 2021 | 185 Caselli Av | remodel kithcen in-kind. replce shower valve and sink on master bathroom. no walls moved, modified or altered.Details
remodel kithcen in-kind. replce shower valve and sink on master bathroom. no walls moved, modified or altered. | $13,000 |
| Jan 28, 2021 | Completed final sign-off Jun 2021 | 1450 Washington St | apt 5: remodel kitchen & bathroom.Details
apt 5: remodel kitchen & bathroom. | $22,500 |
| Jan 25, 2021 | Never finaled issued Jan 2021, no final | 1938 Bush St | apt 1: remodel kitchen & 2 bathrooms.Details
apt 1: remodel kitchen & 2 bathrooms. | $25,000 |
| Jan 13, 2021 | Completed final sign-off Oct 2021 | 3646 Baker St | rev. to pa202008131731-1/f: addition of family room, bathroom, office & gym. addition of 2 bathrooms & remodel on 2 bathrooms on upper (3rd) floor. pa202008131731(remodel ktichen, laundry & bathroom).Details
rev. to pa202008131731-1/f: addition of family room, bathroom, office & gym. addition of 2 bathrooms & remodel on 2 bathrooms on upper (3rd) floor. pa202008131731(remodel ktichen, laundry & bathroom). | $165,000 |
| Dec 14, 2020 | Never finaled issued Dec 2020, no final | 497 Arlington St | rev to pa# 202011309796; to comply with nov 202067791 to correct address from 493 to 497 arlington st. remove and replace finishes on apt.renovate kitchen and bathroomDetails
rev to pa# 202011309796; to comply with nov 202067791 to correct address from 493 to 497 arlington st. remove and replace finishes on apt.renovate kitchen and bathroom | $16,000 |
| Nov 30, 2020 | Expired or cancelled expired Feb 2021 | 493 Arlington St | unit #493: to comply with nov# 202067791. renovate kitchen & bathroom. replace finishes. electrical & plumbing as needed.Details
unit #493: to comply with nov# 202067791. renovate kitchen & bathroom. replace finishes. electrical & plumbing as needed. | $16,000 |
| Jul 6, 2020 | Completed final sign-off Jan 2021 | 738 Edinburgh St | renovate (e) bathroom (5x7)inkind, upgrade (e) laundry (3x4) in-kind. upgrade plumbing & electrical as needed.Details
renovate (e) bathroom (5x7)inkind, upgrade (e) laundry (3x4) in-kind. upgrade plumbing & electrical as needed. | $15,000 |
| Jun 12, 2020 | Expired or cancelled expired Mar 2026 | 420 14th St | apt 8: renovation of (e) kitchen & bathroom remodel in-kind. no modifications to layout or walls.Details
apt 8: renovation of (e) kitchen & bathroom remodel in-kind. no modifications to layout or walls. | $18,000 |
| May 14, 2020 | Completed final sign-off Mar 2021 | 699 Valencia St | replace tile on (e) bathroom due to vandalism. repair ada sales counter. no layout changes. to comply with nov # 202028114Details
replace tile on (e) bathroom due to vandalism. repair ada sales counter. no layout changes. to comply with nov # 202028114 | $1,000 |
| Feb 28, 2020 | Completed final sign-off Apr 2020 | 3053 Turk Bl | unit #1 - renovate kitchen and bathroom, all in-kind plumbing and electrical as needed.no wall move. no windows or doorDetails
unit #1 - renovate kitchen and bathroom, all in-kind plumbing and electrical as needed.no wall move. no windows or door | $15,000 |
| Feb 28, 2020 | Completed final sign-off Sep 2020 | 734 Bush St | unit #56 - renovate kitchena nd bathroom, all in-kind plumbing and electrical as needed.Details
unit #56 - renovate kitchena nd bathroom, all in-kind plumbing and electrical as needed. | $15,000 |
| Feb 27, 2020 | Completed final sign-off Aug 2020 | 3149 California St | unit 2e - remodel (e) bathroom, relocate (e) kitchen provide new bedroom.Details
unit 2e - remodel (e) bathroom, relocate (e) kitchen provide new bedroom. | $45,000 |